Case Synopsis & Summary

This is an appeal from O.S.463/1995 in the Sub Court, Ernakulam, filed for specific performance of Ext. A1, an agreement for sale of 3 cents of the plaint schedule property for Rs 60,000. The trial court declined a decree for specific performance and, instead, decreed the plaintiff to recover the advance of Rs 10,000 with interest, effectively denying the main relief. The plaintiff, Ravendran alias Ravi, contends he was ready and willing to pay the balance and that the defendant refused to execute the sale deed despite performance; she asserts that some items of the property were mortgaged to a bank and therefore the original documents would not be released, justifying cancellation and return of the advance. The defendant also alleges fabrication of Ext. A1’s pages and disputes the one-year period fixed for performance. The lower court relied on a decision in DeSmet (India) Pvt. Ltd. v. B.P. Industrial Corporation (P) Ltd (AIR 1980 Allahabad 253) to deny specific performance, and did not frame issues on specific performance. On appeal, the Kerala High Court distinguishes that decision, cites Boothalinga Agencies v. V.T.C. Poriaswami Nadar (AIR 1969 SC 110) and Prakash Chandra v. Angadlal (AIR 1979 SC 1241), and holds that specific performance should be granted where equity and contract terms justify. The appeal is allowed; a decree for specific performance is issued and the defendant is directed to execute the sale deed upon payment of the balance within three months, with costs to the plaintiff.

Precedent Explorer

Find Cases Like This

Explore other judgments dealing with similar legal situations, facts, or statutory provisions.

Case Details & Bench

Court
High Court of Kerala
Hon'ble Judges
  • Harun-ul-Rashid
Judgment Date
2010-03-03
Court Decision / Holding
Appeal allowed. A decree for specific performance of Ext. A1 is granted; the defendant is directed to execute the sale deed in favour of the plaintiff and to place the plaintiff in possession on the date of execution after payment of the balance sale consideration. The balance is to be paid within three months from today; failing which, the plaintiff may seek execution of the sale deed. Appellant to receive costs throughout.
Final Disposition
Appeal allowed; decree for specific performance; defendant to execute sale deed; balance to be paid within three months; costs to plaintiff.

Parties to the Case

Appellants / Petitioners

  • Raveendran alias Ravi

Respondents

  • Mrs. P. K. Rajamma

Legal Representation & Advocates

Counsels for Petitioners

  • • K. C. Charles

Counsels for Respondents

  • • JaiJi Itten

Provisions of Law Cited

Section 56, Indian Contract Act, 1872

Legal Doctrines & Maxims

  • Doctrine of Frustration of Contract
  • Self-Induced Frustration

Submissions & Arguments

Contentions of Appellants / Petitioners

The appellant submits that Ext. A1 was executed in time and that Rs 10,000 was paid as advance; he was ready and willing to pay the balance and to have the sale deed executed. The defendant’s refusal to perform amounts to breach. The mortgage/ lien with the bank cannot extinguish the contract; the bank documents can be released or cleared and the balance paid at the time of execution. Exts. A4 and A6 show the defendant’s desire to cancel and return the advance, but the plaintiff contends that the contract remains enforceable and that reliance on DeSmet (India) Pvt. Ltd. is misplaced. The law as set out in Prakash Chandra v. Angadlal supports a decree for specific performance where the other requirements are satisfied, and the ratio in Boothalinga Agencies clarifies the scope of the doctrine of frustration under Section 56. The court below erred in applying a judgment that is not dispositive of the present facts and should have decreed specific performance rather than merely refunding the advance.

Contentions of Respondents

The defendant contends that Ext. A1 pages 2 and the last page are fabricated; the signature of the witness is not genuine; the period fixed for performance is six months, not one year. The property, including the disputed portion, is mortgaged to a bank, and the bank will not release original documents until the debt is paid, making sale impossible. Ext. A4 and the reply (Ext. A6) show cancellation and return of the advance. The defendant has consistently maintained that she does not intend to execute the sale deed due to the encumbrance and the risk to the bank’s lien. The lower court did not properly evaluate the defendants’ case of fabrication and mortgage, and DeSmet’s decision was misapplied.”},

Legal Doctrine & Issue Explorer

Explore This Legal Issue

Find relevant judgments and authoritative positions on the legal questions discussed here.

Cited Precedents (3)

Case NameCitationTreatmentExplanation
Boothalinga Agencies v. V.T.C. Poriaswami NadarAIR 1969 SC 110PositiveCited for understanding the doctrine of frustration as part of the law of discharge under Section 56; emphasizes that self-induced frustration cannot negate contractual obligations.
Prakash Chandra v. Angadlal and othersAIR 1979 SC 1241PositiveGoverns the grant of a decree for specific performance; ordinarily, specific performance should be granted unless equitable considerations warrant denial.
DeSmet (India) Private Ltd. v. B.P. Industrial Corporation (P) LtdAIR 1980 Allahabad 253OverruledThe High Court expressly declines to follow this Allahabad decision; the present decision favors specific performance.
Case Applicability Diagnostic

Apply This to My Facts

Share your situation and test whether this judgment governs, supports, or challenges your case.

Official Judgment Record
•1,875 words•~9 min read

In The Court Record

Raveendran alias Ravi v. P.K. Rajamma

IN THE HIGH COURT OF KERALA AT ERNAKULAM PRESENT : THE HON'BLE MR.JUSTICE HARUN-UL-RASHID WEDNESDAY, THE 3RD MARCH 2010 / 12TH PHALGUNA 1931 AS.No. 285 of 1999(A) --------------------OS.463/1995 of PRINCIPAL SUB COURT,ERNAKULAM .................... APPELLANT/PLAINTIFF: ----------------RAVEENDRAN ALIAS RAVI, SON OF KRISHNA PILLAI, AGED 35, PANAKKADU, VENNALA KARA, EDAPPALLY SOUTH VILLAGE, KANAYANNUR TALUK. BY ADV. SRI.K.C.CHARLES SRI.K.C.CHARLES RESPONDENT/DEFENDANT: ------------------ MRS. P.K. RAJAMMA, W/O.NARAYANAN, AGED42, KIZHAKKEVELIKKAKATHU, PALARIVATTOM, EDAPPALLY SOUTH VILLAGE, KANAYANNUR TALUIK. ADV. SRI.JAIJI ITTEN THIS APPEAL SUIT HAVING BEEN FINALLY HEARD ON 03/03/2010, THE COURT ON THE SAME DAY DELIVERED THE FOLLOWING: ORDER ON CMP.NO.2081/99 IN A.S.NO.285/99 ----------------- Dismissed 3/3/2010 Sd/Harun-Ul-Rashid, Judge. True Copy **HARUN-UL-RASHID,J. -------------------------A.S.NO.285 OF 1999 -------------------------DATED THIS THE 3RD DAY OF MARCH, 2010** ## **JUDGMENT** Plaintiff in O.S.No.463/95 on the file of the sub Court, Ernakulam is the appellant. The suit was filed for specific performance. The court below declined to grant a decree for specific performance. A decree was passed allowing the plaintiff to realise the advance amount of Rs.10,000/- with interest thereon. Aggrieved by the said judgment and decree to the extent it denies the relief for specific performance, the plaintiff has preferred this appeal. The parties hereinafter are referred to as the plaintiff and the defendant as arrayed in the suit. 2. Ext.A1 is the agreement for sale executed between the plaintiff and the defendant. The defendant owns the plaint schedule property. The extent of the plaint schedule property is 3 cents. Ext.A1 is dated 26/5/1994. The price agreed to be paid is **-2-** ## A.S.No.285/99 Rs.60,000/-. An amount of Rs.10,000/- was received on the date of Ext.A1 agreement as advance. The period fixed for performance of the contract is one year from the date of Ext.A1 agreement. These facts are not disputed. It is the plaintiff's case that he is ready and willing to pay the balance consideration, that in spite of her repeated demands, the defendant did not care to execute the sale deed as per the terms and conditions stipulated in Ext.A1 agreement. Ext.A2 is the Lawyer notice issued on 24/3/1995 requesting the defendant to fulful her part of the agreement and to execute the sale deed. Ext.A6 is the reply notice dated 7/4/ 1995. Exts.A2 and A4 are issued by the respective parties within the period fixed for execution of the agreement. In Ext.A6 reply the defendant informed the plaintiff that she is unable to execute the sale deed in favour of the plaintiff for the reasons stated in her notice dated 24/3/1995, which is marked as Ext.A4. In Ext.A4 the defendant informed the plaintiff that some items of properties including the disputed property were mortgaged to the bank for availing a loan in the **-3-** ## A.S.No.285/99 name of her husband, that the bank will not release the original documents until the entire amounts due to the bank are paid and therefore it has become impossible to sell the property. It is further informed by the defendant that she wanted the agreement to be cancelled and expressed her willingness to return the advance amount. Ext.A6 reply notice issued by the defendant would show that the defendant was not prepared to execute the sale deed as demanded by the plaintiff. Exts.A4 and A6 referred supra are notices sent by the defendant before the expiry of the period fixed by the parties for execution of the sale deed. Ext.A7 is the Lawyer notice dated 13/4/95 issued by the plaintiff to the defendant in which it is stated that the conduct of the defendant in not willing to execute the sale deed is unfair, that the reasons stated are untrue and that the plaintiff is ready and willing to perform of the terms and conditions of the agreement and requested the defendant to execute the sale deed as agreed. 3. In Ext.A4 notice and Ext.A6 reply the only reason stated is that since the property is mortgaged to the a bank, she is unable **-4-** ## A.S.No.285/99 to execute the sale deed. In the written statement a contrary stand is taken. It is contended that page No.2 and the last page of Ext.A1 agreement are fabricated, that the plaintiff replaced page No.2 and that the signature of one of the witnesses seen in the last page of the agreement is not genuine. Velayudhan Pillai is one of the witnesses to Ext.A1 agreement. It is also alleged that in the 2[nd] page of the agreement the period is stated as one year, in fact the agreed period of six months. The defendant admitted the execution of Ext.A1 agreement and the receipt of Rs.10,000/as advance. The only contention raised before the court below is that two pages of Ext.A1 agreement are not genuine and are fabricated. 4. In Ext.A1 the parties agreed to execute the sale deed within the time prescribed therein. It is stated that there is no liability outstanding in the property and further stipulated that if for any reason it is found that any liability is outstanding, that will be cleared by the defendant before the execution of the sale deed. **-5-** ## A.S.No.285/99 5. The evidence in the case consists of the oral evidence of PW1, DWs.1 and 2 and Exts.A1 to A11(a). No documentary evidence was adduced by the defendant. The court below examined the issues in the light of the contentions raised in the written statement. The court below specifically examined whether the period fixed in Ext.A1agreement is one year or six months and whether the signature of the witness, Velayudhan Pillai is a fabircated one as alleged in the written statement. The court below, after examining the oral evidence of the parties and the documents produced by the plaintiff held that there is no reason to disbelieve the evidence of PW1 and that the period fixed for execution of the sale deed is one year. The court below held that the contention of the defendant that the period fixed for execution of the sale deed is six months is false. The further question examined by the court below is whether the signature of Velayudhan Pillai in the last page of Ext.A1 is a fabricated one. After discussing the evidence and the attendant circumstances, the court below held that the evidence of Velayudhan Pillai, who **-6-** ## A.S.No.285/99 was examined as DW2, shows that the signature in Ext.A1 is not fabricated as contended in the written statement. Thus, the contentions raised by the defendant in the suit are found against. The court below thereafter examined the terms of Ext.A1 agreement, Ext.A2 letter, Ext.A4 lawyer notice, Ext.A6 and Ext.A7 reply notices. The court below on the basis of the pleadings of the parties and the oral and documentary evidence on record, found that the plaintiff was ready to pay the balance sale consideration; but the defendant was not ready to execute the sale deed in his favour. Following the decision reported in **DeSmet (India) Private Ltd. v. B.P. Industrial Corporlation (P) Ltd. (AIR 1980 Allahabad 253** , the court below, after finding that the breach of agreement is committed by the defendant, decreed the suit holding that the plaintiff is entitled to get back the advance amount with interest at the rate of 12% per annum and the costs of the suit. The court below did not go into the question whether the plaintiff is entitled to a decree for specific performance. In fact, the relief sought for in the plaint is to pass a **-7-** ## A.S.No.285/99 decree for specific performance of the contract. 6. The learned counsel for the appellant brought to this Court's attention the decision of the Apex Court in **Boothalinga** **Agencies v. V.T.C. Poriaswami Nadar (AIR 1969 SC 110).** Paragraph 10 of the said decision reads as follows: “The doctrine of frustration of contract is really an aspect or part of the law of discharge of contract reason of or by supervening impossibility illegality of the act agreed to be done and hence comes within the purview of Section 56 of the Indian contract Act. It should be noticed that Section 56 lays down a rule of positive law and does not leave the matter to be determined according to the intention of the parties.” 7. The Apex Court further held that the principle of this case applies to the Indian law and that Section 56 of the Indian Contract Act cannot apply to a case of “self-induced frustration.” In other words, the doctrine of frustration of contract cannot apply where the event which is alleged to have frustrated the contract arises from the act or election of a party. **-8-** ## A.S.No.285/99 8. The learned counsel also relied on the decision reported in **Prakash Chandra v. Angadlal and others (AIR 1979 SC 1241).** The Apex Court laid down the the principles governing the grant of a decree for specific performance as an agreement for sale. The Apex Court held that the ordinary rule is that specific performance should be granted. It ought to be denied only when equitable considerations point to its refusal and the circumstances show that damages would constitute an adequate relief. 9. The facts I have discussed above would point out that the plaintiff, after paying the part of the sale consideration, has repeatedly demanded the defendant to execute the sale deed. The defendant in Ext.A4 lawyer notice and Ext.A6 reply notice replied that she is not prepared to execute the sale deed. In the written statement strange contention was raised stating that some of the pages of Ext.A1 are fabricated. Even before expiry of the period of time fixed for execution of the sale deed, the defendant has determined not to execute the sale deed. The reasons stated **-9-** ## A.S.No.285/99 in Exts.A4 and A6 are not the reasons which can be put forward for defeating the rights of the plaintiff. In the circumstances, the court below ought to have decreed the suit as prayed for in the plaint. The relief prayed for in the plaint is for a decree for specific performance of the contract. I do not find any reason to reject the claim of the plaintiff for a decree for specific performance. The court below wrongly followed a decision reported in **De-Smet (India) Pvt. Ltd's case (AIR 1980 Allahabad 253).** The court below did not even frame necessary issue as to whether the plaintiff is entitled to a decree for specific performance. The denial of decree for specific performance is unjust and unfair in the facts and circumstances of the case. In the result, the decree and judgment passed by the court below are modified. A decree for specific performance of Ext.A1 agreement is passed directing the defendant to execute sale deed in respect of the plaint schedule property in favour of the plaintiff and to put the plaintiff in possession of the plaint schedule property on the date of execution of the sale deed, after receiving **-10-** ## A.S.No.285/99 the balance sale consideration, failing which the plaintiff shall approach the court below for execution of the sale deed through court. The time for payment of the balance sale consideration is fixed as three months from today. Appeal is allowed. The plaintiff is entitled to costs through out. **HA RUN-UL-RASHID, JUDGE.** kcv. **-11-** A.S.No.285/99 **HARUN-UL-RASHID,J. -------------------------A.S.NO.285 OF 1999 --------------------------** **JUDGMENT** **3[rd] March, 2010**
End of Judgment Record
Browse All High Court of Kerala (2010) Decisions
2010-09-09

T.K. Biju and Gangaprasad S. v. State of Kerala and The Director, Institute of Human Resources Development (IHRD)

This batch of writ petitions challenges the Institute of Human Resources Development’s (IHRD) recruitment process for the Last Grade Service under notification RECT/03/09/HRD (dated 21.1.2009). The core questions concern the validity of the 23.8.2009 written test, the 23.10.2009 short list (main and supplementary) drawn therefrom, and the 19.3.2010 rank list published after interviews. Petitioners—mostly former daily wage/ad hoc employees—also pursue regularisation, arguing that the selection framework and weightage for past service were either discriminatory or inadequately applied. Ext.P4 had disposed of earlier petitions by directing IHRD to finalise recruitment under a resolution dated 9.7.2007, and Ext.P5 laid down the recruitment rules: an objective written test (70 marks) and an interview (30 marks) with category-wise cut-offs (Rule 5.3) and a rank list valid for three years (Rule 5.4). The court holds that deviations such as clause 8 in the hall ticket do not render the process void in the absence of prejudice, and upholds the short-list’s legality to a large extent. However, drawing on Umadevi (3) and Satya Prakash, the court ultimately directs a limited revisiting of the rank list to grant weightage under Rule 5.2 to those petitioners who would have been included, while denying general regularisation. All petitions are disposed with these directions.

2010-01-21

State of Kerala and District Collector, Kollam v. K. Raghavan

This is a review petition filed by the State of Kerala and the District Collector, Kollam, challenging the High Court’s 23 March 2009 judgment in W.P.(C).29695 of 2005, which directed the Government to consider a freedom fighter’s pension claim and to grant pension from the date of application. The petition traces a long history: the applicant, aged about 75 at the time of filing on 29.12.1995, faced earlier adverse orders in 1987 and 1989; after litigation, the 2005 judgment directed reconsideration and culminated in a 2009 order granting pension in December 2009 but from the date of sanction rather than from the date of application. The review petition contends that the Supreme Court’s decision in State of M.P. and Another v. Devkinandan Maheshwari (2003) and a Division Bench decision followed in W.A. Nos.1419/2006 & 1818/2006 require pension from the date of sanction, not the application date, and thus the judgment should be recalled. It also relies on Dokka Samuel v. Dr. Jacob Lazarus Chelly (1997) to assert that omitting authorities is not a ground for review. The Court, however, finds that omission to cite authorities cannot ground a review and that the government’s delay in compliance violates the Court’s directions, warranting dismissal of the review petition with costs.

2010-02-23

Anitha Rajan v. Revenue Divisional Officer, Thrissur; Thasildar, Chavakkad; Village Officer, Nattika; Sub Registrar, Thriprayar

Anitha Rajan, the petitioner, purchased 50 cents of land in Re-Survey No.166/1, Nattika village, Thrissur district, from the legal heirs of late Gangadharan via Ext.P3 sale deed registered at Triprayar. The conveyance, through power of attorney documents Ext.P1 (executed by Ajayan in Dubai in favor of his mother Rathnabhai) and Ext.P2 (executed by Usha in India), prompted mutation proceedings before the Revenue Divisional Officer (RDO). The RDO refused to effect mutation unless the original Ext.P1 POA was produced for adjudication of stamp duty under the Kerala Stamp Act, 1959, claiming non-compliance with stamping and the need to determine stamp duty under sections 31 and 32. The petitioner contends that it is not mandatory to submit every PoA executed outside India for adjudication; only instruments chargeable with duty which cannot be stamped by private persons must be taken to the Collector under section 18(2). Ext.P1, though executed abroad, is on Indian stamp paper and was presented at registration, having been stamped Rs.150 under Article 44(f). The court analyzed sections 18(1), 18(2), 31 and 32 and held that section 18 applies to instruments executed outside India; since Ext.P1 is duly stamped, Section 18 has no application and Sections 31-32 cannot be invoked to compel production. Relying on Madras High Court decisions Manoharan v. Velu and R.B.K. Rajeswari Nachiar, the court held the Village Officer erred in requiring Ext.P1 before the RDO, quashed Exts.P4 and P6, and directed mutation actions to be completed within two months of certified judgment copy.

2010-03-23

V. Mohanan Nair v. Babu Pillai and others

This writ petition arises from a complex land dispute in Nedumangad where the petitioner, V. Mohanan Nair, challenged a trial court order that set aside a commissioner's report and remitted for a fresh report. In O.S. 380/2005 the plaintiff sought a permanent injunction; in O.S. 542/2005 the second respondent sought declaration of title and possession based on deeds executed in 2005. To resolve the location of the plaint schedule property, a commission was appointed, and Ext. P2 report and plan were filed. Subsequently, I.A. 4808/2009 was filed by the second respondent seeking to set aside the commission report and plan and remit for a fresh report. The trial court remitted the matter; Ext.P8 records the order, which the petitioner challenged in this Writ Petition. The respondents relied on a decision in Sarojini v. Karthiyani Amma to contend that Article 227 petitions against commission reports are not maintainable, while the petitioner argued lack of justification for remitting and the undue delay in filing the petition. The Kerala High Court, while recognizing the normal reluctance to exercise visitorial jurisdiction, held that exceptional circumstances permit interference under Article 227 and remanded the matter for fresh consideration, directing that the trial court assess sufficiency of Exts. C1, C1(a), C1(b) and allow further inspection if needed. The result is a remand to ensure a fair adjudication on the commission report."