SAURASHTRA CHEMICALS LTD. v. NATIONAL INSURANCE CO. LTD.

Case / Petition Number:
Civil Appeal No. 2059 of 2015
Neutral Citation:[2019] 15 S.C.R. 24

Case Synopsis & Summary

The appellant, Saurashtra Chemicals Ltd. (presently the Saurashtra Chemicals Division of Nirma Ltd.), insured stock of coal and lignite under a standard fire and special perils policy with an additional premium for spontaneous combustion cover. After reopening post-SICA restructuring, some stock was diminished due to spontaneous combustion. The insurer repudiated the claim on the ground that spontaneous combustion did not result in fire, thus no liability under the endorsement. The National Consumer Disputes Redressal Commission (NCDRC) rejected the claim, citing delay in intimation under Clause 6(i) of the General Conditions of Policy. On appeal, the Court examined two issues: whether appointment of a surveyor tantamounts to waiver of the time-limit for intimation; and whether absence of delay in the repudiation letter allows delay-based repudiation at the NCDRC stage. Relying on Galada Power and Telecommunication and Sonell Clocks and Gifts (with distinctions), the Court held that an insurer cannot travel beyond the grounds stated in the repudiation letter, and that if delay is not mentioned, it cannot be used as a ground later. The appeal was allowed: the NCDRC order set aside, and the insurer directed to pay Rs. 63,43,679 with 8% interest from the filing date, to be paid within eight weeks, with no costs awarded.

Precedent Explorer

Find Cases Like This

Explore other judgments dealing with similar legal situations, facts, or statutory provisions.

Case Details & Bench

Court
Supreme Court of India
Hon'ble Judges
  • MOHAN M. SHANTANAGOUDAR
  • KRISHNA MURARI
Judgment Date
2019-12-13
Court Decision / Holding
Appeal allowed. The impugned NCDRC judgment is set aside. The insurer is directed to pay Rs. 63,43,679/-, as assessed by the surveyor, to the appellant with interest at 8% from the date of filing until payment, to be made within eight weeks. There will be no order as to costs.
Final Disposition
Appeal allowed

Parties to the Case

Appellants / Petitioners

  • SAURASHTRA CHEMICALS LTD. (PRESENTLY KNOWN AS SAURASHTRA CHEMICALS DIVISION OF NIRMA LTD.)

Respondents

  • NATIONAL INSURANCE CO. LTD.

Legal Representation & Advocates

Counsels for Petitioners

  • • Nikhil Goel
  • • Ms. Naveen Goel
  • • Dushyant Sarna

Counsels for Respondents

  • • Yogesh Malhotra
  • • Gaurav Sharma

Provisions of Law Cited

Clause 6(i) of General Conditions of PolicyCondition No. 3 of the policySICA (Sick Industrial Companies Act)

Legal Doctrines & Maxims

  • Waiver
  • Estoppel
  • Sine qua non
  • Cannot travel beyond the grounds mentioned in the repudiation letter

Submissions & Arguments

Contentions of Appellants / Petitioners

The appellant contends that the NCDRC erred in treating delayed intimation under Clause 6(i) as a bar. By appointing a surveyor, the insurer did not waive the time-limit and could not later rely on delay as a ground if not mentioned in the repudiation letter. The appellant relies on Galada Power and Telecommunication Ltd. and Sonell Clocks and Gifts Ltd., arguing that waiver cannot be inferred from conduct and that delay-based defense cannot be raised for the first time before the consumer forum. Since the repudiation letter did not reference delay, the insurer cannot use Clause 6(i) at the NCDRC stage. The insurer’s sole ground relied on spontaneous combustion not causing fire, which the policy endorsement does not cover for liability; thus the claim should be payable. The Court should apply Galada’s principle on issue (2) and suppress any expansion of grounds not stated in the repudiation letter.

Contentions of Respondents

The insurer argues that Clause 6(i) is a condition precedent and delay can be invoked as a ground for repudiation; appointing a surveyor does not amount to waiver. The repudiation letter did not mention delay, but the insurer could raise it at the NCDRC stage if facts permit. Galada’s dictum was considered but Sonell Clocks distinguished it on facts; the insurer contends that the policy’s sine qua non requires timely intimation, and delay cannot be introduced for the first time in consumer forum. The insurer further submits that the spontaneous combustion endorsement imposes a fire-result requirement and that cessation of cover due to occupancy changes is a separate policy provision. Therefore, the rejection of the claim is valid, and denial should stand unless the letter of repudiation already cancels the claim.”},

Legal Doctrine & Issue Explorer

Explore This Legal Issue

Find relevant judgments and authoritative positions on the legal questions discussed here.

Cited Precedents (3)

Case NameCitationTreatmentExplanation
Sonell Clocks and Gifts Ltd. v. New India Assurance Company Ltd.(2018) 9 SCC 784DistinguishedThe Court acknowledges Sonell Clocks but distinguishes it on facts, noting that it did not have occasion to consider raising delay as a ground before a consumer forum; later, the Galada principle is treated as controlling on issue (2).
Galada Power and Telecommunication Ltd. v. United India Insurance Company Ltd & Another(2016) 14 SCC 161PositiveThe Court follows Galada on issue (2) and holds that the insurer cannot travel beyond the repudiation grounds; Galada remains the settled law in this context.
Krishna Wanti v. LICUnreportedMentioned OnlyCited in the context of discussing Galada’s dictum; not a binding controlling authority in the present case.
Case Applicability Diagnostic

Apply This to My Facts

Share your situation and test whether this judgment governs, supports, or challenges your case.

Official Judgment Record
•4,523 words•~21 min read

In The Court Record

SAURASHTRA CHEMICALS LTD. v. NATIONAL INSURANCE CO. LTD.

SUPREME COURT REPORTS [2019] 15 S.C.R. 24 [2019] 15 S.C.R. 24 - A SAURASHTRA CHEMICALS LTD. (PRESENTLY KNOWN AS SAURASHTRA CHEMICALS DIVISION OF NIRMA LTD.) v. ## NATIONAL INSURANCE CO. LTD. B (C.A. No. 2059 of 2015) ## DECEMBER 13, 2019 ## **[MOHAN M. SHANTANAGOUDAR AND KRISHNA MURARI, JJ.]** - _Consumer Protection – Loss of stock of goods insured – Claim_ - C _for – Appellant-company purchased a standard fire and special perils policy from the respondent-insurer and further paid a additional premium to cover the risk of loss of the stock on account of spontaneous combustion – Thereafter, appellant was declared a sick unit and its factory was closed for some time – After re-opening_ - D _it was noticed that some amount of stock of coal and lignite was diminished/destroyed on account of spontaneous combustion, causing loss and damage – Appellant demanded claim of Rs.1.4 crores on account of loss suffered by it from the respondent-insurer – Pursuant to the claim, the respondent-insurer appointed a surveyor – The surveyor submitted his report and assessed total loss to the_ - E _tune of Rs.63,43,679/- – However, respondent-insurer repudiated the claim via letter solely on the ground that since spontaneous combustion did not result into fire and loss was not caused by fire as stipulated by policy conditions, there was no liability under the policy – Appellant filed complaint before the NCDRC – Before_ - F _NCDRC, respondent-insurer alleged that appellant contravened cl.6(i) of the General Conditions of Policy – The NCDRC rejected the claim of the appellant and held that intimation of claim was sent with considerable delay of over a month thereby violating cl.6(i) of the General Conditions of Policy – On appeal, held: It is a settled position that an insurance company cannot travel beyond the_ - G _grounds mentioned in the letter of repudiation – If the insurer has not taken delay in intimation as a specific ground in letter of repudiation, they cannot do so at the stage of hearing of the consumer complaint before NCDRC – In the instant case, admittedly there was no reference of delay in intimation or lodging of the claim_ H 24 SAURASHTRA CHEMICALS LTD. v. NATIONAL INSURANCE CO. LTD. 25 _as stipulated in cl.6(i) of the General Conditions of Policy in the_ A _repudiation letter – Therefore, order of the NCDRC set aside – The respondent-insurer directed to make payment of Rs.63,43,679/- as assessed by the surveyor._ ## **Allowing the appeal, the Court** ## **HELD : Whether the respondent-insurer had waived the condition relating to delay in intimation and lodging of the claim, by appointing a surveyor.** **1. In view of the law laid down by the three Judge Bench in the** _**Sonell Clocks and Gifts Ltd. v. New India Assurance Company Ltd**_ **, the argument that by appointing a surveyor the respondentinsurer is estopped from raising the plea of violation of condition prescribing a time limit for intimation/lodging of the claim, has no legs to stand. Thus, issue is answered accordingly. [Para 18][34-E-F]** _Sonell Clocks and Gifts Ltd. v. New India Assurance Company Ltd_ **(2018) 9 SCC 784 : [2018] 10 SCR 35 – relied on.** _Galada Power and Telecommunication Ltd. v. United India Insurance Company Ltd & Another_ **(2016) 14 SCC 161 – referred to.** B C D E **Whether in the absence of any mention, of aspect of delay in intimation and violation of conditions of Clause 6(i) of General Conditions of Policy, in the repudiation letter, the same could be taken as defence before the NCDRC.** **2. Insofar as this issue is concerned it is undisputed that the letter of repudiation did not even remotely mention anything about violation of duration clause stipulated in Clause (6) (i) of the General Conditions of Policy. The Respondent-insurer repudiated the claim solely on the ground that since spontaneous combustion did not result into fire and loss had not been caused by fire as stipulated by policy conditions, there was no liability under the policy. It was for the first time the respondent-insurer raised the issue of delayed intimation of claim and violation of stipulation of Clause 6(i) of the General Conditions of Policy in its reply filed before NCDRC. [Para 19][34-G-H]** F G H 26 SUPREME COURT REPORTS [2019] 15 S.C.R. - A **3. Undoubtedly, this Court in** _**Sonell Clocks**_ **has distinguished** _**Galada Power**_ **on facts and held that the appointment of a surveyor cannot, as a matter of law, be construed as a waiver of the terms and conditions of the insurance policy. However, in** _**Sonell Clocks**_ **, the insurer had taken a specific plea in the repudiation letter that the loss was not conveyed within the stipulated period. Hence** - B **the singular issue before this Court was only whether the insurer had waived the condition as to delay in intimation by appointing a surveyor. This Court in** _**Sonell Clocks**_ **did not have the occasion to consider whether the insurance company could have raised delay as a ground for repudiation for the first time before the** - C **consumer forum. [Para 21][35-E-F]** **4. Hence, this Court is of the considered opinion that the** **law as laid down in ‘Galada’ on issue (2) still holds the field. It is a settled position that an insurance company cannot travel beyond the grounds mentioned in the letter of repudiation. If the insurer** D **has not taken delay in intimation as a specific ground in letter of repudiation, they cannot do so at the stage of hearing of the consumer complaint before NCDRC. [Para 22][35-G-H]** _Galada Power and Telecommunication Ltd. v. United India Insurance Company Ltd & Another_ **(2016) 14** E **SCC 161 – relied on.** _Sonell Clocks and Gifts Ltd. v. New India Assurance Company Ltd_ **(2018) 9 SCC 784 : [2018] 10 SCR 35 – referred to.** **5. Admittedly in the case at hand there was no reference of** F **delay in intimation or lodging of the claim as stipulated in Clause 6(i) of the General Conditions of Policy in the repudiation letter. The NCDRC has failed to take into consideration this aspect of the matter and, therefore, cannot be held to be justified in rejecting the claim of the appellant, on that ground. [Paras 23** G **and 24]** ## **Case Law Reference** |**(2016)**|**14**|**SCC**|**161**|**referred to**|**Para 18**| |---|---|---|---|---|---| |**[2018]**|**10**|**SCR**|**35**|**relied on**|**Para 18**| H SAURASHTRA CHEMICALS LTD. v. NATIONAL INSURANCE CO. LTD. 27 **(2016) 14 SCC 161 relied on Paras 21, 22** A **[2018] 10 SCR 35 referred to Paras 21, 22** CIVIL APPELLATE JURISDICTION: Civil Appeal No.2059 of 2015. From the final Judgment and Order dated 06.01.2015 of the B National Consumer Disputes Redressal Commission at New Delhi in Consumer Case No.115 of 2007. Nikhil Goel, Ms. Naveen Goel, Dushyant Sarna, Advs. for the Appellant. Yogesh Malhotra, Gaurav Sharma, Advs. for the Respondent. C The Judgment of the Court was delivered by ## **KRISHNA MURARI, J.** 1. The appellant purchased a standard fire and special perils policy from the respondent National Insurance Company Ltd. thereby insuring D the risk of loss/damage to the stock of coal and lignite stored in its factory compound. An additional premium of Rs. 59,200/- was paid by the appellant company so as to cover the risk of loss of the aforesaid stock on account of spontaneous combustion. The appellant was declared a Sick Unit and was accordingly registered under SICA. The factory E remained closed from 17.02.2006 to 09.08.2006 and was re-opened on 10.08.2006. 2. After re-opening it was noticed between the period from 11.8.2006 to 20.8.2006 that some amount of stock of coal and lignite has been diminished/destroyed on account of spontaneous combustion, causing loss and damage. Intimation in this regard was sent to the respondentinsurer on 12.09.2006. 3. Pursuant to the claim made, a surveyor was appointed who visited the premises of the appellant on 18.09.2006 and sought certain details, which were provided on 28.11.2006. After carrying out the requisite survey, the surveyor submitted his report on 11.04.2007 assessing total loss to the tune of Rs. 63,43,679/-. F G 4. The claim lodged by the appellant was however repudiated by the respondent-insurer vide communication dated 27.07.2007 on the ground that since spontaneous combustion did not result into fire thus, H 28 SUPREME COURT REPORTS [2019] 15 S.C.R. - A loss had not been caused by fire as stipulated in the relevant endorsement with respect to spontaneous combustion of the insurance policy. The appellant was further informed through the letter that unless spontaneous combustion results into fire, there is no liability under the policy. 5. On denial of the claim the appellant approached the National B Consumer Disputes Redressal Commission (hereinafter referred to as the NCDRC) vide consumer complaint no. 115 of 2007 seeking following reliefs:- - (a) To direct the respondent company to allow the demanded claim of Rs. 98,46,732/- on account of loss suffered by it on account - C of loss of stock of goods insured with the respondent; - (b) To award compensation of a sum of Rs. 25,00,000/- on account of pain and suffering suffered by the appellant on account of deficient service provided by the respondent company; - (c) Award of sum of Rs. 11,81,608/- being interest @ 18% from - D the date of the claim till the filing of the petition; - (d) Award further interests @ 18% pendent lite on amounts specified in Clause (a) and (b); - (e) Award cost of Rs. 1,00,000/- to the complainant; - E The complaint was resisted by the Insurer on three main grounds:- - (i) No claim was payable under the terms and conditions on which policy was issued inasmuch as destruction or damage, if any, caused to the property by fire on account of its own fermentation, natural heating or spontaneous combustion or - F undergoing natural heating or drying process is not covered. - (ii) Since the factory remained closed from 17.02.2006 to 09.08.2006, the insurance cover ceased to operate in view of the condition no. 3 of the policy which provides that unless the insured has obtained the prior sanction of the company in - G this regard, the insurance would cease to operate as regards the property affected : - H - (a) if the trade or manufacture carried on be altered or if the nature of occupation of or other circumstances affecting the building insured or containing the property insured be SAURASHTRA CHEMICALS LTD. v. NATIONAL INSURANCE CO. LTD. [KRISHNA MURARI, J.] 29 changed in such a way as to increase the risk of loss or A damage. (b) if the building insured or containing the insured property becomes unoccupied and so remains for a period of more than 30 days. - (iii) Intimation of claim was sent with considerable delay of over a month thereby violating condition no. 6(i) of the General Conditions of Policy. 6. Insofar as ground nos. (i) and (ii) are concerned, the same were not accepted by NCDRC and were decided against the respondentinsurer. The said two grounds (i) and (ii) are not in issue before us in this appeal as such we need not enter into the same. 7. However ground no. (iii) raised by the respondent-insurer in defence to the claim of the appellant found favour with the NCDRC and the complaint was dismissed on the premise that there was breach of conditions incorporated in Clause 6(i) of the General Conditions of Policy. Under Clause 6(i) the intimation of loss and damage was required to be given in writing by way of notice within 15 days of the occurance thereof. It is an admitted case between the parties that intimation of loss/damage was given by the appellant to the respondent-insurer for the first time on 12.09.2006 and a claim for loss for a sum of Rs. 1.4 Crores to 1.5 Crores was made vide letter dated 14.09.2006. B C D E 8. The NCDRC rejected the claim holding that since the complainant (Appellant herein) had contravened Clause 6(i) of the General Conditions of Policy, no claim is payable. F 9. We have heard Sh. Nikhil Goel, Learned Counsel for the appellant and Sh. Yogesh Malhotra for the respondent. 10. It is submitted by Learned Counsel for the appellant that the NCDRC has erred in holding that the claim stands defeated because of delayed intimation as postulated in Clause 6(i) of the General Conditions of Policy. It is also contended that, since respondent company had appointed a surveyor, its right to advance the plea, with respect to the claim being not maintainable because of delayed intimation as envisaged in Clause 6(i), stood waived. It is further contended that since the letter of repudiation does not even remotely refer to delayed intimation or G H 30 SUPREME COURT REPORTS [2019] 15 S.C.R. - A delayed claim, as postulated in Clause 6(i), the said ground cannot be taken as a defence to the claim. Reliance in support of the above contentions is placed upon judgment rendered by this Court in _**Galada Power and Telecommunication Ltd. vs. United India Insurance Company Ltd & Another**_ .[1] B 11. Mr. Yogesh Malhotra, Learned Counsel for the respondentinsurer while supporting the order passed by the NCDRC contended that by mere appointment of a surveyor, the insurer is not estopped from raising a plea of the violation of a condition warranting repudiation of the claim. Hence there is no waiver of the condition relating to delay in C intimation as stipulated in the General Conditions of Policy. It is further submitted that the judgment rendered by the two judge Bench of this Court in the case of _Galada_ (Supra) was considered by a three Judge Bench in the case of _Sonell Clocks and Gifts Ltd. v/s New India Assurance Company Ltd.[2]_ and was distinguished on the ground that dictum in _Galada_ case was in context of peculiar facts of that case. D 12. We have considered the argument advanced by Learned Counsel at the bar. The twin issues which arise for consideration in this appeal are:- - (1) Whether the respondent-insurer had waived the condition - E relating to delay in intimation and lodging of the claim, by appointing a surveyor. - (2) Whether in the absence of any mention, of aspect of delay in intimation and violation of conditions of Clause 6(i) of General Conditions of Policy, in the repudiation letter, the same could - F be taken as defence before the NCDRC. 13. It is not disputed that on the basis of the communication made by the appellant, the respondent-insurer appointed a surveyor on 18.09.2006 without any caveat and qualification. G 14. The Surveyor submitted his report dated 11.04.2007 assessing total loss to the tune of Rs. 63,43,679/-. Subsequently, vide letter dated 27.07.2007 the respondent-insurer repudiated the claim by stating as under:- - 1 (2016) 14 SCC 161 H 2 (2018) 9 SCC 784 SAURASHTRA CHEMICALS LTD. v. NATIONAL INSURANCE CO. LTD. [KRISHNA MURARI, J.] 31 _M/s Saurashtra Chemicals Ltd. Nirma House, Ashram Road, Ahmedabad,_ A _Kind Attn: Sh. Deepak Shah, Company Secretary._ _Dear Sir,_ B _Re:- Policy No. 301200/11/06/3300000033_ _Claim No. 301200/33/37/2007_ _Loss/Damage due to Spontaneous Combustion to Lignite and Coal._ C _This has reference to the claim lodged by you as above._ _On scrutiny of survey reports, various claim documents, the nature cause and circumstances of the loss, it is noticed that in the instant case the Spontaneous Combustion has occurred, but it did not result into the fire and loss has not been caused by fire only as stipulated in the relevant endorsement of spontaneous combustion._ _Further, the spontaneous combustion endorsement is clear and unambiguous in this regard and unless the spontaneous combustion results into fire, there is no liability under the policy._ D E _In view of the above the competent authority has decided to repudiate the said claim which please note._ _Sd/-_ _(George Valamchery)_ F _Sr. Divisional Manager._ 15. As is evident from the repudiation letter there is no reference to any of the aspects enumerated in Clause 6(i) of the General Conditions of Policy which reads as under:- _“6(i) On the happening of any loss or damage, the insured shall forthwith give notice thereof to the company and shall within 15 days after the loss or damage or such further time as the company may in writing allow in that behalf deliver to the company.”_ G H 32 SUPREME COURT REPORTS [2019] 15 S.C.R. A 16. Insofar as issue (1) is concerned, a two Judge Bench of this Court in the case of _Galada_ (supra) where despite violation of duration clause stipulated in Clause 5(3) to Clause 5(5) of the policy insurance company had appointed a surveyor held as under:- _“13. The National Commission has relied upon Clause 5 and_ B _on that basis has rejected the claim by putting the blame on the complainant. The letter of repudiation dated 20-9-1999, which we have reproduced hereinbefore, interestingly, does not whisper a single word with regard to delay or, in fact, does not refer at all to the duration clause. What has been stated in the letter of repudiation is that the claim lodged by_ C _the complainant does not fall under the purview of transit loss because of the subsequent investigation report. It is evincible, the insurer had taken cognizance of the communication made by the Appellant and nominated a surveyor to verify the loss. Once the said exercise has been_ D _undertaken, we are disposed to think that the insurer could not have been allowed to take a stand that the claim is hit by the clause pertaining to duration……………._ _18. In the instant case, the insurer was in custody of the policy. It had prescribed the clause relating to duration. It was very_ E _much aware about the stipulation made in Clauses 5(3) to 5(5), but despite the stipulations therein, it appointed a surveyor. Additionally, as has been stated earlier, in the letter of repudiation, it only stated that the claim lodged by the insured was not falling under the purview of transit loss. Thus, by positive action, the insurer has waived its right to advance_ F _the plea that the claim was not entertainable because conditions enumerated in duration clause were not satisfied. In our considered opinion, the National Commission could not have placed reliance on the said terms to come to the conclusion that there was no policy cover in existence and_ G _that the risks stood not covered after delivery of goods to the consignee.”_ 17. However, the dictum in _Galada_ case (supra) came up for consideration before a three Judge Bench of this Court in the case of _Sonell Clocks and Gifts Ltd._ (supra) and it was distinguished on the H ground that dictum in _Galada_ is in context of the peculiar facts and SAURASHTRA CHEMICALS LTD. v. NATIONAL INSURANCE CO. LTD. [KRISHNA MURARI, J.] 33 circumstances of that case and does not lay down that on appointment of the surveyor, the insurer is estopped from raising of plea of violation of condition stipulated in the insurance policy. It may be relevant to extract the following from the said report:- _“20. The Respondent has rightly pointed out the other distinguishing features in the present case. To wit, in that case [Galada], the Court had considered Clause 5 of a Marine Insurance Policy wherein the issue was whether the insurance cover itself had extinguished by efflux of time and that the intimation given by the insured to the insurer was not made within 7 days of arrival of the vehicle at the destination mentioned in the policy. According to the insurer, on expiry of 7 days from delivery the insurance cover stood perished and no cover would subsist beyond the said 7 days’ period. It is in that context, the Court noted that appointment of the surveyor by the insurer beyond the said period can be construed as an act of waiver by the insurer of the position that the policy stands extinguished. In other words, appointment of a surveyor by the insurer was interpreted as a manifestation of the stand of the insurer that the insurance cover still subsists. This is evident from the dictum in para 13 of the reported decision as the Court noted that once a surveyor was nominated to verify the loss, the insurer could not be allowed to take a stand that the claim is hit by the clause pertaining to duration and more so because of absence of any mention in the letter of repudiation. Thus, it went on to hold that from the positive conduct of the insurer in unequivocally appointing a surveyor, the insurer had waived the right which was in its favour under the duration clause._ _21. The expression “duration” is of some significance which is reflective of the existence or otherwise of the policy itself. In the present case, there is no dispute about the subsistence of the policy but is one of violation of Condition 6 of the policy. Furthermore, in the present case the controversy will have to be answered on the basis of Standard Fire and Special Perils Policy relatable to Condition 6 obligating the insured to give forthwith intimation of the loss to the insurer. The two clauses are materially different and relate to two different_ A B C D E F G H 34 SUPREME COURT REPORTS [2019] 15 S.C.R. A _and distinct insurance policies. In other words, Clause 5 of the Marine Insurance Policy and Clause 6 of the present policy are incomparable being qualitatively different._ _22. To put it differently, Galada case was not a case which considered repudiation based on a premise or a reason similar_ B _to Condition 6 of the present policy and a specific plea taken by the insurer in that behalf in the repudiation letter itself. Notably, Clause 5 of the Marine Insurance Policy which was the subject-matter in Galada case did not have a negative covenant as in this case in the proviso to Condition 6 of the_ C _subject policy. The fulfilment of the stipulation in Clause 6 of the General Conditions of the Policy is the sine qua non to maintain a valid claim under the policy._ _23. We, therefore, agree with the Respondent that the dictum in Galada case is in the context of the facts of that case and_ D _does not lay down that on the appointment of a surveyor, per se, the insurer is estopped from raising a plea of violation of the condition warranting a repudiation of the claim. The factum of waiver has to be gathered from the totality of the obtaining circumstances.”_ E _(Emphasis supplied)_ 18. In view of the law laid down by the three Judge Bench in the _Sonell Clocks_ (supra), the argument that by appointing a surveyor the respondent-insurer is estopped from raising the plea of violation of condition prescribing a time limit for intimation/lodging of the claim, has F no legs to stand. Thus issue no. (1) is answered accordingly. 19. Insofar as issue no. (2) is concerned it is undisputed that the letter of repudiation did not even remotely mention anything about violation of duration clause stipulated in Clause (6) (i) of the General Conditions of Policy. The Respondent-insurer repudiated the claim solely on the G ground that since spontaneous combustion did not result into fire and loss had not been caused by fire as stipulated by policy conditions, there was no liability under the policy. It was for the first time the respondentinsurer raised the issue of delayed intimation of claim and violation of stipulation of Clause 6(i) of the General Conditions of Policy in its reply filed before NCDRC. H SAURASHTRA CHEMICALS LTD. v. NATIONAL INSURANCE CO. LTD. [KRISHNA MURARI, J.] 35 20. This court in the case of _Galada Power Ltd._ (supra) has elucidated upon issue (2) as under : _“It is evincible, the insurer had taken cognizance of the communication made by the Appellant and nominated a surveyor to verify the loss. Once the said exercise has been undertaken, we are disposed to think that the insurer could not have been allowed to take a stand that the claim is hit by the clause pertaining to duration. In the absence of any mention in the letter of repudiation and also from the conduct of the insurer in appointing a surveyor, it can safely be concluded that the insurer had waived the right which was in its favour under the duration clause. In this regard, Mr. Mukherjee, learned Senior Counsel appearing for the Appellant has commended us to a decision of the High Court of Delhi in Krishna Wanti v. LIC, wherein the High Court has taken note of the fact that if the letter of repudiation did not mention an aspect, the same could not be taken as a stand when the matter is decided. We approve the said view.”_ A B C D _(Emphasis supplied)_ 21. Undoubtedly, as mentioned supra, this Court in _Sonell Clocks_ (supra) has distinguished _Galada Power_ on facts and held that the appointment of a surveyor cannot, as a matter of law, be construed as a waiver of the terms and conditions of the insurance policy. However, in _Sonell Clocks_ , the insurer had taken a specific plea in the repudiation letter that the loss was not conveyed within the stipulated period. Hence the singular issue before this Court was only whether the insurer had waived the condition as to delay in intimation by appointing a surveyor. This Court in _Sonell Clocks_ did not have the occasion to consider whether the insurance company could have raised delay as a ground for repudiation for the first time before the consumer forum. 22. Hence we are of the considered opinion that the law as laid down in ‘Galada’ on issue (2) still holds the field. It is a settled position that an insurance company cannot travel beyond the grounds mentioned in the letter of repudiation. If the insurer has not taken delay in intimation as a specific ground in letter of repudiation, they cannot do so at the stage of hearing of the consumer complaint before NCDRC. E F G H 36 SUPREME COURT REPORTS [2019] 15 S.C.R. A 23. Admittedly in the case at hand there was no reference of delay in intimation or lodging of the claim as stipulated in Clause 6(i) of the General Conditions of Policy in the repudiation letter. 24. The NCDRC has failed to take into consideration this aspect of the matter and, therefore, cannot be held to be justified in rejecting B the claim of the appellant, on that ground. 25. In view of the aforesaid analysis the appeal stands allowed and the impugned judgment and the order of the NCDRC is set aside. The Respondent-insurer is directed to make payment of Rs. 63,43,679/ -, as assessed by the surveyor, to the appellant with interest @ 8% from C the date of the filing of the claim of petition till date of payment. The payment, as above, be made within eight weeks from today. 26. There will be no order as to costs. D Ankit Gyan Appeal allowed. E F G H
End of Judgment Record
Browse All Supreme Court of India (2019) Decisions
2019-09-03

Uber India Systems Pvt. Ltd. v. Competition Commission of India & Ors.

Uber India Systems Pvt. Ltd. v. Competition Commission of India & Ors. concerns allegations that Uber, in its ride‑hailing network, abused a dominant position under the Competition Act, 2002. The case arose on appeals challenging the Competition Appellate Tribunal’s order in Appeal No. 31 of 2016, which upheld the Director General’s inquiry into whether Uber’s pricing and incentive practices violated Section 4. The Supreme Court analysed whether the information before it sufficed to constitute a prima facie case under Section 26(1) and whether there was abuse of a dominant position in the National Capital Region. It focused on the two ingredients for abuse: the existence of a dominant position and its misuse. The court considered, based on a statement summarizing driver incentives and a period when Uber reportedly paid high incentives to fleet owners, that Uber may have pursued a pricing strategy that would affect its competitors. Under Section 4(2)(a), abuse includes an unfair price, including predatory pricing. The Court accepted that there is a prima facie case for infringement, yet did not itself interfere with the Appellate Tribunal’s order and dismissed the appeals. It directed the Director General to complete the investigation within six months from today.

2019-07-19

STATE OF BIHAR & ORS. v. DR. CHAITRAYA KUMAR SINGH & ORS.

This civil appeal concerns the reorganization of the erstwhile Bihar into Bihar and Jharkhand in 2000 and the post-allocation transfer of an employee. The first respondent, Dr. Chaitraya Kumar Singh, was initially allocated to Jharkhand in 2007 as an Ayurvedic Medical Officer and, following Union guidelines permitting transfer after final allocations, was re-allocated to Bihar on 6 September 2010 with mutual consent of both States. Bihar issued formal orders, and the respondent joined Jharkhand in 2007; however, he remained in Jharkhand and continued to work there until his retirement on 30 April 2017. A few days before retirement, he filed a writ petition in Jharkhand seeking relief to join Bihar and to be relieved by Jharkhand so that Bihar could accept joining. The Jharkhand High Court confirmed a Single Judge’s order directing Bihar to absorb him. The appellants contend that after the 2010 allocation there was no vacancy, the respondent did not pursue available remedies promptly, and seven years of service in Jharkhand after allocation render absorption in Bihar inappropriate. The Court agrees, noting the allocation to Bihar continued to hold and the petitioner failed to pursue remedies in time; his superannuation in Jharkhand eliminates the basis for absorption. The relieving order issued post-retirement is irrelevant. The appeal is allowed, the High Court’s order set aside, and there shall be no costs; pending applications are disposed.

2019-01-07

PUNJAB FINANCIAL CORPORATION v. M/S PAULBRO LEATHERS PVT. LTD.

Punjab Financial Corporation (lender) filed against Paulbro Leathers Pvt. Ltd. after Paulbro defaulted on a loan. The dispute was settled under the Corporation’s One Time Settlement (OTS) policy on 01.04.2003, and a court-ordered reference to a Chartered Accountant (CA) was made to determine the remaining outstanding balance. After the CA submitted his report, a new dispute arose about the precise liability and how much had been paid, prompting the Corporation to issue a demand for Rs. 49,86,713 which Paulbro disputed in a writ petition before the Punjab and Haryana High Court. The High Court allowed the petition on the ground that the entire exercise had been carried out with consent and no objection had been raised, effectively barring re-opening of the settlement. The appellant challenged these rulings in this Court. The Supreme Court held that the settlement created a fresh dispute arising out of its terms and that the matter must be decided on its merits under the law. It emphasized that the High Court should record how and on what basis Paulbro satisfied the settlement and discharged liability, and if needed, refer the report to another CA. The Court remanded the case to the High Court to decide the writ petition afresh on merits, with a directions to decide expeditiously (preferably within six months).

2019-12-06

RAJESH KUMAR DWIVEDI v. STATE OF U.P. & ANR.

Rajesh Kumar Dwivedi challenges the rejection of his candidature for the post of Instructor in Fitter at Government Industrial Training Institutes in Uttar Pradesh. An advertisement of 17 March 2008 required candidates to possess a certificate in the respective trade from the NCVT, in addition to experience. Dwivedi possessed three National Trade Certificates from Model Industrial Training Institute, Haldwani (one-year basic training in Mechanical, six-month Fitter General module, six-month Metrology and Engineering Inspection), but did not hold a two-year NCVT certificate. The High Court had dismissed his writ petition, holding that three separate courses could not be treated as equivalent to the NCVT qualification. Dwivedi relied on (i) the 16 December 1983 circular clarifying equivalence between the Restructured and Conventional patterns of the Craftsmen Training Scheme, and (ii) 1988 and 1992 UP circulars recognizing MITI, Haldwani training as equivalent to NCVT, including a two-year Fitter trade certificate. The State argued that the amended UP ITI Rules require NCVT certification and that the reliance on circulars cannot override the Rules. The Supreme Court held that the eligibility condition is to have a certificate in the respective trade from NCVT, and that if the State had earlier treated certain qualifications as equivalent through its circulars, such equivalence cannot be disregarded. Consequently, the appellant’s candidature could not be validly rejected, and the State was directed to appoint him within two months. The decision underscores how State-issued equivalence can complement or override rigid Rule-based qualifications when consistently recognized.