Ramrao Shankar Tapase v. Maharashtra Industrial Development Corporation (MIDC) & Others

Case / Petition Number:
Civil Appeal No. 2732 of 2022

Case Synopsis & Summary

This Supreme Court judgment consolidates a group of land acquisition appeals arising from the Maharashtra Industrial Development Corporation Act, 1961, Section 32(2) notifications in Bhoyar village, Yavatmal, for extending an industrial estate. The Reference Court initially enhanced compensation payable to original claimants. The High Court, in a common judgment, partly allowed the acquiree’s appeals and reduced compensation amounts. The present Court, while upholding the broad framework of valuation, re-evaluates fair market value by relying on the best sale exemplar (Ex. 41) from Bhoyar, considering a three-year gap from the 1992 sale, and applying an escalation and a non-agricultural potentiality uplift. It clarifies that compensation for land cannot be solely anchored to future industrial use and development charges must be deducted; it also accepts that lands within the same village may command different market values depending on location. Following a detailed analysis across multiple parcels, the Court partly allows the claimants’ appeals and prescribes revised per-hectare compensation levels (cultivable vs. uncultivable) ranging approximately from Rs. 1,75,000 to Rs. 2,25,000, with higher values for lands near the industrial area and non-agricultural potential. The judgment directs that there shall be no interest on the enhanced amount for the periods of delay and that costs will not be awarded. The decision covers Civil Appeal Nos. 2732 and 2733-2743 of 2022 and related SLPs.

Precedent Explorer

Find Cases Like This

Explore other judgments dealing with similar legal situations, facts, or statutory provisions.

Case Details & Bench

Court
Landmark Cases
Hon'ble Judges
  • M. R. Shah
Judgment Date
2022-04-19
Court Decision / Holding
Appeals partly allowed. The Court recalibrated compensation using the Bhoyar village exemplar, applying 12% cumulative increase (instead of 10%) and adding non-agricultural potentiality where appropriate, and deducted development charges. The Court fixed revised per-hectare compensation for cultivable/uncultivable land across the affected parcels, as detailed in the judgment, with most cultivable values around Rs. 1,75,000 to Rs. 2,00,000 per hectare and uncultivable values around Rs. 87,500 to Rs. 1,00,000 per hectare. It directed no interest on the enhanced amount for delayed appeals and no costs.
Final Disposition
Partly allowed (appeals partly allowed; revised compensation as per the Court’s orders)

Parties to the Case

Appellants / Petitioners

  • Ramrao Shankar Tapase

Respondents

  • Maharashtra Industrial Development Corporation (MIDC)
  • The State of Maharashtra

Provisions of Law Cited

Section 32(2) of the Maharashtra Industrial Development Act, 1961Section 34 of the Land Acquisition Act, 1894 read with Section 18Section 1(3) r/w 31 of the Maharashtra Industrial Development Act, 1961Maharashtra Industrial Development Act, 1961 (as context)Land Acquisition Act, 1894

Legal Doctrines & Maxims

  • Best evidence / Best exemplar principle for determining fair market value (sale price evidence)
  • Future use of land cannot be the sole basis for increasing compensation
  • Differences in location within the same village can yield different market values
  • Cumulative increase in market value of land up to 10-12% per year (as per Pehlad Ram and related precedents)
  • Deduction of development charges when calculating compensation for land acquired for industrial development
  • Non-agricultural potentiality may augment value but requires contextual application

Submissions & Arguments

Contentions of Appellants / Petitioners

The claimants argued that the lands acquired under the MIDC Act for expansion of the industrial estate have commercial/industrial potential and should be compensated at market value reflecting non-agricultural use. They relied on sale exemplars (notably Ex. 41) from Bhoyar and adjacent Lohara, contending that the proximity to MIDC and future industrial development justify higher compensation. They urged a uniform approach for lands acquired under a common notification, and sought 12% cumulative per-year escalation and deduction of development charges where applicable, along with allowances for non-agricultural potentiality.

Contentions of Respondents

The MIDC and State contended that the High Court’s findings were well-reasoned, relying on Ex. 41 as the best evidence of fair market value, with development charges deduction not always applicable. They argued that the purpose of acquisition (industrial development) should not elevate market value beyond the land’s actual sale evidence, and that varying locations within the village can justify different compensation; they defended the 10% to 15% per-year escalation framework and cautioned against overreliance on adjacent-area sales.

Legal Doctrine & Issue Explorer

Explore This Legal Issue

Find relevant judgments and authoritative positions on the legal questions discussed here.

Cited Precedents (12)

Case NameCitationTreatmentExplanation
Dollar Co. v. Collector of Madras(1975) 2 SCC 730PositiveUsed to support the principle that sale price is the best evidence of fair market value.
Shakuntalabai v. State of Maharashtrsa(1996) 2 SCC 152PositiveCited in context of principles relating to market value evidence and valuation.
Tarlochan Singh v. State of Punjab(1995) 2 SCC 424PositiveSupports the notion that lands in the same or neighboring areas do not uniformly command identical market prices.
Hookiyar Singh v. Special Land Acquisition Officer(1996) 3 SCC 766PositiveAffirms that the purpose of acquisition does not automatically determine compensation; future use is not the sole determinant.
Subh Ram v. State of Haryana(2010) 1 SCC 444PositiveStates that purpose of acquisition cannot be used to inflate market value; supports fair market value approach.
Kanwar Singh v. Union of India(1998) 8 SCC 136PositiveAffirms that adjacent villages may have different values; variability in land values is expected.
Sabhia Mohammed Yusuf Abdul Hamid Mulla (D) By Lrs. v. Special Land Acquisition Officer(2012) 7 SCC 595DistinguishedCourt distinguishes this earlier uniform compensation approach from the current case's valuation framework.
L. Kamalamma v. Land Acquisition Officer Revenue Divisional Officer(1998) 2 SCC 385PositiveCited regarding considerations in the valuation framework and implications for uniformity across lands.
General Manager, ONGC Ltd. v. Rameshbhai Jivanbhai Patel(2008) 14 SCC 745PositiveCited for principles on cumulative increase in market value over years.
Pehlad Ram v. Haryana Urban Development Authority(2014) 14 SCC 778PositiveSupports the doctrine of gradual escalation (10-15% per year) in market value.
Manoj Kumar v. State of Haryana(2018) 13 SCC 96PositiveCited in context of escalation of market value over time.
Atma Singh v. State of Haryana(2008) 2 SCC 568PositiveUsed to justify considerations of non-agricultural potentiality in valuation.
Case Applicability Diagnostic

Apply This to My Facts

Share your situation and test whether this judgment governs, supports, or challenges your case.

Official Judgment Record
•5,467 words•~25 min read

In The Court Record

Ramrao Shankar Tapase v. Maharashtra Industrial Development Corporation (MIDC) & Others

## REPORTABLE ## IN THE SUPREME COURT OF INDIA CIVIL APPELLATE JURISDICTION CIVIL APPEAL NO. 2732 OF 2022 Ramrao Shankar Tapase …Appellant ## Versus Maharashtra Industrial Development Corpn. & Others ...Respondents ## WITH - CIVIL APPEAL NOS. 2746 2747 OF 2022 (Arising from SLP(Civil) Nos.6309-6310/2022 @ Diary No.8900/2021) CIVIL APPEAL NO.2745 OF 2022 (Arising from SLP(Civil) No. 6308/2022 @ Diary No.36320/2019) CIVIL APPEAL NO. 2744 OF 2022 - CIVIL APPEAL NOS. 2733 2734 OF 2022 - CIVIL APPEAL NOS. 2737 2738 OF 2022 - CIVIL APPEAL NOS. 2740 2741 OF 2022 CIVIL APPEAL NO. 2739 OF 2022 - CIVIL APPEAL NOS. 2735 2736 OF 2022 - CIVIL APPEAL NOS. 2742 2743 OF 2022 ## J U D G M E N T ## M.R. SHAH, J. 1. As common questions of law and facts arise in this group of appeals from the same land acquisition proceedings, all these appeals Signature Not Verified Digitally signed by are decided and disposed of by this common judgment. DEEPAK SINGH Date: 2022.04.19 17:39:24 IST Reason: 1 2. All these appeals arise from the land acquisition proceedings undertaken by the State Government for the Maharashtra Industrial Development Corporation (MIDC) (hereinafter referred to as the ‘Acquiring Body’), for extension of industrial estate in village Bhoyar, Taluka and District Yavatmal. The State Government issued a notification on 09.03.1995 under Section 32(2) of the Maharashtra Industrial Development Act, 1961 (hereinafter referred to as the ‘Act’) for acquisition of the lands in question pertaining to village Bhoyar. By the said notification, several extents of land located in various survey numbers spread out in the village of Bhoyar, belonging to the original claimants, were acquired. The Special Land Acquisition Officer declared the awards and determined the quantum of compensation payable to the original claimants, particulars of which are given hereinbelow. The original claimants preferred reference applications under Section 34 of the Act, read with Section 18 of the Land Acquisition Act, 1894 before the Reference Court seeking enhancement of compensation. The Reference Court enhanced the amount of compensation. Against the common judgment and award passed by the Reference Court both, the original claimants as well as the acquiring body preferred appeals before the High Court. The original claimants preferred the appeals for enhancement of compensation. By the impugned common judgment and order, the High Court has disposed of all the appeals and cross 2 objections and has partly allowed the appeals preferred by the acquiring body and has reduced the amount of compensation determined and awarded by the Reference Court as under. Hence, the original claimants have preferred the present appeals. 3. The factual aspects in case of each claimant and the appeal/s are as under: ## **Civil Appeal No. 2732/2022 @ SLP (C) No. 23250/2018** The present appeal arises out of the impugned judgment and order passed by the High Court in First Appeal No. 133/2007. Land admeasuring 4.91 Hectares in Survey No. 31/2 in village Bhoyar came to be acquired. The Land Acquisition Officer declared the award dated 27.11.1997 and determined the compensation at Rs.50,000/- per Hectare for 4.23 Hectares of cultivable land and Rs.1,500/- per Hectare for 0.68 hectare of uncultivable land. Rs.24,400/- was awarded for the well. At the instance of the claimants, a reference was made to the Reference Court, which was numbered as L.A.C. No. 213/1999. The Reference Court enhanced the compensation to Rs. 3,75,000/- per hectare. The acquiring body – MIDC preferred the appeal before the High Court, being First Appeal No. 133/2007. Relying upon and considering the sale deed produced at Ex. 41 dated 18.09.1992 with respect to the land bearing Survey No. 20/2 in village Bhoyar itself and considering the potentiality of the acquired land and considering the time 3 gap between the said notification dated 18.09.1992 and the present notification dated 9.3.1995 and considering the time gap of approximately three years, adding 10% towards the price rise/escalation and adding further 15% towards the potentiality and the location of the acquired land, the High Court, by the impugned judgment and order, has determined the compensation at Rs.1,50,000/- per hectare. Hence, the original claimant has preferred the present appeal. ## **- - Civil Appeal Nos. 2746 2747/2022 @ SLP(C) Nos.6309 6310/2022 @ D.No. 8900/2021** Land admeasuring 2.43 Hectares in Survey No. 33/2 in village Bhoyar came to be acquired. The Land Acquisition Officer declared the award and determined the compensation at Rs.1,500/- per hectare. The Reference Court enhanced the amount of compensation to Rs.4,00,000/per hectare. By the impugned judgment and order, the High Court has determined the compensation to Rs.2,00,000/- per hectare. Hence, the original claimants have preferred the present appeals. ## **Civil Appeal No. 2745/2022 @ SLP(C) No. 6308/2022 @ D.No.36320/2019** Land admeasuring 1.62 hectares in Survey No. 32/1 in village Bhoyar came to be acquired. The Land Acquisition Officer determined and awarded compensation at Rs. 1500/- per hectare. The Reference Court enhanced the amount of compensation to Rs.3,75,000/- per hectare, relying upon the sale deed of the adjacent village Lohara. The 4 High Court, by the impugned judgment and order, has reduced the amount of compensation and determined and awarded the compensation at Rs.2,00,000/- per hectare, relying upon the sale deed at Ex. 41 dated 18.09.1992 with respect to the land situated in village Bhoyar and the claimant has preferred the present appeal. ## **Civil Appeal No. 2744/2022 @ SLP(Civil) No. 1793/2019** Land admeasuring 4.47 hectares in Survey No. 33/4 in village Bhoyar came to be acquired. The Land Acquisition Officer declared the award and determined the compensation at Rs. 1500/- per hectare. The Reference Court determined and awarded the compensation at Rs.17/per sq. ft., relying upon the sale deed produced at Ex. 31 dated 28.11.1994 of village Lohara. By the impugned judgment and order, the High Court in First Appeal No. 56/2006 filed by the acquiring body has determined and awarded the amount of compensation at Rs.2,00,000/per hectare. Hence, the claimant has preferred the present appeal. ## **Civil Appeal Nos. 2733-2734/2022 @ SLP(Civil) Nos.2489024891/2018** Land admeasuring 7.75 hectares in Survey No. 17 in village Bhoyar came to be acquired. The Land Acquisition Officer determined and awarded compensation at Rs. 45,000/- per hectare for 7.24 hectares of cultivable land and Rs. 1500/- per hectare for 0.51 hectare of uncultivable land. The Reference Court enhanced the amount of 5 compensation to Rs.1,80,000/- per hectare for cultivable land and Rs.90,000/- per hectare for uncultivable land. By the impugned judgment and order, the High Court has determined and awarded the compensation at Rs.1,50,000/- for cultivable land and Rs.75,000/- for uncultivable land. Hence, the original claimants have preferred the present appeals. ## **- - Civil Appeal Nos.2737 2738 of 2022 @ SLP(Civil) Nos.26245 26246/2018** Land admeasuring 4.05 hectares in Survey No. 4/3 in village Bhoyar came to be acquired. The Land Acquisition Officer determined and awarded the compensation at Rs.55,000/- per hectare for cultivable land of 3.75 hectares and Rs.1500/- per hectare for 0.30 hectare of uncultivable land. The reference Court enhanced the compensation to Rs. 2,40,000/- per hectare for the entire land. Both, the land owners as well as the acquiring body preferred the first appeals before the High Court. By the impugned judgment and order, the High Court has partly allowed the appeal preferred by the acquiring body and consequently dismissed the appeal preferred by the land owners determining the awarding of compensation at Rs.1,80,000/- per hectare. Hence, the original claimants have preferred the present appeals. **Civil Appeal Nos.2740-2741/2022 @ SLP(Civil) Nos.2714027141/2018** 6 Land admeasuring 3.40 hectares in Survey No. 2/1 in village Bhoyar came to be acquired by the same notification. The Land Acquisition Officer awarded Rs. 62,529/- per hectare for 2.75 hectares of cultivable land and Rs.1500/- per hectare for 0.65 hectare of uncultivable land. The Reference Court enhanced the amount of compensation to Rs.2,00,000/- per hectare for cultivable land and Rs.1,00,000/- per hectare for uncultivable land. Both, the land owners as well as the acquiring body preferred appeals before the High Court. By the impugned common judgment and order, the High Court has partly allowed the appeal preferred by the acquiring body and consequently dismissed the appeal preferred by the land owners determining and awarding the compensation at Rs. 1,80,000/- per hectare for cultivable land and Rs.90,000/- per hectare for uncultivable land. Hence, the original claimants have preferred the present appeals. ## **Civil Appeal No. 2739/2022 @ SLP(Civil) No. 26249/2018** Land admeasuring 8.46 hectares in Survey No. 10/3 in village Bhoyar came to be acquired by the same notification. The Land Acquisition Officer awarded compensation at Rs. 45,000/- per hectare for 7.29 hectares of cultivable land and Rs.1500/- per hectare for 1.17 hectares of uncultivable land. The Reference Court enhanced the amount of compensation to Rs.1,80,000/- per hectare for cultivable land and Rs.90,000/- per hectare for uncultivable land. The original claimants 7 preferred appeal before the High Court for enhancement of compensation. By the impugned judgment and order, the High Court has dismissed the said appeal and has maintained the amount of compensation at Rs. 1,80,000/- per hectare for cultivable land and Rs. 90,000/- per hectare for uncultivable land, as awarded by the Reference Court. Hence, the present appeal by the land owners. ## **- - Civil Appeal Nos. 2735 2736/2022 @ SLP(C) Nos.24909 24910/2018** Land admeasuring 2.20 hectares in Survey No. 2/2 in village Bhoyar came to be acquired. The Land Acquisition Officer awarded the compensation at Rs. 1500/- per hectare. The Reference Court enhanced the amount of compensation at Rs. 2,40,000/- per hectare. Both, the original claimants as well as the acquiring body preferred appeals before the High Court. By the impugned common judgment and order, the High Court has partly allowed the appeal preferred by the acquiring body and has dismissed the appeal preferred by the original claimants determining and awarding compensation at Rs.1,80,000/- per hectare. Hence, the present appeals by the original claimants. ## **- - Civil Appeal Nos.2742 2743/2022 @ SLP(C) Nos.27888 27889/2018** Land admeasuring 2.02 hectares in Survey No. 17 in village Bhoyar came to be acquired. The Land Acquisition Officer determined and awarded compensation at Rs. 45,000/- per hectare for 1.92 hectares of cultivable land and Rs.1500/- per hectare for 0.10 hectares of 8 uncultivable land. The Reference Court enhanced the amount of compensation at Rs.1,80,000/- per hectare for cultivable land and Rs.90,000/- per hectare for uncultivable land. Both, the acquiring body and the original claimants preferred appeals before the High Court. By the impugned common judgment and order, the High Court has partly allowed the appeal preferred by the acquiring body and consequently has dismissed the appeal preferred by the original claimants by determining and awarding the amount of compensation at Rs.1,50,000/per hectare for cultivable land and Rs.75,000/- per hectare for uncultivable land. Hence, the present appeals at the instance of the original claimants. 4. Learned counsel appearing on behalf of the respective appellants – original claimants have made the following submissions in support of their case to enhance the amount of compensation: i) that the present acquisition is under a Special Act, i.e., the Maharashtra Industrial Development Corporation Act, 1961, whose object and purpose is to establish an Industrial Development Corporation. It is therefore submitted that the land acquired is to be used for commercial purpose; ii) that the contiguous land of three adjoining villages, vis-à-vis, Bhoyar, Pangri and Lohara were acquired by a common notification dated 9.3.1995 for extension of industrial area of Maharashtra 9 Industrial Development Corporation, which is a purely commercial/industrial purpose. The aforesaid purpose of acquisition goes to the root of the matter and should have been a guiding/deciding factor in determining compensation under the beneficial legislation such as Land Acquisition Act. It is submitted that the said overwhelming factor has been completely overlooked by the High Court; iii) that the land in question is acquired for commercial/industrial purpose bears sufficient testimony to its non-agricultural potentiality and commercial value. It is submitted that the entire land in question is going to be sold as commercial plots to the prospective industries at a commercial rate, is a factor which is completely ignored by the High Court. Reliance is placed upon the decision of this Court in the case of _Atma Singh v. State of Haryana, (2008) 2 SCC 568 (para 5)_ ; iv) that the High Court has committed an error in merely relying upon the sale deed at Ex. 41 in determining the market value. It is submitted that the sale deed at Ex. 41 solely could not have been relied upon by the High Court for the following reasons: (a)That the sale deed at Ex. 41 is in respect of purely agricultural land whereas the acquisition in the instant case is purely for commercial/industrial purpose; 10 - (b)That judicial notice can be taken of the fact that the sale consideration mentioned in the sale deeds are always undervalued to save the stamp duty and registration charges; - (c)That the sale deed at Ex. 41 is almost three years prior to the present acquisition and does not reflect the commercial/industrial market value of the land and is certainly not the sale consideration for which a willing seller would part his property which is a commercial/industrial value. v) that the land owners of village Lohara were awarded compensation at Rs. 3,75,000/- per hectare. As by way of common notification, the contiguous land of three villages without any boundaries, i.e., Bhoyar, Pangri and Lohara were acquired for a common purpose, i.e., for extension of industrial area, the High Court has committed a grave error in determining and awarding a meagre compensation to the extent of Rs. 1,50,000/- per hectare. It is submitted that the approach of the High Court in classifying the land into different categories is clearly contrary to the law laid down by this Court in the case of _Sabhia Mohammed Yusuf Abdul Hamid Mulla (D) By Lrs. v. Special Land Acquisition Officer, (2012) 7 SCC 595 (para 22);_ vi) that the landowners in question whose land is acquired for common purpose by common notification should be uniformly compensated at the same rate and should not be discriminated. 11 Reliance is placed on the decision of this Court in the case of _Land Acquisition Officer Revenue Divisional Officer v. L. Kamalamma (D) By Lrs., (1998) 2 SCC 385 (para 7)_ . vii) that the land in question is having a non-agricultural potentiality which can be judged considering the fact that it was at a distance of 6-7 kilometers from the district place of Yavatmal; it is adjacent to the wall of the MIDC area; rate at the relevant point of time for nonagricultural land was around Rs. 20-25/- per sq. ft.; and it is perennially irrigated land. viii)it is further submitted by the learned counsel appearing on behalf of the original claimants that in case of some of the claimants, the lands were situated just adjacent to village Lohara. It is therefore submitted that the original claimants shall be entitled to the compensation for the land acquired at par with the landowners of village Lohara and/or considering the sale deeds produced on record with respect to the lands situated in village Lohara. 5. Making the above submissions and relying upon the aforesaid decisions, it is prayed to allow the present appeals. 6. All these appeals are vehemently opposed by the learned counsel appearing on behalf of the MIDC as well as the State, by submitting as under: 12 i) that the High Court has passed a well-reasoned judgment after considering the facts of each case and considering the principles of law laid down by this Court relating to computation of compensation for land acquisition. It is submitted that the claimants have not demonstrated any wrong application of a legal principle or overlooking of some important point/evidence affecting valuation by the High Court; ii) that the High Court has given cogent reasons for interfering with the orders passed by the Reference Court granting exorbitant compensation to the landowners/original claimants. It is submitted that the High Court has noted the reasons given by the Reference Court and thereafter has given cogent reasons for reducing the amount of compensation in each case; iii) that the High Court has rightly relied upon the sale deed at Ex. 41 dated 18.09.1992 by which one of the original claimants – Satish Nimodiya had purchased the acquired agricultural land admeasuring 1.21 hectares in survey No. 20/2 in village Bhoyar at Rs. 1,21,000/per hectare and then gave cumulative increase of 10% to arrive at the fair market value of the agricultural lands in 1995, which are the subject matter of acquisition. It is submitted that the High Court has also considered that acquired agricultural lands have non-agricultural potential and after ascertaining the location of the respective lands 13 from the map of village Bhoyar, it has arrived at the fair market value of the lands and their non-agricultural potential in each case; iv) that the High Court has considered the settled legal principle relating to computation of fair market value. It is submitted that the landowners – original claimants had relied upon the sale exemplars of small plots in village Lohara, where an industrial estate exists and the orders passed by the Reference Court in the present cases. It is urged that a meticulous exercise has been made by the High Court and considering the same exemplar produced at Ex. 41, which was with respect to very village of Bhoyar has discarded the other evidence and has rightly determined the compensation by relying upon the sale exemplar produced at Ex. 41; v) that the acquired lands are agricultural lands. Considerable area would be used for developmental infrastructure and this would require huge developmental investment/expenses by MIDC. It is submitted that deduction of development charges was required to be done, which has not been done by the High Court; vi) it is submitted that the High Court has granted a cumulative increase of 10% increase per year after noting that the Reference court had granted 50% cumulative increase per year, which was just contrary to the decision of this Court in the case of _Pehlad Ram v. Haryana Urban Development Authority, (2014) 14 SCC 778_ by which it 14 is observed and held that the cumulative increase of 10 to 15% per year in the market value of the land may be accepted. It is submitted that if the cumulative increase per year is increased to 12% from 10%, compensation would have to be reduced considering development charges of 33%, which has not been done in the present case. There is also no evidence to show that there was increasing trend in the sale price of agricultural land in village Bhoyar to justify the increase from 10 to 12%. 6.1 Learned counsel appearing on behalf of the acquiring body as well as the State have relied upon the decisions of this Court in the cases of _Dollar Co. v. Collector of Madras, (1975) 2 SCC 730; Shakuntalabai v. State of Maharashtrsa, (1996) 2 SCC 152; T.S. Ramachandra Shetty v. Chairman, Karnataka Housing Board, (2009) 14 SCC 334_ , on the principle that the sale price of the acquired land is best evidence for determining its fair market value. 6.2 Learned counsel appearing on behalf of the acquiring body as well as the State have also relied upon the decisions of this Court in the cases of _Tarlochan Singh v. State of Punjab, (1995) 2 SCC 424; Hookiyar Singh v. Special Land Acquisition Officer, (1996) 3 SCC 766; and Subh Ram v. State of Haryana, (2010) 1 SCC 444,_ on the principle that the purpose of acquisition/future use of acquired land cannot be considered for determination of compensation, and the decision of this 15 Court in the case of _Kanwar Singh v. Union of India, (1998) 8 SCC 136_ , on the principle that the land in adjacent village or even the same village may not possess the same quality and therefore cannot command common market price. 6.3 Learned counsel appearing on behalf of the acquiring body as well as the State have also relied upon the decisions of this Court in the cases of _General Manager, ONGC Ltd. v. Rameshbhai Jivanbhai Patel, (2008) 14 SCC 745; Pehlad Ram (supra); and Manoj Kumar v. State of Haryana, (2018) 13 SCC 96_ , on the cumulative increase which would vary from 10 to 15% per year in the market value of the land. 6.4 Making the above submissions and relying upon the aforesaid decisions, it is prayed to dismiss the present appeals. 7. We have heard the learned counsel for the respective parties at length. The High Court by the impugned common judgment and order has awarded different amounts of compensation for different lands situated at different locations, but with respect to the same village Bhoyar, the particulars of which are collated in the form of a chart as under: ## Chart 1. Land acquired is in village Bhoyar, District Yavatmal, Maharashtra. Acquired for extension of Industrial Estate at adjoining village Lohara. 16 2. Notification u/s 1(3) r/w 31 of the Maharashtra Industrial Development Act, 1961 = 30.11.1994 3. Notification u/s 32(2) of the Maharashtra Industrial Development Act, 1961, initiating L.A. proceedings = 09.03.1995 **==> picture [452 x 585] intentionally omitted <==** **----- Start of picture text -----**<br> Sr. Owner Civil Surve Are First Compensati<br>No Appeal y No. a Appeal on awarded<br>. No. (H) No. by the High<br>Court<br>1. Shaila Kailash 2744/22 33/4 4.4 56/2006 Rs.<br>Chandra 7 2,00,000/-<br>Chaudhari & per hectare<br>ors<br>[Kailashchand<br>had<br>purchased the<br>acquired land<br>by sale deed<br>dated<br>01.04.1989 for<br>Rs. 55,000/-<br>2. Sindhubai 2745/22 32/1 1.6 489/2017 Rs.<br>Prajapati 2 2,00,000/-<br>per hectare<br>3. Leelabai 2746- 33/2 2.4 124/07 & Rs.2,00,000/<br>Langote (D) 47/2022 3 591/2006 - per hectare<br>through Lrs.<br>4. Lalita 2740- 2/1 3.4 1254/200 Rs.1,80,000/<br>Suraswar & 2741/202 0 9 & - per hectare<br>Umashankar 2 7/2013 for cultivable<br>Gautam land<br>Rs. 90,000/-<br>per hectare<br>for<br>uncultivable<br>land<br>5. Dinesh Boara 2735- 2/2 2.2 216/2011 Rs.1,80,000/<br>& Another 2736/202 0 & - per hectare<br>2 276/2011<br>6. Chandrashekh 2737- 4/3 4.0 215/2011 Rs.1,80,000/<br>ar Mor 2738/202 5 & - per hectare<br>**----- End of picture text -----**<br> 17 **==> picture [452 x 551] intentionally omitted <==** **----- Start of picture text -----**<br> 2 602/2012<br>7. Ramrao 2732/202 31/2 4.9 133/2007 Rs.1,50,000/<br>Tapase 2 1 - per hectare<br>8. Jagannath 2742- 17 2.0 1234/200 Rs.1,50,000/<br>Zinge 2743/202 2 9 & - per hectare<br>2 430/2018 for cultivable<br>land<br>Rs.75,000/-<br>per hectare<br>for<br>uncultivable<br>land<br>9. Madhao 2733- 17 9.5 1248/200 Rs.1,50,000/<br>Lagad (D) by 2734/202 0 9 & - per hectare<br>Lrs. 2 431/2018 for cultivable<br>land<br>Rs.75,000/-<br>per hectare<br>for<br>uncultivable<br>land<br>10. Umashankar 2739/202 10/3 8.4 1255/200 Appeal<br>Gautam 2 6 9 dismissed<br>without<br>reducing<br>compensatio<br>n at<br>Rs.1,80,000/<br>- per hectare<br>for cultivable<br>land, Rs.<br>90,000/- for<br>uncultivable<br>land<br>**----- End of picture text -----**<br> At the outset, it is required to be noted that before the Reference Court and even the High Court, the original claimants relied upon Ex. 41, 42, 43 and 44 and other sale deeds/sale instances with respect to the land of village Lohara. However, the sale deeds with respect to the lands 18 of village Lohara were either of the period subsequent to the land acquired in the present case and/or the same were with respect to small areas of land. The High Court has discarded the same with which we agree. 8. It is also required to be noted that in some of the cases, the Reference Court, relying upon the sale deed at Ex. 31, added 50% cumulative increase and awarded compensation, which has been modified by the High Court by the impugned judgment and order raising 10% price rise/escalation. 9. The High Court by the impugned judgment and order has mainly relied upon Ex. 41, the sale deed with respect to the land bearing Survey No. 20/2 of the very village Bhoyar dated 18.09.1992, by which one of the claimants – Satish Nimodiya purchased the said land at Rs. 91,736/p per hectare. The High Court has rounded off the same to Rs.1,00,000/per hectare. Therefore, the High Court has considered the value of the land in 1992 at Rs. 1,00,000/- per hectare. Considering three years gap between the sale exemplar dated 18.09.1992 (Ex. 41) and the land acquired in the present case, the High Court has added 10% increase cumulatively for three years and has determined the fair market value of the acquired land at Rs. 1,30,000/- per hectare. That thereafter, considering the fact that the lands acquired have non-agricultural potentiality and are situated nearer to the industrial area, the High Court 19 has further added 15% and has determined and awarded the compensation at the rate of Rs. 2,00,000/- per hectare for cultivable land. In some of the cases, the same is reduced to Rs.1,80,000/- per hectare or reduced to Rs.1,50,000/- per hectare (Civil Appeal Nos. 27332734/2022), by considering the location of the lands acquired. 10. Looking to the fact that the sale deed produced at Ex. 41 with respect to the land bearing Survey No. 20/2 was with respect to the very village Bhoyar which was the only sale exemplar of the same village and other sale exemplars/sale deeds were with respect to another village Lohara and also with respect to small pieces of land, we are of the considered view that the High Court has rightly relied upon and considered the sale exemplar at Ex. 41 while determining the compensation in the present cases with respect to the lands of very village Bhoyar. However, at the same time, bearing in mind the decision of this Court in the case of _Pehlad Ram (supra)_ , by which this Court has observed and held that a cumulative increase of 10 to 15% per year in the market value of the land may be accepted, in the facts and circumstances of the case, we are of the opinion that instead of 10% cumulative increase as adopted by the High Court, if 12% cumulative increase would have been adopted, it would have been just and proper and in the fitness of things. 20 11. Now, so far as the submission on behalf of the claimants that the lands in question were acquired for the industrial corporation and were to be used for the industries/commercial purpose and accordingly the compensation should have been paid is concerned, what is required to be considered is that the lands in question were agricultural lands. Even for the purpose of industrial use and/or industries, the corporation is required to incur the expenditure towards its development and therefore the development charges would have to be deducted while determining the compensation. However, in the present case, the development charges are not deducted. Even otherwise, the future use of the acquired land cannot be the main criteria to determine the compensation for the lands acquired. 12. In the case of _Hookiyar Singh (supra)_ , it is observed and held that while determining the compensation, the future use of the land is not the relevant consideration. 12.1 In the case of _Subh Ram (supra)_ , it is observed and held that the purpose of acquisition is also a relevant factor. However, the said observation may not apply in all cases and all circumstances as the general rule is that the landowner is being compensated for what he has lost and not with reference to the purpose of acquisition. It is further observed and held that the purpose of acquisition can never be a factor to increase the market value of the acquired land. 21 13. Now, so far as the compensation determined differently for different lands acquired with respect to the same village Bhoyar, ranging from Rs. 1,50,000/- per hectare to Rs. 2,00,000/- per hectare is concerned, different market value/compensation can be determined for different lands located differently in the same village or locality. In the case of _Tarlochan Singh (supra)_ , it is observed and held that it is common knowledge that all the lands in the same village may not possess the same quality and command a common market price. 13.1 In the case of _Basant Kumar (supra)_ , it is observed and held that even in the same village, no two lands command same market value. The lands abutting the main road or national highway would command a higher market value and as the location of the land is interior, the market value of such land would be lesser despite the quality of land being similar to the land on the main road or highway. 13.2 In the case of _Kanwar Singh (supra)_ , it is observed and held that generally there would be difference in the potentiality of lands situated in two different villages. 14. In the present case, as such, there is already a sale exemplar at Ex. 41 with respect to very village Bhoyar which as observed hereinabove can be said to be the best exemplar while determining the compensation with respect to the lands acquired of the same village Bhoyar. The High Court has rightly relied upon and considered the sale 22 deed at Ex. 41 being land survey no. 20/2 and determined the market value at Rs.1,00,000/- per hectare in the year 1992 and has rightly determined the compensation relying upon the sale exemplar produced at Ex. 41. However, at the same time, as observed hereinabove, instead of 10% cumulative increase, the High Court ought to have added 12% increase cumulatively for about three years. To that extent, the impugned common judgment and order passed by the High Court is required to be modified and the appeals preferred by the original claimants are required to be partly allowed to the aforesaid extent. Thus, the market value of the acquired land would be Rs. 1,40,492/- per hectare and after rounding off, it will become Rs.1,50,000/- per hectare. Further adding 50% towards the non-agricultural potentiality, the fair market value for determining the compensation would be Rs. 2,25,000/per hectare in the cases where the High Court has determined and awarded the compensation at Rs. 2,00,000/- per hectare. There shall be corresponding reduction in the compensation with respect to other lands as made by the High Court looking to the location of the lands. Thus, wherever the High Court has determined the compensation at Rs.1,80,000/- per hectare, it will come to Rs. 2,00,000/- per hectare and wherever the High Court has determined the compensation at Rs. 1,50,000/- per hectare, it will come to Rs. 1,75,000/- per hectare. The 23 appeals preferred by the claimants are required to be partly allowed to the aforesaid extent. 15. In view of the above discussion and for the reasons stated above, all these appeals are partly allowed. The respective appellants – original claimants are entitled to the compensation as under, with all statutory benefits, which may be available to them under the Act. **==> picture [483 x 501] intentionally omitted <==** **----- Start of picture text -----**<br> Sr. Owner Civil Survey Are First Appeal Compensation Compensatio<br>No. Appeal No. a No. awarded by the n awarded<br>No. (H) High Court by this Court<br>01 Shaila Kailash 2744/2 33/4 4.4 56/2006 Rs. 2,00,000/- Rs.2,25,000/<br>Chandra Chaudhari 2 7 per hectare - per hectare<br>& ors [Kailashchand<br>had purchased the<br>acquired land by<br>sale deed dated<br>01.04.1989 for Rs.<br>55,000/-<br>02 Sindhubai Prajapati 2745/2 32/1 1.6 489/2017 Rs. 2,00,000/- Rs.2,25,000/<br>2 2 per hectare - per hectare<br>03 Leelabai Langote 2746- 33/2 2.4 124/07 & Rs.2,00,000/- Rs.2,25,000/<br>(D) through Lrs. 47/202 3 591/2006 per hectare - per hectare<br>2<br>04 Lalita Suraswar & 2740- 2/1 3.4 1254/2009 Rs.1,80,000/- Rs.2,00,000/<br>Umashankar 2741/2 0 & 7/2013 per hectare for - per hectare<br>Gautam 022 cultivable land for cultivable<br>Rs. 90,000/- per land<br>hectare for Rs.1,00,000/<br>uncultivable - per hectare<br>land for<br>uncultivable<br>land<br>05 Dinesh Boara & 2735- 2/2 2.2 216/2011 & Rs.1,80,000/- Rs.2,00,000/<br>Another 2736/2 0 276/2011 per hectare - per hectare<br>022<br>06 Chandrashekhar 2737- 4/3 4.0 215/2011 & Rs.1,80,000/- Rs.2,00,000/<br>Mor 2738/2 5 602/2012 per hectare - per hectare<br>022<br>07 Ramrao Tapase 2732/2 31/2 4.9 133/2007 Rs.1,50,000/- Rs.1,75,000/<br>022 1 per hectare - per hectare<br>08 Jagannath Zinge 2742- 17 2.0 1234/2009 Rs.1,50,000/- Rs.1,75,000/<br>2743/2 2 & 430/2018 per hectare for - per hectare<br>022 cultivable land for cultivable<br>Rs.75,000/- per land<br>hectare for Rs.87,500/-<br>uncultivable per hectare<br>land for<br>uncultivable<br>land<br>09 Madhao Lagad (D) 2733- 17 9.5 1248/2009 Rs.1,50,000/- Rs.1,75,000/<br>**----- End of picture text -----**<br> 24 **==> picture [483 x 209] intentionally omitted <==** **----- Start of picture text -----**<br> by Lrs. 2734/2 0 & 431/2018 per hectare for - per hectare<br>022 cultivable land for cultivable<br>Rs.75,000/- per land<br>hectare for Rs.87,500/-<br>uncultivable per hectare<br>land for<br>uncultivable<br>land<br>10 Umashankar 2739/2 10/3 8.4 1255/2009 Appeal Rs.2,00,000/<br>Gautam 022 6 dismissed - per hectare<br>without reducing for cultivable<br>compensation at land<br>Rs.1,80,000/- Rs.1,00,000/<br>per hectare for - per hectare<br>cultivable land, for<br>Rs. 90,000/- for uncultivable<br>uncultivable land<br>land<br>**----- End of picture text -----**<br> However, so far as Civil Appeal Nos. 2746-2747/2022 and Civil Appeal No. 2745/2022 are concerned, as there was a delay of 613 and 438 days respectively in preferring the appeals, it is directed that the claimants shall not be entitled to interest on the enhanced amount of compensation for the aforesaid delayed period. 16. All these appeals stand partly allowed to the aforesaid extent. However, in the facts and circumstances of the case, there shall be no order as to costs. ………………………………….J. [M.R. SHAH] NEW DELHI; ………………………………….j. APRIL 19, 2022. [B.V. NAGARATHNA] 25 26
End of Judgment Record
Browse All Landmark Cases Judgments
2019-01-22

State of Himachal Pradesh & Anr. v. Pinju Ram & Others; State of Himachal Pradesh & Ors. v. Ganesh Dutt & Anr.

This batch of appeals concerns regularisation and monetary benefits of part‑time employees in Himachal Pradesh who were converted to daily‑wage status. The State had issued a policy on 27 February 2004: part‑time Class‑IV employees who had completed ten years of continuous service as on 31 December 2003 would be made daily wagers with prospective effect, and posts vacated by such employees would stand abolished; Education and Ayurveda were excluded from the policy. Revenue Chowkidars, engaged by Panchayats, were not covered by that policy and received separate treatment. Following writ petitions and an order of the Himachal Pradesh High Court and in light of later developments, the State drew‑up directions in 2011 (22 September) to give seniority to Revenue Chowkidars on the basis of ten years of service, but with wages from the date of actual appointment and without back‑dated monetary benefits; 7 July 2012 further instructions reiterated this stance for remaining part‑time employees, with monetary benefits not guaranteed in the interregnum. The respondents pressed for back wages dating from 1 January 2007 and broader coverage. The Supreme Court held that the 2007 back‑pay direction was unsustainable, clarified that seniority would count from ten years without past benefits, and that the 2011 policy and Moti Singh principle should guide the approach. The appeals are allowed; no costs. The related writ petitions are to be disposed of consistent with these directions.

2018-08-14

Union Bank of India and Others v. C.G. Ajay Babu and Anr.

This is a Supreme Court of India appeal concerning the forfeiture of gratuity under the Payment of Gratuity Act, 1972. The respondent was a branch manager of the appellant bank and was dismissed on 3 June 2004 after disciplinary proceedings. A show-cause notice sought to forfeit gratuity due to misconduct involving moral turpitude, which was ordered on 20 April 2004. The High Court upheld the dismissal but held that gratuity could be paid since there was no financial loss to the bank, and that a bipartite settlement between the bank and employees permitted forfeiture only where misconduct caused financial loss. The Division Bench, however, held that forfeiture under Section 4(6) must be read together with Section 4(5) and that no loss was proven, thus entitling the employee to gratuity in accordance with the bipartite settlement. The Supreme Court agreed with the High Court that forfeiture is not automatic; it is controlled by Sections 4(5) and 4(6) of the Act and by the bipartite settlement, which requires loss to justify forfeiture. The Court emphasized that an act must constitute an offence involving moral turpitude and that conviction is generally required for forfeiture under 4(6)(b)(ii). The appeal is dismissed with no costs.

2018-09-25

Reema Salkan v. Sumer Singh Salkan

This is a Supreme Court of India criminal appeal under the Criminal Appellate Jurisdiction arising from a maintenance dispute under Section 125 Cr.P.C. The parties, married in 2002, had a protracted litigation history. The Family Court granted maintenance to the wife from 17 July 2003 to 8 December 2010, and held no maintenance thereafter. The High Court, in revision, partly allowed the application, directing Rs.9,000 per month from 9 December 2010 onward, while upholding the earlier period’s Rs.10,000 per month. This Court had earlier granted interim maintenance of Rs.20,000 per month in 2014 (Criminal Appeal Nos. 2347-2349 of 2014). The appellant contends there has been no change in circumstances since the interim order and that the respondent’s substantial assets, education, and overseas earnings establish the capacity to pay higher maintenance. The respondent defends the High Court’s reasoning, arguing that the Family Court’s assessment, demeanor observations, and the principle that maintenance should not be perpetual require careful scrutiny, and that the notional minimum wage approach used by the High Court is flawed. The overarching issue is the quantum of monthly maintenance payable to the appellant and whether the interim amount should be augmented beyond the period up to 2010.”

2019-12-03

M/s Embassy Property Developments Pvt. Ltd. v State of Karnataka & Ors.

This judgment concerns three Civil Appeals filed by a Resolution Applicant, the Corporate Debtor (through its Resolution Professional) and the Committee of Creditors, challenging an Interim Order of the Karnataka High Court staying an NCLT order in proceedings under the Insolvency and Bankruptcy Code, 2016. The NCLT Chennai had admitted an application under Section 7 of the IBC against M/s Tiffins Barytes Asbestos & Paints Ltd. and directed a moratorium under Section 14. The Interim Resolution Professional then sought a deemed extension of a mining lease under MMDR Act, 1957 and the Government of Karnataka rejected it. The NCLT, by an order dated 11.12.2018, set aside the Government’s order and directed execution of Supplement Lease Deeds for the period up to 31.03.2020. The Government of Karnataka challenged this in a High Court writ petition, which stayed the impugned NCLT order. The core issues were: (i) whether the High Court may interfere under Article 226/227 with an NCLT order in IBC when an appeal lies to the NCLAT, and (ii) whether fraud can be inquired into by NCLT/NCLAT in CIRP. The Court reiterates that IBC is a complete, umbrella code with a three‑tier mechanism (NCLT, NCLAT, Supreme Court) and that public‑law disputes arising from MMDR Act obligations lie outside IBC. It ultimately holds that while NCLT/NCLAT may inquire into fraud, they cannot adjudicate MMDR‑related public legal disputes; and the High Court’s writ jurisdiction in public‑law contexts remains permissible. The appeals are dismissed.