Case Synopsis & Summary

This contempt petition arises from the Modern Cooperative Group Housing Society Limited in Delhi, where an approved strength of 211 members led to the expulsion of 27 members, including the petitioners, and the induction of 15 new members against vacancies. The expulsion was challenged up to the Supreme Court, which by an order dated 18 October 2010 in Civil Appeal No. 9439 of 2003 accepted the claim of the expelled members and directed readmission against unallotted flats. Subsequently, the Registrar of Cooperative Societies (RCS) issued orders (notably 24 February 2012) setting aside allotments to the 15 newcomers and directing re-admission of 14 of them. The newly inducted contemnors approached the Court again, seeking enforcement of undertakings to vacate but alleging that their induction was not clandestine, that they had paid instalments, and that construction had been completed with their deposits. The matter traversed High Court proceedings and a fresh contempt petition led the Court, in 2018-19, to analyze viability of alternatives including a 18-apartment tower within existing FAR, with Municipal Corporation of Delhi in principle supporting construction. The Court directed vacating by 31 August 2019, deposits by specified dates, re-admission upon compliance, and an application to erect a new building, while balancing the interests of both sets of members. The petitions were disposed of with no costs, but with detailed interim directions aimed at realigning occupancy and contributing to construction.

Precedent Explorer

Find Cases Like This

Explore other judgments dealing with similar legal situations, facts, or statutory provisions.

Case Details & Bench

Court
Supreme Court of India
Hon'ble Judges
  • Uday Umesh Lalit
  • Sanjay Kishan Kaul
Judgment Date
2019-05-08
Court Decision / Holding
Contempt Petitions disposed of. The Court held that though the contemnors violated undertakings by not vacating, there are equities in their favour due to their non-secretive induction against vacancies, timely instalment payments, and occupancy that contributed to construction. The Court directed: (i) all contemnors vacate by 31.08.2019; (ii) each who seeks a new apartment deposit Rs.10 lakhs by 31.10.2019 along with an affidavit undertaking to deposit further sums if required; (iii) upon deposit and affidavit, readmission as members; (iv) within one month file an application with 18 apartments for a new building, with Municipal Corporation of Delhi’s cooperation; (v) fresh draw of lots for allotment in presence of an Official from the Registrar, Cooperative Societies; (vi) contemnors to obtain transit accommodation; (vii) construction costs to be borne by contemnors; (viii) costs, if any, to be decided by the society; (ix) further steps to ascertain FAR and permissions. The matter was disposed of with no costs.
Final Disposition
Contempt Petitions disposed of. No costs.

Parties to the Case

Appellants / Petitioners

  • Sant Lal Gupta & Ors.

Respondents

  • Umesh Kumar Jain & Ors.

Legal Representation & Advocates

Counsels for Petitioners

  • • A. K. Sinha
  • • S. D. Singh
  • • Puneet Kr. Jain
  • • Ms. Shweta Sinha
  • • Ms. Surabhi Shukla
  • • Ms. Meenu Singh
  • • Ms. Deepika Goyal
  • • R. K. Singh
  • • Ms. Bharti Tyagi
  • • Krishnamohan K.
  • • Madan Mohan
  • • Ajay Kumar Giri
  • • Suvesh Kumar
  • • Sandeep Kumar
  • • B. P. Gupta
  • • Shekhar Kumar
  • • Dania Nayyar
  • • Ms. Kiran Bhardwaj
  • • R. C. Kaushik
  • • Ms. Sunita Sharma
  • • Ms. Arunima Dwivedi
  • • B. V. Balaram Das
  • • Praveen Swarup
  • • Madan Mohan

Counsels for Respondents

  • • A. K. Sinha
  • • S. D. Singh
  • • Puneet Kr. Jain
  • • Ms. Shweta Sinha
  • • Ms. Surabhi Shukla
  • • Ms. Meenu Singh
  • • Ms. Deepika Goyal
  • • R. K. Singh
  • • Ms. Bharti Tyagi
  • • Krishnamohan K.
  • • Madan Mohan
  • • Ajay Kumar Giri
  • • Suvesh Kumar
  • • Sandeep Kumar
  • • B. P. Gupta
  • • Shekhar Kumar
  • • Dania Nayyar
  • • Ms. Kiran Bhardwaj
  • • R. C. Kaushik
  • • Ms. Sunita Sharma
  • • Ms. Arunima Dwivedi
  • • B. V. Balaram Das
  • • Praveen Swarup
  • • Madan Mohan

Provisions of Law Cited

Right to Information Act, 2005

Submissions & Arguments

Contentions of Appellants / Petitioners

The contemnors submit that they were inducted as members against vacancies after expulsions and have paid all instalments due; construction was carried out with deposits from all members including them; they have occupied flats since 2002 and the ongoing process to vacate would cause prejudice. They contend land remains available within the society’s plot and that a new building could be constructed within FAR, with Municipal Corporation of Delhi in principle agreeing to permission. They offer to deposit funds (initially proposed at Rs.30 lakhs, later adjusted to Rs.10–30 lakhs as directed) and seek readmission as members upon compliance, asserting ends of justice require balancing interests of both groups of members.

Contentions of Respondents

The contemnors’ undertakings to vacate were not honoured; enforcement of undertakings is essential to uphold the rule of law and protect other members’ rights. The respondents emphasize that vacancies and occupancy must follow the sequence of orders and that the society’s funds and long occupancy should not prejudice the orderly allotment to those directed to be readmitted. They also highlight the lack of finalized approved plans and that any new construction must comply with FAR and municipal approvals; the contest is whether the contemnors can be accommodated without undermining the directives of the Supreme Court and the Registrar’s orders.

Legal Doctrine & Issue Explorer

Explore This Legal Issue

Find relevant judgments and authoritative positions on the legal questions discussed here.

Cited Precedents (1)

Case NameCitationTreatmentExplanation
Sant Lal Gupta & Ors. v. Umesh Kumar Jain & Ors.Civil Appeal No. 9439 of 2003PositiveThe 2010 Supreme Court judgment upheld the claim of expelled members and directed readmission against unallotted flats; the present judgment relies on and is consistent with that decision, rather than overruling it.
Case Applicability Diagnostic

Apply This to My Facts

Share your situation and test whether this judgment governs, supports, or challenges your case.

Official Judgment Record
•5,736 words•~27 min read

In The Court Record

Sant Lal Gupta & Ors. v. Umesh Kumar Jain & Ors.

506 SUPREME COURT REPORTS [2019] 7 S.C.R. 506 [2019] 7 S.C.R. A ## SANT LAL GUPTA & ORS. v. ## UMESH KUMAR JAIN & ORS. (Contempt Petition (Civil) Nos.1505-1506/2017 B ## in (Special Leave Petition (Civil) Nos.10375-10376 of 2017) ## MAY 08, 2019 ## **[UDAY UMESH LALIT AND SANJAY KISHAN KAUL, JJ.]** C _Cooperative Society – Modern Cooperative Group Housing Society had approved strength of 211 members – 27 members were expelled including the present contempt petitioners – 15 new members including the alleged contemnors were inducted against the vacancies – Expulsion of those 27 members was challenged and_ D _finally Supreme Court accepted their claim and directed their adjustment against the unallotted flats – Newly inducted members including the alleged contemnors approached Supreme Court – Directed to move the Administrator/Registrar,Cooperative Societies – Registrar, Cooperative Societies vide order dtd. 24.02.12 set aside the allotment of flats to them and directed re-admission of 14 persons_ E _as members of the Society – Order challenged before the High Court – Rejected – Special leave petitions dismissed by Supreme Court, however liberty granted to the petitioners to file undertakings to vacate the apartments in their occupation – Undertakings filed – Present contempt petitions filed alleging that despite undertakings_ F _the alleged contemnors failed to vacate the apartments in question – Order passed by Supreme Court on 10.01.19 – Affidavits filed by the alleged contemnors indicating their willingness to deposit Rs.30 lakhs, for construction of a new building in the society, as stated in the said order – Held: Contemnors violated the orders passed by Supreme Court as despite having furnished the undertakings they_ G _failed to vacate and hand over possession – But there are certain equities in their favour – They were inducted as members not clandestinely but against the resultant vacancies after expulsion of certain members, they paid all the instalments in time, on the basis of such instalments paid by the members including the alleged_ H 506 507 SANT LAL GUPTA & ORS. v. UMESH KUMAR JAIN & ORS. _contemnors, the construction was completed and they were put in_ A _possession of the apartments soon thereafter –In view of the reports made by the Architect a new building can be constructed with 18 apartments– Alleged contemnors to vacate their respective apartments – Apartments so vacated be allotted to those persons who were directed to be re-admitted as members in order dtd. 24.02.12_ B _– Each of the alleged contemnors, if he or she desires to have a new apartment in the newly erected building, shall deposit Rs.10 lakhs with the Administrator,Cooperative Societies – Further directions passed._ ## **Disposing of the Contempt Petitions, the Court** **HELD: 1.1 The alleged contemnors violated the orders passed by Supreme Court and despite having furnished appropriate undertakings, failed to vacate and hand over possession. But there are certain equities in their favour; in that they were inducted as members not clandestinely but against the resultant vacancies after expulsion of certain members, that they had paid all the instalments in time, that on the basis of such instalments paid by the members including the alleged contemnors the construction was completed, and that they were put in possession of the apartments soon thereafter. It is only as a result of the expulsion orders of the contempt petitioners getting set aside that the alleged contemnors have to vacate their apartments and make way for the contempt petitioners. The society had raised amounts and was benefited from two sets of persons that is the alleged contemnors as well as the contempt petitioners and the fact of the matter is that the society is presently having funds to the tune of more than Rs.4 crores. Going by the reports made by the Architect a new building can be constructed with 18 apartments, which means that after satisfying the requirements of all the alleged contemnors there will still be some apartments left, from the sale of which money for construction can be garnered. Furthermore, according to the Architect, within the FAR available to it, the society can construct such new building. The Municipal Corporation of Delhi has also in principle agreed that if FAR is available, the authority would not have any objection to grant permission for construction of a new building. [Paras 10, 11] [519-A-F]** C D E F G H 508 SUPREME COURT REPORTS [2019] 7 S.C.R. - A **1.2 In the circumstances, ends of justice would be met, if following directions are passed:- a) All the alleged contemnors shall vacate their respective apartments on or before 31.08.2019. The apartments so vacated shall thereafter be allotted to those persons who were directed to be re-admitted as members in terms of para 9 of the order passed by the Registrar, Cooperative** - B **Societies on 24.02.2012. The allotment shall be done in the presence of an Official from the Office of the Registrar, Cooperative Societies in a manner known to law. b) Each of the alleged contemnors, if he or she desires to have a new apartment in the newly erected building, shall deposit a sum of Rs.10 lakhs** - C **with the Administrator of the Modern Cooperative Group Housing Society Limited on or before 31.10.2019. Along with such deposit, an appropriate affidavit shall be filed by such person (s) undertaking that in case any further amount (s) are to be deposited towards the cost of construction, he or she shall abide by such requisition scrupulously. c) Upon such deposit and furnishing of** - D **an affidavit every such person shall be re-admitted in the Society as a Member. d) Within one month from the date of this order, the Administrator shall prefer an appropriate application annexing therewith all the required documents including plans and drawings and seek permission to erect a new building with 18 apartments.** - E **Such application shall be preferred with the concerned appropriate Authorities including Municipal Corporation of Delhi. (e) Municipal Corporation of Delhi which has agreed in principle that the permission for erecting a new building can be granted, shall consider said application and take appropriate decision in the matter within one month from the date when the application is** - F **preferred. (f) After the construction has begun, the Administrator shall be entitled to initiate the process for having new members admitted who are willing to deposit such sums as are required towards the cost of construction of an individual apartments which could then be allotted to them. (g) The Administrator shall also** - G **be entitled to have a fresh draw of lots in the presence of an Official from the Office of Registrar, Cooperative Societies in respect of the building to be constructed so that each of those 18 apartments could be allotted to the concerned persons including the alleged contemnors herein. (h) The alleged contemnors shall have to find new or transit accommodation till they are finally put** - H **in possession of the apartments so allotted to them after** 509 SANT LAL GUPTA & ORS. v. UMESH KUMAR JAIN & ORS. **completion of construction. The cost and charges in that behalf shall be borne by the alleged contemnors and they shall not be entitled to have any amount reimbursed either from the society or from any of the members. (i) Whether the cost of construction must come entirely from the allottees of apartments in the new building to be constructed or whether the society would like to contribute in that behalf, is a matter which ought to be decided by the society. The alleged contemnors had made their contribution and as a matter of fact the society has funds to the tune of more than Rs.4 crores available with it. In our view, the directions as aforesaid would not only ensure that the contempt petitioners are put in possession of the apartments to which they have been found to be entitled to but will also take care of the interests of the alleged contemnors who are required to vacate the apartments only because of the setting aside of the expulsion of the contempt petitioners. [Paras 12, 13] [519-G-H; 520-A-H; 521-A-D]** A B C D CIVIL APPELLATE JURISDICTION : Contempt Petition (Civil) Nos. 1505-1506 of 2017 in Special Leave Petition (Civil) Nos. 1037510376 of 2017. From the Judgment and Order dated 31.03.2017 of the Supreme Court of India in S.L.P.(Civil) Nos. 10375-10376 of 2017. E ## With M.A. Nos. 1260, 1261, 1262, 1263 of 2018 in Civil Appeal No. 9439 of 2003. A. K. Sinha, Sr. Adv., S. D. Singh, Puneet Kr. Jain, Ms. Shweta Sinha, Ms. Surabhi Shukla, Ms. Meenu Singh, Ms. Deepika Goyal, R. K. Singh, Ms. Bharti Tyagi, Krishnamohan K., Mohit Singh, Ms. Dania Nayyar, Ms. Kiran Bhardwaj, R. C. Kaushik, Ms. Sunita Sharma, Ms. Arunima Dwivedi, B. V. Balaram Das, Praveen Swarup, Madan Mohan, Ajay Kumar Giri, Suvesh Kumar, Sandeep Kumar, B. P. Gupta, Shekhar Kumar, Advs. for the appearing parties. The Judgment of the Court was delivered by F G ## **UDAY UMESH LALIT, J.** 1. This Contempt Petition _inter alia_ seeks enforcement of the order dated 31.03.2017 passed by this Court in SLP(C)…..CC No.6319 of 2017 and prays for direction that the contempt petitioners be put in H 510 SUPREME COURT REPORTS [2019] 7 S.C.R. - A possession of 12 apartments indicated in the Contempt Petition. The order dated 31.03.2017 passed by this Court was to the following effect: “Taken on board. B Application for exemption from filing certified as well as plain copy of the impugned order and permission to file SLP(s) without certified copy as well as plain copy of impugned order are allowed. We do not see any reason to interfere with the impugned order(s) of the High Court. The special leave petitions are dismissed. C D Learned Counsel for the petitioners requests that the petitioners be given some reasonable time to vacate the disputed premises in question. Having regard to the facts and circumstances and the history of the case, we deem it appropriate to grant three months’ time to the petitioners to vacate the premises in question subject to the condition that the petitioners shall file an undertaking before this Court that they would so vacate. Such an undertaking be filed by the petitioners within a period of two weeks from today.” 2. The facts leading to the filing of this Contempt Petition, in brief, are as under: E F G a) The Modern Cooperative Group Housing Society Limited having an approved strength of 211 members passed a Resolution dated 27.12.1987 in a General Body Meeting expelling 27 members including the present contempt petitioners. It appears that there were certain resignations after such expulsion and 15 new members including the alleged contemnors herein were inducted against the vacancies. b) The expulsion of those 27 members was subject matter of challenge and finally by judgment and order dated 18.10.2010 passed by this Court in Civil Appeal No.9439 of 2003, the claim of those who were expelled, was accepted and following direction was passed: “31. Be that as it may, we have been informed by learned counsel for the parties that the Society has been taken over by the Administrator and a large number of flats remained unallotted. The appellants have filed the information sought by H SANT LAL GUPTA & ORS. v. UMESH KUMAR JAIN & ORS. 511 [UDAY UMESH LALIT, J.] them under the Right to Information Act, 2005 on 23.04.2008 A which makes it clear that 15 flats bearing Nos.14, 23, 217, 324, 325, 327, 418, 421, 426, 513, 516, 619, 623 and 726 category – ‘B’ and 737 category – ‘A’ remained unallotted. In order to meet the ends of justice it is required that appellants be adjusted against the said un-allotted flats. However, the Society shall B put a demand, if any, and the appellants are directed to make the payment with interest in accordance with law.” c) The newly inducted members including the alleged contemnors then approached this Court by way of IA No.6-7 of 2011 which were disposed of by this Court on 03.03.2011, recording as under: “The applicants are permitted to move the Administrator/ Registrar, Cooperative Societies, Delhi to vindicate their grievance and it is for them to substantiate and establish their rights. It is made clear that the applications shall be disposed of after hearing the parties as well as Society.” d) The second round of litigation then began with the newly inducted members approaching Registrar Cooperative Societies submitting _inter alia_ that relevant facts were concealed from this Court and it was not disclosed to this Court that pursuant to the draw of lots held on 20.10.2002, the newly enrolled members were put in physical occupation of said apartments. The matter was considered by the Registrar Cooperative Societies and following order was passed on 24.02.2012: “08. Meetings with Administrator were held on a number of occasions to discuss the issue of allotment in the light of the Apex Court orders dated 18.10.2010 and dated 04.03.2011 and as a consequence of those meetings, the Administrator in continuation of his letter dated 31.10.2011 sent another letter dated 11.01.2012 informing that in view of the direction of this office which were sent on 01.04.2011 for complying the orders of Hon’ble Supreme Court dated 18.10.2010, the demand letters were sent to the 14 members who were ordered to be admitted by the RCS vide his order dated 26.08.1997. Thirteen persons have deposited the amount demanded from them, however, one person, namely Shri Naurang Ram (Membership No.160) has not deposited the demanded amount. The Administrator C D E F G H 512 SUPREME COURT REPORTS [2019] 7 S.C.R. A B C D E F G was also called in this office, who had apprised the undersigned about the possession of society flats and the matter of occupancy of flat and other related issues were discussed thereafter in the light of subsequent order of Hon’ble Supreme Court on 04.03.2011. In consequence thereof, the Administrator met the persons occupying the 15 flats which were allotted to them in an unauthorized draw, on 01.10.2011 and 10.10.2011. On 20.10.2011 those members have also submitted documents in their possession to the Administrator in support of their claims of being the bonafide members of the society. All these documents have been forwarded by the Administrator to this office apart from forwarding the details of cheques deposited, by the 13 members. These documents were examined and thereafter, as per the direction of the Hon’ble Supreme Court, 15 unauthorized occupants of the flats in the society were called for personal hearing by the undersigned on 14.02.2012. The Administrator of the society Shri D.K. Mishra, IAS was also called to represent the society. All 15 persons or their representatives as also the Administrator were present during the hearing on 14.02.2012. The applicants re-iterated that they were allotted flats and living in the society since 2002. There are 06 persons who are still occupying flats and 09 have sold those after getting possession on 20.10.2002. 09. On the basis of the records available in this office, orders passed by the various courts as well as the Apex Court, report of the Administrator and submissions made by the appellants and the unauthorized occupants of the flats in I.A.No.6-7 of 2011, I am of the considered opinion that the self draw held on 20.10.2002 was illegal and this was never organized or regularized by this office. The Hon’ble Supreme Court of India vide its order dated 18.10.2010 upheld the order dated 26.08.1997 of the RCS. The operative part of the order dated, 26.08.1987 of the then RCS in this regard is given below:- “in the circumstances the proposed expulsions are rejected against 14 persons. The society is directed to readmit the 14 persons whose names are given below: 1. Sh. Mithlesh Jain 2. Sh. Naurang Ram 2. Sh. Sant Lal Gupta 4. Sh. Virender Kumar Jain H SANT LAL GUPTA & ORS. v. UMESH KUMAR JAIN & ORS. 513 [UDAY UMESH LALIT, J.] 5. Sh. Raghbir Singh 6. Sh. Om Prakash Gupta A 7. Sh. Rakesh Grover 8. Sh. Vijay Grover 9. Sh. Narender Kumar 10. Sh. Ram Saran 11. Sh. Vinod Kumar 12. Sh. Shyam Lal 13. Sh. Kashmiri Lal 14. Sh. Shiv Prasad B 10. In view of the aforesaid order of the Hon’ble Supreme Court, I direct the Society to readmit the above 14 persons as members of the Society. They should be issued share certificate by the Administrator of the society immediately. With respect to the flats being occupied by the applicants, who had filed I.A. Nos.6-7 of 2011 in Civil Appeal No.5439 of 2003, these persons were admitted as members by the Society in utter violation of the provisions of law since there was no clear vacancies at that moment. Accordingly, their admission as members and consequently allotment of flats to them, cannot be recognized and same is therefore set aside.” e) The aforesaid order directing those 14 persons to be readmitted, was confirmed by the Financial Commissioner in Revision Petition Nos.119 of 2012 and 151 of 2012. The matter reached the High Court by way of Writ Petition (Civil) No.4202 of 2014 at the instance of the newly inducted members. The challenge was rejected and the following order was passed by the High Court on 31.01.2017. “16. We, therefore, dispose of the writ petitions with the direction to the RCS to draw out a seniority list of members after consultation with the Administrator. The members lower in the seniority will have to surrender and vacate the flats in their occupation in favour of the Rakesh Grover Group (14 members). We are given to understand that the members lowest in the seniority list are in occupation of flats mentioned and recorded by the Supreme Court in paragraph 31 of their order dated 18[th] October, 2010. This is apparently correct and this is the reason why they have filed W.P. (C)No.8553 of 2014. They would have to vacate and handover the possession of the flats to Rakesh Grover Group (14 Members). C D E F G H 514 SUPREME COURT REPORTS [2019] 7 S.C.R. A 17. The RCS will complete the aforesaid exercise within a period of two months from the date a copy of this order is received. With the aforesaid directions, the writ petitions are disposed of. All pending applications are also disposed of. No costs.” B (f) The order passed by the High Court was put in challenge before this Court and the special leave petitions were dismissed by this Court on 31.03.2017. In terms of the liberty granted, the special leave petitioners filed appropriate undertakings to vacate the apartments in their occupation. The undertakings were filed on 13.04.2017 and the relevant averments in that behalf are to be C found in para no.15 of the present contempt petition as under:- - D - “15. That as many as 12 persons have filed undertakings on 13.04.2017 vide Diary No.31470 before this Hon’ble Court. The names of the persons/contemnors, filed the undertaking with flat number are given herein below:- - (i) Dinesh Kumar – Flat No.327 - (ii) Harbinder Kaur Sarna – Flat No.623 - (iii) Ritu Sethi – Flat No.325 - E - (iv) S. Khurana (Sneh Lata Khurana) – Flat No.513 - (v) Ritu Singh – Flat No.619 - (vi) Anita Goel – Flat No.516 - (vii) Trishala Jain alias S.B. Sharma – Flat No.426 - F (viii) Umesh Kr. Jain – Flat No.726 - (ix) Arun Kumar Jain – Flat No.421 - (x) Devender Nath Sharma – Flat No.217 - (xi) Vineet Mittal – Flat No.14 ## G - (xii) Sanjay Kumar – Flat No.418" 3. Alleging that despite such undertakings, the alleged contemnors had failed in vacating the apartments in question and in handing over possession, the present contempt petition was filed. The notice was issued on 04.08.2017 and by further order dated 25.01.2018 status quo H was directed to be maintained. SANT LAL GUPTA & ORS. v. UMESH KUMAR JAIN & ORS. 515 [UDAY UMESH LALIT, J.] 4. It was submitted on behalf of the alleged contemnors that they A had been inducted as new members, had paid all the instalments which the society had demanded, and had been in occupation of the apartments for last several years. It was further submitted that the entire construction was undertaken on the strength of deposits made by all the members including the alleged contemnors and it would result in great prejudice, if B they were now asked to vacate the apartments after such a length of time. It was also submitted that the land in occupation of the society was sufficient enough where one more building could be constructed and if such possibilities were explored, the interest of the alleged contemnors could also be taken care of. Finding substance in the submission, following order was passed by this Court on 25.10.2018:C “We have heard Mr. A.K. Panda, learned senior counsel appearing for the Administrator/Society and all other learned counsel. We direct the Administrator to file an affidavit indicating: - (1) The extent of land available where a Tower could be constructed; D (2) The extent of FAR available to the Society as on date; (3) How many apartments could be constructed in the open piece of land still available with the society?; and (4) The technical details including the timeline and the cost of construction which would be required to complete the project. E All these details shall be supported by technical appraisal by a qualified Architect. The affidavit be filed within four weeks from today.” 5. Thereafter the matter appeared on 29.11.2018, when the following order was passed:- “Pursuant to our order dated 25.10.2018, an affidavit has been filed by the Administrator of the Modern Cooperative Group Housing Society Ltd. The documents annexed to the affidavit indicate that quotations were called for from the Architects and quotation submitted by the Design Enhance, 310, S.G. Shopping Mall, D.C. Chowk, Sector – 9, Rohini, Delhi-110085 was accepted and work order was also issued on 20.11.2018. F G H 516 SUPREME COURT REPORTS [2019] 7 S.C.R. A Learned Counsel appearing for the administrator submitted that the architect’s report is expected shortly and that the matter be suitably adjourned to enable the administrator to place on record complete documentation including the cost analysis as well as the number of apartments that could be constructed in the new building. B We accept the submission and adjourn the matter for six weeks, to enable filing of such appropriate affidavit.” 6. The subsequent order dated 10.01.2019 passed by this Court was as under: C D E F G H “In pursuance of order dated 29.11.2018 passed by this Court, an affidavit has been filed by the Administrator of the Modern Cooperative Group Housing Society Limited on 07.01.2019. The affidavit has enclosed an extract of the report given by the Architect who has opined that within the FAR available for the Society, new tower can be constructed in the existing plot with 18 apartments of the size of 83.46 sq.meters each. It is a matter of record that there are 14 claimants involved in the matter and as such four apartments could be constructed over and above the existing requirement. At this stage, we deem it appropriate to solicit the response of the Municipal Corporation of Delhi (North), whether such tower can be constructed and whether it would be within the FAR permissible for the society. Let a copy of this petition be served upon the Municipal Corporation of Delhi (North) which shall file its response within three weeks from the receipt of the notice. We also direct the Administrator to convene a meeting of the General Body of the Society so that the proposal submitted by the Architect could be discussed in the meeting and response of the General Body could be placed on record before the next date of hearing. Learned counsel for the alleged-contemnors shall also file individual affidavits of undertaking on behalf of every single alleged-contemnor indicating his/her willingness to deposit a sum of Rupees thirty lakhs into the account of the Society so that appropriate orders can be passed on the next date of hearing. The affidavit of undertaking must also indicate the time-line within which such deposit can be made.” SANT LAL GUPTA & ORS. v. UMESH KUMAR JAIN & ORS. 517 [UDAY UMESH LALIT, J.] 7. Thereafter, affidavits were filed by all the alleged contemnors indicating their willingness to deposit a sum of Rs.30 lakhs as stated in the order dated 10.01.2019. A General Body meeting was convened on 24.02.2019 which was attended by 73 members including 14 persons who have been litigating and are interested in getting back the possession of the apartments, whereas the alleged contemnors, having lost the status as members, could not vote. 43 members voted against the proposal of having a new building constructed, while 30 members voted in favour of the proposal. Nine Postal ballots received after the meeting showed that all nine members had cast their votes in support of the new construction. Thus, the voting pattern was:- 43 votes against the proposal and 39 votes in favour of the proposal. A B C 8. The matter thereafter came up on 28.02.2019 when following order was passed:- “In accordance with the direction issued by this Court on 10.01.2019, a General Body Meeting of the Society was held under the Chairmanship of the Administrator on 24.02.2019. Minutes of the Meeting are enclosed in the Affidavit tendered across the bar by the Administrator. The affidavit is taken on record. Mrs. Kiran Bhardwaj, learned counsel has also filed affidavit on behalf of some of the alleged contemnors pursuant to the directions issued in the order dated 10.01.2019. 11 of the alleged contemnors have thus filed affidavits, which are taken on record. Copies of these affidavits be given to the other side. Further, pursuant to the direction issued on the last occasion, an affidavit has also been filed on behalf of the North Delhi Municipal Corporation, para 3 whereof reads as under: “3. That accordingly, on last date of hearing i.e. on 10.01.2019 this Hon’ble Court has directed the Municipal Corporation of Delhi (North), to file its response as to whether such tower can be constructed and whether it would be within the FAR permissible for the society. In regard to the above order dated 10.01.2019, it is respectfully stated that there is no record pertaining to approved layout that there is no record pertaining to approved layout plan/ completion plan of Modern Cooperative Group Housing Society Limited available in the department, so as to ascertain the D E F G H 518 SUPREME COURT REPORTS [2019] 7 S.C.R. A B C balance FAR availing for further construction by the society. Further, it is submitted that new tower with 18 dwelling units can be constructed only if balance ground coverage and FAR is available as against permissible ground coverage and permissible FAR prescribed for group housing in MPD-2021 under clause 4.4.3, B-Residential Plot – Group Housing mentioning as below: 1. Maxi, Ground 33.3% (in case addition of Coverage: alteration of existing DUs for availing balance FAR ground coverage upto 40% may be allowed. 2. Maximum FAR: 200 D 3. Height: NR (Subject to clearance from AAI/Fire Department and other statutory bodies. 4. Parking: - 2.0 ECS/100 sqm built up area and 0.5 ECS/100 sqm for EWS Service Personal Housing.” Since the Minutes of the General Body Meeting dated E 24.02.2019 has taken a particular stand, we direct the Administrator to place on record, for our perusal, complete record with respect to the said meeting including E-mails and letters received by the Administrator in respect of said meeting. - 9.We have heard Mr. S.D. Singh, learned Advocate for the - F contempt petitioners, Ms. Kiran Bhardwaj, learned Advocate for alleged contemnors, Mr. Praveen Swarup, learned Advocate for the Municipal Corporation of Delhi and all other learned Advocates. Mr. S. D. Singh very fairly submitted that if the contempt petitioners were assured of possession of apartments, they would be having no objection to support the cause of the alleged contemnors in having a new building constructed - G by the society. Consequently, the voting pattern which effectively was 43 votes against the proposal and 39 votes in favour of the proposal would then drastically change and would be 29 votes against the proposal and 53 votes in favour of the proposal. 10. Some of the salient features in the matter are:- H SANT LAL GUPTA & ORS. v. UMESH KUMAR JAIN & ORS. 519 [UDAY UMESH LALIT, J.] 1. The alleged contemnors have violated the orders passed by this Court and despite having furnished appropriate undertakings, have failed to vacate and hand over possession. But there are certain equities in their favour; in that they were inducted as members not clandestinely but against the resultant vacancies after expulsion of certain members, that they had paid all the instalments in time, that on the basis of such instalments paid by the members including the alleged contemnors the construction was completed, and that they were put in possession of the apartments soon thereafter. 2. It is only as a result of the expulsion orders of the contempt petitioners getting set aside that the alleged contemnors have to vacate their apartments and make way for the contempt petitioners. 3. The society had raised amounts and was benefited from two sets of persons that is the alleged contemnors as well as the contempt petitioners and the fact of the matter is that the society is presently having funds to the tune of more than Rs.4 crores. 11. Going by the reports made by the Architect a new building can be constructed with 18 apartments, which means that after satisfying the requirements of all the alleged contemnors there will still be some apartments left, from the sale of which money for construction can be garnered. Furthermore, according to the Architect, within the FAR available to it, the society can construct such new building. The Municipal Corporation of Delhi has also in principle agreed that if FAR is available, the authority would not have any objection to grant permission for construction of a new building. A B C D E F 12. In the circumstances, though we are considering the matter in contempt jurisdiction, in our considered view ends of justice would be met, if following directions are passed:- G a) All the alleged contemnors shall vacate their respective apartments on or before 31.08.2019. The apartments so vacated shall thereafter be allotted to those persons who were directed to be re-admitted as members in terms of para 9 of the order passed by the Registrar, Cooperative Societies on 24.02.2012. The allotment shall be done in the presence of an Official from the H 520 SUPREME COURT REPORTS [2019] 7 S.C.R. A B C D E F G H Office of the Registrar, Cooperative Societies in a manner known to law. b) Each of the alleged contemnors, if he or she desires to have a new apartment in the newly erected building, shall deposit a sum of Rs.10 lakhs with the Administrator of the Modern Cooperative Group Housing Society Limited on or before 31.10.2019. Along with such deposit, an appropriate affidavit shall be filed by such person (s) undertaking that in case any further amount (s) are to be deposited towards the cost of construction, he or she shall abide by such requisition scrupulously. c) Upon such deposit and furnishing of an affidavit every such person shall be re-admitted in the Society as a Member. d) Within one month from the date of this order, the Administrator shall prefer an appropriate application annexing therewith all the required documents including plans and drawings and seek permission to erect a new building with 18 apartments. Such application shall be preferred with the concerned appropriate Authorities including Municipal Corporation of Delhi. (e) Municipal Corporation of Delhi which has agreed in principle that the permission for erecting a new building can be granted, shall consider said application and take appropriate decision in the matter within one month from the date when the application is preferred. (f) After the construction has begun, the Administrator shall be entitled to initiate the process for having new members admitted who are willing to deposit such sums as are required towards the cost of construction of an individual apartments which could then be allotted to them. (g) The Administrator shall also be entitled to have a fresh draw of lots in the presence of an Official from the Office of Registrar, Cooperative Societies in respect of the building to be constructed so that each of those 18 apartments could be allotted to the concerned persons including the alleged contemnors herein. (h) The alleged contemnors shall have to find new or transit accommodation till they are finally put in possession of the apartments so allotted to them after completion of construction. SANT LAL GUPTA & ORS. v. UMESH KUMAR JAIN & ORS. 521 [UDAY UMESH LALIT, J.] The cost and charges in that behalf shall be borne by the alleged A contemnors and they shall not be entitled to have any amount reimbursed either from the society or from any of the members. (i) Whether the cost of construction must come entirely from the allottees of apartments in the new building to be constructed or whether the society would like to contribute in that behalf, is a matter which ought to be decided by the society. We may only observe that the alleged contemnors had made their contribution and as a matter of fact the society has funds to the tune of more than Rs.4 crores available with it. 13. In our view, the directions as aforesaid would not only ensure that the contempt petitioners are put in possession of the apartments to which they have been found to be entitled to but will also take care of the interests of the alleged contemnors who are required to vacate the apartments only because of the setting aside of the expulsion of the contempt petitioners. These directions, in our considered view is the only solution in which the interests of all can be sufficiently taken care of. B C D 14. We, therefore, order accordingly. These Contempt Petitions stand disposed of. No costs. E Divya Pandey Contempt Petitions disposed of. F G H
End of Judgment Record
Browse All Supreme Court of India (2019) Decisions
2019-09-03

Uber India Systems Pvt. Ltd. v. Competition Commission of India & Ors.

Uber India Systems Pvt. Ltd. v. Competition Commission of India & Ors. concerns allegations that Uber, in its ride‑hailing network, abused a dominant position under the Competition Act, 2002. The case arose on appeals challenging the Competition Appellate Tribunal’s order in Appeal No. 31 of 2016, which upheld the Director General’s inquiry into whether Uber’s pricing and incentive practices violated Section 4. The Supreme Court analysed whether the information before it sufficed to constitute a prima facie case under Section 26(1) and whether there was abuse of a dominant position in the National Capital Region. It focused on the two ingredients for abuse: the existence of a dominant position and its misuse. The court considered, based on a statement summarizing driver incentives and a period when Uber reportedly paid high incentives to fleet owners, that Uber may have pursued a pricing strategy that would affect its competitors. Under Section 4(2)(a), abuse includes an unfair price, including predatory pricing. The Court accepted that there is a prima facie case for infringement, yet did not itself interfere with the Appellate Tribunal’s order and dismissed the appeals. It directed the Director General to complete the investigation within six months from today.

2019-07-19

STATE OF BIHAR & ORS. v. DR. CHAITRAYA KUMAR SINGH & ORS.

This civil appeal concerns the reorganization of the erstwhile Bihar into Bihar and Jharkhand in 2000 and the post-allocation transfer of an employee. The first respondent, Dr. Chaitraya Kumar Singh, was initially allocated to Jharkhand in 2007 as an Ayurvedic Medical Officer and, following Union guidelines permitting transfer after final allocations, was re-allocated to Bihar on 6 September 2010 with mutual consent of both States. Bihar issued formal orders, and the respondent joined Jharkhand in 2007; however, he remained in Jharkhand and continued to work there until his retirement on 30 April 2017. A few days before retirement, he filed a writ petition in Jharkhand seeking relief to join Bihar and to be relieved by Jharkhand so that Bihar could accept joining. The Jharkhand High Court confirmed a Single Judge’s order directing Bihar to absorb him. The appellants contend that after the 2010 allocation there was no vacancy, the respondent did not pursue available remedies promptly, and seven years of service in Jharkhand after allocation render absorption in Bihar inappropriate. The Court agrees, noting the allocation to Bihar continued to hold and the petitioner failed to pursue remedies in time; his superannuation in Jharkhand eliminates the basis for absorption. The relieving order issued post-retirement is irrelevant. The appeal is allowed, the High Court’s order set aside, and there shall be no costs; pending applications are disposed.

2019-01-07

PUNJAB FINANCIAL CORPORATION v. M/S PAULBRO LEATHERS PVT. LTD.

Punjab Financial Corporation (lender) filed against Paulbro Leathers Pvt. Ltd. after Paulbro defaulted on a loan. The dispute was settled under the Corporation’s One Time Settlement (OTS) policy on 01.04.2003, and a court-ordered reference to a Chartered Accountant (CA) was made to determine the remaining outstanding balance. After the CA submitted his report, a new dispute arose about the precise liability and how much had been paid, prompting the Corporation to issue a demand for Rs. 49,86,713 which Paulbro disputed in a writ petition before the Punjab and Haryana High Court. The High Court allowed the petition on the ground that the entire exercise had been carried out with consent and no objection had been raised, effectively barring re-opening of the settlement. The appellant challenged these rulings in this Court. The Supreme Court held that the settlement created a fresh dispute arising out of its terms and that the matter must be decided on its merits under the law. It emphasized that the High Court should record how and on what basis Paulbro satisfied the settlement and discharged liability, and if needed, refer the report to another CA. The Court remanded the case to the High Court to decide the writ petition afresh on merits, with a directions to decide expeditiously (preferably within six months).

2019-12-06

RAJESH KUMAR DWIVEDI v. STATE OF U.P. & ANR.

Rajesh Kumar Dwivedi challenges the rejection of his candidature for the post of Instructor in Fitter at Government Industrial Training Institutes in Uttar Pradesh. An advertisement of 17 March 2008 required candidates to possess a certificate in the respective trade from the NCVT, in addition to experience. Dwivedi possessed three National Trade Certificates from Model Industrial Training Institute, Haldwani (one-year basic training in Mechanical, six-month Fitter General module, six-month Metrology and Engineering Inspection), but did not hold a two-year NCVT certificate. The High Court had dismissed his writ petition, holding that three separate courses could not be treated as equivalent to the NCVT qualification. Dwivedi relied on (i) the 16 December 1983 circular clarifying equivalence between the Restructured and Conventional patterns of the Craftsmen Training Scheme, and (ii) 1988 and 1992 UP circulars recognizing MITI, Haldwani training as equivalent to NCVT, including a two-year Fitter trade certificate. The State argued that the amended UP ITI Rules require NCVT certification and that the reliance on circulars cannot override the Rules. The Supreme Court held that the eligibility condition is to have a certificate in the respective trade from NCVT, and that if the State had earlier treated certain qualifications as equivalent through its circulars, such equivalence cannot be disregarded. Consequently, the appellant’s candidature could not be validly rejected, and the State was directed to appoint him within two months. The decision underscores how State-issued equivalence can complement or override rigid Rule-based qualifications when consistently recognized.