Supreme Court of IndiaSupreme Court · 1998Single JudgeAppeal dismissed.

SECRETARY-CUM-CHIEF ENGINEER, CHANDIGARH v. HARi OM SHARMA AND ORS.

Case / Petition Number:
Civil Appeal No. 5546 of 1995
Neutral Citation:[1998] 3 S.C.R. 100

Case Synopsis & Summary

This appeal concerns a service-law dispute over promotion to the post of Junior Engineer-I in a Chandigarh electricity department. Promotions were to be drawn from three feeder posts with fixed quotas: 34% direct recruitment from diploma holders, 33% from diploma holders line-men, and 33% from non-diploma line-men/meter readers with 10 years’ service. An integrated seniority list was prepared and promotions were made from this list, disregarding the quota system. The respondent, senior-most among non-diploma holders, was promoted to Junior Engineer-I in 1990 but was neither paid salary for that post nor considered for regular promotion. He approached the Central Administrative Tribunal, Chandigarh, which directed payment of salary for the post and consideration for regular promotion on the basis of the quota fixed for non-diploma holders with 10 years of service. The appellant challenged this, arguing reliance on certain prior decisions to uphold integrated seniority and that an undertaking not to claim salary would be enforceable. The Supreme Court dismissed the appeal, upholding the Tribunal’s order: salary from the date of officiation and promotion on the stipulated quota, and holding the undertaking unenforceable as against public policy. The case clarifies the primacy of quota-based promotions over integrated seniority in this context and rejects the stop-gap salary deprivation line of argument.

Precedent Explorer

Find Cases Like This

Explore other judgments dealing with similar legal situations, facts, or statutory provisions.

Case Details & Bench

Court
Supreme Court of India
Hon'ble Judges
  • S. Saghir Ahmad
  • K. Vankataswami
  • Rajendra Babu
Judgment Date
1998-04-29
Court Decision / Holding
Appeal dismissed. The Supreme Court upheld the Central Administrative Tribunal’s directions: promote the respondent on the basis of the quota fixed for non-diploma holders with 10 years of service and pay salary for the post of Junior Engineer-I with effect from 1990, while recognizing the right to regular promotion based on the quota framework. The undertaking not to claim salary was held unenforceable under Section 23 of the Indian Contract Act and contrary to public policy.
Final Disposition
Appeal dismissed.

Parties to the Case

Appellants / Petitioners

  • Secretary-cum-Chief Engineer, Chandigarh

Respondents

  • Hari Om Sharma
  • Others

Legal Representation & Advocates

Counsels for Petitioners

  • • Ujjagar Singh
  • • G. C. Sharma
  • • Naresh Bakshi

Counsels for Respondents

  • • Sunil Gupta
  • • Indu Malthora
  • • Kavita Walia
  • • A.K. Mahajan (NP)

Provisions of Law Cited

Indian Contract Act, 1872: Section 23

Legal Doctrines & Maxims

  • Public policy
  • Salary entitlement on officiation to a higher post

Submissions & Arguments

Contentions of Appellants / Petitioners

The appellant contends that promotions to Junior Engineer-I should be as per the fixed quotas for the three feeder categories, and not by integrated seniority. It relies on earlier judgments to challenge the Tribunal’s approach and argues that the respondent’s stop-gap promotion does not create a right to salary or regular promotion; an undertaking not to claim salary is, in their view, enforceable, and the government cannot be bound by such an argument in public employment.

Contentions of Respondents

The respondents contend that the Tribunal correctly ordered salary for the post and promotion on the basis of the quota fixed for non-diploma holders with 10 years of service. They emphasize that the respondent was officiating on a higher post for a long period and is entitled to pay and promotion, and that reliance on prior decisions to negate this right is misplaced; they rely on the tribunal’s view and the controlling jurisprudence (Murugesan) supporting quota-based promotions.

Legal Doctrine & Issue Explorer

Explore This Legal Issue

Find relevant judgments and authoritative positions on the legal questions discussed here.

Cited Precedents (5)

Case NameCitationTreatmentExplanation
Punjab State Electricity Board & Anr. v. Ravinder Kumar Sharma & Ors.[1986] 4 SCC 617OverruledThe Ravinder Sharma decision was overruled by T. Murugesan & Ors. v. State of Tamil Nadu & Ors., (1993) 2 SCC 340; hence not to be followed for the present context.
Punjab State Electricity Board v. Sukhdev Raj Sharma & Ors.JT (1987) 1 SC 333OverruledQuashed by this Court on 30 January 1987; its quota-based reasoning was displaced.
T. Murugesan & Ors. v. State of Tamil Nadu & Ors.(1993) 2 SCC 340PositiveViewed as controlling authority supporting quota-based promotions over integrated seniority.
Shreedaran Chandra Ghosh v. State of Assam & Ors.(1996) 10 SCC 567Mentioned OnlyCited in argument by appellant; court did not adopt its reasoning.
State of Haryana v. S. M. Sharma & Ors.JT (1993) 3 SC 740Mentioned OnlyCited in argument; court rejected the argument.
Case Applicability Diagnostic

Apply This to My Facts

Share your situation and test whether this judgment governs, supports, or challenges your case.

Official Judgment Record
•1,848 words•~9 min read

In The Court Record

SECRETARY-CUM-CHIEF ENGINEER, CHANDIGARH v. HARi OM SHARMA AND ORS.

A # SECRETARY-CUM-CHIEF ENGINEER, CHANDIGARH # v. HAR! OM SHARMA AND ORS. ## APRIL 29, 1998 ## [S. SAGHIR AHMAD, K. VANKATASWAMI ANDS. RAJENDRA BABU, JJ.] B _Service Law-Promotion-Feeder cadre-Quotas fixed for-Promotion made on the basis of integrated seniority list instead of making on quota basis-Validity of_ C _Service law-Promotion-Stop gap arrangement-Employee continuing for a long period-But neither paid salary for that period nor considered for regular promotion-Direction by Tribunal for payment of salary and to consider him for regular promotion-Held valid_ D _Indian Contract Act, 1872: Section 23._ _Government service-Employee-Stop gap promotion-Continuing for a long period-Undertaking from employee that he would not claim salary of higher post or other benefits-Held contrary to public policy._ E In this case promotion to the post of Junior Engineer-I was being made from three different feeder posts. For promotion, quota was fixed for (1) direct recruitment from open market from amongst diploma holders; (ii) diploma holders line-man already working with the appellant; and (iii) nondiploma holders line man/meter readers who had put in ten years of service. F However, an integrated seniority list o·f persons from three cadres was drawn up on the basis of which promotions were made without adhering to the quota system. _(_ The respondent, a seniormost person in the cadre of n~n-diploma holders was promoted as Junior Engineer. However, he was n~ither paid G salary for that post nor was he considered for regular promotiqn. On the other hand, while promoting him on a stop gap arrangement, an un~ertaking was taken from him that he would neither claim promotion as of right nor would he claim any benefit pertaining to that post. The respondent approached the Central Administrative Tribunal, H 99 SUPREME COURT REPORTS [1998] 3 S.C.R. 100 A Chandigarh which directed that the respondent shall be paid salary for the post of Junior Engineer and shall also be considered for promotion on regular basis on the basis of quota fixed for non diploma holders with ten years of service. Against the decision of Tribunal an appeal was preferred before this Court. ## B Dismissing the appeal, this Court HELD : 1. The Tribunal was fully justified in ordering that the respondent shall be promoted on the basis of "quota" fixed for non-diploma holders with 10 years of service and not on the basis of integrated seniority. It was also justified in ordering payment of salary to the respondent for the C post of Junior Engineer-I with effect from 1990 when he was made to work on that post. The respondent, to begin with, was promoted in stop-gap arrangement as Junior Engineer-I but that by itself would make no difference to his claim of salary for that post. If a person is put to officiate on a higher post with greater responsibilities, he is normally entitled to salary of that D post The Tribunal has rightly held that the respondent having been promoted as Junior Engineer-I, though in stop-gap arrangement , was continued on that post and, therefore he has a right to be considered for regular promotion. [102-E-HJ .. , 2. An agreement that if a person is promoted to the higher post or put E to officiate on that post or, as in the instant case, a stop-gap arrangement is made to place him on the higher post, he would not claim higher salary or other attendant benefits would be contrary to law and also against public policy. It would, therefore, be unenforceable in view of section 23 of the Contract Act. [103-DJ p _Punjab State Electricity Board & Anr._ v. _Ravinder Kumar Sharma & Ors.,_ [1986) 4 SCC 617, dissented from (Being already overruled). _Purijab State Electricity Board_ v. _Sukhdev Raj Sharma & Ors.,_ JT (1987) 1 SC 333 and _T. Murugesan & Ors._ v. _State of Tamil Nadu & Ors.,_ It 993 J 2 sec 340, referred to. ## G _Shreedaran Chandra Ghosh_ v. _State of Assam & Ors.,_ (1996) 10 SCC 567 and _State of Haryana_ v. _S.M. Sharma & Ors.,_ JT (1993) 3 SC 740, distinguished. CIVIL APPELLATE JURISDICTION : Civil Appeal No. 5546 of H 1995. SECY.-CUM-CHIEF-ENGG. _v._ HARi OM SHARMA [S. SAGHIR AHMAD, J.] J OJ From the Judgment and Order dated 14.12.93 of the Central Administrative Tribunal, Chandigarh in O.A. No. 433/CH/1993. Ujjagar Singh, G .C. Sharma and Naresh Bakshi for the Appellant. Sunil Gupta, Ms. Indu Malthora and Ms. Kavita Walia for the Respondents. **B** A.K. Mahajan (NP) for Respondent-Ex-Parte. The Judgment of the Court was delivered by ... S. **SAGHIR AHMAD, J.** This appeal is directed against the judgment C dated 14.12.93 passed by the Central Administrative Tribunal, Chandigarh (for short, 'the Tribunal'). 2. The dispute relates to the promotion on the posts of Junior Engineer- !. Admittedly, promotion on the posts of Junior Engineer-I are made from amongst Junior Engineers/S.S.Os./Meter Inspectors. Since there were three **D** different feeder posts from which promotions were to be made, the appellant themselves fixed the respective quotas. 34 percent of the posts were to be filled up by direct recruitment from the open market from amongst diploma holders. 33 per cent of the posts were to be filled up by diploma holders linemen already working with the appellant. Another 33 per cent of the posts were to be filled up from amongst non-diploma holders linemen/Meter Readers E who had put in I 0 years of service. 3. In order to make promotions, an integrated seniority list of persons working in three categories of feeder posts was drawn up and it was from this seniority list that promotions were made and the quota system was not adhered to in view of the decision of this Court in _Punjab State Electricity_ F _Board and Anr._ v. _Ravinder Kumar Sharma & Ors._ [1986] 4 SCC 617. It is also stated by the appellant that 33 per cent quota, meant for non-diploma holders, was quashed by this Court by its Judgment dated 30th of January, 1987 in _Punjab State Electricity Board_ v. _Sukhdev Raj Sharma & Ors.,_ JT (1987) 1 SC 333. It was after this Judgment that the recruitment rules were G modified and it was provided that the posts of Junior Engineer-I would be filed up, not on the basis of quota, but on the basis of integrated senioritycum-merit. 4. The respondent was promoted as Junior Engineer-I in 1990 and has been continuing on that post without being paid salary for that post or **H** SUPREME COURT REPORTS (1998] 3 S.C.R. 102 A without being promoted on regular basis. It was in this situation that the respondent approached the Tribunal and the Tribunal, as pointed out earlier, allowed the claim petition with the direction that the respondent shall be paid salary for the post of Junior Engineer-I and shall also be considered for promotion on regular basis on the basis of quota fixed for non-diploma B holders with IO years of service. Admittedly, the respondent is the seniormost person in the cadre of non-diploma holders and has also put in IO years of service. 5. The decision in _Punjab State Electricity Board and Anr._ v. _Ravinder Kumar Sharma & Ors.,_ (supra) was overruled by this Court in _T. Murugesan_ C _& Ors._ v. _State of Tamil Nadu & Ors.,_ (1993] 2 SCC 340. It was on this decision that the Tribunal placed reliance and came to the conclusion that the promotions had still to be made on the basis of quota fixed for three different feeder categories and not on the basis of integrated seniority particularly as the classification on the basis of _"educational qualification"_ was held to be valid by this Court. D 6. Having regard to these facts, we are of the view that the Tribunal was fully justified in ordering that the respondent shall be promoted on the basis of"quota" fixed for non-diploma holders with 10 years of service and not on the basis of integrated seniority. The Tribunal was also justified in ordering payment of salary to the respondent for the post of Junior Engineer-I with E effect from 1990 when he was made to work on that post. It is true that the respondent, to begin with, was promoted in stop-gap arrangement as Junior Engineer-I but that by itself would make no difference to his claim of salary for that post. If a person is put to officiate on a higher post with greater responsibilities, he is normally entitled to salary of that post. The Tribunal has F noticed that the respondent has been working on the post of Junior Engineer! since 1990 and promotion for such a long period of time cannot be treated to be a stop-gap arrangement. 7. Learned counsel for the appe)lant has placed reliance on _Shreedaran Chandra Ghosh_ v. _State of Assam & Ors.,_ (1996] IO SCC 567, as also on _State_ G _o/Haryana_ v. _S.M Sharma & Ors., IT_ (1993) 3 SC 740, to contend that since the respondent was promoted on the basis of stop-gap arrangement, he could not claim promotion as a matter of right nor could he claim salary for the post of Junior Engineer-I as he was given only current duty charge of that post. Both the contentions cannot be accepted. The Tribunal has already held that the respondent having been promoted as Junior Engineer-I, though in stopH gap arrangement, was continued on that post, and therefore, he has a right 103 SECY.-CUM-CHIEF-ENGG. v. HAR! OM SHARMA [S. SAGHIR AHMAD, J.] " to be considered for regular promotion. Having regard to the facts of this case, there is no, reason to differ with the Tribunal. 8. Learned counsel for the appellant attempted to contend that when the respondent was promoted in stop-gap arrangement as Junior Engineer-I, he had given an undertaking to the appellant that on the basis of stop-gap arrangement, he would not claim promotion as of right nor would he claim any B benefit pertaining to that post. The argument, to say the least, is preposterous. Apart from the fact that the Government in its capacity as a model employer cannot be permitted to raise such an argument, the undertaking which is said to constitute an agreement between the parties cannot be enforced at law. The respondent being an employee of the appellant had to break his period of C stagnation although, as we have found earlier, he was the only person amongst the non-diploma holders available for promotion to the post of Junior Engineer! and was, therefore, likely to be considered for promotion in his own right. An agreement that if a person is promoted to the higher post or put to officiate on that post or, as in instant case, a stop-gap ~mangement is made to place him on the higher post, he would not claim higher salary or other D attendant benefits would be contrary to Jaw and also against public policy. It would, therefore, be unenforceable in view of Section 23 of the Contract Act. 9. For the reasons stated above, we find no merit in this appeal which is dismissed without any order as to costs. T.N.A Appeal dismissed.
End of Judgment Record
Browse All Supreme Court of India (1998) Decisions
1998-11-03

ASHIRWAD ISPAT UDYOG AND ORS. v STATE LEVEL COMMITTEE

These appeals arise from cancellation of eligibility certificates issued under the Madhya Pradesh General Sales Tax Act for exemption from tax in respect of iron and steel scrap processing. The central question is whether the activity of cutting scrap into narrower strips and pieces, to be used by rolling mills and other manufacturers, amounts to “manufacture” within the Act’s special definition. The MP Act defines “manufacture” in Section 2(j) as including a process or manner of producing, collecting, extracting, preparing or making any goods, and the definition is not limited to producing a completely new article. The Madhya Pradesh High Court had held that the scrap processing did not create a new product and thus did not constitute manufacture for exemption. The appellants argued that the plain text widens the concept of manufacture to cover processes that prepare saleable goods, and that the exemption notification itself contemplated such processing by permitting manufacture of goods as well as by-products. The Supreme Court concluded that the definition’s plain words must prevail and that, within this Act, “manufacture” is broad enough to include processing that renders scrap saleable. It held that cutting scrap into strips and pieces, with mechanical processing, can amount to manufacture under Section 2(j). Consequently, the appeals were allowed and relief was to be granted to the appellants in accordance with the judgment, with no costs awarded.”

1998-04-15

MOHD. IQBAL M. SHAIKH v. STATE OF MAHARASHTRA

Following the demolition of the Bahri Masjid, communal violence erupted in Mumbai. The appellants, including Mohd Iqbal M. Shaikh, were convicted under the Terrorist and Disruptive Activities (Prevention) Act, 1987 (TADA) and various IPC sections in a Designated Court for the January 7, 1993 incident in which Hindus in a chawl were set ablaze, resulting in several deaths. The Supreme Court undertook a focused review of whether the acts constituted a "terrorist act" under Section 2(h) of TADA and whether pre-condition sanctions under Section 20-A were valid, especially given that Section 20-A was introduced later. It held that the incident occurred before the 1993 amendment but that, on the Commissioner of Police’s post hoc sanction and the investigation’s context, there was no infirmity in applying TADA, framing charges, or the Designated Court’s trial. The Court also stressed that the standard for evaluating evidence under TADA is the same as under ordinary criminal law, requiring stringent scrutiny of eyewitness testimony given delays, inconsistencies, and lack of a proper Test Identification Parade. Nevertheless, given the gravity of the crime and the communal backdrop, the Court ultimately allowed the appeals and set aside the convictions and sentences, directing the appellants to be released forthwith unless required in other proceedings.

1998-05-13

UNION OF INDIA AND OTHERS v. ASHOKE KUMAR BANERJEE

Union of India and Ashoke Kumar Banerjee concerns pay fixation under Fundamental Rules 22(1)(a)(i) in the Central Public Works Department. The respondent, then a Junior Engineer, was placed in the Assistant Engineer pay scale (2000-3500) on a personal basis after 15 years of service, with his pay fixed under FR 22(1)(a)(i). On promotion to the substantive post of Assistant Engineer on 1 August 1991, he claimed that FR 22(1)(a)(i) should again apply to fix his pay in the higher scale and grant a fresh increment, pointing to higher duties and responsibilities. The Central Administrative Tribunal allowed the petition, holding that because the promotion entailed higher duties and the move was from the lower to the higher post, the FR should be applied again. The Union of India appealed, contending that this would amount to twice giving the same benefit and would create an anomaly, contrary to the FR, since the benefit had already been conferred earlier while he was still functioning in the lower post. The Supreme Court rejected the Tribunal's reasoning. It held that, though the officer received the benefit during his earlier service, he was not entitled to a fresh fitment on regular promotion, for the FR contemplates a single notional pay fixation when moving to the higher scale and would not permit duplication. The appeal was allowed and the Tribunal's OA was dismissed; no costs were awarded.

1998-04-27

Maharashtra Rajya Sahkari Sakkar Karkhana Sangh Ltd. & Ors. v. State of Maharashtra & Ors.

This is a Supreme Court appeal involving the Maharashtra Government’s 1997 Amendment to the Maharashtra Sugar Factories (Reservation of Areas of Crushing and Sugarcane Supply) Order, 1984. The appellants challenged the Amendment Order which allowed cane growers who were not members of cooperative societies to sell their cane to any factory, while members of cooperative societies were required to supply in the ratio of their shares, with a permissible excess to other factories. The primary legal backdrop is the Sugarcane (Control) Order, 1966 (as amended) and the Essential Commodities Act, 1955, under which Clause 6 empowers the Central Government and, via notification, state governments to regulate cane areas and the sale of cane. The High Court had upheld the 1984 order, and this Court, upon transfer petitions, examined whether the 1997 Amendment (introduced under Clauses 6 and 9 of the Sugar (Control) Order, 1966) is valid, not conflicting with central order, not arbitrary, and not aimed at destroying the cooperative movement. The Court concluded that the Amendment Order is not unreasonable, was enacted as a policy balancing farmers’ interests (members and non-members) with cooperative societies, and was within the State Government’s delegated powers. It dismissed the appeals and transfer petitions. The decision emphasizes that zoning and price mechanisms may require periodic rationalization to ensure fair cane pricing and adequate supply for the sugar industry.