High Court of KeralaSingle JudgeWP(C) 21068/2006 allowed; WP(C) 226/2014 dismis...

Secretary, Kerala State Electricity Board v. Industrial Tribunal, Idukki; All Kerala Electricity Board Petty Contract Employees Union, KTUC (M) and others

Case / Petition Number:WP(C).No.21068 of 2006 (G) and WP(C).No.226/2014
Neutral Citation:/

Case Details & Bench

Court
High Court of Kerala
Hon'ble Judges
  • A. Muhammed Mustaque
Judgment Date
2016-12-17
Court Decision / Holding
WP(C) No.21068/2006 allowed; retrenchment compensation on project completion set aside; WP(C) No.226/2014 dismissed. The court indicates that if benefits accrue to workers under WP(C)21068/2006, they may pursue appropriate remedies; further, if any worker is engaged after project termination, this judgment will not bar their regularization claim in appropriate proceedings.
Final Disposition
WP(C) 21068/2006 allowed; WP(C) 226/2014 dismissed.

Parties to the Case

Appellants / Petitioners

  • The Secretary, Kerala State Electricity Board, Vaidhyuthi Bhavan, Thiruvananthapuram

Respondents

  • The Industrial Tribunal, Idukki
  • The General Secretary, All Kerala Electricity Board, Petty Contract Employees Union, KTUC (M), Karimanal P.O., Thottokanni, Idukki District
  • Addl. R3: P.D. Baiju, Padinjarankaran, Potta P.O., Thrissur
  • Addl. R4: V.A. Thomas, Veluthamorayil, Keezthoduv, IDUKKI
  • Addl. R5: K.Vijayan, Alikkkara House, Sreemoolanagaram P.O., Aluva
  • Addl. R6: V.P. Sivankutty, Paravanathuchirayil, K.R.Puram P.O., Ottappunn Cherthala, Alappuzha District

Legal Representation & Advocates

Counsels for Petitioners

  • • Sri P. Santhalingam, Senior Advocate
  • • Sri Raju Joseph, Senior Advocate
  • • Smt. Aneetha A.G., SC
  • • Sri C.K. Karunakaran
  • • Sri S. Sharan, SC
  • • Sri K.T. Paulose, SC

Counsels for Respondents

  • • Sri S. Gopinathan (Senior Government Pleader)
  • • Sri B. Ashok Shenoy
  • • Sri H.B. Shenoy
  • • Sri S.M. Prem
  • • Smt. K.P. Santhi
  • • Sri P.K. Nijoy

Case Synopsis & Summary

These two writ petitions arise from an award of ID 12/1998 of the Industrial Tribunal, Idukki, concerning 14 petty contractors engaged by the Kerala State Electricity Board (KSEB) at inspection bungalows for the Lower Periyar H.E. Project. The Tribunal held the contractors to be workmen under the Industrial Disputes Act, 1947, but not eligible for absorption in regular service, since the post was to be filled by the PSC. The Board contended the engagement was a provisional contract for service and that the projects and temporary structures would end with the project, justifying non-regularization and termination upon project completion, with retrenchment compensation only under specific conditions. The workmen asserted that, despite the label “petty contractors,” their duties were that of workmen under Board supervision and that their long service warranted absorption or retrenchment protection. The Court, hearing WP(C) Nos. 21068/2006 and 226/2014, allowed WP(C) No.21068/2006 in part by setting aside the tribunal’s direction to pay retrenchment compensation on project completion, while dismissing WP(C) No.226/2014 (prayer for reinstatement, back wages and other benefits). It left open potential benefits accruing to some workers under the 21068/2006 decision and clarified that post-project engagement would not block relief sought elsewhere.

Provisions of Law Cited

Industrial Disputes Act, 1947Section 2(oo)(bb)Section 2(cc)Section 25OSchedule V Clause 10 r/w Section 2(ra)

Legal Doctrines & Maxims

  • Nilajkar test for retrenchment in project/scheme employment
  • Unfair labour practice under Schedule V Clause 10 r/w Section 2(ra)
  • Definition of ‘closure’ under Section 2(cc) of the IDA

Submissions & Arguments

Contentions of Appellants / Petitioners

The Board contends that the 14 petty contractors were engaged provisionally as contractors for a project. They argue the workmen were not absorbed because the posts were to be PSC-filled; the engagement was a contract for service, with temporary structures to be dismantled after project completion. They submit retrenchment compensation under IDA 1947 cannot apply to project completion, and rely on the Nilajkar precedent to argue compensation if termination occurs before project completion.

Contentions of Respondents

The workers claim that although labelled petty contractors, their functions and supervision were that of workmen under the Board; many had long service and sought absorption. They argue the tribunal erred in treating them as mere contractual workers; they seek regularization and retrenchment protection under the IDA. The respondents rely on the Tribunal’s finding of employer–employee relation and challenge the Board’s reading that PSC-absorption negates retrenchment rights.

Cited Precedents (1)

Case NameCitationTreatmentExplanation
S.M.Nilajkar & Others v. Telecom District Manager, Karnataka(2003) 4 SCC 27PositiveCited with approval to discuss retrenchment in project-based employment and to support the proposition that termination prior to project completion may attract compensation under sub-clause (bb); the court uses the Nilajkar framework to evaluate when retrenchment rights attach.

Diagnostic Tool

Beta

Does this judgment govern your specific facts?

Don't risk relying on a distinguishable precedent. Enter your facts or proposition below. We will test it against Secretary, Kerala State Electricity Board v. Industrial Tribunal, Idukki; All Kerala Electricity Board Petty Contract Employees Union, KTUC (M) and others and instantly map out authorities that support, challenge, or govern your position.

Extracted Judgment Text

Exact text extracted from official judgment records.

## **IN THE HIGH COURT OF KERALA AT ERNAKULAM** ## **PRESENT:** ## **THE HONOURABLE MR. JUSTICE A.MUHAMED MUSTAQUE** **SATURDAY, THE 17TH DAY OF DECEMBER 2016/26TH AGRAHAYANA, 1938** ## **WP(C).No. 21068 of 2006 (G)** **----------------------------** ## **PETITIONER :** **-----------------------** ## **THE SECRETARY, KERALA STATE ELECTRICITY BOARD, VAIDHYUTHI BHAVAN, THIRUVANANTHAPURAM.** **BY SRI.P.SANTHALINGAM,SENIOR ADVOCATE SRI.RAJU JOSEPH,SENIOR ADVOCATE SMT.ANEETHA A.G., SC, SRI.C.K.KARUNAKARAN, SRI.S.SHARAN,SC,K.S.E.BOARD SRI.K.T.PAULOSE, SC, KSEB** ## **RESPONDENT(S):** **----------------------------** ## **1. THE INDUSTRIAL TRIBUNAL, IDUKKI.** **2. THE GENERAL SECRETARY, ALL KERALA ELECTRICITY BOARD, PEETY CONTRACT EMPLOYEES UNION, KTUC (M), KARIMANAL P.O., THOTTOKKANNI, IDUKKI DISTRICT.** ## ***ADDL.R3 TO R6 ARE IMPLEADED** ***Addl. R3. P.D.BAIJU,** **PADINJARANKARAN, POTTA.P.O.,** **THRISSUR.** ***Addl. R4. V.A. THOMAS, VELUTHAMORAYIL, KEEZHTHODU P.O., IDUKKI.** ***Addl. R5. K.VIJAYAN, ALIKKARA HOUSE, SREEMOOLANAGARAM.P.O., ALUVA.** **2/-** **-2-** **WP(C).NO.21068/2006** ***Addl. R6. V.P. SIVANKUTTY, PARAVANATHUCHIRAYIL,** **K.R.PURAM P.O., OTTAPPUNNA CHERTHALA, ALAPPUZHA DISTRICT.** ***ADDL.R3 TO R6 ARE IMPLEADED AS PER ORDER DATED 7/8/12 IN IA.NO.10631/2012.** ## **R1 BY SR GOVERNMENT PLEADER SRI.S.GOPINATHAN** **R2 BY ADVS. SRI.B.ASHOK SHENOY** **SRI.H.B.SHENOY R4 BY ADV. SRI.S.M.PREM SMT.K.P.SANTHI SRI.P.K.NIJOY** **THIS WRIT PETITION (CIVIL) HAVING BEEN FINALLY HEARD ON 17-12-2016, ALONG WITH WPC.NO. 226/2014, THE COURT ON THE SAME DAY DELIVERED THE FOLLOWING:** **sts** ## **WP(C).NO.21068/2006** ## **APPENDIX** ## **PETITIONER'S EXHIBITS:** - **P1 COPY OF THE WRITTEN STATEMENT FILED BY THE PETITIONER IN I.D.NO.12 OF 1998 DATED 12/3/1998.** - **P2 COPY OF THE AWARD IN I.D.NO.12/98 OF THE INDUSTRIAL TRIBUNAL DATED 31/1/2005.** ## **RESPONDENT'S EXHIBITS:** **NIL** **/TRUE COPY/** **P.A.TO JUDGE** **sts** ## **A. MUHAMED MUSTAQUE, J.** -------------------------------------------------- W.P.(C) Nos. 21068 of 2006 & 226 of 2014 -------------------------------------------------Dated this the 17[th] day of December, 2016 ## **J U D G M E N T** - 1.These writ petitions are arising from the award passed in ID No.12/1998 of the Industrial Tribunal, Idukki. Therefore, both writ petitions are heard together and disposed of, as follows, by a common judgment. - 2.WP(C) No.21068/2006 is filed by the Kerala State Electricity Board (hereinafter referred to as, “the Board”) and WP(C) No.226/2014 is filed by the workmen, whose dispute was espoused by the union in ID No.12/1998. - 3.The Board engaged 14 persons as petty contractors in the inspection bungalows of the Board at Vazhathoppu, Karimanal and Pambla in Idukki. These petty contractors raised the industrial dispute claiming absorption in regular service of the Board. The Government referred the dispute for adjudication by W.P.(C) Nos. 21068 of 2006 & 226 of 2014 **==> picture [19 x 9] intentionally omitted <==** ## the Industrial Tribunal, Idukki, as follows; “Whether the 14 persons engaged in the inspection bungalows of Kerala State Electricity Board at Vazhathoppu, Karimanal and Pambla, Idukki can be termed as workman as defined in the Industrial Disputes Act, 1947 and whether they are to be absorbed in the Kerala State Electricity Board in the posts in which they are working? If not, the benefit to which they are entitled?” 4.The tribunal, holding that these petty contractors, though styled as contractors, are engaged on a contract of service and therefore, they are workmen as referable under the Industrial Disputes Act, found that these workmen are not eligible for regularization and their service has to be terminated on completion of the contract. It was also noted that the post, in which the workmen were engaged, is liable to be filled up through Kerala Public Service Commission. It was further ordered that in the event of these workmen happen to be retrenched for appointment by the Public Service Commission, they shall be paid retrenchment compensation. Challenging this award, the Board has come up with WP(C) No.21068/2006. The workmen have W.P.(C) Nos. 21068 of 2006 & 226 of 2014 **==> picture [19 x 9] intentionally omitted <==** come up with WP(C) No.226/2014 to implement the award and to extend the benefits due to them under the award. 5.The Board contended before the Tribunal that they have engaged these workmen as petty contractors and their contract is being extended from time to time. It was their case that considering the nature of the work being carried on by the workmen, they are provisionally engaged as petty contractors. It was also argued that the inspection bungalows, in which the petty contractors are engaged, are not permanent establishments of the Board. It was the case of the Board that they have put up temporary constructions and the said temporary constructions are intended for accommodation of the officers, who will have to travel for official purposes in connection with the inspection of the work in respect of the Lower Periyar H.E. Project. Therefore, according to the Board, as soon as the construction is over, they will dismantle the entire temporary structures. Thus, it was W.P.(C) Nos. 21068 of 2006 & 226 of 2014 **==> picture [19 x 9] intentionally omitted <==** contended that the petty contractors are provisionally engaged till the completion of the project and as soon as the project is completed their service will be terminated. To sum up the contentions of the Board, the Board's case is that these persons were engaged as petty contractors provisionally till the completion of the project. The relationship, according to the Board, is, thus, a contract for service with the persons engaged. - 6.On the other hand, the workmen claimed that though they are styled as petty contractors, actually, the work they perform and the duties they discharge are that of a workman, under the direct supervision and control of the officers of the Board. It was their case that most of them have completed more than 3 to 10 years under the Board. - 7.The tribunal overruled the contention of the Board that the relationship between the persons engaged by the Board is that of under contract for service and found that the relationship is of contract of service, thereby W.P.(C) Nos. 21068 of 2006 & 226 of 2014 **==> picture [19 x 9] intentionally omitted <==** implying that there exists employer and workman relationship. However, the tribunal declined the relief of absorption into regular service, finding that the post in which the persons were engaged as petty contractors, is liable to be filled up by the PSC. It is to be noted that there is no challenge against this finding of the tribunal. Therefore, the only question now remains is whether the award of the tribunal is liable to be interfered with to the extent it holds that there is employer - workman relationship between the Board and the 14 persons referred therein. 8.It is to be noted the 14 persons are engaged in connection with the Lower Periyar H.E. Project at the inspection bungalows of the Board. There is no dispute as to the fact that the inspection bungalows are of temporary nature and erected only for the purpose of commission of the Lower Periyar H.E. Project. The tribunal had found that these 14 persons are not liable to be absorbed into regular service taking note of the W.P.(C) Nos. 21068 of 2006 & 226 of 2014 **==> picture [19 x 9] intentionally omitted <==** nature of engagement. The definite finding of the tribunal is that these 14 persons are engaged under a contract of service. Therefore, they would be entitled for retrenchment compensation if their service happens to be terminated after the completion of the contract. The findings of the tribunal is that the 14 persons shall be paid retrenchment compensation if their service is terminated to accommodate the candidates by PSC or in the event of the project is completed. 9.The learned Standing Counsel for the Board would submit that having found that these 14 persons are engaged under contract of service, in the light of the definition of “retrenchment” as referred under Section 2 (oo)(bb) of the Industrial Disputes Act, 1947, compensation ought to have been rejected. It is further argued that the engagement of the 14 persons was as petty contractors and there was no employer-employee relationship. - 10.On the other hand, the learned counsel for the 14 W.P.(C) Nos. 21068 of 2006 & 226 of 2014 **==> picture [19 x 9] intentionally omitted <==** persons would argue that the tribunal found that there exists employer-employee relationship and therefore, they are entitled for retrenchment compensation if their service is terminated before completion of the project or in the event of the completion of project under Section 25O of the Act (closure). - 11.There is hardly any dispute to the fact that these 14 persons were engaged by the Board under a contract. The Board has admitted this contract as a contract for service. This was found against them by the tribunal. The tribunal, after appreciating the evidence on record, found that the nature of contract of service implied that there exists employer-workman relationship. The term, “contract”, would mean that the relationship continues till the fulfillment of terms and conditions of the contract. Admittedly, the 14 persons were engaged at the inspection bungalow, which was temporarily erected for the commission of Lower Periyar H.E. Project. Therefore, it is to be understood that the nature of W.P.(C) Nos. 21068 of 2006 & 226 of 2014 **==> picture [19 x 9] intentionally omitted <==** relationship between the Board and 14 persons is that of under a contract to mean that they are engaged till the project is over. The tribunal did not find any 'unfair labour practice' on account of the engagement under a contract. If that be so, certainly the tribunal ought to have ordered regularization of the workmen, holding that they are entitled to be absorbed into service in the light of the definition of “unfair labour practice” as referred in Schedule V Clause 10 r/w Section 2(ra). However, there is no such finding by the tribunal. Further, the 14 persons have not chosen to challenge the award. Therefore, it is to be concluded that the engagement of 14 persons can be termed as, “contractual workmen” under a contract of service. 12.The next question is whether they are entitled for retrenchment compensation. Section 2(oo)(bb) of the Act rules out such compensation being paid to the workmen, whose service has been terminated on completion of the contract. But, the learned counsel for W.P.(C) Nos. 21068 of 2006 & 226 of 2014 **==> picture [19 x 9] intentionally omitted <==** the workmen, relying upon the judgment in **S.M.Nilajkar & Others** v. **Telecom District Manager, Karnataka** [(2003) 4 SCC 27], would argue that since the engagement of the 14 persons was specifically for a project, they would be entitled for retrenchment compensation if their service is terminated prior to the completion of project or on closure in the event of the project is being wounded up. In paragraphs 13 & 14 of the above judgment, it was held by the apex court as follows; “13.The termination of service of a workman engaged in a scheme or project may not amount to retrenchment within the meaning of sub-clause (bb) subject to the following conditions being satisfied: - (i) that the workman was employed in a project or scheme of temporary duration; (ii) the employment was on a contract, and not as a daily-wager simpliciter, which provided inter alia that the employment shall come to an end on the expiry of the scheme or project; (iii) the employment cam to an end simultaneously with the termination of the scheme or project and consistently with the terms of the contract; and (iv) the workman ought to have been apprised or made aware of the abovesaid terms by the employer at the commencement of employment. 14. The engagement of a workman as a daily-wager does not by itself amount to putting the W.P.(C) Nos. 21068 of 2006 & 226 of 2014 **==> picture [27 x 9] intentionally omitted <==** workman on notice that he was being engaged in a scheme or project which was to last only for a particular length of time or up to the occurrence of some event, and therefore, the workman ought to know that his employment was short-lived. The contract of employment consciously entered into by the workman with the employer would result in a notice to the workman on the date of the commencement of the employment itself that his employment was short-lived and as per the terms of the contract the same was liable to termination on the expiry of the contract and the scheme or project coming to an end. The workman may not therefore complain that by the act of the employer his employment was coming to an abrupt termination. To exclude the termination of a scheme or project employee from the definition of retrenchment it is for the employer to prove the abovesaid ingredients so as to attract the applicability of sub-clause (bb) abovesaid. In the case at hand, the respondent employer has failed in alleging and proving the ingredients of sub-clause (bb), as stated hereinabove. All that has been proved is that the appellants were engaged as casual workers or daily-wagers in a project. For want of proof attracting applicability of sub-clause (bb), it has to be held that the termination of the services of the appellants amounted to retrenchment. 13.This Court is of the view that if the workmen have a case that their service has been terminated prior to the completion of the project, it is for them to seek compensation in the light of the decision in **S.M.Nilajkar** 's (cited supra) case. However, with respect to the claim for retrenchment compensation on account of the completion of the project, this Court is of W.P.(C) Nos. 21068 of 2006 & 226 of 2014 **==> picture [27 x 9] intentionally omitted <==** the view that the workmen will not be entitled for any such benefit in the light of the definition of retrenchment. According to me, the question of paying compensation in the event of winding up of the project, also does not arise in this case. Admittedly, the workmen were engaged under a contract. The term, “closure”, is defined under Section 2(cc) of the Act as follows; “(cc) “closure” means the permanent closing down of a place of employment or part thereof;” The completion of project, in which the workmen engaged, cannot be considered or treated as a closure of a place of employment. The workmen have no case that they were not engaged under a contract and have no knowledge that this employment was short-lived to claim any compensation in the light of **S.M.Nilajkar** 's (cited supra) case. 14.With the above observation, WP(C) No. 21068/2006 is allowed, setting aside the direction of the tribunal to pay compensation in the event of the project being wounded W.P.(C) Nos. 21068 of 2006 & 226 of 2014 **==> picture [27 x 9] intentionally omitted <==** up on its completion. 15.In view of the judgment allowing WP(C) No.21068/2006, WP(C) No.226/2014 has to be dismissed as the prayer therein is for reinstatement, back wages and other benefits. Accordingly, WP(C) No.226/2014 is dismissed. - 16.However, if any benefit accrues to the 14 persons in WP (C) No.226/2014 pursuant to the judgment in WP(C) No.21068/2006, they are free to take up the matter in appropriate manner. It is also made clear that if any of the 14 persons is engaged even after the termination of the project, this judgment will not stand in the way of such persons to take up their claim for regularization in appropriate manner. ## Sd/- **A. MUHAMED MUSTAQUE JUDGE** bka/-