Ram Chand and Ors. v. Union of India and Ors. and Shri Ved Prakash and Ors. v. Union of India and Ors.

Case / Petition Number:
Writ petitions Nos. 1609 to 1622 of 1981; Civil Appeal No. 2630 of 1980

Case Synopsis & Summary

This judgment deals with protracted land acquisition proceedings under the Land Acquisition Act, 1894, involving notifications issued between 1959 and 1965, declarations under section 6 in 1966-1969, and awards only in 1980-1983. The petitioners contended that the government’s long inaction—over a decade and a half after declarations—violated the Act and the constitutional mandate to provide market value compensation. The respondents argued that delays were condoned and legitimized by the 1984 amendment introducing section 11A, which fixed a two-year period for awards, with a proviso for declarations published before 1984 to be honored within two years from the Act’s commencement. The Court examined the Act’s structure, emphasizing that awards and compensation must precede vesting and that the peg of market value to dates much earlier than the award undermines constitutional protection of compensation and the scheme’s purpose. While acknowledging public interest and administrative realities, the Court rejected the notion that pre-1984 provisos fully validate inaction. It held that delays are generally unreasonable and liable to remedy. Rather than quashing, the Court fashioned a modified relief: payment of an additional compensation at 12% per annum after two years from 23 August 1974, calculated against the market value on the date of the section 4(1) notifications, until awards are made. The petitions were allowed in part."

Precedent Explorer

Find Cases Like This

Explore other judgments dealing with similar legal situations, facts, or statutory provisions.

Case Details & Bench

Court
Supreme Court of India
Hon'ble Judges
  • J.S. Verma
  • N.P. Singh
  • S.P. Bharucha
Judgment Date
1993-09-30
Court Decision / Holding
Petitions allowed in part. Court held that delays beyond a reasonable period were improper and rejected the argument that Section 11A’s proviso fully legitimizes inaction. It directed a modified remedy: pagar an additional compensation at 12% per annum after two years from 23 August 1974 till the date of award, calculated with reference to market value on the date of the Section 4(1) notification, and not to quash the proceedings. This balanced approach recognized public interest while ensuring just compensation for landowners.
Final Disposition
Petitions allowed in part

Parties to the Case

Appellants / Petitioners

  • Ram Chand and Others
  • Shri Ved Prakash and Others

Respondents

  • Union of India and Ors.

Legal Representation & Advocates

Counsels for Petitioners

  • • G.L. Sanghi
  • • A.K. Sen
  • • S.K. Mehta
  • • Dhruv Mehta
  • • B.S. Chauhan

Counsels for Respondents

  • • N.N. Goswamy
  • • T.C. Sharma
  • • S.N. Sikka
  • • Arun Kumar Sharma
  • • B.K. Prasad

Provisions of Law Cited

Land Acquisition Act, 1894: Sections 4(1), 4, 6, 11, 11(1), 11A, 16, 23(1)Constitution of India, 1950: Articles 32, 226, 31A (second proviso)Article 142 (Constitutional power)

Legal Doctrines & Maxims

  • Powers conferred by Parliament must be exercised within a reasonable time after notice; otherwise the notice may be treated as ineffective.
  • Land acquisition must be completed expeditiously; compensation should reflect value close to the date of dispossession or notice, not an inordinately delayed valuation.
  • Article 142: The Supreme Court has wide discretion to do complete justice in ends of justice.

Submissions & Arguments

Contentions of Appellants / Petitioners

The petitioners argued that notifications under Section 4 and declarations under Section 6, issued decades earlier, were followed by no timely awards or compensation, effectively freezing the landowners at old market values and violating the constitutional guarantee for market-value compensation. They contended that the inordinate delay after declaration rendered the acquisitions arbitrary and contrary to the Act’s scheme, and that the newer Section 11A did not retroactively validate pre-existing inaction. They urged quashing the acquisition or, failing that, severe monetary relief to compensate for delayed awards and market-value deflation.

Contentions of Respondents

The respondents maintained that delays were not fatal; they argued that Section 11A fixes a two-year deadline for awards and that, in some cases, delays were condoned by the amendments. They reasoned that pegging market value to the notification date under Section 4(1) was designed to avoid inconsistent valuation and that quashing would disrupt public projects and third-party interests. They invoked longstanding precedents to justify administrative lag and suggested that a modified relief, not quashing, would protect both public interests and individual rights.

Legal Doctrine & Issue Explorer

Explore This Legal Issue

Find relevant judgments and authoritative positions on the legal questions discussed here.

Cited Precedents (16)

Case NameCitationTreatmentExplanation
State of Gujarat v. Raghav NathaAIR 1969 SC 1297PositiveUsed to support the principle that exercise of power must occur within a reasonable time; court emphasizes timely action in acquisition proceedings.
Mansaram v. S.P. Pathak(1984) 1 SCC 125PositiveReiterates the need for reasonable time in exercising power; cited to reinforce the reasonable-time principle.
State of Madhya Pradesh v. Vishnu Prasad Shanna(1966) 3 SCR 557PositiveUsed to argue that once a declaration is issued, expeditious conclusion of proceedings is required.
Ambalal Purshottam G v. Ahmedabad Municipal Corporation(1968) 3 SCR 207PositiveCourt cites to show that after notification under ss. 4 & 6, compensation should be determined without unreasonable delay.
Khadim Hussain v. State of U.P.(1976) 3 SCR 1PositiveSupport for the need to avoid excessive delay between 4 and 6 notices; promotes timely compensation.
The Tiverton and North Devon Railway Company v. Robert Francis Loosemore[A.C. 480]PositiveEngland-based authority cited regarding delay and cost to the owner.
Grice v. Dudley Corporation(1958) 1 Ch 329PositiveAuthority supporting prompt completion of land acquisition proceedings.
Birmingham City Corp. v. West Midland Baptist (Trust) Association[1969] 3 All ER 172PositiveAffirms value fairness at the time of dispossession; supports timely compensation.
Aflatoon v. Lt. Governor of Delhi(1975) 4 SCC 285PositiveEstablishes a two-year reasonable period for awards after declaration; used as baseline.
Ramjas Foundation v. Union of India[1991] Supp. 2 SCC 20Mentioned OnlyCited in context but not pivotal to final holding.
Special Land Acquisition Officer Bombay v. Godrej and Boyce(1988) 1 SCR 590DistinguishedDistinguished; not applicable as post-award context differs from pre-award circumstances.
Ujjain Vikas Pradhikaran v. Raj Kumar Johari(1992) 1 SCC 328Mentioned OnlyCited as supportive but not central to the ruling.
Akhara Brahm Buta Amritsar v. State of PunjabJT (1992) 5, 136Mentioned OnlyCited in discussion of amendments; not central to the decision.
Bihar State Housing Board, State of Bihar v. Ban Bihari MahatoAIR (1988) SC 2134Mentioned OnlyCited in relation to amendment discussions; not central to dispositive reasoning.
Union Carbide Corporation v. Union of IndiaAIR 1992 SC 248 = (1991) 4 SCC 584Mentioned OnlyCited for principles on extraordinary remedies; not central to the outcome.
K.S. Pariapooran v. State of Kerala(1992) 1 SCC 684Partly Overruled / LimitedCorrectness of the judgment questioned and referred to Constitution Bench; limited by later consideration.
Case Applicability Diagnostic

Apply This to My Facts

Share your situation and test whether this judgment governs, supports, or challenges your case.

Official Judgment Record
•7,476 words•~34 min read

In The Court Record

Ram Chand and Ors. v. Union of India and Ors. and Shri Ved Prakash and Ors. v. Union of India and Ors.

A ## RAM CHAND AND ORS. _v._ UNION OF INDIA AND ORS. ## AND B ## SHRI VED PRAKASH AND ORS. _v._ UNION OF INDTA AND ORS. ## SEPTEMBER 30, 1993 c (J.S. VERMA, N.P. SINGH AND S.P. BHARUCHA, JJ.] _Land Acquisition Act, 1894:_ _Sections 4, 4(1), 6, 11, 11(1), llA, 16, 23(1)--Delay in making Awards_ D _and Payment of compensation-Award made several years later on the basis of Market value of land at the time of notice under Section 4(1}-Held: Not proper compliance of mandate regarding payment of market value of land._ _Constitution of India, 1950 :_ E _Articles 32 & 226-Exercise of jurisdiction-Inaction of the authoritiesInjury caused to public-Power of Court to grant modified relief and to direct payment of additional compensation._ Proceedings had been initiated between the years 1959 and 1965 by issuance of notifications under section 4 of the Land Acquisition Act for F acquisition of lands owned by the petitioners/appellants. Though declarations under section 6 of the Act had been made in the years 1966 and 1969, awards were made only in the years 1980, 1981 and 1983. Writ Petition and a civil appeal were filed before the Court quashing G the land acquisition proceedings. > The petitioners/appellants, contended that the respondents had issued the declarations in respect of several thousand bighas of lands, but no further steps, for making of the award or payment of the compensation, were taken for more that 14 years from the date of the declarations under H section 6 of the Act, and the awards were only in the years 1980, 1981 and 558 _559_ RAM CHAND _v._ U.0.1. 1983. This procedure was adopted only to peg the market value of the lands A between the years 1959 and 1965. The respondents contended that even if it be assumed that there had been an unreasonable delay in completion.-Of..the-land acquisition proceed· ings, that delay had been condoned and validated by Section llA which was introduced by the Land Acquisition (Amendment) Act, 1984, and that B in view of the proviso to section llA of the Act, where a declaration under section 6 had been published before the commencement of the Amendment Act of 1984, like the instant cases, the awards could be made within a period of two years from the commencement of the Amendment Act, i.e. up to 23rd September, 1986. C ## Allowing the writ petitions and the appeal, this court HELD: 1. The different sections of the Land Acquisition Act, 1894 indicate that the framers of the Act enjoined, that after publication of notification under sub-section(l) of section 4 of the Act, further proceedD ings should be taken as early as possible. A special feature of the Act is that it requires award to be made and compensation to be paid before the land, which is the subject matter of acquisition, vests in the Government. This is apparent from section 16, which says that when the Collector has made an award under> section 11, "he may take possession of the land, which shall thereupon vest absolutely in the Government, free from all E encumbrances." Normally, in statutes relating to acquisition of interest of the holder, question of assessment and payment of compensation arise after the vesting of the right, title interest of the holder. But the Act conceives that there may be delay in taking possession, due to some unavoidable reasons and, as such making of the award or payment of the F compensation should not be dependent on taking of the possession of such land and vesting thereof in the Government. (564-B-D] _State of Gujarat_ v. _Pastel Raghav Natha,_ AIR (1969) SC 1297 = (1970) SLR 335; _Mansaram_ v. _S.P. Pathak,_ (1984] 1 SCC 125; _State of Madhya Pradesh_ v. _Vishnu Prashad Shanna,_ (1966] 3 SCR _551,Ambalal Purshottam_ G v. _Ahmedabad Municipal Corporation,_ (1968] 3 SCR 207; _Khadim Hussain_ v. _State of U.P.,_ (1976] 3 SCR 1 = AIR (1976) SC 417; _The Tiverton and North Devon Railway Company_ v. _Robert Francis Loosemore,_ 9 Appeal Cases 480 at 489; _Grice_ v. _Duley Corporation,_ (1958) 1 Chancery Division 329 _andBinningham City Corpn._ v. _West Midland Baptist (Trnst) Association_ H 560 SUPREME COURT REPORTS (1993) SUPP. 2 S.C.R. A _(Incorporated),_ [1969] 3 All England Reports 172, referred to. _Craies on Statute Law,_ Seventh Edition, Pl.282, referred to 2. It cannot be said that the pr~viso to section llA of the Act in any manner validates or justified the inaction on the part of the authorities in B delaying and keeping land acquisition proceedings pending for a decade and half, after declarations had been made under section 6 of the Act. [569-E-F] _Aflatoon_ v. _Lt. Governor of Delhi,_ [1975] 4 SCC 285 and _Ramjas Foundation_ v. _Union of India,_ [1991] Suppl. 2 SCC 20, referred to. c 3. In a case where after declaration under section 6, but prior to making of the award acquisition is withdrawn under section 48, the land having enhanced market value remains with the holder thereof. Different States in India by State Amendments introduced section 48A, in order to safeguard the interest of the persons in respect of whose lands declaration · D have been issued under section 6, but no awards have been made within a reasonable time. In view of section 48A aforesaid, the declaration under section 6 may not become invalid because of the delay in the completion of the proceeding for acquisition, but after a period of two years from the date of the publication of such declaration, unless the owner of the land E had been responsible for the delay, the owner shall be entitled to receive compensation for the damage suffered by him in consequence of such delay. Such damage is to be determined under part III of the Act, as compensation payable under section 48A. In view of this section, while computing the quantum of compensation, what damage the owner of the land has suffered due to delay in completion of the acquisition proceeding, F has also to be calculated. Unfortunately, no such amendment was introduced in the principle Act and even when several amendments were introduced by the Land Acquisition (Amendment) Act, 1984, this aspect of the matter appears to have been overlooked. [571-B-F] G _Special Land Acquisition Officer Bombay_ v. _Godrej and Boyce,_ [1988) 1 SCR 590, distinguished. 4. The petitioners/appellants are under great predicament because of the delay and inaction on the part of the respondents. Any amount determined as market value of their lands acquired, with reference to the H dates of issunace of notifications under sub-section(l) of section 4 of the 561 RAM CHAND _v._ U.0.1. _I_ Act i.e. at the rate prevalent 15 to 21 years prior to the dates of the making A of the award, cannot be said to be the compliance of the mandate regarding payment of market value of the land so acquired, under the Constitution and the Land Acquisition Act. [573-E-F] _Ujjain Vikas Pradhikaran_ v. _Raj Kumar Johari,_ [1992] 1 SCC 328, _Akhara Brahm Buta Amritsar_ v. _State of Punjab,_ JT (1992) 5, 136, _Bihar State Housing Board, State of Bihar_ v. _Ban Bihari Mahato,_ AIR (1988) SC 2134 and _Union Carbide corporation_ v. _Union of India,_ [1992] SC 248= [1991] 4 sec 548 ' refered to. c 5. The exercise of power in the facts and circumstances of the cases, by the respondents is against the spirit of the provisions of the Act, tending arbitrariness. In such a situation this Court in exercise of power under Article 32 and the High Court under Article 226, could have quashed the proceedings. But, taking into consideration that in most of the cases, the Delhi Administration and Delhi Development Authority have taken pos- D session of the lands and even developments have been made, it shall not be a proper exercise of discretion on the part of this Court to quash the proceedings because, in that event, it shall affect the public interest. Moreover, third party interests created in the meantime are also likely to be affected and such third parties are not impleaded. The relief of quashing the acquisition proceeding having become in appropriate due to the E subsequent events, the grant of a modified relief, considered appropriate in the circumstances, would be the proper course to adopt., [574-C-F] 6. After the judgment of this Court in _Aflatoon's_ case rendered on 23rd August, 1974, the reasonable time for making the awards was about I two years from that date. Beyond two years, the time taken for making of the awards will be deemed to be unreasonable. As. 'such, after expiry of the period of two years, some additional compensation has to be awarded to the cultivators. Taking into consideration the interest of the cultivators and the public, instead of quashing the proceedings for acquisition, it is directed that the petitioners/appellants shall be paid an additional amount of compensation to be calculated at the rate of twelve percent per annum, after expiry of two years from 23.8.1974, till the date of the making of the awards by the Collector, to be calculated with reference to the market value of the lands in question, on the date of the notifications under sub-section(!) of section 4. [575-B-D] 562 SUPREME COURT REPORTS [1993) SUPP. 2 S.C.R. A _Aflatoon_ v. _Lt. Govemor of Delhi,_ [1975] 4 SCC 285, refered to. CIVIL ORIGINAL APPELLATE JURISDICTION: Writ petitions Nos. 1609 to 1622 of 1981. (Under Article 32 of the Constitution of India.) B ## AND Civil Apeal No. 2630 of 1980. c From the Judgment and Order dated 21.10.80 of the Delhi High Court in Civil Writ Petition No. 963 of 1980. G.L. Sanghi, A.K. Sen, S.K. Mehta, Dhruv Mehta and B.S. Chauhan for the petitioners/appellants. D N.N. Goswamy, T.C. Sharma, S.N.Sikka, Arun Kumar Sharma and B.K. Prasad for the respondents. The Judgment of the Court was delivered by N.P. SINGH, J. Writ petitions and a civil appeal have been filed for quashing the land acquisition proceedings, which had been initiated between the years 1859 and 1965 by issuance of notifications under section 4 E of the Land Acquisition Act (hereinafter referred to as "the Act") but in which no awards were made up to the years 1979-80, although the declarations under section 6 of the Act had been made in the years 1966 and 1969. The first such notification under section 4 of the Act was issued on 13.1.1959 in respect of 24,000 acres of land. Another notification under section 4 was issued on 24.10.1961 in respect of 16,000 acres of land. One F such notification under section 4 was issued on 23.1.1965. Declarations under section 6 of the Act were issued on 16.5.1966 and 13.1.1969. The declaration dated 16.5.1966 related to 2,153 Bighas of land, whereas the declaration dated 13.1.1969 was in respect of 88 Bighas. a declaration under section 6 had been made on 6.12.1966 in respect of 5,898 bighas of G land which is subject matter of controversy in other writ petitions. According to the petitioners, having issued the declarations in respect of several thousand Bighas of land, no further steps, for making of the award or payment of the compensation, were taken for more than 14 years from the date of the declarations under section 6 of the Act. The H awards were made only in the years 1980, 1981 and 1983. This procedure 563 RAM CHAND _v._ U.O.I. [N.P. SINGH, J.] was adopted only to peg the market value of the lands between the years A 1959 and 1965. This has inflicted great injury to the petitioners, inasmuch as the compensation has been worked out with reference to the dates of notifications under section 4 of the Act. The power to acquire private property for public use is an attribute of sovereignty and is essential to the existence of the Government. The power of eminent domain was recognised on the principle that the sovereign State can always acquire the property of a citizen for public good, without the owner's consent. Later, either in the Constitution or in the Act enacted for that purpose, not only this power was recognised, but limitations on exercise of such power were prescribed, for striking a balance between the interest of the public and the individual. B c The right to acquire an interest in land compulsorily has assumed increasing importance as a result of requirement of such land more and more everyday, for different public purpose and to implement the promises D made by the framers of the Constitution to the people of India. But, the Constitution ensures under the second proviso to Article 31A, that wh>;~e any law makes provision for the acquisition by the State of land held by a person, under his personal cultivation, within the ceiling limit, it shall not be lawful for the State to acquire any portion of such land land "unless the E law relating to the acquisition of such land, building or structure, provides for payment of compensation at a rate which shall not be less than the market value thereof." By Constitution (Forty-fourth Amendment) Act, 1978, clause (t) of Article 19 and Article 31 have beep. deleted and, as such, to hold property is no more a fundamental right. But, still the mandate under second proviso to Article 31A continues regarding payment of F market value in respect of the land, the subject-matter of acquisition. The Act provides for payment of compensation in respect of the acquisition made, at the market value of the land, as such it is consistent with second proviso to Article 31A. But in view of sub section (1) of section 11 and sub-section (1) of section 23, the market value of such land is to be fixed with reference to " the date of the publication of the notification under G section 4, sub-section (1)", irrespective of the dates on with declaration under section 6 or award under section 11 are made or possession is taken under section 16 of the Act. Prior to coming in force of the Land Acquisition (Amendment) Act, 1984, no time limit was prescribed for making an award under section 11 of the Act with reference to the date of declaration H E F SUPREME COURT REPORTS (1993) SUPP. 2 S.C.R. 564 ## A under section 6. But the different sections of the Act indicate that the framers of the Act enjoined, that after publication of notification under sub-section (1) of section 4 of the Act, proceedings should be taken as early as possible. A special feature of the Act is that it requires award to be made and B compensation to be paid before the land, which is the subject-matter of acquisition, vests in the Government. This is apparent from section 16, which says that when the Collector has made an award under section 11, "he may take possession of the land, which shall thereupon vest absolutely in the Government, free from all encumbrances." Normally, in statutes c relating to acquisition of interest of the holder of any right, questions of assessment and payment of compensation arise after the vesting of the right, title interest of the holder. But the Act conceives that there may be delay in taking possession, due to some unavoidable reasons and, as such, making of the award or payment of the compensation should not be dependent on taking of the possession of such land and vesting thereof in D the Government. Still, the experience of the courts have been that proceedings for land acquisition have been moving at snail's pace for reasons not always easy to ascertain. B In the case of _State of Gujarat_ v. _Raghav Natha,_ AIR (1969) SC 1297 E [1970) 1 SCR 335, it was considered whether in a statute, if for exercise of the power, no time limit has been fixed, the authority, who has to exercise such power, can exercise the same at any time. It was said :- - "The question arises whether the Commissioner can revise an order made under Section 65 at any time. It is true that there is no period - F of limitation prescribed under Section 211, but it seems to us plain that this power must be exercised in reasonable time and the length of the reasonable time must be determined by the facts of the case and the nature of the order which is being revised." - G Same view was reiterated in the case of _Mansaram_ v. _S.P. Pathak,_ (1984) sec 125. It was said :- - "But as stated earlier, where power is conferred to effectuate a purpose, it has to be. exercised in a reasonable manner and the reasonable exercise of power inheres its exercise within a - H reasonable time." 565 RAM CHAND _v._ U.O.l. [N.P. SINGH, J.] In connection with land acquisition proceeding itself, in the case A _State of Madhya Pradesh_ v. _Vishnu Prasad Shanna,_ [1966] 3 SCR 557, where a grievance had been made in respect of delay in issuance of the declaration under section 6 of the Act, after issuance of notification under section 4( 1) of the Act, it was pointed out : "It is clear from this intimate connection between ss. 4, 5-A and 6 that as soon as the government has made up its mind what particular land out of the locality it requires, it has to issue a declaration under s.6 to that effect." B This must be followed· by expeditious conclusion of the acquisition C proceedings culminating in the Awards and payment of compensation. This Court in the case _ofAmbalal Purshottam v.Ahmedabad Municipal Corporation,_ (1968] 3 SCR 207, said : "We are not hereby to be understood as suggesting that after issue D of the notifications under ss. 4 & 6 the appropriate Government would be justified in allowing the matters to drift and to take in hand the proceeding for assessment of compensation whenever they think it proper to do. It is intended by the scheme of the Act that the notification under s.6 of the Land Acquisition Act must be followed by a proceeding for determination of compensation E without any unreasonable delay. In the case of _Khadim Hussain_ v. _State of U.P.,_ [1976] 3 SCR 1 AIR (1976) SC 417, this Court again said:- F "As indicated by the Division Bench of the Allahabad High Court, the amendment of 1967, was the result of a decision of this court in the _State of Madhya Pradesh_ ·v. _Vishnu Prasad Shanna,_ AIR (1966) SC 1593, holding successive notifications, under Section 6, with excessive intervening delay between a notification under Section 4(2) and a declaration under Section 6, keeping the owner or G other person entitled to compensation in suspense all the time, to be illegal. It may be that, if an umeasonable delay between a declaration and its notification in shown to exist, it may raise a suspicion about the existence of the declaration itself or about the bona fides of acquisition proceedings." H SUPREME COURT REPORTS (1993) SUPP. 2 S.C.R. 566 A Craies on Statute Law, Seventh Edition, p. 282, has also emphasised that the proceeding for compulsory acquisition must be concluded without unreasonable delay :- B "Powers conferred by Act of Parliament must, as a general rule, be exercised within reasonable time after notice has been given to the persons whose property will be affected by their exercise, otherwise the notice will be liable to be treated as being no longer effective." English Courts have been consistenly impressing that the land acC quisition proceeding should be completed within a reasonable time, failing which the whole proceeding is vitiated. It was said in the case of _The Tiverton and North Devon Railway Company_ v. _Robert Francis Loosemore,_ 9 Appeal Cases 480 at 489 : - "If nothing more was done and the company have slept upon their D rights, and certainly if the delay cannot be explained, they should be held to be disabled from going on with any compulsory pur. chase, ...... " E Same view was reiterated in the case of _Grice_ v. _Dudley Corporation,_ (1958) 1 Chancery Division 329. House of Lords in the case of _Binningham City Corporation_ v. _West Midland Baptist (Trust) Association (Incorporated),_ [1969] 3 "All England Reports 172, pointed out that the land acquisition proceedings should be conducted in such a manner that the person affected from the land acquisition, gets substantially the value of his land, which he would got on F the date of his dispossession. It was said :- G "The principle and the rule cannot be reconciled except on the basis that the total value to the owner at the date of the notice to treat is always substantially the same as the value at the date of the expulsion." The Land Acquisition (Amendment) Act, 1984 has now introduced a time limit before which a declaration under section 6 has to be made. The relevant part of amended section 6 says :- H " Provided that no declaration in respect of any particular land 567 RAM CHAND _v._ U.O.I. [N.P. SINGH, J.] covered by a notification under Section 4, sub- section (1),- A (i) published after the commencement of the Land Acquisition (Amendment and Validation) Ordinance, 1967(of1967), but before the commencement of the Land Acquisition (Amendment) Act, 1984, shall be made after the expiry of three years from the date of the publication of the notificaB tion; or (ii) published after the commencement of the Land Acquisition (Amendment) Act, 1984, shall be made after the date of the publication of the notification :" c By the same Act, section 11-A has been introduced, which fixes a time limit for the making of the award under section 11 of the Act, failing which the proceeding for the acquisition of the land is to lapse. Section 11-A is as follows:- "11-A. _Period within which an award shall be made.-_ The Collector shall make an award under Section 11 within a period of two years from the date of the publication of the declaration and if no award is made within that period, the entire proceedings for the acquisition of the land shall lapse : D E Provided that in a case where the said declaration has been published before the commencement of the Land Acquisition (Amendment) Act, 1984, the award shall be made within a period of two years from such commencement. Explanation.- In computing the period of two years referred to in F this section, the period during which any action or proceeding to be taken in pursuance of the said declaration is stayed by an order of a Court shall be excluded." The Parliament has recognised and taken note of the inaction and non-exercise of the statutory power on the part of the authorities, enjoined G by the provisions of the Act to complete acquisition proceedings within a reasonable time and because of that now a time limit has been fixed for making of the award, failing which the entire proceeding for acquisition shall lapse. But, can it be said that before the introduction of amendment aforesaid in. the Act, the authorities were at liberty to proceed with the H SUPREME COURT REPORTS [1993) SUPP. 2 S.C.R. 568 A acquisition proceedings, irrespective of any schedule or time-frame and to complete the same as and when they desired? It is settled that in a statute where for exercise of power no time limit is fixed, it has to be exercised within a time which can be held to be reasonable. This aspect of the matter can be examined in the light of second proviso to Article 31A of the Constitution, which in clear and unambiguous terms prohibits making of B any Jaw which does not contain a provision for payment of compensation at a rate, which shall not be Jess than the market value thereof. The Act is consistent with the second proviso to Article 31A, because it provides for payment of compensation at the market value of the land acquired. But, whether the constitutional and statutory requirement of the payment of the c market value to the persons, whose lands have been compulsorily acquired, is not being circumvented and violated by keeping the land acquisition proceedings pending for more than a decade and half, without making the awards and paying the compensation, which has been pegged to the dates, of notifications under sub-section (1) of section 4 of the Act, which in the D present cases had been issued 14 to 21 years before the making of the awards. If a person is paid compensational in the year 1980/1981 at the market rate, prevailing twenty year before, will that be the compliance of the constitution and statutory mandate? Ignoring the escalation of the market value of the lands, especially near the urban agglomeration or metropolitan cities, will amount to ignoring an earthquake and courts can E certainly take judicial notice of the said fact. The interest and the solatium, which have to be paid under the pro~isions of the Act, are linked with the market value of the land with reference to the date of the notification under sub-section (1) of section 4 of the Act. If a decision had been taken as early as in the year 1966, by issuance of declarations under section 6, that the F lands belonging to the different cultivators, who held those lands within the ceiling limit for cultivation, were needed for public purpose, respondents should have taken steps for completion of the acquisition proceedings and payment of compensation at an early date. In the present cases, unless a justification is furnished on behalf of the respondents, can it be said that the statutory power of making an award under section 11 has been exerG cised, within a reasonable time from the date of the declaration under section 6? Due to escalation in prices of land, more so in this area, during the preceding two decades, in reality, the market rate, on the date of the notification under section 4(1) is a mere fraction, of the rate prevailing at the time of its determination in the Award. H 569 RAM CHAND _v._ U.0.1. [N.P. SINGH, J.] "Mr. J aitley, appearing for Delhi Development Authority, took a stand A that even if it be assumed that there has been an unreasonable delay in completion of the land acquisition proceedings, that delay has been condoned and validated by section llA aforesaid, which was introduced by the Land Acquisition (Amendment) Act, 1984. He pointed out that in view of the proviso to section llA of the Act, where a declaratfon under section B 6 had been published before the commencement of the Amendment Act . of 1984, like present cases, the award can be made within a period of two years from the commencement of such Act i.e. up to 23rd September, 1986. As a first impression this argument is attractive. But, from reading of section llA it is apparent that the said section neither purports to validate any pending acquisition nor it condones any delay which had already c occurred. The main part of section llA introduces a statutory mandate to made an award within a period of two years, from the date of the publication of the declaration under section 6 and provides that if no award is made within that period, the entire proceeding for acquisition of the land is to lapse. In the proviso, yet another mandate has been introduced by the D Parliament, saying that in cases where declaration under section 6 had been published ·before the commencement of the Land Acquisition (Amendment) Act, 1984, the award _shall_ be made within a period of two years from such commencement. The role of a proviso, hardly needs elucidation, in view of well-settled position by series of judgments of this Court and the E rules of interpretation of statutes. The proviso, only carves out an exception, which could have been covered otherwise by the substantive part of the section. According to us, it cannot be held that the proviso to section llA, in any manner, validates or justifies the inaction on the part of the authorities in delaying and keeping land acquisition proceedings, pending for a decade and a half, after declaration had been made under section 6 F of the Act. Apart from that, it is not in dispute that section llA, will not be applicable to land acquisition proceedings, where awards had been made, as in the present cases, prior to 24th September, 1984 when the Amending Act of 1984 came in force. As such, pnJviso tQ section llA is not at all applicable to the proceedings with which we are concerned. G On behalf of the respondents, it was pointed out that the petitioners have approached this Court only after making of the awards, or when awards were to be made, having waited for more than fourteen years, without invoking the jurisdiction of the High Court under Article 226 or of this Court under Article 32. It is true that this Court has taken note of H SUPREME COURT REPORTS [1993] SUPP. 2 S.CR. 570 A delay on the part of the petitioners concerned, in invoking the jurisdiction of the High Court or of this Court for quashing the land acquisition proceedings on the ground that the proceedings for acquisition of the lands in question, have remained pending for more than a decade, in the cases of _Aflatoon_ v. _Lt. Governor of Delh4_ [1975] 4 SCC 285, and _Ramjas_ B _Foundation_ v. _Union of India,_ (1993] Suppl. 2 SCC 20 = AIR (1993) SC 852. According to us, the question of delay in invoking the writ jurisdiction of the High Court under Article 226 or of this Court under Article 32, has to be considered along with the inaction on the part of the authorities, who had to perform their statutory duties. Can the statutory authority take a plea that. although it had not performed its duty within a reasonable time, C but it is of no consequence because the person, who has been wronged or deprived of his right, has also not invoked the jurisdiction of the High Court or this Court, for a suitable writ or direction to grant the relief considered appropriate in the circumstances? The authorities are enjoined by the statute concerned, to perform their duties within a reasonable time, D and as such they are answerable to the Court. why such duties have not been performed by them, which has caused injury to the claimants. By not questioning, the validity of the acquisition proceedings for a long time since the declarations were made under section 6, the relief of quashing the acquisition proceedings has become inappropriate, because, in the meantime, the lands notified have been developed and put to public use. The E lands are being utilised to provide shelter to thousands and to implement the scheme of a planned city, which is a must in the present set up. The outweighing public interest has to be given due weight. That is why this Court has been resisting attempts on the part of the land holders, seeking quashing of the acquisition proceedings, on ground of delay in completion p of such proceedings. But, can the respondents be not directed to compensate the petitioners, who were small cultivators, holding lands within the ceiling limit, in and around Delhi, for the injury caused to them, not by the provisions of the Act, because of the non-exercise of the power by the authorities under the Act within a reasonable time? ## G Mr. Goswami, on behalf of the respondents, referred to the judgment of this Court in the case of _Special Land Acquisition Officer Bombay_ v. _Godrej and Boyce,_ [1988] 1 SCR 590. There an order under section 48 of the Act, withdrawing the acquisition of the land in question, was being challenged on the ground that such order had been issued, long time after H the declaration under section 6. In that context, it was said by this Court RAM CHAND _v._ U.O.I. [N.P. SINGH, J.] 571 that the petitioners, who were the holders of the lands and were in possession thereof, had not been prejudiced by the delay. On basis of that judgment, it was urged that even in present cases, the petitioners have remained in possession of their lands and, such, there is no question of their suffering any injury due to delay in the completion of land acquisition proceedings. That decision is inapplicable in the present situation because section 48 is not applicable after making of the awards, In a case where after declaration under section 6, but prior to making of the award acquisition is withdrawn, under section 48, the land having enhanced market value remains with the holder thereof. B It may be pointed out that different States in India including C Maharashtra, Madhya Pradesh, Tamil Nadu and West Bengal have in the years 1950 and 1955, by State Amendments introduced section 48A, in the relevant Land Acquisition Act, in order to safeguard the interest of the persons in respect of whose lands declaration have been issued unde'. section 6, but no awards have been made within a reasonable time. In view D of section 48A aforesaid, the declaration under section 6 may not become invalid because of the delay in the completion of the proceeding for acquisition, but after a period of two years from the date of the publication of such declaration, unless the owner of the land had been responsible for the delay, the owner shall be entitled to receive compensation for the damage suffered by him in consequence of such delay. Such damage is to E be determined under part III of the Act, as compensation payable under section 48A. In view of this section, while computing the quantum of compensation, what damage the owner of the land has suffered due to delay in completion of the acquisition proceeding, has also to be calculated. Unfortunately, no such amendment was introduced in the principal Act F and even when several amendments were introduced by the Land Acquisition (Amendment) Act, 1984, this aspect of the matter appears to have been overlooked. The learned counsel, appearing for the respondents, while resisting the charge of unreasonable delay in completing the acquisition proceeding, G stated that between the years 1959-65 more than 68 thousand acres of land had been notified under sub- section ( 1) of section 4 of the Act. Thereafter, several thousand objections had been filed; even writ applications had been filed in Delhi High Court, questioning the validity of notifications under section 4 and declarations under section 6 of the Act. In such petitions, the H 572 SUPREME COURT REPORTS (1993] SUPP. 2 S.C.R. A High Court had also passed interim orders. On behalf of the petitioners, it was pointed out that in most of the writ applications, which had been filed questioning the notifications under section 4 and declarations under section 6 of the Act, the interim orders were only in respect of dispossession of the petitioners of such writ B applications. As such the respondents were at liberty to proceed with the land acquisition proceedings and should have prepared the awards within a reasonable time. In any case, all such writ applications were dismissed ,by judgment of this Court on 23rd August, 1974, in the case of _Aflatoon_ v. _Lt. Governor of Delhi,_ (Supra). From the counter affidavits filed before C this Court on behalf of the respondents, there does not appear to be any reasonable explanation, why after dismissal of the aforesaid writ applications on 23rd August, 1974, no effective steps were taken till 1980-1981 and in some cases till 1983 for preparation of the awards. B D D It was urged on behalf of the respondents that in view of sub-section (3) of section 4 of the Land Acquisition (Amendment and Validation) Act, 1967, if the declarations under section 6 have been made after expiry of three years from the· date of publication of notifications under sub-section (1) of section 4, then the persons concerned are entitled to be paid simple interest, calculated at the rate of six per cent annum on the market value E of such land, as determined under section 23 of the Act, up to the date of the tender or payment of the compensation awarded by the Collector for the acquisition of such land. The aforesaid sub-section (3) of section 4 of the Land Acquisition (Amendment and Validation) Act, 1967, may be applicable to cases where the declaration under section 6 has been made p either before or after the commencement of the said Act, but made after the expiry of three years of the notification under sub-section (1) of section 4 of the Act. But in cases where declaration has been made within three years from the date of issuance of notification under sub-section (1) of section 4, obviously the aforesaid Amending Act shall not be applicable. This provision can hardly be said to compensation the persons, who have G been deprived of the legitimate compensation for years. E p Reference was also made to section 34 of the Act. That provision will apply where the compensation had neither been paid nor deposited before taking the possession of the land and, interest at the rate of 6 per H cent which has been later substituted. to 9 per cent by Act 68 of 1984, has 573 RAM CHAND _v._ U.O.I. [N.P. SINGH, J.] to be paid for the time of taking possession until the compensation has been paid or deposited. This section has no relevance in the context of the question involved in the present cases. Section 28 of the Act is also applicable only in respect of the excess amount, which is determined by the Court after a reference· under section B 18 of the Act. This Court had held in the case of _Union of India_ v. _Zora Singh,_ [1992) 1 SCC 673, that sub-section (1-A), which was introduced by Act 68 of 1984, in section 23 regarding payment of interest at the rate of 12 per cent per annum, over the market value of the land for the period commencing on the from the date of the publication of the notification under section 4, sub-section (1), up to the date of the award of the C Collector or up to the date of the taking of the possession of the land whichever is earlier, was applicable to case which were pending after the reference under section 18 of the Act. But in the meantime the correctness of the judgment has been doubted in the case of _KS. Pariapooran_ v. _State of Kerala,_ [1992) 1 sec 684, and the matter has been· referred to the D Constitution Bench. The petitioners because of the delay and inaction on the part of the respondents are under great predicament. Any amount determined as market value of their lands acquired, with reference to the dates of issuance of notifications under sub-section (1) of section 4 of the Act i.e. at the rate E prevalent 15-21 years prior to the dates of the making of the award, cannot be held to be the compliance of the mandate regarding payment of market value of the land so acquired, under the Constitution and the Act. This Court faced with such a situation, where proceedings have remained pending for years, after issuance of declarations under section 6, in order F to protect the petitioners concerned from irreparable injury i.e. getting compensation for their lands acquired with reference to the date of notification under sub- section (1) of section 4, which may be more than a decade before the date of the making of the award, has a~vanced the date of notification under sub-section (1) of section 4 of the Act, so that market value of the land so acquired is paid at a just and reasonable rate. G Reference in this connection may be made to the cases of _Ujjain Vikas Pradhikaran_ v. _Raj Kumar Johri,_ [1992) 1 SCC 328, _Akhara Brahm Buta Amritsar.v. State of Punjab,_ JT (1992) §SC 136 and _Bihar State Housing Board, State of Bihar_ v. _Ban Bihari Mahilto,_ AIR (1988) SC 2134. This Court has advanced the date of notification under sub-section ( 1) of section H SUPREME COURT REPORTS (1993] SUPP. 2 S.C.R. 574 A 4 of the Act, in the cases referred to above, without assigning any reason, as to how the date fixed by sections 11 and 23 or the Act, can be altered for ascertainment of the market value of land. The power of this Court under Article 142 is very wide and can be exercised in the ends of justice. The scope of the said Article was recently examined in the case of _Union_ B _[Carbide ][Corporation ]_[v. ] _[Union ][of ][India, ]_[AIR ][(1992) ][SC ][248 ][= ][(1991) ][SCC ] 584. There appears to be some force in the contention of the petitioners that the object of respondents, was to peg the price of the lands acquired from the different cultivators to a distant part and not .to proceed further C because if the awards had been made soon after the declarations under section 6, respondents had to pay or tender the compensation to the claimants, which for some compulsion, respondents were not in a position to pay or tender then. But, nonetheless, the exercise of power in the facts and circumstances of the cases by the respondents have to be held to be D against the spirit of the provisions of the Act, tending towards arbitrariness. In such a situation this Court in exercise of power under Article 32 and the High Court under Article 226, could have quashed the proceedings. But, taking into consideration that in most of the cases, the Delhi Administration and Delhi Development Authority have taken possession of the lands and even developments have been made, it shall not .be proper E execise of discretion on the part of this Court to quash the proceedings because, in that event, it shall affect the public interest. Moreover, third party interests created in the meantime are also likely to be affected and such third parties are not impleaded. The relief of quashing the acquisition proceeding having become inappropriate due to the subsequent events, the grant of a modified relief, considered appropriate in the circumstances, F would be the proper course to adopt. The High Court or this Court, can grant a modified relief taking into consideration the injury caused to the claimants by the inaction on the part of respondents and direct payment of any additional amount, in exercise of power under Article 226 or Article 32 of the Constitution. ## G We are of the view, that there was no justification on the part of the respondents, for the delay in completion of the proceedings, after the judgment of this Court in _Aflatoon's_ case (supra) on 23rd August, 1974. There is no explanation, except that there were several cases and, as such, H in normal course, there was bound to be delay in making of the awards, J 575 RAM CHAND _v._ U.O.I. [N.P. SINGH, J.] This may have been acceptable if the delay was only in respect of some of A the awards. It is an admitted position that till 1980, no award had been made in respect of any of the acquisitions. As such, the respondents have failed to satisfy that they have performed their statutory duty within a time which can be held to be reasonable. According to us. after the judgment of this Court _inAflatoon's_ case (supra) on 23rd August, 1974, the reasonable time for making the awards was about two years from that date. Beyond two years, the time taken for making of the awards will be deemed to be unreasonable. As such, after expiry of the expiry of the period of two years, some additional compensation has to be awarded to the cultivators. Taking into consideration the C interest of the cultivators and the public, instead of quashing the proceedings for acquisition, we direct that the petitioners shall be paid an additional amount of compensation to be calculated at the rate of twelve per cent per annum, after expiry of two years form 23.1.1974, the date of the judgment of this Court _inAflatoon's_ case (supra) till the date of the making of the awards by the Collector, to be calculated with reference to the D market value of the lands in question, on the date of the notifications under sub-section (1) of section 4. Accordingly, the writ petitions and the civil appeal are allowed in part to the extent indicated above. However, in the circumstances of the E cases, there shall be no order as to costs. U.M. Petitions allowed.
End of Judgment Record
Browse All Supreme Court of India (1993) Decisions
1993-04-22

Commissioner of Income Tax, Madras v. G.R. Karthikeyan

This Supreme Court judgment concerns whether prize money totaling Rs. 22,000 won by G.R. Karthikeyan in the All India Highway Motor Rally could be treated as income under the Income Tax Act, 1961. The Madras High Court had held that the prize money was not income under Sec. 2(24)(ix) since the rally was not a race and the input terms of Sec. 10(3) were not satisfied, viewing the receipt as casual and non-taxable. The Tribunal had similarly decided the money did not constitute income. The Supreme Court reversed, holding that the expression ‘income’ is an inclusive term, and that prize money arising from a rally involving skill and endurance falls within the ambit of income under Sec. 2(24). The Court rejected the High Court’s view that the sub-clauses of Sec. 2(24) are exhaustive and emphasized that income can arise even if a receipt does not fit any sub-clause, provided it possesses the nature of income. It also held that casual receipts can be income under Sec. 10(3) if they exceed Rs. 1,000 in aggregate. The decision discusses the broad constitutional and statutory understanding of ‘income,’ citing multiple authorities to illustrate that the word should be given its widest sense. The appeal was allowed, with the question answered in the Revenue’s favor.

1993-09-08

Satyanarain Bajoria and Anr. v. Ramnarain Tibrewal and Anr.

Satyanarain Bajoria and another (the judgment-debtors) challenged an order setting aside a sale in a money execution case arising from a 1964 decree for Rs. 8,256.05 on a Rs. 4,000 loan. After initial payments, the decree-holder pursued further sums, and land belonging to the judgment-debtor was sold at auction in 1978 for Rs. 1,500, bought by the decree-holder himself. The executing court had set aside the sale due to material irregularities and allegations of fraud; the lower appellate court reversed, holding the application under Order 21 Rule 90 CPC barred by time and that notices had, in fact, been served as per order sheets. The Supreme Court reversed the lower appellate court, holding that notice under Order 21 Rule 22 CPC was mandatory for proceedings after more than two years; that orders under Rule 90 are independent proceedings requiring actual proof of service; and that the conduct of the decree-holder demonstrated deliberate ignorance of the execution proceedings. It found that the sale was conducted fraudulently and without proper notice, causing substantial injustice to the judgment-debtor, and restored the executing court’s order setting aside the sale, with costs to the appellants. The decision underscores the centrality of service, due process, and safeguards in Order 21 proceedings.

1993-11-26

M. JANARDHAN v. STATE

This Supreme Court appeal arises out of a dispute concerning retrospective regularisation and inter se seniority of Health Inspectors in the Andhra Pradesh Public Health Subordinate Service (APPHSS). The background spans 1958–1962 when Appellants were appointed as Health Inspectors on a temporary basis, and 1961–1969 when Respondents 4–121 were temporarily promoted from feeder cadres. In 1964, Special Rules for APPHSS were framed under the proviso to Article 309, retrospectively effective from 1.11.1956, requiring three years of feeder service for promotion to Health Inspector. In 1968 PSC selected candidates for permanent appointments; while both sides were selected, Respondents 4–121 were ranked above the Appellants. Later, the State regularised some temporary promotees retroactively (April 1977) under Rule 37(e). Thereafter, the State attempted to regularise direct recruits retrospectively (memo 46/ Hl/84-11, 22.2.1985) and issued G.O. Ms. No. 105, Health (2.2.1989) arranging zone-wise regularisation and fixing inter se seniority, subject to pending SLP in this Court. The Tribunal dismissed petitions challenging these actions. This Court held that Rule 37(e) permits retrospective regularisation of temporary promotees from an anterior date, though the record did not show such regularisation occurred for Respondents 4–121 as required by the Rules; it also upheld retrospective regularisation of direct recruits under Rule 23(a) and 37(e) and approved the Government’s final seniority arrangement. The appeal is allowed with no costs, and inter se seniority is fixed accordingly.

1993-02-05

Rama Kant Pandey v Union of India

This case concerns Rama Kant Pandey challenging two Representation of the People Amendments enacted in 1992 via Ordinances 1 and 2, which amended sections 52 and 30 of the Representation of the People Act, 1951. The petitioner contends that the amendments violate Articles 14, 19 and 21 by discriminating between candidates tied to recognised political parties and others; modifying the countermanding of elections and shortening the period for poll. The Court, however, held that the right to vote or stand for election is not a fundamental or civil right but a statutory right; and that the constitutional framework recognises the party system and cabinet government as essential to a functioning democracy. It noted that Parliament’s reforms aim to curb disruption of elections amid terrorism and increased independent candidates; the Electoral Reforms Committee recommended these changes; the amendments were subsequently incorporated into statute. The Court concluded there is no constitutional invalidity in distinguishing party-sponsored candidates and in reducing the window from 20 to 14 days as a reasonable measure in the changed security scenario. It dismissed the petition with costs, endorsing the government’s view that the amendments were necessary to ensure the integrity and smooth conduct of elections. The decision underscores the role of political parties in a democratic system and the permissible limits of electoral rights.