S.A. Jalaluddin v. Bangalore Development Authority and Anr.

Case / Petition Number:
Civil Appeal No. 10910 of 1996
Neutral Citation:[2003] 2 S.C.R.

Case Synopsis & Summary

This appeal concerns the validity and interpretation of the Bangalore City Improvement Act, 1945 (BCIA) in relation to the Central Land Acquisition Act, 1894, as amended by the Karnataka Amendment and Validation Act, 1967. The appellant challenged a notification issued under Section 18(1)(a) of the BCIA and the subsequent acquisition proceedings on the ground that the two-year time limit introduced by the Karnataka amendment to Section 6 of the LA Act barred the declaration. The High Court rejected the challenge, and the appellant contends that because a declaration under the BCIA is deemed to be a declaration under the LA Act, the safeguards and time limits of the LA Act should apply to the landowner irrespective of the acquiring instrument. The Court, however, holds that the BCIA has its own seven-year validity for pursuing further action under Section 27, and that Section 27 provides that the LA Act and its provisions are attracted only to the extent applicable. It is impermissible to read into the BCIA the provisions of the LA Act to override or nullify the BCIA. The Court relies on several prior decisions, distinguishing some while endorsing others, and ultimately concludes that the appellant’s challenge has no merit. The appeal is dismissed, with no costs.

Precedent Explorer

Find Cases Like This

Explore other judgments dealing with similar legal situations, facts, or statutory provisions.

Case Details & Bench

Court
Supreme Court of India
Hon'ble Judges
  • Doraiswamy Raju
  • D. M. Dharmadhikari
Judgment Date
2003-02-27
Court Decision / Holding
Appeal dismissed. No costs.
Final Disposition
Appeal dismissed. No costs.

Parties to the Case

Appellants / Petitioners

  • S.A. Jalaluddin

Respondents

  • Bangalore Development Authority
  • Anr.

Legal Representation & Advocates

Counsels for Petitioners

  • • S. Ravindra Bhat

Counsels for Respondents

  • • Altaf Ahmed
  • • S.K. Kulkarni
  • • M. Girish H Kumar
  • • A. Kumar
  • • Ankur S. Kulkarni

Provisions of Law Cited

City of Bangalore Improvement Act, 1945Section 18(1)(a) of the City of Bangalore Improvement Act, 1945Section 18(1)(b) of the City of Bangalore Improvement Act, 1945Section 18(1)(c) of the City of Bangalore Improvement Act, 1945Section 27 of the City of Bangalore Improvement Act, 1945Land Acquisition Act, 1894Section 6 of the Land Acquisition Act, 1894Section 4(1) of the Land Acquisition Act, 1894Karnataka Land Acquisition Amendment and Validation Act, 1967Land Acquisition Act (Karnataka Amendment and Validation) Act, 1967

Legal Doctrines & Maxims

  • Legislation by incorporation (central Act provisions are incorporated into state/special Acts only to the extent applicable)
  • Cannot read into the provisions of the City of Bangalore Improvement Act the provisions of the Land Acquisition Act to override or nullify the Improvement Act
  • Compensation should not be determined by the purpose of acquisition; there should be a consistent standard irrespective of the instrument of acquisition

Submissions & Arguments

Contentions of Appellants / Petitioners

The appellant contends that because Section 18(1)(c) and 27(2) deem the declaration under Section 18 of the City of Bangalore Improvement Act to be a declaration under Section 6 of the Land Acquisition Act, the amendments in the Land Acquisition Act imposing time-bar on the exercise of power of acquisition would inure to the benefit of the landowner. Since the Bangalore Act adopts and refers to the central Act provisions, safeguards under the Central Land Acquisition Act should apply to landowners irrespective of the purpose of acquisition. The appellant submits that the two-year limit should be read into the BCIA’s process.

Contentions of Respondents

The respondents rely on decisions that the provisions of the Land Acquisition Act, as modified by State Acts and the schedule, stand incorporated in the State Acts, such that amendments to Section 6 do not affect acquisitions under state Acts. They argue that the BCIA has its own scheme and period of limitation; it is impermissible to read the LA Act’s limitations into the BCIA, and that compensation rights adhere to the established state Act framework rather than the central Act’s time-bars.

Legal Doctrine & Issue Explorer

Explore This Legal Issue

Find relevant judgments and authoritative positions on the legal questions discussed here.

Cited Precedents (4)

Case NameCitationTreatmentExplanation
Nagpur Improvement Trust & Anr. v. Vithal Rao and Ors.[1973] I SCC 500DistinguishedThe Court notes that the ratio in this decision was not extended beyond its particular context and should not be applied to override the provisions of the City of Bangalore Improvement Act.
The Land Acquisition Officer, City Improvement Trust Board v. H. Narayanaiah[1977] SCR 178PositiveCited to illustrate the concept that the Land Acquisition Act and its provisions are attracted to proceedings under the Act to the extent applicable.
Munithimmaiah v. The State of Karnataka and Ors.[2002] 4 SCC 326PositiveUsed to support the principle that amendments to the Central Land Acquisition Act do not automatically control acquisitions under a State Act; state acts incorporate those modifications only to the extent applicable.
Nagpur Improvement Trust v. Vasantrao and Ors., etc.[2002] 7 SCC 657PositiveAffirms the principle that the provisions of the Land Acquisition Act as modified by State Acts are incorporated into State Acts and that subsequent amendments will have no effect on acquisitions under State Acts.
Case Applicability Diagnostic

Apply This to My Facts

Share your situation and test whether this judgment governs, supports, or challenges your case.

Official Judgment Record
•2,437 words•~12 min read

In The Court Record

S.A. Jalaluddin v. Bangalore Development Authority and Anr.

A ## S.A. JALALUDDIN _v._ BANGALORE DEVELOPMENT AUTHORITY AND ANR. ## FEBRUARY 27, 2003 B [DORAISWAMY RAJU AND D.M. DHARMADHIKARI, JJ.] ## _Urban Development:_ _The City of Bangalore Improvement Act, 1945; Section 18(J)(a)(b) and_ C _(c)-Notification prescribing certain period of limitation for issuance of declaration under the Central Land Acquisition Act-Challenged as barred by limitation under the provisions of Karnataka Act-Held: it is impermissible to read into the provision of the Improvement Act, the provision of the Land Acquisition Act, so as to override or nulli.fY such provision of acquisition_ D _under the Improvement Act-Land Acquisition Act, 1894-Land Acquisition (Karnataka Amendment and Validation) Act, 1967._ Appellant had challenged the Notifications issued by the respondent under Section 18(1)(a) of the City of Banglore Improvement Act (Act) and consequently the acquisition proceedings. The Notification prescribed E limited period of two years for issuance of a declaration under Section 6 of the Acquisition Act which was allegedly barred by limitation under the provisions of the Land Acquisition (Karnataka Amendment and Validation) Act (Karnataka Act). High Court rejected the challenge. Hence the present appeal. F It was contended for the appellant that since declaration under the provision of the Act was to be considered as declaration under the Land Acquisition Act, the amendments in the Land Acquisition Act imposing limitation on the exercise of power of acquisition would enure to the benefit of land owner; and that irrespective of acquisition proceedings under any G of the Act, the safeguards available under the Central Land Acquisition Act should also be made available to the land owner irrespective of the purpose of the special law enacted for acquisition of land. ## Dismissing the appeals, the Court H HELD: I. I. The declaration published under Section 18(1)(c) of the 410 I ;.\ S.A. JALALUDDIN v. BANGALORE DEVELOPMENT AUTHORITY 411 .... City of Bangalore Improvement Act has a validity period of seven years A for being persued for further action under Section 27 of the Act. Section 27 also stipulates that the Land Acquisition Act and the provisions noticed thereunder are attracted to proceedings under the Act "so far as they are applicable", and consequently in respect of the matters wherein the City of Bangalore Improvement Act, 1945 has its own period of limitation or restrictions .on the exercise of powers under the Act or specific provisions B it is impermissible to read into the provisions of the Improvement Act, the provisions of the Land Acquisition Act, so as to override or nullify the provisions of the Improvement Act. (414-F-HI _The State of Karnataka and Ors.,_ (20021 4 SCC 326; _Nagpur_ C _Improvement Trust_ v. _Vasantrao and Ors. etc. etc.,_ (2002) 7 SCC 657 and _The Land Acquisition Officer, City Improvement Trust Board_ v. _H. Narayanaiah etc. etc.,_ (197711 SCR 178, referred to. 1.2. This Court has in some of the similar cases specifically declined to read into the limitations on the exercise of powers importing such D limitations under the Central Act, into the special enactments the position was made clear in unmistakable terms that so far as the r'tyment of compensation is concerned, there could be no different yardstick based on the purpose of acquisition or the provisions of law under which it is acquired. The ratio of the decision in _*Nagpur Improvement Trust & Anr._ v. _Vithal Rao and Ors._ was not extended beyond its purpose, to apply the E principle or the proposition of law sought to be raised to import a limitation on the very exercise of power of acquisition for and under the special and specific laws which has to be adjudged with particular reference, in the instant case, to only the City of Bangalore Improvement Act, 1945. (415-C-EI F F _*Nagpur Improvement Trust and Anr._ v. _Vithal Rao and Ors.,_ (1973) sec 500, distinguished. CIVIL APPELLATE JURISDICTION: Civil Appeal No. 10910 of 1996. CJ From the Judgment and Order dated 26.9.95 of the Kamataka High Court in R.F.A. No. 232 of 1984. S. Ravindra Bhat for the Appellant. Altaf Ahmed, Additional Solicitor General, S.K. Kulkarni, M. Girish H 412 SUPREME COURT REPORTS [2003] 2 S.C.R. A Kumar and Ankur S. Kulkarni for Ms. Sangeeta Kumar for the Respondents. The Judgment of the Court was delivered by The above appeal has been filed against the judgment of a Division Bench of the Karnataka High Court dated 26th September, 1995 in RF A No. B 232 of 1984 whereunder a challenge made to the Notification dated 5-111971 issued under Section 18(1)(a) of The City of Bangalore Improvement Act, 1945 (hereinafter referred to as "the Act") as barred by limitation under the provisions of the Land Acquisition (Karantaka Amendment and Validation) Act, 1967 (hereinafter referred to as "the Karnataka Act" which by an C amendment to the Central Land Acquisition Act prescribed a period of two years of limitation for issuance of a declaration under Section 6 of the Acquisition Act and consequently without the authority of law came to be repelled. To be more specific· as could be seen from the judgment under appeal the contention of the appellant was that by virtue of Section 27 of the Act the proceedings initiated thereunder for acquisition of land are to be D regulated by the provisions under the Land Acquisition Act, 1894 and having regard to the said amendment to the Land Acquisition Act by the Karnataka Act and the proviso introduced to Section 6 to the effect that no declaration could be made or issued in respect of any particular land covered by a notification under sub-section (I) of Section 4, after the expiry of two years from the notification under Section 4(1) or from the commencement of the E Amendment Act. Hence, the plea was that the Board should not have issued the final notification dated 5-11-1971 and consequently acquisition proceedings, particularly, the declarations under Section 18 have been rendered invalid and unforceable. The Division Bench of the High Court after adverting to the catena of cases including the one reported in [1977] 1 SCR 178. The _p_ Land Acquisition Officer, City _Improvement Trust Board_ v. _H. Narayanaiah etc. etc._ has chosen to reject the challenge. Not. satisfied, the appellant have come before this Court. Mr. S. Ravindra Bhat, the learned counsel appearing for the appellant tried to contend that having regard to the. provisions of the Act which by G virtue of stipulation contained in Section 18(l)(c) and 27(2) deemed the declaration under Section 18 of the Act to be a declaration under Section 6 of the Land Acquisition Act, the amendments incorporated to the Central Land Acquisition Act imposing a limitation on the exercise of power of acquisition itself would enure to the benefit ofland owner. Argued the learned H -::ounsel further that the Bangalore Act under consideration, by means of S.A. .IALALUDDIN _v._ BANGALORE DEVELOPMENT AUTHORITY 413 reference refers and adopts the provisions of the Acquisition Act and, therefore, A the principle laid down in the line of cases pertaining to legislation by incorporation will have no relevance in adjudging the challenge by the appellant in this case. Accordingly, the learned counsel tried to distinguish the earlier decision noticed by the Division Bench as well as the decision reported in [2002] 4 SCC 326 _Munithimmaiah_ v. _The State of Karnataka and Ors.,_ and [2002] 7 SCC 657 _(Nagpur Improvement Trust_ v. _Vasantrao and Ors., etc. etc.)_ A submission was also made placing reliance upon the decision of this Court in [1973] I SCC 500 _(Nagpur Improvement Trust and Anr._ v. _Vitha/ Rao and Ors.),_ that so far as the citizen/land owner is concerned it is immaterial whether the acquisition is under one Act or the other or what purpose and that the safeguards available under the Central Land Acquisition Act, should be equally rendered available to all kinds of acquisition irrespective of the purpose or the special law concerned for acquisition of the land of a citizen. Per contra, Mr. Altaf Ahmed, the learned Additional Solicitor General appearing for the respondent's placed strong reliance upon the decision of this Court reported in [2002] 4 SCC 326, _(Munithimmaiah_ v. _The State of Karnataka and Ors.,)_ [2002] 7 SCC 657, _(Nagpur Improvement Trust_ v. _Vasantrao and Ors., etc. etc.)_ as also the decision in [1977] I SCR 178 _(The Land Acquisition Officer, City Improve Trust Board_ v. _H. Narayanaiah etc. etc.)_ In our view, it is unnecessary for us to undertake an extensive consideration of the relevant principle which. should guide a decision in this case since we find such principles to have been stated and re:stated in a series of decisions, including the two latest pronouncements as noticed above. > The decisions in [2002] 7 SCC 657 _(Nagpur Improvement Trust_ v. _Vasant Rao and Ors.,)_ almost a similar challenge came to be projected and F rejected as herein under: > 59. "So far as the acquisition under the Nagpur Act and the U.P. Act . are concerned they have been challenged on the ground that the nptification corresponding to the declaration under Section 6 of the Land Acquisition Act was made more than 3 years after the expiry of the date of the publication of the notification corresponding to the notification under Section 4 of the Land Acquisition Act. This was on the assumption that the provisions of the Land Acquisition Act were not incorporated in the State Acts but were merely referred to and the > amendment of Section 6 of the Land Acquisition Act by insertion of H 414 [2003] 2 S.C.R. A ## SUPREME COURT REPORTS ## B proviso thereto by Act I I of 1967, would apply to the acquisitions. We have already held that the provisions of the Land Acquisition Act as modified by the State Acts and the Schedule thereto stand incorporated in the State Acts and, therefore, the subsequent amendments of Section 6 by the Land Acquisition (Amendment and Validation) Act, 1967 (Act 13 of 1967) or by Act 68 of I 984, will have no effect on the acquisition made under the State Acts." That apart, we are of the view, that the City of Bangalore Improvement Act, I 945 provides for formulating a scheme as also the manner in which it should be published and carried out, in execution. Section I 8 provides that C after the sanction of the Government has been obtained for the scheme, the Chairman of the Board shall forward a declaration for notification under the signature of a Secretary to the Government, stating the fact of such sanction and that the land in question was proposed to be acquired by the Board and the purposes of the scheme. It 1s further ordained therein that the declaration shall be published in the Mysore Gazette and shall state the limits within D which the land proposed to be acquired is situate, with the details of the particulars spe.cified therein and that the said declaration shall be conclusive evidence that the land is needed for the public purpose and the Board shall upon the publication of the said declaration shall proceed to execute the same. Section I 9 provides that where within a period of 7 years from the date E of publication in the Mysore Gazette of the declaration in clause (b) of sub-. section (I) of Section I 8, the Board fails to execute the scheme, substantially the scheme shall lapse and the provisions of Section 27 shall become in operative. The sum and substance of it as also the consequences flowing from the said stipulation is that the declaration published under Section I 8( I)( c) has a validity period of seven years for being pursued for further action under F Section 27 of the Act. While that be the position, it is futile for the appellants to contend that the declaration being not published within two years of the period specified in the Land Acquisition Act, the proceedings under the Improvement Act shall lapse and be of no effect Section 27 also stipulates that the Land Acquisition Act and the provisions noticed thereunder are G attracted to proceedings· under the Act "so far as they are applicable", and consequently in respect of the matters wherein the City of Bangalore Improvement Act, I ::l45 has its own period of limitation or restrictions on the exercise of powers under the Act or specific provisions it is impermissible to read into the provisions of the Improvement Trust Act, the provisions of the Land Acquisition Act, so as to override or nullify the provisions of the H Improvement Trust Act. S.A. JALALUDDIN _v._ BANGALORE DEVELOPMENT AUTHORITY 415 We are also not persuaded to contenance the challenge based on, the A decision reported in [ 1973] I SCC 500 _Nagpur Improvement Trust and Anr._ v. _Vithal Rao and Ors._ The very reasoning therein of the Constitution Bench of this Court was in the particular context of deprivation of the property of a citizen without payment of the due compensation by high lighting the fact that the right of the owner, who comes to be deprived of his property, to receive compensation should not depend upon the purpose or the law which B enables such acquisition. This principle cannot be extended dehors the ratio or rationale behind it for all purposes, to the extent of contending that all acquisitions must be under the same law and under same procedural formalities, dehors the special law to meet different contingencies or deal with various exigencies of situation. As a matter of fact, even in the later line of cases C wherein this Court has specifically declined to read into the limitations on the exercise of powers importing such limita.tions under the Central Act, into the special enactments the position was made clear in unmistakable terms that so far as the payment of compensation in concerned, there could ue no different y&rdstick based on the purpose of acquisition or the provisions of law under which it is acquired. The ratio of the decision in [1973] I sec 500 (supra) D was not extended beyond its purpose, to apply the principle or the proposition of law sought to be raised to import a limitation on the very exercise of power of acquisition for and under the special and specific laws which as we have observed earlier has to be adjudged with particular reference in this case, to only the City of Bangalore Improvement Trust Act, 1945. E For all the reasons stated above, we see no merit in the challenge made to the decision of the High Court. The appeal, therefore, fails and .stands dismissed. No costs. S.K.S. > Appeal dismissed. p
End of Judgment Record
Browse All Supreme Court of India (2003) Decisions
2003-09-22

State of Punjab v. Pohla Singh and Anr.

This is a Supreme Court of India decision (September 22, 2003) arising from Criminal Appeal No. 901 of 1996, where the State of Punjab challenges acquittal by the Punjab and Haryana High Court of two respondents for offences under Section 302 read with Section 34 IPC. The trial court had convicted Pohla Singh and Balkaur Singh for homicidal death of Mandip Singh around 5.30 a.m. on 11 June 1991; the other two accused were given the benefit of doubt. The High Court acquitted the two respondents on the ground of delay in lodging the FIR and questioned the time of occurrence, treating these as improbable factors that undermined the prosecution case. The State contends that there is no embargo on appellate review of acquittals and that the High Court’s reasoning rests on surmises and conjectures, ignoring the eye-witnesses’ detailed testimony and the trial court’s careful evaluation. The Supreme Court agrees to re-appreciate admissible evidence to prevent miscarriage of justice, noting that unexplained delay, standing alone, is the relevant factor, and that the prosecution need not answer every hypothetical question. It faulted the High Court’s approach, upheld the credibility of witnesses, reversed the acquittal, and restored the trial court’s verdict, directing the respondents to serve their sentences.

2003-05-01

Parwati Bai v. Radhika

This Supreme Court decision concerns eviction of a sub-tenant from municipal non-residential premises in Khargaon, Madhya Pradesh. The appellant (Parwati Bai) had leased the premises from the Municipal Council and sub-let to the respondent (Radhika). The ownership of the premises vested in the municipality, and the landlord sought eviction on the ground of non-payment of rent and need for self-occupation under the Transfer of Property Act, while contending that the Madhya Pradesh Accommodation Control Act, 1961 should not apply since the property is owned by a local authority used for non-residential purposes. The Trial Court and the First Appellate Court, and the High Court, held that the accommodation-control Act applied and dismissed the eviction suit for lack of proven grounds under Section 12. The Supreme Court held that the premises, being owned by a local authority, are immune from the Act itself, and between the landlord (appellant) and sub-tenant (respondent), the landlord-tenant relationship arises with the municipality as the landlord. The key issue is whether tenancy was terminated validly under Section 106 of the Transfer of Property Act; there is no infirmity in the notice. Consequently, the appeal is allowed: the suit for eviction is decreed, the respondent to vacate within six months (with undertaking), rent arrears to be determined by the Executing Court, and no order as to costs. The decision aligns with existing rulings on premiss-based immunity and the applicability of transfer-only remedies.

2003-03-31

T. Lakshmipathi v. P. Nithyananda Reddy

This Supreme Court judgment deals with an eviction challenge under the Andhra Pradesh Buildings (Lease, Rent and Eviction) Control Act, 1960, over a property in Chittoor whose ownership status arose from a partition among co-owners. Respondent No. 1, P. Nithyananda Reddy, remained a co-owner and landlord after partition, while several co-owners sold their interests. Tenants of the property temporarily yielded possession to transferees (appellants Nos. 3–5) and later to appellants Nos. 1–2 through sale deeds; eviction petitions were filed on grounds of bona fide need and rent arrears. The Rent Controller decreed eviction, confirmed by the Appellate Authority and High Court. The central issue was whether eviction could proceed when tenancy rights persisted despite transfers, and whether the doctrine of merger could terminate the tenancy. The Court held that merger requires complete coalescence of the lessee’s and lessor’s interests in the whole property at the same time in one person; because the appellants acquired only a portion of the co-owners’ interests, there was no merger, and tenancy rights remained. Demolition of the superstructure by tenants did not destroy the tenancy since the land continued. The judgment relies on several precedents concerning co-ownership, merger, and estoppel, reinforcing that partial acquisitions do not extinguish tenancy. Consequently, the appeal was dismissed and the eviction decree upheld with costs.

2003-11-17

Nair Service Society v. District Officer, Kerala Public Service Commission and Ors.

Nair Service Society (NSS) challenged a Kerala High Court order directing the Kerala Public Service Commission (KPSC) to advise candidates from the Muslim supplementary list against not-joining-duty vacancies (NJD) in the recruitment for Sub-Engineers for the Kerala State Electricity Board (KSEB). The case turns on the Kerala State and Subordinate Service Rules, 1958, particularly Rules 14–17, which provide a rotating chain of appointments between open competition (merit) and reserved categories (SC/ST/OBC) with a 50% aggregate ceiling for reservation in any recruitment year. KPSC had prepared a main rank list of 177 and a supplementary list of 62 to satisfy reservation requirements. After the main list exhausted, KPSC advised Muslims from the supplementary list for NJD vacancies, prompting NSS to file petitions. The High Court and Division Bench had held that the supplementary list could continue to operate, even after the main list expired, to fill NJD vacancies, thereby potentially breaching the 50% ceiling. The Supreme Court held that the supplementary list has no survival once the main list is exhausted and that advising from it would violate the 50:50 rule, as envisaged by Article 16(4) and related provisions. Nevertheless, appointments already made pursuant to the impugned judgment were not to be disturbed. The appeals were disposed of with no costs.