High Court of KeralaSingle JudgeWrit petition dismissed.

Shaji Mathew v Hindustan Newsprint Ltd. and Others

Case / Petition Number:WP(C).No. 28591 of 2012 (Y)

Case Details & Bench

Court
High Court of Kerala
Hon'ble Judges
  • T.R. Ramachandran Nair
Judgment Date
2012-12-19
Court Decision / Holding
Writ petition dismissed. It is made clear that the findings herein are for disposal of the writ petition alone.
Final Disposition
Writ petition dismissed.

Parties to the Case

Appellants / Petitioners

  • Shaji Mathew

Respondents

  • Hindustan Newsprint Ltd., Newsprint Nagar, Kottayam District, PIN 686616
  • The Divisional Forest Officer, Divisional Forest Office, Malayattoor, Kodanad P.O., PIN 683544
  • Gopinathan K., the HOD(FDP) (Bage No.1145) Hindustan Newsprint Limited, Newsprint Nagar, Kottayam District, PIN 686616

Legal Representation & Advocates

Counsels for Petitioners

  • • Sri. Aswin Gopakumar
  • • Sri. Praveen H.
  • • Sri. Anwin Gopakumar
  • • Smti. Kala G. Nambiar
  • • Sri. K. Amal Nath Naik
  • • Smti. R. Anjana

Counsels for Respondents

  • • Sri E.K. Madhavan
  • • Sri V. Krishna Menon
  • • Smti. P. Vijayamma
  • • Smti. J. Surya
  • • Sri M.P. Madhavankutty

Case Synopsis & Summary

The petitioner, Shaji Mathew, secured two contracts through a tender process for clear felling, collection, stacking, and transportation of specified quantities of pulp wood from the 2005 Kottappara Captive Plantation in Kodanad Forest Range, under purchase orders dated 02.08.2012 (Exts. P1 and P2). After commencement, obstructions by local trade union leaders and demands for illegal terms impeded progress, leading to a labour settlement (Ext. P5) and later injunction proceedings (IA No. 909/2012 in OS No. 143/2012) with orders Exts. P6 and P7. Despite a request for extension (Ext. P8), the third respondent issued a show cause notice (Ext. P9) and terminated the contracts by Ext. P10, followed by a re-tender (Ext. P11). The petitioner contends that Ext. P10 violates Articles 14, 19(1)(g), and 21 of the Constitution, that no hearing was afforded, and that mala fides and improper assessment taint the decision. The respondents counter that the purchase orders fixed a schedule and that the contractor delayed commencement; Ext. P3 fixes a cut-off date and Exts. P1–P4 are binding. The court emphasizes that the termination arises from contractual relations and, in the absence of an arbitration clause, writ jurisdiction cannot substitute contract remedies. It declines to resolve disputed facts, dismissing the writ petition with findings limited to disposal of the petition.

Provisions of Law Cited

Article 14 of the ConstitutionArticle 19(1)(g) of the ConstitutionArticle 21 of the ConstitutionArticle 226 of the Constitution

Legal Doctrines & Maxims

  • audi alteram partem
  • principles of natural justice

Submissions & Arguments

Contentions of Appellants / Petitioners

The petitioner submits that Ext. P10 termination and Ext. P11 re-tender amount to an arbitrary, hasty action by the third respondent, in violation of Articles 14, 19(1)(g), and 21 of the Constitution. He contends that no personal hearing was afforded, and the contract terms were not properly assessed. The two contracts were formed after tender, with purchase orders dated 02.08.2012; the petitioner commenced work, but local leaders pressured workers with illegal demands, culminating in a labour settlement (Ext. P5) and court injunction (Ext. P6). Although a request for extension (Ext. P8) was made, the termination followed (Ext. P10) on grounds of delay and non-compliance, which the petitioner disputes as misinterpretation of Exts. P1–P4. It is argued that Ext.P3’s cut-off date cannot override the earlier terms, and that the two areas are contiguous, implying that progress in one area should benefit the other. The learned counsel asserts that writ jurisdiction under Article 226 is maintainable in matters involving violation of natural justice, relying on ABL International Ltd. However, since no arbitration clause exists, the court should examine the contested facts and grant appropriate relief instead of dismissing the petition.

Contentions of Respondents

The respondents contend that termination was necessary due to non-performance, delay in commencement, and failure to supply materials. Exts. P2, P3 fix the time and reflect urgency; the Tender Committee noted delays (24/07/2012). The company followed proper contractual procedures (Ext. P12). The writ petition is not maintainable in purely contractual matters, and the termination is not a quasi-judicial act. The absence of a personal hearing is not a fatal flaw where contract terms govern; cited precedents support that disputes arising under private contracts are to be resolved in civil forums, not by writ petitions, absent arbitration clauses or statutory public-law issues.

Cited Precedents (4)

Case NameCitationTreatmentExplanation
ABL International Ltd. and another v. Export Credit Guarantee Corporation of India Ltd. and others(2004) 3 SCC 553Mentioned OnlyCited to discuss maintainability in contract matters; court finds it inapplicable due to lack of arbitration clause.
State of Uttar Pradesh v. Bridge & Roof Co. (India) Ltd.(1996) 6 SCC 22Mentioned OnlyCited but not relied upon to extend writ relief in contractual disputes.
State of Bihar and others v. Jain Plastics and Chemicals Ltd.(2002) 1 SCC 216PositiveUsed to support the view that breach of contract matters are governed by contract and not by writ petitions; termination in contract matters is not quasi-judicial.
State of Gujarat and others v Meghji Pethraj Shah Charitable Trust and Others(1994) 3 SCC 552PositiveCited to state that termination is not quasi-judicial; natural justice need not be observed in purely contractual terminations.

Diagnostic Tool

Beta

Does this judgment govern your specific facts?

Don't risk relying on a distinguishable precedent. Enter your facts or proposition below. We will test it against Shaji Mathew v Hindustan Newsprint Ltd. and Others and instantly map out authorities that support, challenge, or govern your position.

Extracted Judgment Text

Exact text extracted from official judgment records.

## **IN THE HIGH COURT OF KERALA AT ERNAKULAM** ## **PRESENT:** ## **THE HONOURABLE MR.JUSTICE T.R.RAMACHANDRAN NAIR** ## **WEDNESDAY, THE 19TH DAY OF DECEMBER 2012/28TH AGRAHAYANA 1934** ## **WP(C).No. 28591 of 2012 (Y)** ## **---------------------------** **PETITIONER :** - **------------------** **SHAJI MATHEW, AGED 52 YEARS ASARIPARAMBIL HOUSE, PIRAVOM P.O., ERNAKULAM 686664** ## **BY ADVS.SRI.ASWIN GOPAKUMAR** **SRI.PRAVEEN.H. SRI.ANWIN GOPAKUMAR SMT.KALA G.NAMBIAR SRI.K.AMAL NATH NAIK SMT.R.ANJANA** **RESPONDENTS :** - **-----------------------** **1. HINDUSTAN NEWSPRINT LTD. NEWSPRINT NAGAR KOTTAYAM DISTRICT PIN - 686 616, REPRESENTED BY ITS CHAIRMAN-CUM-MANAGING DIRECTORSRI.M.V.NARASIMHA RAO.** **2. THE DIVISIONAL FOREST OFFICER, DIVISIONAL FOREST OFFICE, MALAYATTOOR, KODANAD P.O., PIN - 683 544.** **3. GOPINATHAN K., THE HOD(FDP) (BAGE NO.1145) HINDUSTAN NEWSPRINT LIMITED, NEWSPRINT NAGAR KOTTAYAM DISTRICT, PIN - 686 616.** **R1 & 3 BY ADVS. SRI.E.K.MADHAVAN SRI.V.KRISHNA MENON SMT.P.VIJAYAMMA SMT.J.SURYA** **R2 BY GOVERNMENT PLEADER, SRI.M.A.THOMAS KUTTY FOREST SRI.M.P.MADHAVANKUTTY, SPL. GOVT. PLEADER FOR FOREST DEPARTMENT** **THIS WRIT PETITION (CIVIL) HAVING BEEN FINALLY HEARD ON 11/12/2012, THE COURT ON 19-12-2012 DELIVERED THE FOLLOWING:** **BP** ## **WP(C).No. 28591 of 2012 (Y)** ## **APPENDIX** ## **PETITIONER'S EXHIBITS :** **EXT.P-1 TRUE COPY OF PURCHASE ORDER NO.240132 DATED 02.08.2012 TOGETHER WITH TERMS AND CONDITIONS ISSUED BY 1ST RESPONDENT COMPANY. EXT.P-2 TRUE COPY OF 'PURCHASE ORDER' NO.240133 DATED 02.08.1012 TOGETHER WITH TERMS AND CONDITIONS ISSUED BY 1ST RESPONDENT COMPANY. EXT.P-3 TRUE COPY OF PROCEEDINGS OF 2ND RESPONDENT TOGETHER WITH ENCLOSED LICENCE, BOTH DATED 14.08.2012 EXT.P-4 TRUE COPY OF PROCEEDINGS OF 2ND RESPONDENT DATED 04.09.2012 ISSUED TO RESPONDENT NO.1 EXT.P-5 TRUE COPY OF LABOUR SETTLEMENT AGREEMENT DATED 21.08.2012 EXT.P-6 TRUE COPY OF INTERIM ORDER DATED 07.09.2012 PASSED BY THE MUNSIFF'S COURT, PERUMBAVOOR IN IA NO.909/2012 IN OS NO.143/2012. EXT.P-7 TRUE COPY OF THE INTERIM ORDER DATED 28.09.2012 PASSED BY THE HONOURABLE HIGH COURT OF KERALA IN WPC NO.22083/2012 EXT.P-8 TRUE COPY OF THE REPRESENTATION DATED 20.10.2012 SUBMITTED BY THE PETITIONER. EXT.P-9 TRUE COPY OF THE LETTER DATED 30.10.2012 ISSUED BY RESPONDENT NO.3 EXT.P-10 TRUE COPY OF THE ORDER DATED 21.11.2012 ISSUED BY RESPONDENT NO.3 EXT.P-11 TRUE COPY OF TENDER NOTICE NO.HNL/FD/2T/W/27/2012-13 DATED 22.11.2012 ISSUED BY RESPONDENT NO.1 EXT.P-12 COPY OF THE GENERAL CONDITIONS OF CONTRACT FOR RAW MATERIAL EXTRACTION WORK BROUGHT UT BY RESPONDENT NO.1. EXT.P-13 COPY OF THE LETTER DATED 09/11/2010 ISSUED BY RESPONDENT NO.1.** ## **RESPONDENT'S EXHIBITS : NIL.** **//TRUE COPY//** **P.A. TO JUDGE** ## **BP** ## **`T.R. RAMACHANDRAN NAIR, J. ~~~~~~~~~~~~~~~~~~~~~~~~~~~ W.P.(C). No.28591/2012 ~~~~~~~~~~~~~~~~~~~~~~~~~~~ Dated this the 19[th]` day of December** **`, 2012`** ## **`J U D G M E N T`** The petitioner is aggrieved by the termination of a contract by Ext.P10 and a re-tender notice which is issued as Ext.P11. 2. The petitioner was granted, after a tender process, two separate contracts for clear felling, collection, stacking and transportation of specified quantities of pulp wood from the “2005 Kottappara Captive Plantation” situated in Kodanad Forest Range. They are produced as Exts.P1 and P2. Requisite permissions were given as per Exts.P3 and P4. According to the petitioner, he started execution of the work but certain objections were raised by the local leaders of various Trade Unions and they dictated illegal terms regarding engagement of workmen and wages payable to them. They arrived at a settlement as evident from Ext.P5. Thereafter, the work was progressing and again one of the office bearers filed an injunction petition as I.A.No.909/2012 in O.S.No.143/2012 wherein an order was issued as per Ext.P6. The new office bearers raised unreasonable demands and obstructed the contract work and law and order situations emanated which compelled the petitioner to approach this Court by W.P.(C).No.22083/2012 and an interim order was granted as per Ext.P7. The respondents are also parties therein. The petitioner, thereafter, requested for extension of three months' time to complete the ## **W.P.(C). No.28591/2012** ## **-:2:-** work as per Ext.P8. But later the third respondent, who was hostile to the petitioner issued a show cause notice as per Ext.P9 proposing to terminate the contract which was replied by the petitioner but, without heeding to the request, Ext.P10 termination order has been issued. 3. The petitioner contends that the order Ext.P10 is in violation of Articles 14, 19 (1) g and 21 of the Constitution of India. The petitioner was not granted an opportunity of hearing before the Order is passed. The order is issued hastily and arbitrarily. Various aspects, pointed out by the petitioner, have not been assessed also. Finally, it is also stated that there are _mala fides_ in the matter. 4. In the statement filed by the third respondent, various aspects have been explained. It is explained that in the purchase orders, phased programmes are specified in clause 2. In respect of Ext.P2 purchase order, the petitioner has delayed commencement of work. In the meeting of the Tender Committee held on 24/07/2012, he was informed about the urgency of commencing the work covered by the said purchase order. Thereafter also, there is failure. Letters were issued on 09/10/2012, 19/10/2012 and 20/10/2012 pointing out the delay in execution of the work and seeking to expedite the work. Thereafter also, there is failure. Thus, Ext.P9 show cause notice was issued. Even thereafter, he failed to commence the work and supply materials. The work was awarded for the year 2011-12 after getting special sanction for plantation well in advance to ## **W.P.(C). No.28591/2012** ## **-:3:-** extract and transport before commencement of the working season as the company was in urgent need of the materials. The contract period was accordingly specified as 31/12/2012. In the statement, the stand taken is that the termination was required in such circumstances and the allegations of _mala fides_ have been denied. 5. Learned counsel for the petitioner submitted that for various reasons, the action is bad in law and that the term prescribing the cut off date as 31/12/2012 in Exts.P1 and P2 is contradictory to Exts.P3 and P4 orders issued by the Divisional Forest Officer, Malayattoor Division. It is further submitted that the general conditions produced along with the reply affidavit also will have to be gone into (Ext.P12). It is also submitted that there is total denial of principles of natural justice as no personal hearing was granted. Learned counsel emphasised the fact that even though the area is covered by two purchase orders, it is contiguous. Therefore, the work done by the petitioner in respect of the area covered by Ext.P1 will enure to his benefit and hence the allegation cannot be justified. 6. In Ext.P3, the Divisional Forest Officer has prescribed a cut off date as 31/05/2013. This is heavily relied upon by the learned counsel for the petitioner Shri Aswin Gopakumar to contend that Exts.P1 and P2 should be read along with Ext.P3. Learned counsel for the Company Shri E.K.Madhavan submitted that actually, the contract was for 2011-12 extraction itself and, therefore, the period was fixed as 31/12/2012. ## **W.P.(C). No.28591/2012** ## **-:4:-** 7. Evidently, the petitioner has accepted the terms of Exts.P1 and P2 and cannot now turn round and attack the conditions as attached therein and, therefore, there is no merit in the said contention. Ext.P3 is the proceedings of the Divisional Forest Officer, and the company has provided different tenders for the two areas for which they are duly empowered also. Therefore the said contention also cannot be accepted. 8. With regard to the maintainability of the writ petition in contractual matters, learned counsel for the petitioner relied upon **ABL International Ltd. and another v. Export Credit Guarantee Corporation of India Ltd. and others [(2004) 3 SCC 553]** para.14, which is extracted below: “This judgment again, in our opinion, does not help the the first respondent in the argument advanced on its behalf that in contractual matters remedy under Article 226 of the Constitution does not lie. It is seen from the above extract that in that case because of an arbitration clause in the contract, the Court refused to invoke the remedy under Article 226 of the Constitution. We have specifically inquired from the parties to the present appeal before us and we have been told that there is no such arbitration clause in the contract in question. It is well known that if the parties to a dispute had agreed to settle their dispute by arbitration and if there is an agreement in that regard, the courts will not permit recourse to any other remedy without invoking the remedy by way of arbitration, unless of course both the parties to the dispute agree on another mode of dispute resolution. Since that is not ## **W.P.(C). No.28591/2012** ## **-:5:-** the case in the instant appeal, the observations of this Court in the said case of _State of U.P. v. Bridge & Roof Co.(India) Ltd. [(1996) 6 SCC 22]_ are of no assistance to the first respondent in its contention that in contractual matters, writ petition is not maintainable.” It is submitted that the writ petition is therefore maintainable as this Court can enter into areas where principles of natural justice are violated. 9. Learned counsel for the respondent company Shri E.K.Madhavan relied upon the dictum laid down by the Apex Court in **State of Bihar and others v. Jain Plastics and Chemicals Ltd. [(2002) 1 SCC 216]** wherein in para.7 it was held as follows: “7. In our view, it is apparent that the order passed by the High Court is on the face of it, illegal and erroneous. It is true that many matters could be decided after referring to the contentions raised in the affidavits and counter-affidavits, but that would hardly be ground for exercise of extraordinary jurisdiction under Article 226 of the Constitution in case of alleged breach of contract. Whether the alleged non-supply of road permits by the appellants would justify breach of contract by the respondent would depend upon facts and evidence and is not required to be decided or dealt with in a writ petition. Such seriously disputed questions or rival claims of the parties with regard to breach of contract are to be investigated and ## **W.P.(C). No.28591/2012** ## **-:6:-** determined on the basis of evidence which may be led by the parties in an properly instituted civil suit rather than by a Court exercising prerogative of issuing writs.” My attention was also invited to another Judgment of the Apex Court in **State of Gujarat and others v. Meghji Pethraj Shah Charitable Trust and Others [(1994) 3 SCC 552]** wherein in para.22 with regard to the requirement of observing the principles of natural justice, it was laid down thus: “22. We are unable to see any substance in the argument that the termination of arrangement without observing the principle of natural justice ( _audi alteram partem_ ) is void. The termination is not a quasi-judicial act by any stretch of imagination; hence it was not necessary to observe the principles of natural justice. It is not also an executive or administrative act to attract the duty to act fairly. It was - as has been repeatedly urged by Sri Ramaswamy - a matter governed by a contract/agreement between the parties. If the matter is governed by a contract, the writ petition is not maintainable since it is a public law remedy and is not available in private law field, e.g., where the matter is governed by a non-statutory contract. [In this connection, See Assistant Excise Commissioner etc. etc. v. Isaac Peter and etc. etc. (1994) (2) JT 140) on the relevance of doctrine of fairness in matters governed by contract, arrived at calling for tenders, auction or by negotiations]. Be that as it may, in view of our opinion on the main question, it is not necessary to pursue this reasoning further.” ## **W.P.(C). No.28591/2012** ## **-:7:-** The Supreme Court was of the view that termination is not a quasi-judicial, executive or administrative act. Purely, the terms are governed by the contract entered into between the parties. 10. Herein, the petitioner was given a show cause notice and a reply was also given by the petitioner. Even in the writ petition and in the reply affidavit, the petitioner has not explained anything about the progress of the work and therefore, it is evident that as far as the work tendered under Ext.P2 is concerned, there was no progress. There are clauses in the agreement which provide for termination. Absence of a personal hearing cannot lead to violation of the principles of natural justice. 11. This Court cannot, therefore, enter into disputed questions of facts. In a matter like this where the obligations arise under contract, normally, jurisdiction under Article 226 of the Constitution of India will not help the petitioner to get a relief. If there is a breach of contract, according to the petitioner, he will have to move other forums for getting appropriate relief. For all these reasons, the writ petition is dismissed. It is made clear that the findings entered into herein are for the disposal of the writ petition alone. Sd/- ## **`(T.R. Ramachandran Nair, Judge.)`** ## **`ms`**