These civil appeals arise from a Land Acquisition Act reference concerning Gat No.85, Mhasekota, Soygaon, Aurangabad, acquired for the Hiwra Dam project. The Special Land Acquisition Officer awarded compensation for 0.80 hectare of non-agricultural land and 1.44 hectare of agricultural land, including Potkharaba land, along with separate valuations for civil structures and machinery. The Reference Court enhanced land value to Rs.6 per sq ft but deducted 10% for development costs, and awarded amounts for dismantling, damages, and loss of business. The High Court of Bombay, Aurangabad, by a 2017 order, partly allowed the appeal, reducing land value and applying a 40% deduction toward development costs, while adjusting electrical installation, machinery, and loss of business. The appellants challenged the High Court’s approach, contending that the valuation certificate Exh.-21 should be given weight, that 40% development deduction is excessive for an irrigation project, and that several heads of damage were miscalculated. The Supreme Court allowed the appeals in part, remanding to apply a nuanced approach to market value and development charges. It reaffirmed the general rule of a one-third development deduction but clarified that deduction may range from 20% to 75% depending on location and development. It modified the compensation heads accordingly and directed payment of the balance with statutory benefits as awarded by the Reference Court.

Precedent Explorer

Find Cases Like This

Explore other judgments dealing with similar legal situations, facts, or statutory provisions.

Case Details & Bench

Court
Landmark Cases
Hon'ble Judges
  • R. Banumathi
  • A. S. Bopanna
Judgment Date
2020-03-17
Court Decision / Holding
Partly allowed; The High Court’s order was modified; land value and other heads were adjusted, with a 20% deduction for development (instead of 40%), leading to a total land value of Rs.14,42,707 and reaffirmation or modification of other heads as per the Supreme Court’s directions. The balance amount, with statutory benefits, is to be paid to the appellants as per the modified compensation.
Final Disposition
Partial relief; The appeals are partly allowed; Compensation heads modified, with a 20% deduction for development in place of 40%, and balance payable with statutory benefits as per modified amounts.

Parties to the Case

Appellants / Petitioners

  • Sajan

Respondents

  • State of Maharashtra and Others

Legal Representation & Advocates

Counsels for Petitioners

  • • Shirish K. Deshpande
  • • Sagar N. Pahune Patil
  • • Gopal Balwant Sathe

Counsels for Respondents

  • • Aaditya A. Pande
  • • Rahul Chitnis

Provisions of Law Cited

Land Acquisition Act, 1984Section 4Section 6Section 11Section 18

Legal Doctrines & Maxims

  • One-third deduction towards development charges is the general rule; deduction may vary from 20% to 75% depending on location and development.
  • In semi-developed urban areas, deduction for development may be as low as 25% to 40% because basic infrastructure may already be in place.
  • The range of percentages (20% to 75%) is a tentative standard and must be proved to the contrary.

Submissions & Arguments

Contentions of Appellants / Petitioners

The appellants contended that the valuation certificate Exh.-21 should be given weight as it was duly proved by PW-2, and that the High Court erred in applying a 40% development deduction. They submitted Exh.-21 shows civil, electrical and mechanical valuations (Rs.9,55,000; Rs.3,21,000; Rs.10,69,000) and that depreciation/dismantling costs were not properly considered. They argued that the sugar factory was idle and the factory closure and financial distress should be reflected; that the 40% deduction is excessive for irrigation purposes and that the Reference Court’s 10% deduction was reasonable. They further urged that loss of business was miscalculated and that the valuation evidence should be accepted while applying a lower development deduction (20%), resulting in a higher land value and appropriate statutory benefits.

Contentions of Respondents

The State argued that the land had limited development potential in a remote village and that market value should reflect development potential, not undeveloped plots. It contended that the High Court’s reduction of compensation was justified since the land was treated as having limited non-agricultural use, and faulted reliance on certain sale deeds. It urged that the area and project nature did not justify the 40% development deduction and that the SDO’s report indicated the factory was idle, supporting a more conservative valuation and the need to adjust compensation accordingly.

Legal Doctrine & Issue Explorer

Explore This Legal Issue

Find relevant judgments and authoritative positions on the legal questions discussed here.

Cited Precedents (12)

Case NameCitationTreatmentExplanation
Tehsildar (LA) v. A. Mangala Gowri1991 4 SCC 218PositiveCited as part of the authority establishing the general rule of one-third deduction toward development.
Gulzara Singh v. State of Punjab1993 4 SCC 245PositiveCited in context of the development deduction framework.
Santosh Kumari v. State of Haryana1996 10 SCC 631PositiveUsed to reinforce development deduction jurisprudence.
Revenue Divl. Officer and LAO v. Sk. Azam Saheb2009 4 SCC 395PositivePart of the development deduction jurisprudence.
A.P. Housing Board v. K. Manohar Reddy2010 12 SCC 707PositiveCited for development deduction norms.
Ashrafi v. State of Haryana2013 5 SCC 527PositiveCited within the development deduction framework.
Kashmir Singh v. State of Haryana2014 2 SCC 165PositiveCited for guidance on development deduction ranges.
Lal Chand v. Union of India2009 15 SCC 769PositiveUsed to illustrate the 20%-75% range for development deduction depending on context.
Major General Kapil Mehra and Others v. Union of India and Another2015 2 SCC 262PositiveSupports the general rule of one-third deduction with variability.
Director, Land Acquisition v. Malla Atchinaid2006 12 SCC 87PositiveEnlarges the jurisprudence on development deduction variations.
Mummidi Apparao v. Nagarjuna Fertilizers & Chemicals Ltd.2009 4 SCC 402PositiveCited in the context of market value considerations and related deductions.
Haryana State Agricultural Market Board v. Krishan Kumar2011 15 SCC 297PositiveUsed to discuss development deduction ranges in different circumstances.
Case Applicability Diagnostic

Apply This to My Facts

Share your situation and test whether this judgment governs, supports, or challenges your case.

Official Judgment Record
•3,546 words•~17 min read

In The Court Record

Sajan v. State of Maharashtra and Others

## **REPORTABLE** # **IN THE SUPREME COURT OF INDIA CIVIL APPELLATE JURISDICTION** **CIVIL APPEAL NOS. 2170-2171 OF 2020 (Arising out of SLP(C) Nos.16945-46 of 2018)** **SAJAN …..Appellant** ## **VERSUS** **STATE OF MAHARASHTRA AND OTHERS …..Respondents** ## **WITH** **CIVIL APPEAL NOS. 2172-2173 OF 2020 (Arising out of SLP(C) Nos.6393-6394 of 2020 @ SLP(C) Diary No.24459 of 2019)** ## **J U D G M E N T** ## **R. BANUMATHI, J.** Leave granted. Signature Not Verified Digitally signed by MADHU BALA Date: 2020.03.17 15:35:21 IST Reason: 2. These appeals have been filed by the appellants assailing the impugned judgment and final order dated 21.08.2017 passed by the High Court of Judicature at Bombay Bench at Aurangabad in First Appeal No.601 of 1997 along with Cross Objection St. No.22145 of 1997 in the First Appeal in and by which the High Court partly allowed the appeal and inter-alia reduced the compensation for the land by giving 40% deduction towards development cost. 3. The facts giving rise to these appeals are that land in Gat No.85 at village Mhasekota, Tehsil Soyegaon, District Aurangabad 1 admeasuring 6 acres (2.40 hectares) owned by the partnership firm of the appellant and respondents No.2 and 3 was proposed for acquisition for the purpose of construction of Hiwra Dam project by the office of the Executive Engineer, Jalgaon Medium Project Division. Accordingly, on 29.03.1982, the Special Land Acquisition Officer issued notification under Section 4 of the Land Acquisition Act, 1984 (for short, “Land Acquisition Act”) and on 03.11.1983, notification under Section 6 was published. Out of this acquired land, land admeasuring 0.80 hectares was non-agricultural land used for running the Sugar Mill by the partnership firm and the remaining was cultivable land. 4. The Special Land Acquisition Officer, Aurangabad passed an award dated 01.09.1986 under Section 11 of the Land Acquisition Act awarding compensation considering valuation of land @ Rs.29,712/- (Rs.20,000/- per hectare for 0.80 hectares nonagricultural land, Rs.9500/- per hectare in respect of 1.44 hectare cultivable land and Rs.200 per hectare in respect of 0.16 hectare Potkharaba land). Apart from the costs of the land, the S.L.A.O. has also fixed the valuation of structure under three heads i.e. (i) Civil part/Building valuation Rs.3,67,100/-; (ii) Electrical installation (now to be demolished) Rs.1,06,000/-; and (iii) Mechanical 2 machinery (dismantling and transportation) Rs.1,05,000/-, total Rs.5,78,100/-. To this compensation amount, statutory entitlement of 30% solatium and 12% enhancement of compensation value w.e.f. notification under Section 4 was added. The net amount payable was calculated at Rs.36,00,385.50/-. 5. Aggrieved, the appellant and also respondents No.2 and 3 filed reference application (Land Acquisition Reference No.299/94) under Section 18 of Land Acquisition Act on the ground that market value has not been properly determined. The appellant and respondents No.2 and 3 further claimed damages and loss of business @ Rs.5,00,000/- per year since 1981 till 1986 to the tune of Rs.30,00,000/-. The appellants claimed market value @ Rs.10 per sq.ft and claimed total compensation at Rs.1,69,45,111/- along with other statutory benefits. 6. The Reference Court-Civil Judge, Senior Division, Aurangabad, vide judgment and award dated 24.04.1996 awarded compensation at the enhanced rate of Rs.6/- per sq. ft. for the entire acquired land by treating the entire land as land meant for non-agricultural use and deducted 10% towards development costs, Rs.3,86,867/- towards demolishing and dismantling charges of electrical, mechanical and machinery installation, Rs.5,00,000/- was 3 awarded for loss of earning for the period from 1981 to 1986, Rs.91,000/- towards damages and dismantling charges and Rs.15,000/- towards transportation, loading and unloading along with the statutory benefits. Thus, total additional claim of the appellant to the extent of Rs.23,73,011/- was allowed. 7. Respondent-State filed First Appeal No.601 of 1997 assailing the aforesaid order and the appellant and respondents No.2 and 3 also filed Cross Objection bearing St. No.22145 of 1997. Initially this cross-objection was dismissed by the High Court for non-removal of objections. Restoration application was also dismissed on account of inordinate delay and the appeal filed by the respondents was partly allowed. Against this dismissal, the appellant and respondents No.2 and 3 filed appeal No.2432 of 2005 before the Supreme Court which was allowed vide judgment dated 20.04.2011 and the matter was remitted back to the High Court for fresh disposal taking into consideration the law laid down by this court in recent judgments. 8. Thereafter, by impugned Judgment dated 21.08.2017, the High Court partly allowed the appeal as well as cross-objections and passed the following award:- |i.|Cost of the land @|….|Rs.9,40,896/-| |---|---|---|---| ||Rs.6/-<br>per<br>sq.ft.||| ||(Deduction at 10%)||| |ii.|Dismantling and damage|….|Rs.4,26,890/-| 4 ||of Civil work costs|||| |---|---|---|---|---| |iii.|Replacement|of|….|Rs.2,39,000/-| ||electrical installation|||| |iv.|Depreciated value|of|….|Rs.6,62,000/-| ||machineries|||| |v.|Loss of business||….|Rs.5,00,000/-| ||**Total**||**….**|**Rs.21,60,974/-**| 9. Mr. Gopal Balwant Sathe, learned counsel for the appellant assailed the impugned judgment contending that the High Court failed to consider the valuation certificate (Exh.-21) duly proved by PW-2-Mukund Dharashivkar-Empanelled Government Valuer whose evidence remained unrebutted by the State Government. Further, it has been submitted that Exh.-21 proves that the civil work comes to the tune of Rs.9,55,000/-, electrical installation Rs.3,21,000/- and mechanical installation Rs.10,69,000/- which totally comes to Rs.23,45,000/- and the depreciation value comes to Rs.14,28,000/-. Totally, the valuation of the civil, mechanical and electrical structure comes to Rs.63,80,000/- and the valuation done by PW-21-Valuer has not been considered by the High Court. It was further submitted that the High Court has completely ignored the fact that the respondents had not adduced any documentary evidence to show that the valuation certificate (Exh.-21) issued by PW-2 is not proper and lacks precision. It was further submitted that computation of loss of business @ Rs.1,00,000/- per year is 5 completely erroneous. It was submitted that the High Court erred in not taking into consideration that the appellant had to close the sugar factory and face financial crisis suffering decree of civil court for recovery of loan amount as the appellant had raised loan from the bank. It was further submitted that the High Court erred in making deduction of 40% though the lands were acquired for irrigation project which does not require development charges like providing basic amenities like roads, water etc. and the Reference Court rightly made deduction of 10% which is a reasonable deduction and the High Court erred in reducing the compensation amount. 10. On the other hand, Mr. Aaditya A. Pande, learned counsel appearing for the State of Maharashtra has submitted that the Reference Court has committed an error by considering the market value of fully developed plot and comparing the same with undeveloped land. It was submitted that village Mhasekota is a very small village having a population of one thousand, situated in a remote area without any development potentials and there was no potential value of the acquired land as non-agricultural land. It was further contended that no purchaser will come forward to purchase the large area of land admeasuring 1.44 hectares on square feet 6 basis and without considering this aspect, the Reference Court had enhanced the compensation @ Rs. 6.90 per sq.ft. Drawing our attention to the evidence of the State witness Dilip Gudwe, Sub-Divisional Officer, it was submitted that SDO had visited the site and factory premises and submitted a report (Exh.-54) mentioning that the factory was not in operation and the machinery was lying idle and considering the same, the High Court has recorded a finding that the claimants had closed the sugar factory. The learned counsel urged that the High Court rightly reduced the compensation awarded by the First Appellate Court and there is no ground warranting interference with the impugned judgment. 11. We have heard Mr. Shirish K. Deshpande and Mr. Sagar N. Pahune Patil, learned counsel appearing on behalf of the appellants and Mr. Rahul Chitnis, learned counsel appearing on behalf of the respondent-State. We have carefully considered the contentions and perused the impugned judgment and materials on record. 12. The land Gat No.85 admeasuring 6 acres, situated at Mhasekota in Soygaon Tahsil of Aurangabad district, owned by the appellants-claimants came to be acquired by the Government for construction of Hiwra medium project. The land Gat No.85 admeasuring 2 hectares 40 R came to be acquired including 0.16 7 hectare Potkharaba land. Out of this area, land admeasuring 0.80 hectare has been converted into non-agriculture (N.A) purpose for installation of Khandsari factory (sugar factory). Rest of the area admeasuring 1.44 hectare is appellants claim that they have been using for non-agricultural purpose. Though the claimants had asked for non-agricultural permission for the land admeasuing 1.44 hectare out of the land Gat No.85, the same was not granted by the concerned authority. The S.L.A.O. on 29.03.1982 has published the notification under Section 4 of the Land Acquisition Act and on 01.09.1986 awarded the compensation for the acquired land admeasuring 0.80 R, since converted into the non-agriculture land, at the rate of Rs.2.00 per sq. meter i.e. Rs.20,000/- per hectare. The S.L.A.O. has awarded the compensation to the agricultural land admeasuring 1.44 R at the rate of Rs.9500/- per hectare. So far as Potkharaba land, which is 0.16 hectare is concerned, the S.L.A.O. has awarded the compensation at the rate of Rs.200/- per hectare. The S.L.A.O. has awarded total compensation at Rs.29,712/- as the costs of the land, as stated above. 13. So far as the use of the entire land for non-agricultural purpose is concerned, the High Court found that the Reference Court is justified in treating the entire land having the potential for 8 non-agricultural purpose of the remaining area – 1.44 hectare. Referring to the Project report – Exh.42 - scheme of the factory approved by the Small Scale industries, Aurangabad, the High Court found that the main raw material required for the sugar factory is sugarcane and part of the building is used for keeping the raw materials. The High Court further found that besides flow sheet, certain part of the land would be utilised for office building, workshop, staff quarters, etc. and also used for parking and various other purposes. The High Court also pointed out that the State has not adduced any evidence to the effect that the land admeasuring 1 hectare 44 R out of the acquired land was mainly used for agricultural purpose and not for the non-agricultural purpose. In view of the concurrent findings by the Reference Court and by the High Court that apart from 0.80 hectare, the land measuring 1 hectare 44 R be taken as having the potential for non-agricultural purpose, we do not find any reason to take a different view. ## **Market value and deduction for development** 14. The High Court has taken Exh.23 dated 03.06.1976 as exemplar which is the sale deed for plot admeasuring 30x32 ft. 9 (960 sq.ft.) for Rs.3,000/- i.e. at the rate of Rs.3.12 per sq.ft. The appellants have also placed further reliance on the sale deed dated 03.02.1982 Exh.35 wherein, the plot of admeasuring 5023 sq.ft. was sold for Rs.35,000/- i.e. Rs.6.90 per sq.ft. The High Court has taken Exh.23 sale deed dated 03.06.1976 and had taken 10% increase for every year and arrived at the value at Rs.6 per sq.ft. Even going by Exh.35 sale deed (03.02.1982) under which Rs.5023 sq.ft. was sold for Rs.35,000/- i.e. Rs.6.90 per sq.ft., Exh.35 sale deed (03.02.1982) is after possession of the land was taken by the State Government (21.11.1981) and Section 4 Notification dated 10.02.1982. Since Exh.35 sale deed dated 03.02.1982 is between two dates - date of taking possession of the land and the date of Section 4 Notification, it is necessary to adopt a reasonable valuation. Considering Exh.23 and Exh.35, the value adopted by the Reference Court at Rs.6.90 per sq.ft., in our view, fixation of valuation at Rs.6.90 per sq.ft., the value adopted is fair and reasonable and the same is affirmed. 15. Taking the value at Rs.6.90 per sq.ft, the High Court deducted 40% towards the development cost and calculated the value of the land at Rs.2,61,300 sq.ft. at Rs.9,40,896.00. While determining the market value of the acquired land, normally one-third deduction i.e. 33 1/3% towards development charges is allowed. After referring to 10 number of judgments, in _Major General Kapil Mehra and Others vs._ _Union of India and Another_ **(2015) 2 SCC 262** , the Supreme Court held as under:- **“36.** While determining the market value of the acquired land, normally one-third deduction i.e. 33 1/3% towards development charges is allowed. One-third deduction towards development was allowed in _Tehsildar (LA)_ v. _A. Mangala Gowri_ (1991) 4 SCC 218, _Gulzara Singh_ v. _State of Punjab_ (1993) 4 SCC 245, _Santosh Kumari_ v. _State of Haryana_ (1996) 10 SCC 631, _Revenue Divl. Officer and LAO_ v. _Sk. Azam Saheb_ (2009) 4 SCC 395, _A.P. Housing Board v. K. Manohar Reddy_ (2010) 12 SCC 707, _Ashrafi_ v. _State of Haryana_ (2013) 5 SCC 527 and _Kashmir Singh_ v. _State of Haryana_ (2014) 2 SCC 165. **37.** Depending on the nature and location of the acquired land, extent of land required to be set apart and expenses involved for development, 30% to 50% deduction towards development was allowed in _Haryana State Agricultural Market Board_ v. _Krishan Kumar_ (2011) 15 SCC 297, _Director, Land Acquisition_ v. _Malla Atchinaid_ (2006) 12 SCC 87, _Mummidi Apparao_ v. _Nagarjuna Fertilizers & Chemicals Ltd._ (2009) 4 SCC 402 and _Lal Chand_ v. _Union of India_ (2009) 15 SCC 769.” 16. Rule of one-third deduction towards development is the general rule. But depending upon the purpose of acquisition and taking note of well planned layouts, if any, the deduction for development cost may vary from 20% to 75%. Observing that deduction towards development can range from 20% to 75% of the price of the plot, in _Lal Chand vs. Union of India and Another_ **(2009) 15 SCC 769** , the Supreme Court held as under:- “ **19.** If the acquired land is in a semi-developed urban area, and not an undeveloped rural area, then the deduction for development may be as much less, that is, as little as 25% to 40%, as some basic infrastructure will already be available. ( _Note_ : The 11 percentages mentioned above are tentative standards and subject to proof to the contrary.) ……. **22.** Some of the layouts formed by the statutory development authorities may have large areas earmarked for water/sewage treatment plants, water tanks, electrical substations, etc. in addition to the usual areas earmarked for roads, drains, parks, playgrounds and community/civic amenities. The purpose of the aforesaid examples is only to show that the “deduction for development” factor is a variable percentage and the range of percentage itself being very wide from 20% to 75%.” 17. In the present case, since the land was acquired for the construction of Hiwra Dam project, much of the development like in the case of a layout for housing colony is not required. In our view, 40% deduction made by the High Court appears to be on the higher side. Considering the purpose of the acquisition and the facts and circumstances of the case, 20% deduction for development cost would be reasonable. Taking the entire land 2,61,300 sq.ft. as non-agricultural and making 20% deduction for the development cost, the value of the land is calculated at Rs.12,54,530/- as under:- ||**Value of the land**| |---|---| ||2,61,360 x 6.90<br>….<br>Rs.18,03,384.00| ||20% deduction<br>….<br>Rs.3,60,67.68| ||Rounded to<br>….<br>Rs.3,60,677/-| ||**Total**<br>**….**<br>**Rs.14,42,707/-**| ## **Valuation of the construction/civil works** 18. PW-2-Mukund Dharashivkar in his valuation report Exh.21 has considered the valuation of the civil work and foundation under four 12 heads:- (i) reproduction costs; (ii) market value as on today; (iii) dismantling costs and damages; and (iv) transportation costs of good materials. The reproduction costs has been shown as Rs.9,55,020/- whereas, the market value as on the date of report has been shown at Rs.5,26,575/- and Rs.4,09,565/- has been shown under the head of dismantling costs and damages and further Rs.17,325/- has been shown as transportation costs of good materials. PW-2-Mukund Dharashivkar has deposed that the valuation of the civil work is Rs.5,26,575/- and that it includes the valuation of foundation embedded in the earth. As referred to by the High Court in its judgment in Para (28), PW-2-Mukund Dharashivkar has considered the civil work and foundation with regard to power house, office and workshop, staff quarter, water storage tank and other infrastructure/constructions with size, specifications and the number of items. Per contra, witness No.3 for the State, Sub-Divisional Engineer, Mr. Dilip Gudwe has assessed the valuation of civil work amounting to Rs.3,67,100/-. After extracting the relevant portion of the judgment of the Reference Court as to the valuation of the civil work, the evidence of PW-2 and witness No.3 for the State- Sub-Divisional Engineer, the High Court has assessed the valuation of the dismantling costs and damages of civil work and foundation to the tune of Rs.4,09,565/- and 13 Rs.17,325/- for transportation costs of good materials and arrived at the total amounting to Rs.4,26,890/-. We do not find any reason to take a different view and we affirm the amount of Rs.4,26,890/towards damages of civil work and foundation and transportation of good materials. ## **Electrical installation and re-installation** 19. As against the amount of Rs.3,86,867/- awarded by the Reference Court, the High Court has awarded Rs.2,39,000/towards depreciated market value of the electrical installation. As per the project report that was initially prepared for the year 1976, cost of factory installation was given at Rs.6,93,677/- and as per award, it has been given Rs.5,78,100/-. Referring to Exh.21 report and evidence of PW-2-Mukund Dharashivkar, the Reference Court has awarded Rs.3,86,867/- towards dismantling charges in respect of electrical, mechanical and re-installation. During the course of dismantling and re-installation, there is every possibility of the electrical installation being damaged. Considering the findings of the Reference Court, in our view, the High Court was not justified in reducing the amount of Rs.3,86,867/- to Rs.2,39,000/- on the ground of depreciated market value of electrical installation. Therefore, the amount of Rs.3,86,867/- awarded by the Reference 14 Court is affirmed. For the dismantling of the electrical installation and re-installation of the same, the amount of Rs.2,39,000/awarded by the High Court is enhanced to Rs.3,86,867/- as awarded by the Reference Court. ## **Replacement cost of machinery and mechanical installation** 20. Based on the report Exh.21 and the evidence of PW-2, the High Court has awarded depreciated market value of the machinery and mechanical installation to the tune of Rs.6,62,000/- and the same is affirmed. ## **Loss of business** 21. A perusal of the evidence of PW-2-Mukund Dharashivkar examined on behalf of the appellants shows that in the year 197879, when the witness has visited the factory of the appellants, he noticed that the production of the sugar was stopped. As pointed out by the Reference Court as well as by the High Court, as regards income, no statement of income had been produced. During the period 1981 till 1986, the sugar mill was idle. The balance sheet for the years 1975-76 as per Exh.33 shows that the factory was running in loss initially during the year 1975-76. Though the appellants have claimed that they were making profit of Rs.2,00,000/- per year, as pointed out by the courts below, no 15 statement had been filed to show that the sugar factory was making profit of Rs.2,00,000/-. The courts below have recorded the concurrent findings for awarding the compensation of Rs.5,00,000/for loss of business from the year 1981, the time of taking possession of the property and compensation paid in the year 1986. The compensation amount of Rs.5,00,000/- paid towards the loss of business is also affirmed. 22. The compensation awarded to the appellants under various heads is modified as under:- **==> picture [379 x 206] intentionally omitted <==** **----- Start of picture text -----**<br> Sr. Description of By the High By the Supreme<br>No. Items Court Court<br>i. Land value Rs.9,40,896/- Rs.14,42,707/-<br>ii. Civil work Rs.4,26,890/- Amount confirmed<br>iii Replacement of Rs.2,39,000/- Rs.3,86,867/- as<br>electrical installation awarded by the<br>Reference Court<br>iv Depreciated value of Rs.6,62,000/- Amount confirmed<br>the machinery and<br>mechanical<br>installation<br>V Loss of business Rs.5,00,000/- Amount confirmed<br>from the year 1981<br>to 1986<br>**----- End of picture text -----**<br> In the counter affidavit filed by the respondent-State, it is stated that the office of the Executive Engineer, Jalgaon Medium Project Division-1 has deposited the decreetal amount of Rs.72,02,224/- by way of a cheque deposited in the Civil court. Further the amount of Rs.10,00,000/- has been paid to the appellant on 21.09.2018 by way of cheque bearing No.000081 vide receipt No.0114362 and the 16 amount of Rs.5,00,000/- has been paid to the appellants on 02.11.2018 by way of the cheque bearing No.000094 (receipt No.0114663). It is stated that the appellant has also executed the receipt of the above said amount and has also executed an acknowledgement to the effect that, his entire claim has been settled. As per the modified amount of compensation, the appellants are entitled to the balance amount. 23. In the result, the impugned judgment and final order dated 21.08.2017 passed by the High Court of Judicature at Bombay Bench at Aurangabad in First Appeal No.601 of 1997 along with Cross Objection St. No.22145 of 1997 in the First Appeal, is modified as stated above in Para (22) and these appeals are partly allowed. The balance amount as per the modified amount of compensation be paid to the appellants/claimants with all statutory benefits as awarded by the Reference Court. **..…………………….J. [R. BANUMATHI]** **..…………………….J. [A.S. BOPANNA]** **New Delhi; March 17, 2020.** 17
End of Judgment Record
Browse All Landmark Cases Judgments
2019-01-22

State of Himachal Pradesh & Anr. v. Pinju Ram & Others; State of Himachal Pradesh & Ors. v. Ganesh Dutt & Anr.

This batch of appeals concerns regularisation and monetary benefits of part‑time employees in Himachal Pradesh who were converted to daily‑wage status. The State had issued a policy on 27 February 2004: part‑time Class‑IV employees who had completed ten years of continuous service as on 31 December 2003 would be made daily wagers with prospective effect, and posts vacated by such employees would stand abolished; Education and Ayurveda were excluded from the policy. Revenue Chowkidars, engaged by Panchayats, were not covered by that policy and received separate treatment. Following writ petitions and an order of the Himachal Pradesh High Court and in light of later developments, the State drew‑up directions in 2011 (22 September) to give seniority to Revenue Chowkidars on the basis of ten years of service, but with wages from the date of actual appointment and without back‑dated monetary benefits; 7 July 2012 further instructions reiterated this stance for remaining part‑time employees, with monetary benefits not guaranteed in the interregnum. The respondents pressed for back wages dating from 1 January 2007 and broader coverage. The Supreme Court held that the 2007 back‑pay direction was unsustainable, clarified that seniority would count from ten years without past benefits, and that the 2011 policy and Moti Singh principle should guide the approach. The appeals are allowed; no costs. The related writ petitions are to be disposed of consistent with these directions.

2018-08-14

Union Bank of India and Others v. C.G. Ajay Babu and Anr.

This is a Supreme Court of India appeal concerning the forfeiture of gratuity under the Payment of Gratuity Act, 1972. The respondent was a branch manager of the appellant bank and was dismissed on 3 June 2004 after disciplinary proceedings. A show-cause notice sought to forfeit gratuity due to misconduct involving moral turpitude, which was ordered on 20 April 2004. The High Court upheld the dismissal but held that gratuity could be paid since there was no financial loss to the bank, and that a bipartite settlement between the bank and employees permitted forfeiture only where misconduct caused financial loss. The Division Bench, however, held that forfeiture under Section 4(6) must be read together with Section 4(5) and that no loss was proven, thus entitling the employee to gratuity in accordance with the bipartite settlement. The Supreme Court agreed with the High Court that forfeiture is not automatic; it is controlled by Sections 4(5) and 4(6) of the Act and by the bipartite settlement, which requires loss to justify forfeiture. The Court emphasized that an act must constitute an offence involving moral turpitude and that conviction is generally required for forfeiture under 4(6)(b)(ii). The appeal is dismissed with no costs.

2018-09-25

Reema Salkan v. Sumer Singh Salkan

This is a Supreme Court of India criminal appeal under the Criminal Appellate Jurisdiction arising from a maintenance dispute under Section 125 Cr.P.C. The parties, married in 2002, had a protracted litigation history. The Family Court granted maintenance to the wife from 17 July 2003 to 8 December 2010, and held no maintenance thereafter. The High Court, in revision, partly allowed the application, directing Rs.9,000 per month from 9 December 2010 onward, while upholding the earlier period’s Rs.10,000 per month. This Court had earlier granted interim maintenance of Rs.20,000 per month in 2014 (Criminal Appeal Nos. 2347-2349 of 2014). The appellant contends there has been no change in circumstances since the interim order and that the respondent’s substantial assets, education, and overseas earnings establish the capacity to pay higher maintenance. The respondent defends the High Court’s reasoning, arguing that the Family Court’s assessment, demeanor observations, and the principle that maintenance should not be perpetual require careful scrutiny, and that the notional minimum wage approach used by the High Court is flawed. The overarching issue is the quantum of monthly maintenance payable to the appellant and whether the interim amount should be augmented beyond the period up to 2010.”

2019-12-03

M/s Embassy Property Developments Pvt. Ltd. v State of Karnataka & Ors.

This judgment concerns three Civil Appeals filed by a Resolution Applicant, the Corporate Debtor (through its Resolution Professional) and the Committee of Creditors, challenging an Interim Order of the Karnataka High Court staying an NCLT order in proceedings under the Insolvency and Bankruptcy Code, 2016. The NCLT Chennai had admitted an application under Section 7 of the IBC against M/s Tiffins Barytes Asbestos & Paints Ltd. and directed a moratorium under Section 14. The Interim Resolution Professional then sought a deemed extension of a mining lease under MMDR Act, 1957 and the Government of Karnataka rejected it. The NCLT, by an order dated 11.12.2018, set aside the Government’s order and directed execution of Supplement Lease Deeds for the period up to 31.03.2020. The Government of Karnataka challenged this in a High Court writ petition, which stayed the impugned NCLT order. The core issues were: (i) whether the High Court may interfere under Article 226/227 with an NCLT order in IBC when an appeal lies to the NCLAT, and (ii) whether fraud can be inquired into by NCLT/NCLAT in CIRP. The Court reiterates that IBC is a complete, umbrella code with a three‑tier mechanism (NCLT, NCLAT, Supreme Court) and that public‑law disputes arising from MMDR Act obligations lie outside IBC. It ultimately holds that while NCLT/NCLAT may inquire into fraud, they cannot adjudicate MMDR‑related public legal disputes; and the High Court’s writ jurisdiction in public‑law contexts remains permissible. The appeals are dismissed.