Supreme Court of IndiaSupreme Court · 2024Division BenchAppeal allowed.

R.P. Garg v. The Chief General Manager, Telecom Department & Ors.

Case / Petition Number:
Civil Appeal No. 10472 of 2024
Neutral Citation:[2024] 9 S.C.R. 763 : 2024 INSC 743

Case Synopsis & Summary

This Civil Appeal concerns the entitlement to post-award interest on the sums awarded by an Arbitral Award under the Arbitration and Conciliation Act, 1996. The Arbitrator, while allowing the appellant’s claim, denied post-award interest on the ground that the arbitration agreement prohibited it. The District Court later granted post-award interest at 18% per annum, which the High Court reversed, accepting that the contract prohibited such interest. The Supreme Court allowed the appeal, holding that under Section 31(7)(b) of the Act, a sum directed to be paid by an arbitral award shall carry interest, and this is not contingent on the contract between the parties for post-award periods. The Court clarified the distinction between pre-award (Section 31(7)(a)) and post-award (Section 31(7)(b)) interest, and that the latter is not subject to party autonomy; the rate may be set by the Arbitrator, with statutory rates applying if not specified. The judgment also distinguishes Jaiprakash Associates Ltd. v. Tehri Hydro Development Corporation (India) Ltd. (pendente lite interest) as inapplicable to post-award interest, and cites Morgan Securities & Credits (P) Ltd. v. Videocon Industries Ltd. to support the principle. The District Court’s order granting 18% post-award interest is restored, with costs borne by the parties.

Precedent Explorer

Find Cases Like This

Explore other judgments dealing with similar legal situations, facts, or statutory provisions.

Case Details & Bench

Court
Supreme Court of India
Hon'ble Judges
  • Pamidighantam Sri Narasimha
  • Sandeep Mehta
Judgment Date
2024-09-10
Court Decision / Holding
The appeal is allowed. The High Court’s 14.05.2019 decision is set aside, and the First Appellate Court’s order dated 04.03.2003 granting post-award interest at 18% p.a. is restored. Parties shall bear their own costs.
Final Disposition
Appeal allowed.

Parties to the Case

Appellants / Petitioners

  • R.P. Garg

Respondents

  • The Chief General Manager, Telecom Department & Ors.

Legal Representation & Advocates

Counsels for Petitioners

  • • Parikshit Mahipal
  • • Vaibhav Kumar Garg
  • • Ms. Savita Garg
  • • Ms. Shivani Mahipal
  • • Ms. Bushra Parveen

Counsels for Respondents

  • • Pradeep Kumar Mathur
  • • Chiranjeev Johri
  • • M.K. Tiwari
  • • Gurmeet Singh Makker

Provisions of Law Cited

Arbitration and Conciliation Act, 1996Section 31(7)(a)Section 31(7)(b)Section 11

Legal Doctrines & Maxims

  • Post-award interest is not subject to contract between the parties under Section 31(7)(b).
  • Distinction between pre-award and post-award interest under Section 31(7).
  • Clause (a) permits interest subject to the arbitration agreement; Clause (b) governs post-award interest independent of contract, with rate determined by the arbitrator or statutory defaults.
  • Jaiprakash Associates Ltd. v. Tehri Hydro Development Corporation (India) Ltd. is distinguished as limited to pendente lite interest and not applicable to post-award scenarios.

Submissions & Arguments

Contentions of Appellants / Petitioners

The appellant contends that post-award interest on the sum awarded by the Arbitral Award is mandated by Section 31(7)(b) and cannot be negated by any contract clause prohibiting it. The court must recognize that post-award interest flows from the award itself, with rate determined by the Arbitrator, and that the expression 'unless the award otherwise directs' relates to rate, not entitlement. The High Court’s reliance on contractual clauses was erroneous. The decision in Morgan Securities & Credits (P) Ltd. v. Videocon Industries Ltd. supports the view that post-award interest is not confined by contract, and Jaiprakash Associates is distinguishable as it pertains to pendente lite interest. For these reasons, the appeal should be allowed and the District Court’s order granting 18% post-award interest should be affirmed.

Contentions of Respondents

The respondents argue that the contract explicitly disallows interest on certain payments, including post-award interest, and the arbitration agreement cannot override this. They rely on Jaiprakash Associates to support the proposition that contractual prohibitions govern interest, and contend that the High Court correctly held that the contract barred post-award interest. They also argue that the rate of interest is a matter governed by the contract and the Court should not read Section 31(7)(b) to override express contract terms. In their view, the clause 'No interest will be payable...' anchors the position and pendente lite concepts from Jaiprakash are not relevant here.

Legal Doctrine & Issue Explorer

Explore This Legal Issue

Find relevant judgments and authoritative positions on the legal questions discussed here.

Cited Precedents (2)

Case NameCitationTreatmentExplanation
Jaiprakash Associates Ltd. v. Tehri Hydro Development Corporation (India) Ltd.[2019] 2 SCR 41 : (2019) 17 SCC 786DistinguishedThe Court distinguished Jaiprakash on the issue of pendente lite interest and held it inapplicable to post-award interest.
Morgan Securities & Credits (P) Ltd. v. Videocon Industries Ltd.[2022] 9 SCR 819 : (2023) 1 SCC 602PositiveMorgan Securities affirmed that post-award interest is not subject to contractual prohibitions and supported the Court’s view.
Case Applicability Diagnostic

Apply This to My Facts

Share your situation and test whether this judgment governs, supports, or challenges your case.

Official Judgment Record
•2,242 words•~11 min read

In The Court Record

R.P. Garg v. The Chief General Manager, Telecom Department & Ors.

[2024] 9 S.C.R. 763 : 2024 INSC 743 ## **R.P. Garg** **v.** ## **The Chief General Manager, Telecom Department & Ors.** (Civil Appeal No. 10472 of 2024) 10 September 2024 ## **[Pamidighantam Sri Narasimha* and Sandeep Mehta, JJ.]** ## **Issue for Consideration** Whether the appellant is entitled to post-award interest on the sum awarded by the Arbitrator. ## **Headnotes[†]** **Arbitration and Conciliation Act, 1996 – s.31(7)(b) – Grant of post-award interest, not subject to the contract between the parties – Appellant claimed payment of post-award interest, denied on the ground that the contract between the parties did not permit it – Correctness:** **Held:** Not correct – By virtue of s.31(7)(b), a sum directed to be paid by an Arbitral Award shall carry interest – s.31(7)(b) deals with grant of interest for post award period i.e., from the date of the award till its realization – The statutory scheme relating to grant of interest provided in s.31(7) creates a distinction between post-award and pre-award interest – s.31(7)(a) regulates pre-award interest and provides that the grant of interest shall be subject to the agreement between the parties as is evident from the expression at the commencement of the sub-section “unless otherwise agreed by the parties” – Whereas, so far as the entitlement of the post-award interest is concerned, s.31(7)(b) provides that the sum directed to be paid by the Arbitral Tribunal shall carry interest – The rate of interest can be provided by the Arbitrator and in default the statutory prescription will apply – Thus, s.31(7)(b) is not subject to party autonomy and is in contrast with s.31(7)(a) as it does not give the parties the right to “contract out” interest for the post-award period – Further, the expression ‘unless the award otherwise directs’ in s.31(7)(b) relates to rate of interest and not entitlement of interest – The only distinction made by s.31(7)(b) is that the rate of interest granted under the Award is to be given precedence over the statutorily prescribed rate – Impugned judgment of the High Court set aside – Judgment of the First * Author [2024] 9 S.C.R. 764 ## **Digital Supreme Court Reports** Appellate Court-District Court granting 18% interest from the date of the award to its realization, restored. [Paras 9, 11, 13] ## **Case Law Cited** _Jaiprakash Associates Ltd. v. Tehri Hydro Development Corporation (India) Ltd._ **[2019] 2 SCR 41 : (2019) 17 SCC 786 – held inapplicable.** _Morgan Securities & Credits (P) Ltd. v. Videocon Industries Ltd._ **[2022] 9 SCR 819 : (2023) 1 SCC 602 – relied on.** ## **List of Acts** Arbitration and Conciliation Act, 1996. ## **List of Keywords** Post-award interest; Pre-award interest; Contract/agreement between the parties; Telecom Department; Arbitration Agreement; Party autonomy. ## **Case Arising From** CIVIL APPELLATE JURISDICTION: Civil Appeal No. 10472 of 2024 From the Judgment and Order dated 14.05.2019 of the High Court of Punjab & Haryana at Chandigarh in CR No. 2561 of 2003 (O&M) ## **Appearances for Parties** Parikshit Mahipal, Vaibhav Kumar Garg, Ms. Savita Garg, Ms. Shivani Mahipal, Ms. Bushra Parveen, Advs. for the Appellant. Pradeep Kumar Mathur, Chiranjeev Johri, M.K. Tiwari, Gurmeet Singh Makker, Advs. for the Respondents. ## **Judgment / Order of the Supreme Court** ## **Judgment** ## **Pamidighantam Sri Narasimha, J.** 1. Leave granted. 2. The short question before us is whether the appellant is entitled to post award interest on the sum awarded by the Arbitrator. The Arbitrator [2024] 9 S.C.R.  765 ## **R.P. Garg v. The Chief General Manager, Telecom Department & Ors.** denied payment of such interest under a misplaced impression that the contract between the parties prohibited it. The executing Court[1] affirmed the finding of the Arbitrator and rejected the prayer. However, allowing the appeal, the District Court[2] held that the appellant will be entitled to post award interest. By the order impugned before us, the High Court[3] allowed the revision and set aside the District Court order while holding that the contract between the parties did not permit grant of post award interest. - 2.1 For the reasons to follow, while allowing the appeal we have held that as this is a case arising out of the Arbitration and Conciliation Act, 1996,[4] by operation of Section 31(7)(b), the _sum_ directed to be paid under the Arbitral Award shall carry interest. This is a first principle. A sum directed to be paid by an Arbitral Award must carry interest. In this view of the matter, we have restored the judgment of the District Court granting 18% interest from the date of the award to its realization. The short facts are as under: 3. A contract was executed on 17.10.1997 between the appellant contractor, and the Telecom Department of Haryana, Respondents 1 and 2 herein, for trenching and laying of underground cables. Terms of the contract required the appellant to furnish a security of Rs. 10 Lakhs. Disputes that arose with respect to non-payment of bills submitted by the appellant during execution of the contract were referred to Arbitrator appointed under Section 11 of the Act on 24.10.2000. 4. The Arbitrator passed the Award on 08.03.2001. In the said Award, though the claim of the appellant was allowed, his plea for interest was denied on the ground that there is a specific clause in the Arbitration Agreement prohibiting the same. 5. During execution of the Award, the appellant claimed payment of post award interest on the Award by raising a specific objection to that effect. However, the learned Civil Judge, Senior Division vide his order dated 10.10.2002 dismissed the objection and affirmed the original award. - 1 Order in M.A No. 19 of 2001 dated 10.10.2002. > 2 Order passed by the District Judge in Civil Appeal no.86 of 11.11.2002 dated 04.03.2003 > 3 Order dated 14.05.2019 passed by the High Court of Punjab and Haryana in Civil Revision No. 2561 of 2003 - 4 Hereinafter referred to as ‘the Act’ [2024] 9 S.C.R. 766 ## **Digital Supreme Court Reports** 6. Aggrieved, the appellant filed an appeal. The District Judge allowed the appeal and by Order dated 04.03.2003 directed payment of post award interest at the rate of 18% on the Award amount. The appellant was also directed to approach the trial court for recovery of the same. 7. Being aggrieved, the Telecom Department, the respondent herein, filed a Civil Revision Petition before the High Court which was allowed by the High Court by the order impugned before us. The High Court looked into sub-clause (iv) of Clause 1 of the Contract entered between parties which provides for the scope of the grant of interest on certain payment. The sub clause is as under:- - “ _No interest will be payable on the earnest money or security deposit amount or any amount payable to the contractor under the contract._ ” 8. Assuming that the above referred clause of interest is an agreement between the parties prohibiting the grant of interest, the High Court proceeded to allow the Revision and set aside the grant of interest. The High court referred to the decision of this Court in _Jaiprakash Associates Ltd. v. Tehri Hydro Development Corporation (India) Ltd.[5]_ and came to the conclusion that the Supreme Court has laid down a precedent that interest cannot be paid when a contractual clause specifically prohibits it. 9. We are of the opinion that the judgment of High Court is clearly erroneous. Firstly, the interest granted by the First Appellate Court only related to post award period, and therefore, for this period, the agreement between the parties has no bearing. Section 31(7)(b) deals with grant of interest for post award period i.e., from the date of the award till its realization. The statutory scheme relating to grant of interest provided in Section 31(7) creates a distinction between interest payable before and after the award. So far as the interest before the passing of the award is concerned, it is regulated by Section 31(7)(a) of the Act which provides that the grant of interest shall be subject to the agreement between the parties. This is evident from the specific expression at the commencement of the sub-section which says “unless otherwise agreed by the parties”. 5 [2019] 2 SCR 41 : (2019) 17 SCC 786 [2024] 9 S.C.R.  767 ## **R.P. Garg v. The Chief General Manager, Telecom Department & Ors.** 10. The relevant extract of Section 31 of the Act is reproduced herein for ready reference: ## **“** _**31 Form and contents of arbitral award** ._ _“…_ _7(a) Unless otherwise agreed by the parties, where and in so far as an arbitral award is for the payment of money, the arbitral tribunal may include in the sum for which the award is made interest, at such rate as it deems reasonable, on the whole or any part of the money, for the whole or any part of the period between the date on which the cause of action arose and the date on which the award is made._ _(b) A sum directed to be paid by an arbitral award shall, unless the award otherwise directs, carry interest at the rate of two per cent, higher than the current rate of interest prevalent on the date of award, from the date of award to the date of payment.”_ 11. So far as the entitlement of the post-award interest is concerned, sub-Section (b) of Section 31(7) provides that the sum directed to be paid by the Arbitral Tribunal _shall_ carry interest. The rate of interest can be provided by the Arbitrator and in default the statutory prescription will apply. Clause (b) of Section 31(7) is therefore in contrast with clause (a) and is not subject to party autonomy. In other words, clause (b) does not give the parties the right to “contract out” interest for the post-award period. The expression ‘unless the award otherwise directs’ in Section 31(7)(b) relates to rate of interest and not entitlement of interest. The only distinction made by Section 31(7) (b) is that the rate of interest granted under the Award is to be given precedence over the statutorily prescribed rate. The assumption of the High Court that payment of the interest for the post award period is subject to the contract is a clear error. 12. The clear position of law that granting post-award interest is not subject to the contract between the parties was recently affirmed in the decision of this Court in _Morgan Securities & Credits (P) Ltd. v. Videocon Industries Ltd.,[6] wherein the court observed as follows:_ 6 [2022] 9 SCR 819 : (2023) 1 SCC 602 [2024] 9 S.C.R. 768 ## **Digital Supreme Court Reports** _“24. The issue before us is whether the phrase “unless the award otherwise directs” in Section 31(7)(b) of the Act only provides the arbitrator the discretion to determine the rate of interest or both the rate of interest and the “sum” it must be paid against. At this juncture, it is crucial to note that both clauses (a) and (b) are qualified. While, clause (a) is qualified by the arbitration agreement, clause (b) is qualified by the arbitration award. However, the placement of the phrases is crucial to their interpretation. The words, “unless otherwise agreed by the parties” occur at the beginning of clause (a) qualifying the entire provision. However, in clause (b), the words, “unless the award otherwise directs” occur after the words “a sum directed to be paid by an arbitral award shall” and before the words “carry interest at the rate of eighteen per cent”. Thereby, those words only qualify the rate of post-award interest._ _25. Section 31(7)(a) confers a wide discretion upon the arbitrator in regard to the grant of pre-award interest. The arbitrator has the discretion to determine the rate of reasonable interest, the sum on which the interest is to be paid, that is whether on the whole or any part of the principal amount, and the period for which payment of interest is to be made — whether it should be for the whole or any part of the period between the date on which the cause of action arose and the date of the award. When a discretion has been conferred on the arbitrator in regard to the grant of pre-award interest, it would be against the grain of statutory interpretation to presuppose that the legislative intent was to reduce the discretionary power of the arbitrator for the grant of post-award interest under clause (b). Clause (b) only contemplates a situation where the arbitration award is silent on post-award interest, in which event the award-holder is entitled to a post-award interest of eighteen per cent.”_ 13. The High Court, therefore, committed an error in relying on the decision of this Court in _Jaiprakash_ (supra). The judgement in _Jaiprakash_ deals with the issue of prohibition of _pendente-lite_ interest and will have no application to the facts of the present case where the claim relates to post-award interest. [2024] 9 S.C.R.  769 ## **R.P. Garg v. The Chief General Manager, Telecom Department & Ors.** 14. In view of the above, the appeal is allowed. The judgment of the High Court in Civil Revision No. 2561 of 2003 (O&M) dated 14.05.2019 is set-aside, and the decision of the First Appellate Court in C.A No. 86 of 11.11.02 dated 04.03.2003 for granting interest @ 18% p.a. is restored. 15. Parties shall bear their own costs. _Result of the Case:_ Appeal allowed. - _†Headnotes prepared by:_ Divya Pandey
End of Judgment Record
Browse All Supreme Court of India (2024) Decisions
2024-04-09

Kizhakke Vattakandiyil Madhavan (Dead) Thr. Lrs. v. Thiyyurkunnath Meethal Janaki and Ors

This appeal concerns partition of a family property in Eravattur, Kozhikode, governed by pre-1956 Mitakshara succession. Madhavan died before 1910; his widow Chiruthey remarried Neelakandan, triggering Section 2 of the Hindu Widow’s Remarriage Act, 1856, which extinguishes a widow’s rights in her deceased husband’s property on remarriage. Chiruthey’s second marriage, and a sequence of instruments dated 1910–1925—back-to-back deeds creating a lease in favour of Cheriyamma and her son (Exhibits A-20 and A-1) and an assignment (Exhibit A-2)—formed the basis for Chandu (the plaintiff) and Sankaran’s successors-in-interest to seek partition in OS 157/1985. The Trial Court granted partition to the plaintiff; the First Appellate Court dismissed; the Kerala High Court restored the Trial Court’s decree. The Supreme Court, however, allowed the appeal. It held that on remarriage the widow’s title over Madhavan’s property stood lapsed under Section 2; yet the back-to-back deeds involved Nangeli (Madhavan’s mother) and Sankaran, who retained an interest. Exhibit A-20 was treated as a valid conveyance, but Chiruthey’s own title did not survive; the lease purportedly created by A-1 could not extend beyond its 12-year term. Consequently, the plaintiff’s claim for partition could not be sustained, and the appeal was allowed with the trial/decree of the lower courts set aside.

2024-10-04

Banshidhar Construction Pvt. Ltd. v. Bharat Coking Coal Limited & Others

Banshidhar Construction Private Limited (the appellant) challenged Bharat Coking Coal Limited’s tender for a mega project to salvage, develop, and operate a coal mine under a revenue-sharing arrangement for 25 years. The tender NIT dated 16.08.2023 imposed stringent eligibility criteria, including Clause 10 requiring financial capacity documentation and a Power of Attorney for signing bids. The appellant contended that its Power of Attorney (dated 07.11.2023 and notarised 14.11.2023) was valid, and its bid documents were uploaded before the last submission date (01.12.2023). Technical bids opened on 04.12.2023, yet the appellant was declared technically disqualified on 06.05.2024 on grounds that it did not meet Clause 10. Meanwhile, Respondent No.8 was declared technically qualified and later found to be the successful bidder after financial bids were opened on 07.05.2024, despite non-compliance with the “mandatory” Clause 10 documents, including delayed Audited Balance Sheets. The High Court dismissed the writ petition. The Supreme Court, while acknowledging limited review in mega-project tenders, held that public authorities must act with fairness, transparency, and without arbitrariness or malafides. It held that the Power of Attorney requirement was satisfied and that accepting the non-compliant Respondent No.8 while rejecting the appellant was arbitrary. The Court set aside the impugned decision and permitted a fresh tender process in accordance with law, reaffirming that Article 14 requires equal treatment and non-arbitrariness in public procurement.

2024-03-21

Union of India v. M/s Indian Oil Corporation Ltd.

This Supreme Court judgment concerns an appeal by the Union of India challenging a batch of Allahabad High Court orders that directed refunds to IOCL for a difference of approx. 110 km in freight charges on the Baad–Hisar route. IOCL had been charged on the basis of a distance of 444 km under the old Local Distance Table; following Railway Ministry circulars in 2004 and 2005 rationalizing the rounding-off of chargeable distance, the distance was reduced to 333.18–334 km in practice. IOCL issued notices under Section 106 of the Railways Act, 1989 (formerly Section 78-B of the Railways Act, 1890) seeking refunds of the alleged overcharge, and 122 consignments were paid at the old distance before the authorities corrected the distance. The Railway Claims Tribunal dismissed most claims as time-barred, while the Allahabad High Court allowed IOCL’s appeals, holding that the original 444 km charge was an “illegal charge” rather than an overcharge, and thus protected by equity. The Union of India challenged this, arguing that Section 106(3) only covers refunds of overcharges and not illegal charges; that the change in distance stemmed from policy rationalization and circulars, not an erroneous charge. The Court distinguishes Hindustan Petroleum, clarifies the overcharge/illegal charge distinction, and ultimately holds that the 444 km distance was illegal. As a result, the Union’s appeals are dismissed, and IOCL’s refunds for the difference would be payable to IOCL. The matter underscores the nuanced interplay between statutory time limits, chargeable distance, and the nature of the charge in refund claims.

2024-07-23

Gene Campaign & Anr. v. Union of India & Ors.

This is a batch of writ petitions initiated in 2004–2005 addressing the environmental and regulatory treatment of GM crops, specifically the environmental release of transgenic mustard DMH-11 (Dhara Mustard Hybrid-11). The Supreme Court examined whether GEAC’s 18.10.2022 conditional approval and the 25.10.2022 decision were legally sound, whether they violated Article 21 (right to a safe environment) and whether the precautionary principle was properly applied. The court undertook a comprehensive review of the regulatory framework under the Environment Protection Act, 1986 and the 1989 Rules, as well as the Technical Expert Committee (TEC) reports and Parliamentary Standing Committee recommendations. A key feature is the dual opinions: Justice Nagarathna (with Justice Karol concurring but delivering a separate opinion) upheld a robust judicial review of executive policy in GM regulation and found serious irregularities in the decision-making process, quashing the impugned approvals and directing a national policy on GM crops, greater public transparency, and safe-guarded field testing. Justice Karol, in a separate opinion, while endorsing the need for precaution, cautioned against an outright ban on HT crops and emphasized policy matters be left to the legislature. The judgment thus emphasizes environmental rule of law, public trust, intergenerational equity, and a precautionary approach, while mandating further regulatory reform and public participation.