Tenetowl LogoTenetowl
High Court of KeralaKerala High Court · 2009Single JudgePartly allowed; conviction under Section 138 ma...

Saseendran Nair v. State of Kerala

Case / Petition Number:
CRRP 2684/07

Case Synopsis & Summary

In Saseendran Nair v. State of Kerala, the Kerala High Court heard a Criminal Revision Petition under Section 138 of the Negotiable Instruments Act challenging concurrent verdicts of guilty and conviction, upheld by the courts below. The accused issued a post-dated cheque for Rs 2,00,000 on 30.04.1999 to discharge a debt, which bounced for insufficient funds when presented on 26.10.1999. The complainant issued a demand notice and subsequently filed proceedings after the statutory period, leading to a conviction. The accused contended that the cheque was never issued for a legally enforceable debt, and that it might have been stealthily removed from his scooter by the complainant and his brother; he relied on a stop payment memo dated 18.03.99 (Ext. D4) and bank records. DW1 (bank manager) corroborated Ext. D4, but the court noted the absence of a clear date of receipt of the memo and the lack of independent proof of theft. The appellant’s theory of stealthy removal failed on broad probabilities; the evidence of PW1 and the signature on the cheque supported the debt transaction and the presumption under Section 139 NI Act. While upholding the conviction, the court applied leniency in sentencing, citing Anilkumar v. Shammi, and modified the sentence to imprisonment till rising of the court, plus Rs 2,20,000 as compensation with a window until 30.04.09 to pay.

Precedent Explorer

Find Cases Like This

Explore other judgments dealing with similar legal situations, facts, or statutory provisions.

Case Details & Bench

Court
High Court of Kerala
Hon'ble Judges
  • R. Basant
Judgment Date
2009-03-16
Court Decision / Holding
This revision petition is allowed in part. The conviction and judgment under Section 138 NI Act are upheld. However, the sentence is modified: the accused shall undergo imprisonment till rising of the court and pay Rs. 2,20,000 as compensation under Section 357(3) Cr.P.C.; in default, he shall undergo a further simple imprisonment for three months. The accused is given until 30.04.2009 to make the payment; if paid, the entire amount is released to the complainant. The case to be re-sealed on 02.05.2009 for execution of the modified sentence if required.
Final Disposition
Partly allowed; conviction under Section 138 maintained; sentence modified as specified (imprisonment till rising of the court and Rs 2,20,000 compensation; 30.04.2009 deadline); default sentence of 3 months if default occurs; further proceedings for execution if required.

Parties to the Case

Appellants / Petitioners

  • Saseendran Nair

Respondents

  • State of Kerala represented by Public Prosecutor, High Court of Kerala, Ernakulam
  • Shanmughan (and related respondent Shajini Bhavanam, Manalil, Ayuranalalloor Via, Anchal)

Legal Representation & Advocates

Counsels for Petitioners

  • • Sri C. Rajendran

Counsels for Respondents

  • • Public Prosecutor, High Court of Kerala
  • • Sri P. Ravindra Babu
  • • Sri R. Suraj Kumar
  • • SMT Geetha P. Menon

Provisions of Law Cited

Section 138 of the Negotiable Instruments ActSection 357(3) Cr.P.C.Section 139 of the Negotiable Instruments Act

Legal Doctrines & Maxims

  • Presumption under Section 139 of the Negotiable Instruments Act

Submissions & Arguments

Contentions of Appellants / Petitioners

The revision petitioner contends that the cheque was not issued for the due discharge of a legally enforceable debt and that the cheque may have been stealthily taken from the accused’s scooter by the complainant and his brother. He relies on Ext. D4 (a stop payment memo dated 18.03.99) and the bank records to challenge the legality of the debt and the timing of the issuance. He also questions the lack of a prompt reply in the reply notice and the credibility of the complainant’s oral evidence.

Contentions of Respondents

The complainant argues that the cheque was issued for the due discharge of a legally enforceable debt and that the notice of demand, hearing, and prosecution were properly conducted under the NI Act. The bank records and Ext. D4 are relied upon to counter the stealth removal theory, and the presumption under Section 139 is pressed against the accused.

Legal Doctrine & Issue Explorer

Explore This Legal Issue

Find relevant judgments and authoritative positions on the legal questions discussed here.

Cited Precedents (1)

Case NameCitationTreatmentExplanation
Anilkumar v. Shammi2002(3) KLT 852PositiveCited for guiding the court on the principles of sentencing under Section 138 NI Act and for applying leniency in appropriate cases after considering the duration of litigation and the need to compensate the complainant.
Case Applicability Diagnostic

Apply This to My Facts

Share your situation and test whether this judgment governs, supports, or challenges your case.

Official Judgment Record
•2,291 words•~11 min read

In The Court Record

Saseendran Nair v. State of Kerala

IN THE HIGH COURT OF KERALA AT ERNAKULAM PRESENT : THE HONOURABLE MR. JUSTICE R.BASANT MONDAY, THE 16TH MARCH 2009 / 25TH PHALGUNA 1930 Crl.Rev.Pet.No. 2684 of 2007() -----------------------------CRA.43/2004 of I ADDL. SESSIONS COURT, KOLLAM CC.81/2000 of JUDL.MAGISTRATE OF FIRST CLASS-I, PUNALUR .................... REVN. PETITIONER/APPELLANT/ACCUSED: ---------------------------------------------- SASEENDRAN NAIR, S/O.SURENDRAN PILLAI, SUSEENDRATHIL VEEDU, MANALIL, AYURANALLOOR, PATHANAPURAM. BY ADV. SRI.C.RAJENDRAN ## RESPONDENTS/RESPONDENTS/COMPLAINANT& STATE: ---------------------------------------------- 1. STATE OF KERALA REPRESENTED BY THE PUBLIC PROSECUTOR, HIGH COURT OF KERALA, ERNAKULAM. 2. SHANMUGHAN, SHAJINI BHAVANAM, MANALIL, AYURANALLOOR VIA, ANCHAL. R1 BY PUBLIC PROSECUTOR, SRI.P. RAVINDRA BABU R2 BY ADV. SRI.R.SURAJ KUMAR SMT.GEETHA P.MENON THIS CRIMINAL REVISION PETITION HAVING BEEN FINALLY HEARD ON 16/03/2009, THE COURT ON THE SAME DAY PASSED THE FOLLOWING: ## **R. BASANT, J.** ----------------------------------------------Crl.R.P. No. 2684 OF 2007 ----------------------------------------------Dated this the 16[th] day of March, 2009 ## **O R D E R** This revision petition is directed against the concurrent verdict of guilty, conviction and sentence in a prosecution under Section 138 of the Negotiable Instruments Act. The petitioner faced a sentence of simple imprisonment for a period of three months. He is further directed to pay the cheque amount Rs.2 lakhs as compensation under Section 357(3) Cr.P.C. No default sentence is seen imposed. 2. Complainant alleged that accused had borrowed an amount of Rs.2 lakhs from him on 30.03.99. According to him, earlier there were many transactions between the accused and the complainant and the complainant used to promptly repay the amounts. When the alleged amount was borrowed on 30.03.99 it was agreed that, repayment shall be effected on 30.04.99. But on that day, repayment was not effected. Complainant insisted on return of the amount and it was then that a post dated cheque (Ext.P1) dated 18.10.99 was issued on 30.04.99 for the discharge of the said legally enforceable debt/liability. That cheque was CRRP:2684/07 -:2:- presented on 26.10.99. The same was dishonoured by the Bank on the sole ground of insufficiency of funds. When the dishonour memo was received by the complainant, he caused notice of demand to be issued to the accused. That did not evoke any response. Later the complainant after observing the statutory time table strictly, initiated prosecution under Section 138 of the Negotiable Instruments Act. Long after the initiation of prosecution, a reply notice was received by the complainant. Neither the accused nor the complainant has produced that reply notice. 3. As stated earlier, the complainant came to the court with the complaint observing the statutory time table. Cognizance was taken. The accused denied the offence alleged against him. Thereupon the complainant examined himself as PW1 and proved Exts.P1 to P7. 4. In the course of cross examination of the accused and later when the accused was examined under Section 313 Cr.P.C, it appears that the accused wanted to raise a contention that the cheque was stealthily taken from the scooter of the accused by CRRP:2684/07 -:3:- the complainant and his brother on a date when there was an alleged attack against the accused by the complainant. Surprisingly, throughout the case the date of that incident is not mentioned at all. Of course, there is a statement that there was an incident on 26.05.99, but, that is long after the date of the alleged issuance of the cheque on 30.04.99. 5. The accused, it appears, wanted to rely on a stop payment memo dated 18.03.99 submitted by him to the bank to stop payment. There are indications to suggest that reference was made in the reply notice about the stealthy removal of the cheque of the accused. 6. The bank manager was examined as DW1. He proved Exts.D1 to D6. Records show that Ext.D4 dated 18.03.99 is the stop payment memo issued by the accused to his bank. The relevant register shows that the such a stop payment memo dated 18.03.99 was received by the bank. But, surprisingly, the date of receipt of Ext.D4 by the bank is not indicated in any one of the documents. 7. The courts below came to the conclusion that the CRRP:2684/07 -:4:- complainant has succeeded in establishing all ingredients of the offences punishable under Section 138 of the Negotiable Instruments Act. Accordingly, the court below proceeded to pass the impugned concurrent judgment. 8. Called upon to explain the nature of the challenge which the petitioner/accused wants to mount against the impugned concurrent verdict of guilty, conviction and sentence, the learned counsel for the petitioner/accused advances various contentions. 9. First of all it is contended that, the cheque was not issued for the due discharge of a legally enforceable debt/liability. Signature in the cheque is not seen disputed. The cheque is produced by the complainant. I, now look for the explanation of the accused as to how the cheque signed by him travelled from his possession to the possession of the complainant. Though a vague contention is raised that the accused was attacked by the complainant and his brother and the cheque was stealthily removed from the scooter of the accused, there is significantly no whisper of an explanation as to the date on which the cheque came into the hands of the complainant. What did the accused do CRRP:2684/07 -:5:- when he found the cheque was stolen/missing ? No complaint has been made before any authorities admittedly and at any rate, there is nothing to show that such a complaint of theft of cheque by the complainant or his brother was ever made before any authorities. Thus, there is absolutely no material to show that the accused had complained to anyone about the alleged removal of the cheque stealthily by the complainant and/or his brother. This, according to me, is crucial and vital. 10. The learned counsel for the petitioner/accused contends that there are indications to show that Ext.D4 stop payment memo dated 18.03.99 was given by the accused to the bank. As already noted, it is impossible to ascertain the date on which Ext.D4 was handed over by the accused to his bank. It will not be in apposite in this context to note that the memo of dishonour does not at all refer to such a stop payment memo. The accused has no case as to the date on which the cheque was stealthily removed by the complainant and/or his brother from his scooter. It is crucial to note that in Ext.D4 there is no allegation that anyone had stealthily removed the cheque, but, the only case is that, it was lost from the CRRP:2684/07 -:6:- possession of the accused. Ext.D4 dated 18.03.99 cannot in these circumstances inspire confidence at all. That is not referred to in the memo of dishonour. There is no explanation as to the date on which the cheque was lost or stealthily removed. Very interestingly, no complaint has ever been made to anyone alleging that the complainant and/or his brother had removed the cheque stealthily from the possession of the accused/petitioner from the scooter of the accused. Moreover, the accused does not even attempt to explain why a signed blank cheque was kept in the scooter and made available to all and sundry for stealthy removal. In short, the conclusion appears to be inevitable that the theory of stealthy removal of the cheque from the possession of the accused cannot be validly explained at all. 11. In the relevant registers, the number of the cheque and the date shown in Ext.D4 are seen noted. This, according to me, is totally insufficient to conclude that Ext.D4 stop payment memo was received by the bank on 18.03.99. This has to be read in the light of the total absence of any material to show that the accused who allegedly knew that the complainant and his brother were CRRP:2684/07 -:7:- responsible for such stealthy removal had not filed any complaint before anyone about such stealthy removal of the cheque. 12. I am, in these circumstances, of the opinion that the mere fact that Ext.D4 stop payment memo was available in the bank and that it was produced by the bank before the Magistrate cannot lead a prudent mind to the conclusion that such stop payment memo was issued to the bank prior to the date of the impugned transaction on 30.03.99 or prior to 30.04.99 the date on which, according to the complainant, the cheque was handed over to him. 13. The court below took note of the circumstances that it is quite possible, even assuming that the cheque was lost from the possession of the accused prior to 18.03.99 and that he may have traced it and may have issued the same on 30.04.99 to the complainant. In that view of the matter also, Ext.D4 cannot clinch the issue. 14. The crux of the contention of the accused is that the cheque was stealthily removed from his possession by the complainant. There is no semblance of material to show that on CRRP:2684/07 -:8:- any date prior to 18.03.99 or prior to 30.04.99 any such incident had taken place at all. In fact, the only suggestion about such incident having taken place prior to 26.05.99 is not available in evidence nor is it available from Ext.D4. 15. I now come to the appreciation of the evidence of PW1. According to the complainant, the amount was paid earlier and the cheque was issued for the due discharge of the liability on a later date. The version of the complainant is eminently corroborated by his ability to produce the cheque which admittedly has the signature of the accused affixed on it. As already stated, the theory of stealthy removal of the cheque falls to the ground on broad probabilities and also on the basis of the materials produced. The evidence of PW1 shows that the cheque was issued for the due discharge of a legally enforceable debt/liability. In the facts and circumstances of the case, I find no reason not to accept and act upon the oral evidence of PW1 on this aspect. In these circumstances I am of the opinion that, the complainant has succeeded in proving the transaction and the issuance of the cheque to the complainant by the accused for the due discharge CRRP:2684/07 -:9:- ## of such legally enforceable debt/liability. 16. It may not be in apposite in this context to note that even admittedly reply notice was issued long after the notice of demand was received. It was issued 12 days after the complaint was filed. The absence of a prompt reply in this context has relevance. The non-production of the reply is also of crucial relevance in the circumstances of the case though of course the complainant could also have produced the same. 17. I am, in these circumstances, of the opinion that sufficient materials have been placed before court by the complainant in the form of his own oral evidence and the original of the cheque produced by him to confirm that the cheque has been issued for the due discharge of the legally enforceable debt/liability for the due execution and handing over of the cheque is proved satisfactorily by the oral evidence of PW1. Such execution and handing over having been proved, the presumption under Section 139 of the Act stares at the accused. The accused has not succeeded in proving his case. In these circumstances, I am satisfied that the complainant has successfully established the CRRP:2684/07 -:10:- crucial ingredient under Section 138 of the Negotiable Instruments Act that the cheque was issued for the due discharge of the legally enforceable debt/liability. No other contentions are raised on merits and I am in these circumstances satisfied that the impugned verdict of guilty and conviction only deserves to be upheld. I agree with the conclusion of the courts below that the cheque was issued for the due discharge of such legally enforceable debt/liability. 18. The learned counsel for the revision petitioner finally contends that the sentence imposed is excessive. Substantive sentence of simple imprisonment for three months and a direction for payment of the cheque amount as compensation are imposed. No default sentence is imposed. Counsel prays that leniency may be shown on the question of sentence. I have already adverted to the principles governing imposition of sentence in a prosecution under Section 138 of the Negotiable Instruments Act in the decision in _**Anilkumar v. Shammi**_ [ **2002(3) KLT 852** ]. I am satisfied that leniency can be shown to the petitioner but only after ensuring that the complainant who has been compelled to fight CRRP:2684/07 -:11:- three rounds of battle and wait from 1999 is adequately compensated. The challenge in this revision can succeed only to the above extent. ## 19. In the result: ## a) This revision petition is allowed in part. b) The impugned verdict of guilty and conviction under Section 138 of the Negotiable Instruments Act are upheld. c) But, the sentence imposed is modified and reduced. In supersession of the sentence imposed on the petitioner by the courts below, he is sentenced to undergo imprisonment till rising of court. He is further directed to pay an amount of Rs.2,20,000(Rupees two lakhs and twenty thousand only) as compensation and in default to undergo a simple imprisonment for a period of three months. If deposited, the entire amount shall be released to the complainant. d) The petitioner shall have time till 30.04.09 to make the payment and avoid the default sentence. The modified sentence shall not be executed till that date. The accused shall appear and the sureties shall CRRP:2684/07 -:12:- produce him before the learned Magistrate on 02.05.09 for execution of the modified sentence hereby imposed. e) If the accused does not appear, needless to say, appropriate action under Section 446 Cr.P.C can be initiated against the petitioner and his sureties. **R. BASANT, JUDGE** ttb CRRP:2684/07 -:13:- CRRP:2684/07 -:14:-
End of Judgment Record
Browse All High Court of Kerala (2009) Decisions
2009-06-26

Nishana Mol.N v Alappuzha Municipality & Secretary, Alappuzha Municipality

This writ petition concerns the registration of a marriage under the Kerala Registration of Marriages (Common) Rules, 2008 (Common Rules). The petitioner Nishana Mol.N, whose marriage was solemnized on 8 March 2009, sought registration of her marriage by the Local Registrar. Her husband was abroad, and she submitted Form No. 1 along with documents; however, the Local Registrar demanded the presence of both spouses for registration, a point contested by the petitioner. The court recalls the apex court’s directions in Seema v. Ashwani Kumar (2006) to frame rules ensuring compulsory registration to protect women and provide evidence of marriage, while noting that registration under the Rules does not itself create a marriage but evidences one solemnized otherwise. The Rules specify that registration is mandatory for marriages solemnized within the state, with various procedural requirements (Rules 5, 6, 9, 10, 11, 13, 16, 17) and mechanisms for correction, appeal, and re-registration. The court clarifies that the presence of both parties is not ordinarily required; the registrar may require appearance only in cases where there is reasonable doubt about identity, and even then as an exception rather than a rule. Ultimately, the court directs that registration and certificate issuance be completed within one month from copy of the judgment, without insisting on joint appearance, provided the memorandum is in order.

2009-07-27

Abdul Majeed Kalathil v. District Collector, Malappuram & Others

This batch of writ petitions concerns the constitutional validity of Section 17 of the Kerala Anti-Social Activities (Prevention) Act, 2007, and the power of District Magistrates to confiscate vehicles used in anti-social activities. The petitions challenge the absence of a substantive prohibition against using vehicles for anti-social activities and the lack of a defined procedure for confiscation or an appellate remedy. In W.P.C. No. 9925 of 2009 (the lead case), Abdul Majeed Kalathil contends that his goods carriage KL 11-B/6651 was seized by the Sub Inspector of Pandikkad Police and reported to the District Collector, Exts.P1–P2. The court scrutinizes Section 17's scope, defining anti-social activity (Section 2(a)) and whether the District Collector’s power to confiscate is constitutionally tenable. It finds Section 17 to be vague and violative of Articles 14, 19(1)(g) and 21, as it rests on subjective police satisfaction with no clear standards or process. It also notes environmental objectives but concludes that fundamental rights must prevail. The court does not sustain confiscation under Section 17; instead, it directs that such vehicles be dealt with under the Kerala Protection of River Banks and Regulation of Removal of Sand Act, 2001 and Rules, with interim release under specified conditions. It further directs initiation of Sand Act proceedings within a month and finalization within another month. The writ petitions are disposed of accordingly, preserving the rule of law and environmental protection.

2009-06-11

WA No. 671 of 2006 (Fertilizers and Chemicals Travancore Ltd v Union of India)

This writ appeal concerns the pay revision and pensionary benefits of employees of the Fertilizers and Chemicals Travancore Ltd (FACT). The long-term settlement covering terms of employment expired on 31 December 1996. A fresh settlement was concluded (notified 28 August 2001) and made retroactive to 1 January 1997, with revisions in wages and benefits. Clause 29 of Ext. P1 provides that arrears relating to wage revision and dearness allowance for the period 1 January 1997 to 30 June 2001 will be reviewed and decided by management/government only when the company earns profits for at least three consecutive years; Clause 33.1 provides that employees who retired on or after 1 January 1997 will be eligible for arrears calculated from 1 January 1997 to the date of retirement, subject to adjustments for interim relief already paid, with any unclaimed amount transferred to a Welfare Fund. The appellants—the retirees who fall in the 1 January 1997 to 1 July 2001 window—argue that they were denied arrears and were paid pensionary benefits at pre-revised rates, creating discrimination. Respondents contend Ext. P1 binds the parties and arrears depend on profits, and that pay revision administered to others does not compel retroactive change. The court held that Ext. P1 terms survive as terms of employment and directed the management to consider terminal benefits at revised rates within two months and to release arrears when paid to current workers, with connected matters following."

2009-05-29

M/S. Palm Fibers & Yars Trading Co. v. State of Kerala & Others

The petitioner, a Small Scale Industrial unit, ran two LT power connections (No.13070 and No.13427) with commercial production starting in July 1994 and July 1995. On 06/02/1992, the Government issued Ext.P1 guaranteeing concessional tariffs (pre-1992 tariff) for five years from the date of commencement or substantial capacity expansion, certified by the District Industries Centre. Ext.P2 certified eligibility for this concession. Subsequently, the petitioner increased power demand to 300 KVA and was reclassified/advised to HT status from 15/05/1998, converting LT supply to HT. The petitioner argued that Ext.P1 benefits should extend for the full five-year period, covering the LT quantities certified in Ext.P2, and that the HT conversion was a mere reclassification directed by the Board, not a cessation of eligibility. The Board argued Ext.P1 targets only those who commenced production during 1992–1996 and that HT conversion from 15/05/1998 falls outside the Ext.P1 window, rendering the petitioner eligible only up to 15/05/1998. Earlier orders (Ext.P3) had set aside a cut-off date for merits, and Ext.P6/Ext.P4 handled appeals. Ultimately, the Court held that the HT conversion was outside Ext.P1’s period, but directed that the LT benefits for the two LT connections be extended only until 23/05/1998 (LT dismantling date) and without reimbursement from the Industries Department, as held in OP No.7622/1998. The petition was disposed of as above.