Tenetowl LogoTenetowl
High Court of KeralaKerala High Court · 2009Single JudgeSecond Appeal partly allowed; damages portion s...

S.A. No. 827 of 1995

Case / Petition Number:
SA NO. 827 of 1995

Case Synopsis & Summary

Second Appeal arises from the judgment and decree of the District Judge, Palakkad, in A.S. No. 51 of 1990, affirming a Munsiff’s decree in O.S. No. 185 of 1979, concerning a dispute over a water channel described as OPQRS. The respondent plaintiff claimed a right of easement to drain rainwater and to draw water from a natural channel that runs through the appellants’ property, and sought a mandatory injunction to restore a portion of the channel which the appellants had filled near their paddy field. The appellants denied the existence of any such water channel, contending that no OPQRS channel existed and that water from the respondent’s land did not travel through the appellants’ property. PWs 1–4 and Exts. C1–C5 supported the trial court’s finding of a water channel, its existence, and its closure by the appellants; the expert Advocate Commissioner’s report corroborated these conclusions. The trial court granted a mandatory injunction and damages. The District Judge upheld the finding of the channel’s existence and the respondent’s right to use it, but modified the future damages awarded. The High Court held the water channel to be a natural channel and affirmed the respondent’s rights under the Indian Easements Act, particularly Sec. 7 (Illustration (h)) and Sec. 9 (Illustration (h)). It also found the award of future damages at 100 paras of paddy per year unsupported by evidence and set it aside, while maintaining other relief. The appeal was partly allowed and partially dismissed; CMP No. 1990 of 1995 stands dismissed.

Precedent Explorer

Find Cases Like This

Explore other judgments dealing with similar legal situations, facts, or statutory provisions.

Case Details & Bench

Court
High Court of Kerala
Hon'ble Judges
  • Thomas P. Joseph
Judgment Date
2009-09-22
Court Decision / Holding
Second Appeal partly succeeds: the existence of the water channel and the respondent’s right to use it are affirmed; the mandatory injunction to restore the channel is upheld, but the portion of the decree awarding future damages at 100 paras of paddy per year is set aside for lack of evidentiary basis. The rest of the decree remains, and CMP No. 1990 of 1995 is dismissed.
Final Disposition
Second Appeal partly allowed; damages portion set aside; otherwise dismissed; CMP dismissed.

Parties to the Case

Appellants / Petitioners

  • Saramma, W/o Varghese
  • A.C. George, S/o Cherian
  • A.C. Chacko, S/o Cherian

Respondents

  • Janardana Vaidayar, S/o Kesavan Vaidayar, Cheraya Amsom Kongadu Desom, Palakkad Taluk

Legal Representation & Advocates

Counsels for Petitioners

  • • Sri Thampan Thomas

Counsels for Respondents

  • • Sri T.C. Mohandas
  • • Sri A.R. Gangadas

Provisions of Law Cited

Indian Easements Act, 1882, Section 7 Illustration (h)Indian Easements Act, 1882, Section 9 Illustration (h)

Legal Doctrines & Maxims

  • Right of easement by necessity
  • Riparian rights (right of discharge and use of natural stream)
  • Natural right to use a water channel protected under the Indian Easements Act

Submissions & Arguments

Contentions of Appellants / Petitioners

The appellants contended that there is no water chal or OPQRS on their land; they denied the existence of the alleged water channel and the claimed right of easement. They argued that the respondent’s water stream does not pass through their property and that there was no basis for awarding future damages; they challenged the injuries claimed and questioned the evidence supporting the existence of the water channel and the necessity of the claimed easement.

Contentions of Respondents

The respondent asserted the existence of a natural water channel OPQRS on the land of the appellants and that the respondent had a natural right to drain water from his land and draw water for irrigation. He argued that the water channel is a natural stream and that the appellants’ act of filling it violated the easement rights protected by the Indian Easements Act; he supported the award of damages and the restoration of the channel.

Legal Doctrine & Issue Explorer

Explore This Legal Issue

Find relevant judgments and authoritative positions on the legal questions discussed here.

Cited Precedents (1)

Case NameCitationTreatmentExplanation
M.Kanna & Others v. T. Chathu & Another(1970 KLT 124)PositiveCited to recognize the right of riparian owners to discharge and use a natural stream irrespective of diminution in quantity.
Case Applicability Diagnostic

Apply This to My Facts

Share your situation and test whether this judgment governs, supports, or challenges your case.

Official Judgment Record
•1,941 words•~9 min read

In The Court Record

S.A. No. 827 of 1995

## **IN THE HIGH COURT OF KERALA AT ERNAKULAM** **PRESENT :** **THE HONOURABLE MR. JUSTICE THOMAS P.JOSEPH** **TUESDAY, THE 22ND SEPTEMBER 2009 / 31ST BHADRA 1931** **SA.NO. 827 OF 1995()** **----------------------------AS.51/1990 OF DISTRICT COURT, PALAKKAD OS.185/1979 OF PRL.MUNSIFF COURT, PALAKKAD** **....................** ## **APPELLANT(S) – APPELLANTS - DEFENDANTS:** ## **--------------------------------------------------------** **1. SARAMMA, W/O. VARGHESE, RESIDING AT THOTAPUZHA HOUSE, ERAVIPEROOR VILLAGE, THIRUVALLA TALUK, PATHANAMTHITTA DISTRICT.** **2. A.C. GEORGE, S/O. CHERIAN, RESIDING AT AZHANTHARA VEETTIL KADIYANGADU, CHERAYA AMSOM KONGAD DESOM, PALAKKAD TALUK.** **3. A.C. CHACKO, S/O.CHERIAN DO. DO. DO.** **BY ADV. SRI.THAMPAN THOMAS** ## **RESPONDENT(S) – RESPONDENT - PLAINTIFF:** **----------------------------------------------------------** **JANARDANA VAIDYAR, S/O.KESAVAN VAIDYAR, CHERAYA AMSOM KONGADU DESOM, PALAKKAD TALUK.** **ADV. SRI.T.C.MOHANDAS SRI.A.R.GANGADAS FOR SMT.ANJU GOVIND SMT.S.CHITHRA SMT.M.PREETHA** **THIS SECOND APPEAL HAVING BEEN FINALLY HEARD ON 22/09/2009, THE COURT ON THE SAME DAY DELIVERED THE FOLLOWING:** ## **THOMAS P.JOSEPH, J.** = = = = = = = = = = = = = = = = = = = = = = = = **S.A. NO. 827 of 1995** = = = = = = = = = = = = = = = = = = = = = = = = = Dated this the 22[nd] day of September, 2009 ## **J U D G M E N T** ---------------------- Second Appeal arises from judgment and decree of learned District Judge, Palakkad in A.S. No.51 of 1990 and the Cross Objection therein modifying decree and judgment of learned munsiff in O.S. No.185 of 1979. Respondent sued appellants for declaration of right of easement or in the alternative for declaration that the disputed water chal described as “OPQRS’ in the sketch appended to the plaint is a natural stream, respondent has right to drain out rain water from his land to that water chal, draw water from the water chal and for mandatory injunction to direct appellants to restore the filled up portion of the water chal running through their property. He also claimed from the appellants damages to the tune of Rs.1,000/- and future damages at the rate of 200 hundred paras of paddy per year till the filled up portion of water chal is restored. According to respondent disputed water chal was being used to drain out rain water that was collected in the hillock on the north and flowing down towards south. The said water chal joins Kundalassery thodu on the further south. That water chal is having a width of eight feet ## **S.A. NO.827 of 1995** ## **-: 2 :-** and depth of two feet. On 2.9.1999 appellants filled up the water chal near their paddy field. Appellants contended that flow of water from the respondent's property is into the paddy fields of Kuttan and Velayudhan. There was no water chal from the point “Q” in the sketch appended to plaint. It is incorrect to say that water was flowing along “OPQRS” and joined Kundalassery thodu. Appellants denied existence of the water chal. They also denied that they filled up the water chal. Respondent examined P.Ws.1 to 4 and proved Exts.A1 to A9. Appellants examined D.Ws.1 and 2. Exhibits C1 to C5 are reports and plans prepared by the Advocate Commissioner. Learned munsiff came to the conclusion that there is a water chal described as “OPQRS” in the sketch appended to the plaint which is marked by the Advocate Commissioner in Ext.C2 as “MNOPIHGFD”. Learned munsiff also found from the evidence of P.Ws.1 to 4 and Exts.C1 to C5 that water chal existed and that it was closed at point “D” (near the property of the appellants) by the appellants. From the evidence of P.Ws.1 to 4 it was found that during rainy season there was flow of water from north to south through the water chal marked as “MNOPIHGFD”. It was also found that due to the act of appellants respondent suffered damages and while declaring right of respondent to drain out water during rainy season through the disputed water chal ## **S.A. NO.827 of 1995** ## **-: 3 :-** and draw water from the chal for irrigation granted mandatory injunction for its restoration and directed appellants to pay damages to the respondent to the tune of Rs.1,000/- and future damages at the rate of 50 paras of paddy per year till the water chal is restored. Against that decree and judgment appellants preferred A.S. No.51 of 1990. Respondent not being satisfied with future damages awarded preferred the Cross Objection. Learned District Judge concurred with the trial court as to the existence of the water chal, its closure by the appellants near their property and right of respondent to use the water chal. Learned District Judge also found that though the learned munsiff in the body of judgment found future damages payable as at the rate of 100 paras of paddy, in the decretal portion what was granted is only 50 paras of paddy and accordingly allowed Cross Objection and modified future damages payable at the rate of 100 paras of paddy per year till the water chal is restored. Aggrieved, appellants have come up in Second Appeal. The following substantial questions of law are framed. “1. Is the respondent protected by Section 7, Illustration (h) of the Indian Easements Act, 1882 and whether courts below have correctly interpreted the said ## **S.A. NO.827 of 1995** ## **-: 4 :-** provision? 2. Is the first appellate court correct in declaring that respondent is entitled to the right of easement by necessity? 3. Whether courts below were justified in granting injunction as prayed for? 4. Are not courts below wrong in awarding damages especially when the trail court found that there is no evidence to award damages”. 2. So far as finding of fact entered by the courts below as to the existence of water chal, its user by respondents and closure of the water chal where it passed through the property of appellants is concerned, I have referred to the evidence. It is after considering the evidence of P.Ws.1 to 4 and Exts.C1 to C5 and even considering the evidence let in by the appellants that courts below found in favour of existence of water chal and its closure at the point where it passed through the property of appellants. It has also come in evidence that on the north of the property it is a hill and water flows towards south. Advocate Commissioner also found that water flows from the north. ## **S.A. NO.827 of 1995** ## **-: 5 :-** There is no reason to interfere with the concurrent finding entered by the courts below in those regards. 3. Substantial questions of law raised for consideration is whether appellants are protected by Section 7 Illustration (h) of the Indian Easements Act (for short, “the Act”) and whether first appellate court was correct in holding that respondent has right of easement by way of necessity. Section 7 of the Act deals with easements which are restrictive of certain rights such as about right of every owner of land that the water of every natural stream which passes by, through or over his land in a defined natural channel shall be allowed by other persons to flow within such owner's limits without interruption and without material alteration in quantity, direction, force or temperature, the right of every owner of land abutting on a natural lake or pond into or out of which a natural stream flows, that the water of such lake or pond shall be allowed by other persons to remain within such owner's limits without material alteration in quantity or temperature. Clause (i) refers to the right of every owner of upper land that water naturally rising in, or falling on such land, and not passing in defined channels shall be allowed by the owner of adjacent lower land to run naturally thereto. This Court in **M.Kanna & Others v. T. Chathu & Another** (1970 KLT 124) has recognized the right of reparian owners ## **S.A. NO.827 of 1995** ## **-: 6 :-** for discharge and use of natural stream irrespective of diminution in quantity of water in such use. Evidence on record shows that the disputed water chal is a natural chal and as such respondent has a natural right to use the said water chal be it for draining out water from his property or for the purpose of irrigation of his own land. Though there is an observation in the judgment of learned District Judge that respondent is entitled to right of easement by way of necessity also and that right has been infringed by the appellants due to their act what is really involved is the natural right of respondent protected under Sec.9 Illustration (h) of the Act. Therefore respondent is entitled to the mandatory injunction prayed for. 4. Then the question is whether the courts below are justified in awarding damages. So far as the award of Rs.1,000/- is concerned, trial court has referred to the inconveniences suffered by the respondent due to the act of appellants and to compensate the loss caused to the respondent in that way, Rs.1,000/- has been awarded as damages. Assessment of damages would involve some sort of arbitrariness also. What this Court is required to consider is whether damages awarded is alarmingly high so that this Court should interfere. No substantial question of law is involved in that mater. On going through the records I am not inclined to think that Rs.1,000/- ## **S.A. NO.827 of 1995** ## **-: 7 :-** awarded is alarmingly high, involved any substantial question of law and hence required any interference. 5. What remained for consideration is whether courts below are justified in awarding future damages at the rate of 100 paras of paddy per year till the water chal is restored. What the trial court awarded towards future damages is at the rate of 50 paras of paddy and observing that it is a mistake committed by the trail court since in the body of judgment it is stated respondent is entitled to future damages at the rate of 100 paras of paddy per year, first appellate court modified the decree accordingly. Learned counsel for appellants submitted that substantial question of law is involved as the award of future damages is without any basis or data. Learned counsel asserts that property belonging to the respondent has already been converted into rubber plantation and as such question of future damages did not arise. Learned counsel for respondent was not able to say whether the land of respondent has been converted into rubber plantation. Hence I am not going into that question in this appeal. However, learned munsiff has observed that there is no proper evidence to decide the issue regarding future damages. It is not clear what exactly is the damages suffered by the respondent. Without any basis damages could not be awarded. Therefore I am ## **S.A. NO.827 of 1995** ## **-: 8 :-** not inclined to think that courts below were legally correct in awarding future damages at the rate of 100 paras of paddy per year. That part of the judgment and decree are liable to be set aside. 6. Substantial questions of law are answered accordingly. Resultantly, Second Appeal succeeds in part. Judgment and decree under challenge to the extent it awarded future damages to the respondent are set side. In other respects Second Appeal is dismissed without any order as to costs. Civil Miscellaneous Petition No.1990 of 1995 shall stand dismissed. ## **THOMAS P.JOSEPH, JUDGE.** vsv ## **S.A. NO.827 of 1995** ## **-: 9 :-** **THOMAS P.JOSEPH, J. =================== S.A. NO.827 of 1995 ===================** **J U D G M E N T** **22ND SEPTEMBER, 2009**
End of Judgment Record
Browse All High Court of Kerala (2009) Decisions
2009-06-26

Nishana Mol.N v Alappuzha Municipality & Secretary, Alappuzha Municipality

This writ petition concerns the registration of a marriage under the Kerala Registration of Marriages (Common) Rules, 2008 (Common Rules). The petitioner Nishana Mol.N, whose marriage was solemnized on 8 March 2009, sought registration of her marriage by the Local Registrar. Her husband was abroad, and she submitted Form No. 1 along with documents; however, the Local Registrar demanded the presence of both spouses for registration, a point contested by the petitioner. The court recalls the apex court’s directions in Seema v. Ashwani Kumar (2006) to frame rules ensuring compulsory registration to protect women and provide evidence of marriage, while noting that registration under the Rules does not itself create a marriage but evidences one solemnized otherwise. The Rules specify that registration is mandatory for marriages solemnized within the state, with various procedural requirements (Rules 5, 6, 9, 10, 11, 13, 16, 17) and mechanisms for correction, appeal, and re-registration. The court clarifies that the presence of both parties is not ordinarily required; the registrar may require appearance only in cases where there is reasonable doubt about identity, and even then as an exception rather than a rule. Ultimately, the court directs that registration and certificate issuance be completed within one month from copy of the judgment, without insisting on joint appearance, provided the memorandum is in order.

2009-07-27

Abdul Majeed Kalathil v. District Collector, Malappuram & Others

This batch of writ petitions concerns the constitutional validity of Section 17 of the Kerala Anti-Social Activities (Prevention) Act, 2007, and the power of District Magistrates to confiscate vehicles used in anti-social activities. The petitions challenge the absence of a substantive prohibition against using vehicles for anti-social activities and the lack of a defined procedure for confiscation or an appellate remedy. In W.P.C. No. 9925 of 2009 (the lead case), Abdul Majeed Kalathil contends that his goods carriage KL 11-B/6651 was seized by the Sub Inspector of Pandikkad Police and reported to the District Collector, Exts.P1–P2. The court scrutinizes Section 17's scope, defining anti-social activity (Section 2(a)) and whether the District Collector’s power to confiscate is constitutionally tenable. It finds Section 17 to be vague and violative of Articles 14, 19(1)(g) and 21, as it rests on subjective police satisfaction with no clear standards or process. It also notes environmental objectives but concludes that fundamental rights must prevail. The court does not sustain confiscation under Section 17; instead, it directs that such vehicles be dealt with under the Kerala Protection of River Banks and Regulation of Removal of Sand Act, 2001 and Rules, with interim release under specified conditions. It further directs initiation of Sand Act proceedings within a month and finalization within another month. The writ petitions are disposed of accordingly, preserving the rule of law and environmental protection.

2009-06-11

WA No. 671 of 2006 (Fertilizers and Chemicals Travancore Ltd v Union of India)

This writ appeal concerns the pay revision and pensionary benefits of employees of the Fertilizers and Chemicals Travancore Ltd (FACT). The long-term settlement covering terms of employment expired on 31 December 1996. A fresh settlement was concluded (notified 28 August 2001) and made retroactive to 1 January 1997, with revisions in wages and benefits. Clause 29 of Ext. P1 provides that arrears relating to wage revision and dearness allowance for the period 1 January 1997 to 30 June 2001 will be reviewed and decided by management/government only when the company earns profits for at least three consecutive years; Clause 33.1 provides that employees who retired on or after 1 January 1997 will be eligible for arrears calculated from 1 January 1997 to the date of retirement, subject to adjustments for interim relief already paid, with any unclaimed amount transferred to a Welfare Fund. The appellants—the retirees who fall in the 1 January 1997 to 1 July 2001 window—argue that they were denied arrears and were paid pensionary benefits at pre-revised rates, creating discrimination. Respondents contend Ext. P1 binds the parties and arrears depend on profits, and that pay revision administered to others does not compel retroactive change. The court held that Ext. P1 terms survive as terms of employment and directed the management to consider terminal benefits at revised rates within two months and to release arrears when paid to current workers, with connected matters following."

2009-05-29

M/S. Palm Fibers & Yars Trading Co. v. State of Kerala & Others

The petitioner, a Small Scale Industrial unit, ran two LT power connections (No.13070 and No.13427) with commercial production starting in July 1994 and July 1995. On 06/02/1992, the Government issued Ext.P1 guaranteeing concessional tariffs (pre-1992 tariff) for five years from the date of commencement or substantial capacity expansion, certified by the District Industries Centre. Ext.P2 certified eligibility for this concession. Subsequently, the petitioner increased power demand to 300 KVA and was reclassified/advised to HT status from 15/05/1998, converting LT supply to HT. The petitioner argued that Ext.P1 benefits should extend for the full five-year period, covering the LT quantities certified in Ext.P2, and that the HT conversion was a mere reclassification directed by the Board, not a cessation of eligibility. The Board argued Ext.P1 targets only those who commenced production during 1992–1996 and that HT conversion from 15/05/1998 falls outside the Ext.P1 window, rendering the petitioner eligible only up to 15/05/1998. Earlier orders (Ext.P3) had set aside a cut-off date for merits, and Ext.P6/Ext.P4 handled appeals. Ultimately, the Court held that the HT conversion was outside Ext.P1’s period, but directed that the LT benefits for the two LT connections be extended only until 23/05/1998 (LT dismantling date) and without reimbursement from the Industries Department, as held in OP No.7622/1998. The petition was disposed of as above.