Tenetowl LogoTenetowl
High Court of KeralaKerala High Court · 2006Single JudgePetition disposed of; no interference at premat...

Roben Abraham and others v. State of Kerala and others

Case / Petition Number:
WP(C).No. 7552 of 2006
Neutral Citation:/

Case Synopsis & Summary

Roben Abraham, Saju, Mathew and K.P. Jose, residents of Ettumanoor, challenge the proposed alignment for widening the M.C.Road, claiming the survey and line of acquisition carve out an unusually wide 21-meter width in their locality, beyond the ordinary 15-meter road width, and encroach upon their residential plots. They allege malafides, arguing the plan (Exhibit P1) distorts their properties and that influential owners’ lands are exempted to suit convenience. Exhibits P3–P5 record their representations seeking quashing of the present alignment and retention of the central line with an even distribution for widening from both sides; they seek consideration of these representations. The fourth respondent contends the alignment is technically optimal, designed after study, incorporating safety features such as bus bays and parking to improve accessibility and reduce bottlenecks. The Government Pleader emphasizes that no notification under Section 4(1) has been issued and the land acquisition process is in a very early stage, with rights to challenge arising only at the appropriate stage (Section 9 notice and Section 5A enquiry). The court, while concurring that petitioners’ grievances are genuine, refuses to interfere at this premature stage, noting the authorities’ competence and the likelihood of redress through due process. It directs consideration of the representations and disposes of the petition. The decision stands in light of the Anand Buttons principle that courts should not sit in appeal over development-planning alignments.

Precedent Explorer

Find Cases Like This

Explore other judgments dealing with similar legal situations, facts, or statutory provisions.

Case Details & Bench

Court
High Court of Kerala
Hon'ble Judges
  • K. Hema
Judgment Date
2006-06-27
Court Decision / Holding
This petition is disposed of. The court declined to interfere at the premature stage, noted the genuineness of the petitioners’ grievances, and directed that the representations (Exhibits P3–P5) be considered by the authorities without delay. It reiterated that dispossession would occur only after proper notice under the Land Acquisition Act and after due process, including inquiry under Section 5A.
Final Disposition
Petition disposed of; no interference at premature stage; representations to be considered by authorities; no dispossession without notice under the Land Acquisition Act.

Parties to the Case

Appellants / Petitioners

  • Roben Abraham
  • Saju
  • Mathew
  • K.P. Jose

Respondents

  • State of Kerala represented by the Secretary to Government, Public Works Department, Secretariat, Thiruvananthapuram
  • Kerala State Transport Project (KSTP), Director, Thiruvananthapuram
  • The Chief Engineer (KSTP), Kerala State, Killipalam, Thiruvananthapuram
  • The Executive Engineer (KSTP), Muvattupuzha, Ernakulam District
  • The Executive Engineer, PWD (B & R), Kottayam District
  • The Assistant Engineer, P.W.D., Ettumanoor, Kottayam District

Legal Representation & Advocates

Counsels for Petitioners

  • • Adv. Abraham Mathew (Vettoor)
  • • Sri. P. I. Georgekutty

Counsels for Respondents

  • • Government Pleader

Provisions of Law Cited

Section 4(1) of the Land Acquisition ActSection 9 of the Land Acquisition ActSection 5A of the Land Acquisition ActSection 17 of the Land Acquisition Act

Legal Doctrines & Maxims

  • The authority, who has to carry out the planned development of the industrial estate, is in the best position to judge as to which land can be exempted from the acquisition without jeopardizing the development scheme. It is not possible for the court to sit in appeal over the exercise of such satisfaction by the authority vested with the task of implementing the development plan.

Submissions & Arguments

Contentions of Appellants / Petitioners

The petitioners contend that the alignment for road widening is unnecessarily intrusive into their properties, with a 21-meter width proposed in their area contrary to the stated 15-meter average. They point to Exhibit P1 as evidence of malafide intent and allege exclusion of certain influential lands to benefit others. They request quashing of the current alignment, retention of the central line, and equalized widening from both sides, along with consideration of their Exhibits P3–P5 representations. They emphasize the premature stage of acquisition proceedings and invoke their right to be heard in due course under the Land Acquisition Act (Sections 4(1), 5A, 9). They seek relief pending final decision.

Contentions of Respondents

The respondents argue the alignment is technically optimal, designed with safety features (bus bays, parking) to improve accessibility and avoid traffic bottlenecks. They assert the plan is the result of detailed study and technical parameters; changes would be infeasible. They stress that no Section 4(1) notification has been issued and the process is in a preliminary stage, with remedies available during Section 9 notices and Section 5A enquiry. They claim there is no malafide proven and that the plan protects petitioners’ properties by convex projection where necessary. The court should refrain from intervening at this juncture and defer to the planning authority’s expertise.

Legal Doctrine & Issue Explorer

Explore This Legal Issue

Find relevant judgments and authoritative positions on the legal questions discussed here.

Cited Precedents (1)

Case NameCitationTreatmentExplanation
M/s.Anand Buttons Ltd. Etc. v. State of Haryana & Ors.2005(1) Supreme 861PositiveCited to support the proposition that the court cannot sit in appeal over alignment decisions and must defer to the authority implementing the development plan.
Case Applicability Diagnostic

Apply This to My Facts

Share your situation and test whether this judgment governs, supports, or challenges your case.

Official Judgment Record
•1,747 words•~8 min read

In The Court Record

Roben Abraham and others v. State of Kerala and others

IN THE HIGH COURT OF KERALA AT ERNAKULAM PRESENT : THE HONOURABLE MRS. JUSTICE K.HEMA TUESDAY, THE 27TH JUNE 2006 / 6TH ASHADHA, 1928 WP(C).No. 7552 of 2006(Y) ------------------------- PETITIONERS: - ------------------ 1. ROBEN ABRAHAM, S/O. ABRAHAM, KUKRUSUMMOOTIL HOUSE, KIZHAKUMBHAGAM KARA, ETTUMANOOR VILLAGE (KANAKARI P.O),KOTTAYAM DIST. 2. SAJU, S/O. CHACKO, MUNDATHANATHATHU HOUSE, KIZHAKUMBHAGAM KARA, ETTUMANOOR VILLAGE (KANAKARI P.O), KOTTAYAM DIST. 3. MATHEW, S/O. MATHAI, EDAYANTHARATHAYATHADATHIL HOUSE,KIZHAKUMBHAGAMKARA, ETTUMANOOR VILLAGE (KANAKARI P.O), KOTTAYAM DISTRICT. 4. K.P. JOSE, THUNDATHIL HOUSE, KIZHAKUMBHAGAM KARA, ETTUMANOOR VILLAGE (KANAKARI P.O), KOTTAYAM DIST. BY ADV. SRI.ABRAHAM MATHEW (VETTOOR) SRI.P.I.GEORGEKUTTY RESPONDENTS: ----------------------- 1. STATE OF KERALA, REPRESENTED BY THE SECRETARY TO GOVERNMENT, PUBLIC WORKS DEPARTMENT, SECRETARIAT, THIRUVANANTHAPURAM. 2. KERALA STATE TRANSPORT PROJECT (KSTP), DIRECTOR, THIRUVANANTHAPURAM. 3. THE CHIEF ENGINEER (KSTP), KERALA STATE, KILLIPALAM, THIRUVANANTHAPURAM. 4. THE EXECUTIVE ENGINEER (KSTP), MUVATTUPUZHA, ERNAKULAM DISTRICT. 5. THE EXECUTIVE ENGINEER, PWD (B & R), KOTTAYAM DISTRICT. 6. THE ASSISTANT ENGINEER, P.W.D., ETTUMANOOR, KOTTAYAM DISTRICT. BY GOVERNMENT PLEADER THIS WRIT PETITION (CIVIL) HAVING COME UP FOR ADMISSION ON 27/06/2006, THE COURT ON THE SAME DAY DELIVERED THE FOLLOWING: WP(C).NO.7552 OF 2006 ## APPENDIX PETITIONERS' EXHIBITS: EXHIBIT P1: COPY OF PLAN SHOWING PRESENT LINE OF ACQUISITION in the POINT WHERE THE PETITOINERS PROPERTY. EXHIBIT P2: ORIGINAL PHOTOGRAPHS SHOWING THE PRESENT POSITION OF OTHE ROAD IN THE AREA WHERE THE PETITOINERS HOUSES ARE SITUATED. EXHIBIT P2(a): COPY OF PHOTOGRAPH SHOWING THE RESIDENTIAL HOUSE OF THE IST PETITIONER. EXHIBIT P2(b): COPY OF PHOTOGRAPH SHOWING THE RESIDENTIAL HOUSE OF THE 2ND PETITIONER. EXHIBIT P2(c): COPYOF PHOTOGRAPH SHOWING THE RESIDENTIAL HOUSE OF THE 3RD PETITIONER. EXHIBIT P3: COPY OF REPRESENTATION MADE BY THE PETITIONER TO THE 3RD RESPONDENT WITH COPY TO THE OTHER RESPONDENTS DATED 23.11.2005. EXHIBIT P4: COPY OF REPRESENTATION TO THE GOVERNMENT SECRETARY TO THE LOCAL ADMINISTRATION DEPARTMENT DATED 14.12.2005. EXHIBIT P5: COPY OF REPRESENTATION MADE BY THE PETITOINERS TO THE GOVERNMENT SECRETARY TO THE LOCAL ADMINISTRATION DEPARTMENT DATED 8.2.2006. EXHIBIT P5(a): COPY OF REPRESENTATION MADE BY THE PETITIONERS TO THE 2ND RESPONDENT DATED 8.2.2006. EXHIBIT P5(b): COPY OF REPRESENTATION MADE BY THE PETITIONERS TO THE 3RD RESPONDENT DATED 8.2.2006. EXHIBIT P5(c): COPY OF REPRESENTATION MADE BY THE PETITIONERS TO THE 3RD RESPONDENT DT. 8.2.2006. EXHIBIT P6: PHOTOGRAPHS SHOWING THE PROPERTIES OF THE PETITOINERS COVERED BY THE ACQUISITION. EXHIBIT P6(a): PHOTOGRAPHS SHOWING THE EASTERN SIDE AND WESTERN SIDE OF THE ROAD AND SURVEY STONES FOR ACQUISITOIN LAID ON THE WESTERN SIDE. EXHIBIT P6(b): PHOTOGRAPHS SHOWING THE EASTERN SIDE AND WESTERN SIDE OF THE ROAD AND SURVEY STONES FOR ACQUISITION LAID ON THE WESTERN SIDE. EXHIBIT P6(c): PHOTOGRAPHS SHOWING THE WESTERN SIDE OF THE ROAD AND SURVEY STONES. EXHIBIT P6(d): PHOTOGRAPHS SHOWING THE PROJECTED VIEW OF THE WESTERN SIDE OF THE ROAD AND SURVEY STONE LAID. /TRUE COPY/ PA TO JUDGE ## **K.HEMA, J.** **----------------------------------** ## **W.P.(C).NO.7552 of 2006** **---------------------------------** ## **Dated this the 27[th] day of June, 2006** ## **JUDGMENT** First petitioner is the owner of an extent of 5 Ares 25 sqare meters of land in Ettumanoor Village. Second petitioner owns an extent of 6 cents of land in the same village. Petitioners 3 and 4 also are owners of certain extent of land in Ettumanoor Village. Those are situated on the eastern side of the M.C.Road, about 300 meters towards south of the Pattithanam junction near Ettumanoor. The petitioners constructed residential buildings facing the M.C.Road. Those houses are comparatively new. 2. A survey was conducted in the properties of the petitioners, in order to acquire land for widening the M.C.Road. The Survey team has also laid survey stones in the properties of the petitioners. The petitioners are very much aggrieved by the manner in which the present survey has been conducted and the line of acquisition has been determined. According to petitioners, average width of the road is 15 meters, whereas in petitioners' area alone, the line of acquisition has been drawn providing a width of 21 meters, carving out a curve towards the properties of the petitioners. Only in this area, the road is bulging into the petitioners' properties. This is allegedly causing much inconvenience to the petitioners even for the residence. 3. According to petitioners, properties of some influential persons are avoided and not included in the acquisition so as to suit their convenience. A plan is produced as Exhibit P1 to explain the malafides. It is contended that petitioners would not be able to construct even a compound wall, once acquisition is made as per the proposed alignment. Petitioners filed representations before the authorities concerned, but _**W.P(C).7552/06**_ 2 those have not been considered so far. Exhibits P3 to P5 are certain representations filed by them. 4. Petitioners, therefore, seek quashing of Exhibit P1 plan, showing the present alignment, which is prejudicial to the petitioners' interest. They also seek for a direction commanding the respondents to retain the present central line of the existing road and to equally distribute the area for widening of the road from both sides of the road. They also pray for a direction to be issued to the respondents to consider Exhibits P3 to P5 representations. 5. Fourth respondent filed a counter affidavit and it is averred that the proposed alignment is the most suitable and ideal, which was determined after a detailed study. Those are designed based on technical parameters. Any change to the alignment, as per the requirement of the petitioners, will not be feasible, it is submitted. Bus bays and parking places along with various other features that supplement the road safety, easy accessibility to public, and arrangements for avoiding traffic bottlenecks are also provided along the road, which are imperative, according to fourth respondent. 6. Learned Government Pleader also pointed out that even a notification has not been issued in this case under Section 4(1) of the Land Acquisition Act and technically, the proceedings are not initiated. The acquisition proceedings are at a very early stage and petitioners will be entitled to raise their contentions and they can also raise objections at the appropriate stage, on getting notice under Section 9 of the Land Acquisition Act, it is submitted. 7. It is also pointed out that everything will be settled in an enquiry conducted under Section 5A of the Land Acquisition Act. It was strongly submitted that the present prayer is only to intervene in the land acquisition proceedings at a too premature stage. The petitioners also _**W.P(C).7552/06**_ 3 have no right to challenge the proposed alignment, especially since no malafides have been attributed in making the proposed alignment, it is argued. It was also pointed out that Exhibit P1 plan itself will explain that the authorities were actually saving the properties of the petitioners by making a convex projection of the road into the proposed property, lying immediately on the opposite side of the road on the western side. According to learned Government Pleader, the acquisition of the petitioners' properties as per the present alignment has become inevitable. 8. Learned Government Pleader also placed reliance upon a decision reported in _**M/s.Anand Buttons Ltd. Etc. v. State of Haryana & Ors.**_ (2005(1) Supreme 861) and argued that this Court cannot sit in appeal over the alignment. It was argued that the authority will be in the best position to judge, as to which of the land can be exempted from the acquisition, without jeopardizing the development scheme. It is not possible for the court to sit in appeal over the exercise of such satisfaction by the authority vested with the task of implementing the development plan. The relevant portion from the said judgment can be extracted as hereunder: “The authority, who has to carry out the planned development of the industrial estate, is in the best position to judge as to which land can be exempted from the acquisition without jeopardizing the development scheme. It is not possible for the court to sit in appeal over the exercise of such satisfaction by the authority vested with the task of implementing the development plan.” 9. On hearing both sides, I find that there is some projection of the _**W.P(C).7552/06**_ 4 road at some places which the petitioners would contend, is to cause inconvenience to the petitioners, whereas the Government Pleader submitted that it is to suit their convenience and avoid inconvenience to most of the owners of the property who are involved. Any way, as pointed out by learned Government Pleader, this is too premature a stage where the court can intervene. Several aspects have to be considered by the authorities themselves. The land acquisition proceedings are at a very early stage. 10. It cannot be said that the present proposal will be finalised as such, without any changes. The confirmation will be effected only after hearing all the concerned parties and affected land owners, after a detailed enquiry under Section 5A of the Act. The petitioners have their efficacious remedy even before the authorities. In these circumstances, it may not be proper for this Court to enter any finding with respect to the present alignment , malafides, the alleged influence by the owner of the property situated on the western side of the property etc. At the same time, it is clear that the petitioners have some genuine grievance . All their grievances and apprehensions can be placed before the authorities at the appropriate stage and it may be posssible to redress also. This Court expects that Exhibits P3 to P5 representations will be looked into by the authorities concerned, without any delay taking into consideration the anxiety of the petitioners. I do not find any ground to interfere in the matter at this premature stage. 11. Learned Government Pleader also submitted that there is no proposal to acquire the property invoking urgency clause under Section 17 of the Land Acquisition Act and the apprehension of the petitioners that the acquisition proceedings will be carried on without notice to them etc. are baseless. He also submitted that the over anxiety of learned counsel for the petitioners that the petitioners will be dispossessed from the 5 ## _**W.P(C).7552/06**_ property immediately is also baseless and it is made clear that the dispossession will follow only after issuance of a notification under Section 4(1) of the Act and the enquiry to be followed after due notice to the petitioners in accordance with the provisions of the Act. In the light of the above submission, I do not find that any direction need be given to the respondents not to dispossess the petitioners With these observations, this petition is disposed of. **K.HEMA, JUDGE** ## **vgs.**
End of Judgment Record
Browse All High Court of Kerala (2006) Decisions
2006-11-30

Baburaj v. State of Kerala

Baburaj, the appellant, was convicted under Section 302 IPC for intentionally causing the death of his wife Geetha by constrictive neck compression. The Thrissur Sessions Court had sentenced him to life imprisonment on a conviction based on circumstantial evidence. The Kerala High Court heard Crl.A. No. 794 of 2004, challenging that conviction. The occurrence occurred in the early hours of 1 February 2002, approximately at 1:30 A.M., at Engandiyoor, where Geetha was found dead in her home after prior quarrels between husband and wife. The FIR was lodged on 1 February 2002 by Geetha’s brother. Dr. Cyriac Job conducted the post-mortem on 1 February 2002 and found signs of asphyxia with constrictive force on the neck, as well as multiple ante-mortem injuries suggesting a struggle. The prosecution relied on motive—frequent quarrels between the spouses—and the accused’s presence in the house that night to connect him to the crime. The defense contended that timing of death could be earlier than alleged and that the chain of circumstantial evidence was not complete, possibly pointing to accidental death. The High Court evaluated the medical testimony, ocular and accepted witnesses, and found the circumstantial chain sufficient to prove guilt beyond reasonable doubt, applying the principle of last-seen-together, and upholding the Sessions Court’s verdict. The appeal was dismissed, and the conviction affirmed.

2006-11-22

K. Gopi (D/o Late Ex.GS-142996 PNR) v Union of India and others

Petitioner K. Gopi, daughter of late Ex.GS-142996 PNR, sought compassionate appointment in the Border Roads Organisation after her father’s death on 03.03.2002. The petition, filed in 2004, contends that the family, comprising the petitioner, her brother and mother, was very poor and dependent on government employment. An application for compassionate appointment was made on 16.12.2003 but Ext.P4 rejected it, noting a revised policy that the dependent must be a major at the time of death. Subsequently, the government issued policy extensions (Ext.P7 and Ext.P8) allowing a three-year window, and the mother was advised to submit fresh documents. The petitioner argued that completion of 18 years by a dependent at death is not a precondition for eligibility. The respondents asserted that under the revised policy only those who were minor at death qualify; if the son attains 18 later, he may be advised to apply as per rules then in force. The court referred to a Kerala case (O.P.3338/2002) allowing merits-based consideration where there is no laches and noting that policy changes cannot retroactively defeat rights fixed as of death. It also cited Umesh Kumar Nagpal (1994) 4 SCC 138 to acknowledge the need for a reasonable period. Ultimately, the writ petition was allowed, directing the respondents to consider the claim on merits and dispose of it within four months.

2006-11-29

V. Bahuleyan v. State of Kerala and The Secretary to Government, Transport (C) Department, Government Secretariat, Thiruvananthapuram

V. Bahuleyan, a retired Regional Transport Officer, challenged Ext.P5 denying notional promotion to Deputy Transport Commissioner based on a pre-existing select list (Ext.P1) in which he was ranked No.4 as of 15 June 2002. A vacancy for the post arose on 1 December 2002 in the retirement vacancy of Sri Kunhambu, but Bahuleyan, though still in service, was bypassed and superseded by the immediate junior through Ext.P2 dated 6 January 2003. Disciplinary proceedings against him were initiated but later dropped as per Ext.P3 dated 23 August 2003, with his representation Ext.P4 dated 11 February 2004 seeking placement as Deputy Transport Commissioner with effect from 6 January 2003 and arrears. Ext.P5 dated 1 April 2004 rejected the claim. Bahuleyan contends that Note iii to Rule 28(b)(i)(7) of the Kerala State and Subordinate Services Rules provides that an officer included in a select list who is exonerated from major penalties must be promoted on the basis of his position in the list; if fully exonerated, retrospective promotion should be granted. Delhi Jal Board v. Mahinder Singh (JT 2000 (10) SC 158) is cited to support the right to be considered for promotion under Article 16. The High Court holds that Ext.P5 is unsustainable, and Bahuleyan is entitled to notional promotion from 1 December 2002, but no monetary benefits; salary and pension are to be fixed accordingly, and arrears, if any, to be settled within four months. The petition is allowed as above.

2006-12-11

The Correspondent and Chairman Standing Committee, MES, Central College Committee, MES Office, Kozhikode - Rep. by the General Secretary, Muslim Education Society, Kozhikode v. M. Syed Mohammed

This writ petition challenges execution of an order of the University Appellate Tribunal directing re-posting and monetary benefits to the respondent, an employee of a private MES college. The respondent had been moved from M.E.S. College, Kodungallur to M.E.S. College, Mampad, and claimed salary for the period he was kept out of duty. The University Appellate Tribunal held in his favour, and the High Court later directed payment of monetary benefits and posting, but the matter escalated to execution proceedings in which the petitioner (the MES management) contends that Sub Court Kozhikode lacks jurisdiction to execute the order under Calicut University Act, section 60(8). The petition traces the chain of litigation since the Tribunal’s order and a prior High Court order in CRP Nos.895/79 etc. The core issue is where an execution petition under the Tribunal’s order should be heard and executed: should it be the Sub Court with jurisdiction over the private college’s location, or the court where MES’s main office or the employee’s work was situated at the time of the appeal. The court ultimately held that Sub Court Kozhikode has no jurisdiction under section 60(8) and transferred the execution to Sub Court Manjeri, directing expeditious disposal within six months, while disposing of the writ petition.