The appellant-plaintiff, a Class A PWD contractor, was entrusted with constructing two quarters at Thekkady for deputy range officer and forest guards. Building materials (cement and steel) were supplied on 26.09.1987. The appellant claims he partly constructed the quarters but could not complete due to lack of a route permit for transporting materials through forest area, after which he allegedly surrendered the materials to respondent No.3 as per Ext. A1 (28.09.1989). On 15.10.1993 respondent No.2 directed him to return the materials or remit their value. He issued a notice to respondent No.3 to return the materials or pay. Respondent No.3 denied liability, contending no negligence by the respondents and that the appellant failed to obtain route permits. Revenue recovery for Rs.84,436 was initiated, and it was contended that there is no fraud in the plaint, making the suit non-maintainable under Section 72 of the Revenue Recovery Act. The Sub Judge dismissed the suit on the ground that Section 72 applied. The appellant contends Section 72 does not bar civil action for declaratory relief and that fraud allegations, supported by case law, save the suit under the proviso. The Kerala High Court held that Section 72 does not bar declaratory relief; however, on the merits the evidence fails to show surrender of materials, so the declaration and injunction were rightly denied and the appeal is dismissed.

Precedent Explorer

Find Cases Like This

Explore other judgments dealing with similar legal situations, facts, or statutory provisions.

Case Details & Bench

Court
High Court of Kerala
Hon'ble Judges
  • Thomas P. Joseph
Judgment Date
2009-03-31
Court Decision / Holding
Appeal fails. It is dismissed. No costs.
Final Disposition
Appeal dismissed; No costs.

Parties to the Case

Appellants / Petitioners

  • S.Chinnaswamy, S/O.Subbayya Boyan, P.W.D. Contractor, residing at Door No.21A, Jayaprakash Street, P.O.Kottur, Malayandipattanam, Pollachi Taluk, Tamil Nadu

Respondents

  • State of Kerala, rep. by the District Collector, Palakkad
  • The Executive Engineer, P.W.D. Local Work Division, Palakkad
  • Sree Kumar, S/O. Janardhanan Pillai, Assistant Engineer, Local Work Section Office, PWD, Chittur
  • The District Collector, Collectorate, Civil Station, Coimbatore, Tamil Nadu
  • The Tahsildar, Pollachi, Tamil Nadu

Legal Representation & Advocates

Counsels for Petitioners

  • • Sri. D. Krishna Prasad
  • • Sri Joji Varghese
  • • Sri. Hari Sharma.M.

Counsels for Respondents

  • • Sri. T.B. Thankappan
  • • Shri Mathew George Vadakkel, Government Pleader

Provisions of Law Cited

Section 72 of the Revenue Recovery ActProviso to Section 72Section 34 of the Specific Relief Act, 1963Section 42 of the Specific Relief Act, 1877Order VI Rule 4, Code of Civil Procedure (CPC)

Legal Doctrines & Maxims

  • Section 34 does not exhaust the powers of civil courts to grant declaratory reliefs; declaratory reliefs can be granted beyond the confines of Section 34.
  • A declaration as prayed for can be granted by the civil court where the relief is not confined to a mere legal status or right to property.
  • Section 72 does not bar a civil suit for declaratory or consequential relief where such questions are not required to be decided by Board of Revenue or the Collector; the proviso allows suit on allegations of fraud.

Submissions & Arguments

Contentions of Appellants / Petitioners

The appellant contends that the suit seeks a declaration under Section 34 of the Specific Relief Act that he is not liable to pay any amount under the Revenue Recovery Act. He argues that Section 72 of the Act does not bar such a civil suit, and that there are pleadings of fraud sufficient to invoke the proviso to Section 72. He relies on authorities including Ashok Kumar Srivastav v. National Insurance Co. Ltd. to assert that declaratory reliefs can be granted by civil courts and that Section 34 does not exhaust the power to grant such reliefs. He maintains that the relief of injunction is a consequence of obtaining a declaration and should be granted if the declaration is in his favour.

Contentions of Respondents

The respondents argue that the suit is barred by Section 72 of the Revenue Recovery Act since the questions relate to execution and satisfaction of a written demand and such questions must be decided by the Board of Revenue or the Collector, not by a civil court. They contend there is no specific fraud pleaded with requisite particulars, and the relief sought is not maintainable. They emphasize that the appellant failed to prove that materials were surrendered and that the default lay with the appellant for not obtaining a route permit, and hence the liability to pay cannot be avoided. They maintain that the Sub Judge correctly held the suit not maintainable under the Act and that the court rightly dismissed the suit.”},

Legal Doctrine & Issue Explorer

Explore This Legal Issue

Find relevant judgments and authoritative positions on the legal questions discussed here.

Cited Precedents (3)

Case NameCitationTreatmentExplanation
Mahabir Jute Mills v. Firm Kedar NathAIR 1960 Allahabad 254DistinguishedCited to illustrate an earlier view that declaratory relief against contractual liability may not be maintainable; the present decision distinguishes this view in light of later Supreme Court doctrine allowing declaratory relief beyond S.34.
State of Madhya Pradesh v. Khan BahadurAIR 1971 MP 65DistinguishedReferenced as an earlier view that declaration as to liability may not be maintainable; distinguished by the court favoring declaratory relief beyond Section 34.
Ashok Kumar Srivastav v. National Insurance Co. Ltd.AIR 1998 SC 2046PositiveSC held that Section 34 does not exhaust the power to grant declaratory reliefs; supports civil court's jurisdiction to grant declaratory reliefs beyond the scope of Section 34, which the present judgment relies upon.
Case Applicability Diagnostic

Apply This to My Facts

Share your situation and test whether this judgment governs, supports, or challenges your case.

Official Judgment Record
•2,431 words•~12 min read

In The Court Record

S. Chinnaswamy v. State of Kerala and Others

IN THE HIGH COURT OF KERALA AT ERNAKULAM PRESENT : THE HONOURABLE MR. JUSTICE THOMAS P.JOSEPH TUESDAY, THE 31ST MARCH 2009 / 10TH CHAITHRA 1931 AS.No. 958 of 1996() -------------------OS.103/1995 of PRINCIPAL SUB COURT, PALAKKAD .................... APPELLANT(S)/PLAINTIFF: -------------- S.CHINNASWAMY, S/O.SUBBAYYA BOYAN, P.W.D.CONTRACTOR, RESIDING AT DOOR NO.21A, JAYAPRAKASH STREET, P.O.KOTTUR, MALAYANDIPATTANAM, POLLACHI TALUK, TAMIL NADU. BY ADV. SRI.D.KRISHNA PRASAD, SRI JOJI VARGHESE, SRI.HARI SHARMA.M. ## RESPONDENT(S)/DEFENDANTS: --------------- 1. STATE OF KERALA, REP. BY THE DISTRICT COLLECTOR, PALAKKAD. 2. THE EXECUTIVE ENGINEER, P.W.D.LOCAL WORK DIVISION, PALAKKAD 678 014. 3. SREE KUMAR, S/O.JANARDHANAN PILLAI, ASSISTANT ENGINEER, LOCAL WORK SECTION OFFICE, PUBLIC WORKS DEPARTMENT, CHITTUR, CHITTUR TALUK, PALAKKAD. 4. THE DISTRICT COLLECTOR, COLLECTORATE, CIVIL STATION, COIMBATORE, TAMIL NADU. 5. THE TAHSILDAR, POLLACHI, TAMIL NADU. ADV. SRI.T.B.THANKAPPAN FOR R3 GOVERNMENT PLEADER SHRI MATHEW GEORGE VADAKKEL FOR R1 & R2 0 THIS APPEAL SUITS HAVING BEEN FINALLY HEARD ON 31.3.2009, THE COURT ON THE SAME DAY DELIVERED THE FOLLOWING: ## **C.R.** ## **THOMAS P. JOSEPH, J.** **-------------------------------------A.S.No.958 of 1996 -------------------------------------Dated this the 31[st] day of March, 2009.** ## **JUDGMENT** Appellant/plaintiff challenges dismissal of the suit for a declaration that he is not liable to pay the amount demanded by respondent No.5, Tahsildar (Revenue Recovery) pursuant to notice No.NK.20624/94-A dated 12/1994 or any other amount to the respondents and a consequential injunction to restrain the respondents from recovering such amount from him pursuant to the said notice. 2. Appellant is an A class PWD contractor. It is not disputed that he was entrusted with the work of two units of quarters, one for Deputy Range Officer, Thekkady and the other, for the Forest Guards, Thekkady as per separate agreements. Building materials such as cement and steel were entrusted to the appellant on 26.9.1987. Appellant states that though he had constructed the quarters for Deputy Range Officer partly, it could not be completed as the respondents did not provide him with route permit for transportation of cement and steel through forest area and hence he surrendered building materials to respondent No.3 as per Ext.A1, letter dated 28.9.1989. On 15.10.1993 appellant got a letter from respondent No.2 directing him to return the materials or remit its value. Thereon appellant issued notice to respondent No.3 on 8.9.1993 to return such materials or to pay the amount. **AS No.958/1996** 2 Respondent No.3 refuted his liability and hence the suit. Respondents contended that there was no negligence on their part, whatever were required to be done on their part had been done and that it was the negligence of the appellant which resulted in the work not being completed. They also contended that it was the responsibility of the appellant to obtain necessary route permit for transporting building materials to the work site. It is incorrect to say that the materials were returned to respondent No.3. Appellant gave only an information regarding storage of the materials in his custody. Appellant was directed to hand over the duplicate key of the place where the materials were stocked and to comply with Store Rules as per Government Order but he failed to do so. Hence, revenue recovery was advised for realisation of Rs.84,436/- being the value of building materials from the appellant. It is also contended that since there is no allegation of fraud in the plaint, suit is not maintainable under Section 72 of the Revenue Recovery Act (for short, “the Act”). Learned Sub Judge framed issue whether suit is not maintainable under the provisions of the Act and whether appellant is liable to pay the sum of Rs.84,436/- as per demand made by respondent No.5. Learned Sub Judge found that in the absence of allegation of fraud in the plaint and much less evidence, suit is hit by Section 72 of the Act. On the issue regarding liability of the appellant to pay the amount, **AS No.958/1996** 3 learned Sub Judge found that there is no evidence to show that building materials were returned to respondent No.3 as claimed by the appellant and consequently dismissed the suit. Hence this appeal. 3. Following questions arise for a decision: I. Whether finding of the learned Sub Judge as to maintainability of the suit is correct? ## II. Whether appellant is entitled to the relief prayed for? 4. **Point No.I** : It is relying on Section 72 of the Act that respondents contended that in the absence of specific allegation of fraud, suit is not maintainable. Learned counsel for appellant contended that on the facts of the case and in the nature of reliefs claimed, Section 72 of the Act has no application. At any rate, there are sufficient averments in the plaint regarding fraud and hence the suit is saved by the proviso to Section 72. Learned Government Pleader appearing for respondents contended that though there is a one line statement in paragraph 5 of the plaint that there was fraud on the part of respondent No.3, particulars of such fraud as required under the provisions of **AS No.958/1996** 4 Order VI Rule 4 of the Code of Civil Procedure (for short, “the Code”) are not given in the plaint and hence the one line statement in paragraph 5 of the plaint is not sufficient to bring the suit within the mischief of the proviso to Section 72. 5. Section.72 of the Act states that except as otherwise expressly provided in the Act, all questions arising between the Collector or the authorised officer and the defaulter or his representative or any other person claiming any right through the defaulter relating to the execution, discharge or satisfaction of a written demand issued under the Act or relating to the confirmation or setting aside of an order of sale held in execution of such demand shall be determined not by suit but by order of Board of Revenue or the Collector. Proviso to Section 72 states that a suit may be brought in a civil court in respect of any such question on the ground of fraud. 6. The first question that arises for a decision is whether the suit comes within the mischief of the earlier part of Section 72 of the Act. In this case, appellant disputed his liability to pay any amount as per demand notice issued by respondent No.5 pursuant to the requisition for recovery of the amount at the instance of respondent Nos.1 to 3. According to the respondents, amount sought to be recovered from the appellant represents **AS No.958/1996** 5 value of building materials entrusted to the appellant. It is the contention of appellant that he has already returned the materials to respondent No.3 and hence he is not liable to pay any amount as claimed by the respondents. In short, appellant is disputing his liability to pay the amount and wanted a declaration that he is not liable to pay any amount to the respondents. Section 34 of the Specific Relief Act, 1963 deals with the power of the court to grant declaration and states that the court may in its discretion grant a declaration as to any legal character, or to any right as to property. The Allahabad High Court in **Mahabir Jute Mills v. Firm Kedar Nath (AIR 1960 Allahabad 254)** held that a suit for declaration that a contract does not subsist and the plaintiff is not liable for its breach is not maintainable. The Madhya Pradesh High Court in **State of Madhya Pradesh v. Khan Bahadur (AIR 1971 MP. 65)** held that a suit for a declaration as to plaintiff's liability to pay only a particular sum as rent is not maintainable. The view taken in the above cases is that it is Section 42 of the Specific Relief Act, 1877 (corresponding to Section 34 of Act 47 of 1963) which confers power on the court to grant declaration and that the declaration prayed for did not relate to “legal status” or “right to property” as stated in Section 42. But the Supreme Court has held that Section 34 of the Specific Relief Act, 1963 did not exhaust the power of the court to grant declaratory reliefs. In **Ashok Kumar Srivastav v. National Insurance Co. Ltd. (AIR 1998** **AS No.958/1996** 6 **SC 2046)** the Supreme Court considered the question whether court could grant a declaration that termination of service is illegal. Answering the question in the affirmative, it was held that, “.......S.34 is enough to open the corridors of civil courts to admit suits filed for a variety of declaratory reliefs................ It is well to remember that even the wide language contained in S. 34 did not exhaust the powers of the court to grant declaratory reliefs.........”. It is therefore competent for the civil court to grant declaratory reliefs even beyond the scope of Section 34 of the Specific Relief Act. Hence a declaration as prayed for by the appellant as to his liability to pay the amount claimed by respondent Nos.1 to 3 could be granted by the civil court. 7. Section 72 of the Act comes into operation only when a question arises between the Collector or the authorised officer and the defaulter or his representative or any other person claiming any right through the defaulter, relating to the execution, discharge or satisfaction of a written demand issued under the Act or relating to the confirmation or setting aside by an order issued under the Act of a sale held in execution of such demand which is required to be **AS No.958/1996** 7 determined by the Board of Revenue or the Collector, and not by suit. Proviso to Section 72 only saved a suit in respect of the question referred to in the earlier part of that Section which is otherwise required to be decided by the Board of Revenue or the Collector, provided such suit is brought on allegation of fraud. In this case the relief of injunction sought against recovery of the amount stated in the demand notice issued under the Act is consequential to the declaration appellant has prayed for, that he is not liable to pay any amount as he has already returned the materials to respondent No.3. Section 72 of the Act does not take away the jurisdiction of the courts to grant declaratory reliefs and consequential reliefs. The questions whether appellant has returned the materials to respondent No.3 and any amount is due from the appellant to respondent Nos.1 to 3 and whether appellant is entitled to the declaration and consequential reliefs are not matters required to be decided by the Board of Revenue or the Collector under any of the provisions of the Act. Those questions are required to be decided by a suit. If the court decides those questions in favour of the appellant, he is entitled to the consequential relief of injunction against recovery of the amount, be it under the provisions of the Act or any other mode available to the respondents. A suit for a declaration of the nature prayed for and a consequential injunction is one of a civil nature triable by the civil court. That jurisdiction is not expressly or impliedly barred by the **AS No.958/1996** 8 provisions of the Act. In that view, Section 72 of the Act has no application to the facts of this case. Learned Sub Judge was not correct in holding that the suit is not maintainable for want of sufficient pleadings as to fraud to bring the suit within the scope of the proviso to Section 72 of the Act. I hold that the suit is maintainable in the civil court. **8. Point No.II** : Next question is whether appellant is entitled to a declaration as prayed for. Allegations made by the appellant and the counter allegations made by the respondents which are not necessary for deciding the point involved in this case excluded, the only question is whether the building materials collected by the appellant from respondent Nos.2 and 3 on 26.9.1987 had been surrendered to respondent No.3 as claimed by the appellant as per Ext.A1, letter dated 28.9.1989. If the materials had been surrendered as claimed by the appellant, he cannot be asked to pay the value of those materials. Appellant stated as PW1 that he returned the materials to respondent No.3 as per Ext.A1. But he would admit that apart from Ext.A1 and the endorsement on it (Ext.A1(a)) made by respondent No.3, there is no other material with him to substantiate that claim of his. In Ext.A1, copy of the letter dated 28.9.1989 addressed to respondent No.3, appellant states that it is difficult for him to take the building materials to the work site and hence **AS No.958/1996** 9 respondent No.3 is informed that the materials have been stocked in the building owned by one Balakrishnan, Baby Vihar, Kumankattil and at Kittaman Kovil, the place of stay of the appellant. As per Ext.A1(a), respondent No.3 endorsed that appellant should handover the duplicate key (of the building where as per Ext.A1, the materials are said to be stocked) to the Work Superintendent concerned and that the appellant should follow the Stores Rules as per the Government Order. There is no case and much less evidence to show that the direction contained in Ext.A1(a) was complied with by the appellant. Interpreting Exts.A1 and A1(a), learned Sub Judge found that it is not as if materials were surrendered to respondent No.3 but, the materials continued to be in the custody of the appellant who merely gave an intimation to respondent No.3 as to the place where he had stocked it. 9. In the course of evidence appellant developed a case that the building materials had been taken by respondent No.3 for construction of his house. On that also, appellant admitted that he has no evidence to offer. That allegation was specifically denied by respondent No.3 in his evidence as DW1. In Ext.B9, copy of letter dated 22.10.1993 sent by the appellant to the Executive Engineer, PWD what the appellant stated is that without his permission the Kerala Forester (respondent No.3 is the Assistant Executive Engineer, PWD) **AS No.958/1996** 10 took away the remaining materials. Thus, there is no acceptable evidence to show that the materials were surrendered to the PWD through any of its officials including respondent No.3. If that be so, appellant cannot dispute his liability to pay the value of the materials to the Department. The declaration and the consequential relief of injunction prayed for were therefore, rightly disallowed by the court below. Appeal fails. It is dismissed. No costs. C.M.P.No.5899 of 1996 will stand dismissed. **THOMAS P.JOSEPH, Judge.** **cks** **AS No.958/1996** 11 **Thomas P.Joseph, J. A.S.No.958 of 1996 JUDGMENT 31[st] March, 2009.**
End of Judgment Record
Browse All High Court of Kerala (2009) Decisions
2009-06-26

Nishana Mol.N v Alappuzha Municipality & Secretary, Alappuzha Municipality

This writ petition concerns the registration of a marriage under the Kerala Registration of Marriages (Common) Rules, 2008 (Common Rules). The petitioner Nishana Mol.N, whose marriage was solemnized on 8 March 2009, sought registration of her marriage by the Local Registrar. Her husband was abroad, and she submitted Form No. 1 along with documents; however, the Local Registrar demanded the presence of both spouses for registration, a point contested by the petitioner. The court recalls the apex court’s directions in Seema v. Ashwani Kumar (2006) to frame rules ensuring compulsory registration to protect women and provide evidence of marriage, while noting that registration under the Rules does not itself create a marriage but evidences one solemnized otherwise. The Rules specify that registration is mandatory for marriages solemnized within the state, with various procedural requirements (Rules 5, 6, 9, 10, 11, 13, 16, 17) and mechanisms for correction, appeal, and re-registration. The court clarifies that the presence of both parties is not ordinarily required; the registrar may require appearance only in cases where there is reasonable doubt about identity, and even then as an exception rather than a rule. Ultimately, the court directs that registration and certificate issuance be completed within one month from copy of the judgment, without insisting on joint appearance, provided the memorandum is in order.

2009-07-27

Abdul Majeed Kalathil v. District Collector, Malappuram & Others

This batch of writ petitions concerns the constitutional validity of Section 17 of the Kerala Anti-Social Activities (Prevention) Act, 2007, and the power of District Magistrates to confiscate vehicles used in anti-social activities. The petitions challenge the absence of a substantive prohibition against using vehicles for anti-social activities and the lack of a defined procedure for confiscation or an appellate remedy. In W.P.C. No. 9925 of 2009 (the lead case), Abdul Majeed Kalathil contends that his goods carriage KL 11-B/6651 was seized by the Sub Inspector of Pandikkad Police and reported to the District Collector, Exts.P1–P2. The court scrutinizes Section 17's scope, defining anti-social activity (Section 2(a)) and whether the District Collector’s power to confiscate is constitutionally tenable. It finds Section 17 to be vague and violative of Articles 14, 19(1)(g) and 21, as it rests on subjective police satisfaction with no clear standards or process. It also notes environmental objectives but concludes that fundamental rights must prevail. The court does not sustain confiscation under Section 17; instead, it directs that such vehicles be dealt with under the Kerala Protection of River Banks and Regulation of Removal of Sand Act, 2001 and Rules, with interim release under specified conditions. It further directs initiation of Sand Act proceedings within a month and finalization within another month. The writ petitions are disposed of accordingly, preserving the rule of law and environmental protection.

2009-06-11

WA No. 671 of 2006 (Fertilizers and Chemicals Travancore Ltd v Union of India)

This writ appeal concerns the pay revision and pensionary benefits of employees of the Fertilizers and Chemicals Travancore Ltd (FACT). The long-term settlement covering terms of employment expired on 31 December 1996. A fresh settlement was concluded (notified 28 August 2001) and made retroactive to 1 January 1997, with revisions in wages and benefits. Clause 29 of Ext. P1 provides that arrears relating to wage revision and dearness allowance for the period 1 January 1997 to 30 June 2001 will be reviewed and decided by management/government only when the company earns profits for at least three consecutive years; Clause 33.1 provides that employees who retired on or after 1 January 1997 will be eligible for arrears calculated from 1 January 1997 to the date of retirement, subject to adjustments for interim relief already paid, with any unclaimed amount transferred to a Welfare Fund. The appellants—the retirees who fall in the 1 January 1997 to 1 July 2001 window—argue that they were denied arrears and were paid pensionary benefits at pre-revised rates, creating discrimination. Respondents contend Ext. P1 binds the parties and arrears depend on profits, and that pay revision administered to others does not compel retroactive change. The court held that Ext. P1 terms survive as terms of employment and directed the management to consider terminal benefits at revised rates within two months and to release arrears when paid to current workers, with connected matters following."

2009-05-29

M/S. Palm Fibers & Yars Trading Co. v. State of Kerala & Others

The petitioner, a Small Scale Industrial unit, ran two LT power connections (No.13070 and No.13427) with commercial production starting in July 1994 and July 1995. On 06/02/1992, the Government issued Ext.P1 guaranteeing concessional tariffs (pre-1992 tariff) for five years from the date of commencement or substantial capacity expansion, certified by the District Industries Centre. Ext.P2 certified eligibility for this concession. Subsequently, the petitioner increased power demand to 300 KVA and was reclassified/advised to HT status from 15/05/1998, converting LT supply to HT. The petitioner argued that Ext.P1 benefits should extend for the full five-year period, covering the LT quantities certified in Ext.P2, and that the HT conversion was a mere reclassification directed by the Board, not a cessation of eligibility. The Board argued Ext.P1 targets only those who commenced production during 1992–1996 and that HT conversion from 15/05/1998 falls outside the Ext.P1 window, rendering the petitioner eligible only up to 15/05/1998. Earlier orders (Ext.P3) had set aside a cut-off date for merits, and Ext.P6/Ext.P4 handled appeals. Ultimately, the Court held that the HT conversion was outside Ext.P1’s period, but directed that the LT benefits for the two LT connections be extended only until 23/05/1998 (LT dismantling date) and without reimbursement from the Industries Department, as held in OP No.7622/1998. The petition was disposed of as above.