Tenetowl LogoTenetowl
Supreme Court of IndiaSupreme Court · 2002Division BenchAppeals dismissed.

Raj Kumar Johri v. State of Madhya Pradesh and Ors.

Case / Petition Number:
Civil Appeal Nos. 5938-5939 of 2000

Case Synopsis & Summary

This Supreme Court decision deals with land acquisition under the Land Acquisition Act, 1894 in Ujjain, Madhya Pradesh. A notification under Section 4(1) for development of Ujjain was issued in 1977, quashed in 1980, and a fresh notification under Section 4(1) was issued on 21 August 1985. A declaration under Section 6 followed on 25 July 1986 and an award was made on 22 July 1988. The appellants challenged the notification and the declaration before the Madhya Pradesh High Court; the High Court annulled the notification. The Court, in its 1992 decision in Ujjain Vikas Pradhikaran v. Raj Kumar Johri and Ors., upheld the acquisition, set aside the High Court judgment, and, keeping the deemed date of notification under Section 4(1) of 1 January 1988 for determining compensation, allowed the appellants to receive enhanced compensation only to the extent of 25% of the potential value attributable to improvements by the development authority. The judgment clarified that the deemed date is a legal fiction created to grant enhanced compensation and cannot be extended to require a fresh declaration under Section 6 or a fresh award under Section 11 for other claimants. It directed possession under Section 16 and redetermination of compensation, while dismissing the writ petitions as well as the cross-appeal. Finally, it directed payment of compensation and instructed that reference petitions under Section 18 be decided in light of the earlier judgment.

Precedent Explorer

Find Cases Like This

Explore other judgments dealing with similar legal situations, facts, or statutory provisions.

Case Details & Bench

Court
Supreme Court of India
Hon'ble Judges
  • V.N. Khare
  • Ashok Bhan
  • D.M. Dharmadikari
Judgment Date
2002-03-07
Court Decision / Holding
Appeals dismissed. Cross-appeal filed by the Development Authority dismissed. No costs. All L.A. petitions disposed of as infructuous. Development Authority directed to pay compensation within one month of certified copy of the order. Reference petitions under Section 18 to be decided in light of the earlier judgment.
Final Disposition
Appeals dismissed.

Parties to the Case

Appellants / Petitioners

  • Raj Kumar Johri and Anr.

Respondents

  • State of Madhya Pradesh
  • Ujjain Vikas Pradhikaran (Development Authority)

Legal Representation & Advocates

Counsels for Petitioners

  • • S.S. Ray
  • • U.N. Bachawat
  • • Sushil Kumar Jain
  • • A.P. Dhamija
  • • Ms. C Anjali Doshi
  • • Ms. Ruchi Kohli

Counsels for Respondents

  • • B.K. Satija
  • • B.S. Banthia
  • • Ms. Vibha Datta Makhija
  • • Ms. Bharti Tyagi
  • • S.K. Agnihotri

Provisions of Law Cited

Section 4(1) of the Land Acquisition Act, 1894Section 6Section 11Section 28-A (28A)

Legal Doctrines & Maxims

  • Legal fiction created for deemed date under Section 4(1)
  • Limitations on extending the legal fiction beyond its purpose (Mancheri Puthusseri Ahmed v. Kuthir Avattam Estate Receiver, 1996)
  • Constitutional power under Article 142 of the Constitution (reference in argument)

Submissions & Arguments

Contentions of Appellants / Petitioners

The appellants contended that, under the statutory scheme, the authorities were required to issue a fresh declaration under Section 6 within one year of the deemed date of notification under Section 4(1) and an award within two years from the date of declaration. If the declaration under Section 6 were to be taken from the date of this Court’s judgment (11 November 1991), failure to award within two years would cause the entire acquisition to lapse. They urged that the deemed date of notification under Section 4(1) was created to provide enhanced compensation for the claimants in the appeal and should be treated as applicable only to those lands and not to others.

Contentions of Respondents

The respondents argued that the deemed date under Section 4(1) was a device for enhancing compensation for the appellants and that the acquisition could proceed without issuing a fresh Section 6 declaration or award within two years; possession could be taken under Section 16; the 25% enhancement cap was limited to the appeal lands, and the declaration under Section 6 or award under Section 11 need not be reissued for all other lands or claimants. They maintained that the earlier decision’s structure allowed possession and redetermination of compensation based on the deemed date, without invalidating the overall acquisition. They also challenged attempts to extend benefits to other landowners under Section 28-A beyond the deemed-date mechanism.

Legal Doctrine & Issue Explorer

Explore This Legal Issue

Find relevant judgments and authoritative positions on the legal questions discussed here.

Cited Precedents (3)

Case NameCitationTreatmentExplanation
Ujjain Vikas Pradhikaran v. Raj Kumar Johri and Ors.[1992] 1 SCC 328PositiveExplained and reiterated by this Court; used to support the deeming-date approach and compensation framework.
Mancheri Puthusseri Ahmed v. Kuthir Avattam Estate Receiver[1996] 6 SCC 185PositiveCited to illustrate limits of a legal fiction and that it cannot be extended beyond its purpose.
Supreme Court Bar Association v. Union of India and Anr.[1998] 4 SCC 409Mentioned OnlyCited in argument about extraordinary powers under Article 142; the Court notes the submission but rejects its force.
Case Applicability Diagnostic

Apply This to My Facts

Share your situation and test whether this judgment governs, supports, or challenges your case.

Official Judgment Record
•2,593 words•~12 min read

In The Court Record

Raj Kumar Johri v. State of Madhya Pradesh and Ors.

A ....___,~ ## RAJ KUMAR JOHRI AND ANR. _v._ ST A TE OF M.P. AND ORS. ## MARCH 7, 2002 ## B ## [V.N. KHARE, ASHOK BHAN AND D.M. DHARMADHIKARI, JJ.] _Land Acquisition Act, 1894: Ss. 4(1), 6, I I and 28-A-Notification ul s. 4(1)-Deemed date given to by Supreme Court-Effect of-Acquisition of_ c _[land-Notification ][uls, ][4 issued on 21.8,.1985 ][and ][declaration ][uls. ][6 made on ] 25. 7.1986 challenged before High Court-High Court annulling notification uls. 4-Appeal before Supreme Court-Supreme Court upheld the acquisition and set aside judgment of High Court and, keeping in view the peculiar facts and circumstances of the case, postponed the date of notification to 1.1.1988 for purposes of determining the compensation*-Writ petition filed before the_ D _High Court challenging the acquisition proceedings contending that subsequent to order passed by Supreme Court no declaration under_ S. _6 or award under S.11 were made thereby rendering the acquisition proceedings non-est-Writ petition rejected by High Court holding that its decision on the points would amount to reviewing the order of Supreme Court-Held, in the earlier judgment the acquisition proceedings were upheld and declaration uls. 6 was kept intact-_ E _Deemed date to the notification u/s. 4 was given by creating a legal fiction for giving e'nhanced compensation to the claimant in the appeal and it has to be limited to that only-It cannot be extended beyond it leading to the issuance of fresh declaration uls. 6 or giving afresh award u/s. 11-It was made clear that other claimants whose lands may have been acquired under the same_ F _[notification would not be entitled to get enhanced compensation ][uls. ][28-A ] because of deemed date of notification uls. 4(1) given to appellants-Directions given with regard to early payment of compensation and deciding reference petition uls. 18 keeping in view the directions in the earlier judgment._ _*Ujjain Vikas Pradhikaran_ v. _Raj Kumar Johri and Ors.,_ (1992) 1 SCC G 328, explained and reiterated. )... _-<_ _,A;-_ ,_ _Mancheri Puthusseri Ahmed_ v. _Kuthir Avattam Estate Receiver,_ (1996] 6 sec 185, relied on. _-{_ ·' H _Supreme Court Bar Association_ v. _Union of India and Anr.,_ [1998) 4 512 513 RAJ KUMARJOHR!v. STATE A ~ '• sec 409, cited. CIVIL APPELLATE JURISDICTION Civil Appeal Nos. 59385939 of 2000. From the Judgment and Order dated 21.9.99 of the Madhya Pradesh High Court in W.P. No. 1931/93 and L.P.A. No. 139 of 1999. ## WITH C.A. Nos. 5940-594 J of 2000. S.S. Ray and U.N. Bachawat, Sushi! Kumar Jain, A.P. Dhamija, Ms. C Anjali Doshi, Ms. Ruchi Kohli for B.K. Satija, B.S. Banthia, Ms. Vibha Datta Makhija, Ms. Bharti Tyagi and S.K. Agnihotri for the appearing parties. The following Qrder of the Court was delivered : > In September, 1977 for acquisition of more than 600 hectares of land, a notification under Section 4(1) of the Land Acquisition Act (for short 'the D Act') was issued for the purpose of development of Ujjain, a historical town in Madhya Pradesh. On September 17, 1980, for different reasons the notification was quashed. On 21st August, 1985 the impugned notification > was issued afresh under Section 4( l) of the Act Declaration under section 6 was issued on 25th of July, 1986. The award was made on 22nd July, 1988. E The appellants whose land had been acquired filed Writ Petition No. 1707 of 1986 challenging the notification under Section 4 and -the declaration under Section 6 of the Act to the extent of the acquisition of their land. Indore Bench of the High Court rendered the judgment annulling the notification issued under Section 4 of the Act by holding that Scheme No. 23 F framed under M.P. Nagar Tatha Gram Nivesh Adhiniyam, 1973 did not operate against certain specified land of the respondent Ujjain Vikas Pradhikaran (hereinafter referred to as the 'Development Authority'). ' The Development Authority, being aggrieved, against the judgment of the High Court filed Civil Appeal Nos. 4554-4556 o,f 1991 which were G disposed of by an order of this Court on November 14, 1991. The same is reported in _Ujjain Vikas Pradhikaran_ v. _Raj Kumar Johri and Ors.,_ [1992] 1 sec 328. Although a findir g was recorded by this Court that the judgment of the High Court could not be faulted with, but still it was held that due to the H 514 [2002) 2 S.C.R. SUPREME COURT REPORTS - A peculiar facts and circumstances of the case the judgment of the High Court could not be sustained, accordingly, the judgment of the High Court was set aside and the acquisition of the land was upheld. ~::. Keeping in view the peculiar facts and circumstances of the case, the date of notification under Section 4(1) was postponed to 1st January, 1988 B for the purpose of determination of the compensation. It was observed : - "Looking at the matter from these different angles, we have thought it appropriate to allow the appeal, vacate the judgment of the High Court and allow the acquisition to remain subject, however, to the condition that the notification under Section 4(1) of the Act issued in - c 1985 shall be deemed to be one dated January 1, 1988 and the market value of the land for the acquisition shall be determined with reference to that date. We would like to point out that the potential value of the land has substantially enhanced on account of the improvements made pursuant to the notification which had been assailed. We have directed the deemed date of the notification under Section 4(1) to be preponed - D (sic postponed) by almost three years and during this period the appellant· has brought about the bulk of the improvements in the neighbourhood. We direct that 25 per cent of the potential value of the land relatable to the improvements made by the appellant would only be available to the respondents, but in fixing market value all - E other legitimate considerations shall be taken into account. We make it clear that we have no intention to extend the benefit under Section 28-A of the Act to the owners of the lands already acquired under the notification of 1980 or 1985 on the basis of our direction that the respondents' lands shall be deemed to have been notified under Section 4(1) of the Act on January I, 1988. In fact our order must be deemed - F to be a separate notification for acquisition and, therefore, it would not be a common notification for the purpose of Section 28A of the Act. The respondents should, therefore, be entitled to this benefit that instead of the notification under Section 4(1) of the Act being of 1985, it shall be treated to be of January l, 1988. The appellant - G authority is now entitled to take position (sic possession) in accordance with law, subject to the valuation of the compensation in the manner indicated." E F G )..- ...,; ,L ~- A perusal of this order would show that a deemed date to the notification under Section 4(1) of the Act was given for the purpose of givi~g enhanced H compensation to the claimants in the appeal and the notification under Section RAJKUMARJOHRI _v._ STATE 515 ~~ -< x, ~ ' ~ ' 6 was kept in tact. It was made clear that the other claimants whose land may have been acquired under the same notification would not be entitled to get enhanced compensation under Section 28A of the Act because of the deemed date of Notification under Section 4(1) given to the appellants. The appellants thereafter filed Writ Petition No. 1931 of 1993 in the B High Court challenging the acquisition proceedings, _inter a/ia,_ on the ground that subsequent to the order passed by this Court, no notification under Section 6 or an award under Section 11 were made, thereby rendering the acquisition proceedings non-est. The High Court rejected the writ petition holding that decision on these points would amount to reviewing the order of this Court. The appellants were advised to approach the Supreme Court for clarification c or modification of the order passed by it. Thereafter the claimants filed these appeals. The Development Authority has also filed the cross appeal. Shri Sidharth Shankar Ray, learned senior advocate appearing for the[D ] appellants contended that keeping in view the scheme of the Act, the authorities **were required to issue a fresh declaration under Section 6 of the Act within** one year of the deemed date of notification under Section 4( 1) and an award within two years from the date of declaration under Section 6. And if the declaration under Section 6 is taken from the date of rendering of judgment E by this Court, i.e., I Ith November, 1991 then failure to make the award within two years from that date resulted in the lapsing of the entire acquisition proceedings. We do not find any force in this submission. The earlier judgment of this Court can be divided into two parts. In the first part this Court set aside F the order of the High Court and upheld the acquisition proceedings. In the second portion in order to give more compensation to the owners of land a deemed date was given to the notification under Section 4( 1 ). The deemed date to the notification under Section 4 was given for the benefit of the appellants only and not to any other land owners whose land were acquired. G This Court took care to mention that although the price of the land had increased tremendously owing to the improvements made by the development authority after issuance of notification under Section 4 but the appellants would be entitled to only 25% of the potential value of the land relatable to the improvements made by the development authority. The Court after giving a deemed date of notification did not say that from the deemed date given to H 516 [2002) 2 S.C.R. ## SUPREME COURT REPORTS A notification under Section 4, procedure envisaged under the[A.ct ] of making the declaration under Section 6 or an award under Section I III I-A was to be ' followed, Rather the Court gave liberty to the development authority to take possession of the land in accordance with law. Possession could be taken by the authority under Section 16. Fresh declaration under Section 6 was not required to be issued. An award in terms of Section 11/I IA of the Act was B also not required to be given within two years, as has been contended by the learned senior counsel for the appellants. The direction given by the Court was for redetermination of the compensation only. The amount of compensation was to redetermined keeping in view the deemed date given to the notification under Section 4 and the improvements made by the authorities c[between 2nd August, 1985 (the original date ][of ][issuance ][of ][notification) and ] the lst January, 1988 {the deemed date of notification). The appellants entitlement to the increase in the potential value of the land was limited to _25%_ only. The development authority was held entitled to take possession of the land under Section 16 subject to redetermination of the amount of compensation and not subject to the giving of an award in terms of Section D 11/llA. D This Court in _Mancheri Puthusseri Ahmed_ v. _Kuthir Avattam Estate Receiver,_ [1996] 6 SCC 185 has held that whenever a deemed date is given by creating a legal fiction than the Court is required to ascertain for what purpose the fiction is created and after ascertaining this, the Court is to E assume all those facts and consequences which are incidental or inevitable corollaries to give effect to the fiction. While construing the fiction it is not open to the Court to extend the same beyond the. purpose for which it was created. It cannot also be extended by importing another fiction. The deemed date to the notification under Section 4 was given by creating a legal fiction F[for giving enhanced compensation and it has to be limited to that only. It ] cannot be extended beyond it leading to the issuance of fresh declaration under Section 6 or giving a fresh award under Section 11. E Due to the pendency of the writ petition in the High Court and due to the fact that the proceedings were adjourned before the Land Acquisition G[Officer nearly ][40 ][times the amount ][of ][compensation could not be redetermined ] at an early date. It was redetermined on I st January, 1998 and the possession w~taken by the authorities on 9th March, 1998. _f >-_ ~ ~ ~- Shri Ra~ then argued that the earlier judgment rendered by this Court being against the statutory provisions would be deemed to be a non-est \H judgment and therefore not binding on the parties. That if it be deemed that .. RAJ KUMARJOHRI v. STATE 517 ~ ' .,__.._, ... ~ '• ~\ - this Court decided th• earlier case in exercise of its extra-ordinary power A - r;·_ under Article 142 of the Constitution even then it is bad in law because the Court cannot exercise its power under Article 142 in the face of express statutory provisions. That the appellants could not be deprived of their property without giving market price for the same. For this he made reference to a - number of judgments including the judgment of the Constitution Bench in B - _Supreme Court Bar Association_ v. _Union of India and Anr.,_ [1998] 4 SCC 409. In Particular reference was made to paras 47, 48, 50, 51, 52, 55 & 56 of the said judgment. The submission has no force. In the earlier judgment the Court had upheld the acquisition proceedings but in order to give more compensation to the landowners in that case a deemed date was given to the notification under Section 4. So far as the upholding of the acquisition c proceedings is concerned it cannot be held that it is against any statutory provision. That part of the judgment cannot be touched. In any case it is too late to challenge the upholding of the acquisition proceedings in an appeal before a bench of co-ordinate jurisdiction. The other part is of giving deemed date to the notification under Section 4 and limiting the benefits arising D - therefrom. The same is for the benefit of the claimants-appellants. It would not be in the interest of the appellants to get it set aside. Nor would we like to do it. For the reasons stated above, we do not find any merit in the appeals filed by the claimants and dismiss the same. The cross appeal filed by the E development authority lacks merit and is also dismissed. Counsel for the appellants then contended that the claimants have not been given any compensation till date. If that be so, the development authority is directed to pay the compensation to the claimants within one month of the date of receipt/production of a certified copy of this order. F It was brought to our notice that the claimants have already filed a reference petition under Section 18 of the Act for claiming enhanced compensation. If that be so, the reference petition be decided in accordance with law keeping in view the directions given by this Court in the earlier judgment dated 14th November, 1991. There will be no order as to costs. G All the l.A.'s are disposed of as infructuous. / ## R.P. Appeals dismissed. H
End of Judgment Record
Browse All Supreme Court of India (2002) Decisions
2002-12-17

Devender Pal Singh v. State N.C.T. of Delhi

This judgment deals with three review petitions under Article 137 of the Constitution challenging the death sentence in cases involving murder. The petitions focus on whether death should be imposed when one of the three Judges on the bench records acquittal or advocates a life sentence. The Court clarifies that while the scope of review in criminal proceedings has broadened, a review is not a re-hearing of the original appeal and must be grounded in a miscarriage of justice. Review petitions are normally disposed of by circulation, not as full-blown re-arguments, and are permissible only where there is a grave error, manifest on the face of the order, or a miscarriage of justice. The opinion cites P.N. Eswara Iyer and Suthendraraja to stress that review is not routine and cannot be equated with the original hearing; the finality of judgments is preserved unless compelling reasons exist. The majority holds that a death sentence should not be reconsidered merely because two Judges share a different view than one Judge, nor should acquittal by a lower court automatically negate the Possibility of a death sentence if the circumstances still warrant it. The judgment also discusses the “rarest of rare” standard from Bachan Singh and the scope of reference to a larger Bench. A dissent by Shah, J. proposes that altering the death sentence to life imprisonment would meet justice in some cases, but the majority dismisses the petitions.

2002-04-24

Narpat Singh v Jaipur Development Authority

This Supreme Court decision concerns the long-running dispute over land acquired under the Lal Kothi Scheme in Jaipur. Land belonging to four appellants was acquired for a public purpose and an award awarded monetary compensation along with directions to allot residential plots of 1000 or 2000 square yards. On reference, courts enhanced the monetary compensation while upholding the plot allotments. A tripartite settlement among the claimants, the State Government and the Urban Improvement Trust ( UIT, later Ja ipur Development Authority, JDA) reduced the compensation in exchange for plot allotments, with contestants paying a reduced price to acquire plots. Executions proceeded and plots were delivered. The High Court later set aside the compromise decree, holding that the allotment of land by an award in land acquisition proceedings lacked jurisdiction and was inexecutable, relying on precedents such as Jaipur Development Authority v. Radhey Shyam and Secretary v. Daulat Mal Jain. The Supreme Court, while acknowledging the discretionary nature of Article 136, held that this case does not justify upsetting the compromise. It directed the state to restore appeals for merits and to determine quantum of monetary compensation excluding plots, while also directing allotment of smaller plots (about 250 sq yards) in another scheme within three months to maintain consistency with earlier judgments. The land must be used for the public purpose for which it was acquired. The appeals were disposed of with these directions under Article 142 for complete justice.

2002-11-13

Shrawan Bhadaji Bhirad and Ors. v. State of Maharashtra

Shrawan Bhadaji Bhirad and others, members of the Bhirad family, were convicted by an Additional Sessions Judge under sections 147, 148 and 307 read with section 149 IPC for forming an unlawful assembly and assaulting Ganesh Dhage with swords, causing extensive injuries and a prolonged hospitalisation. Ganesh Dhage survived and implicated the appellants, naming them in the dying/dependant statements, which were corroborated by eyewitnesses. The High Court upheld the Sessions Court’s conviction, rejecting the appellants’ contention that the victim did not know the assailants’ names and that the names were a product of enmity. In appeal, the appellants argued that their alleged involvement had no basis and was speculative. The Court emphasised that the dying declaration, though recorded after severe injuries and while the victim was in medical care, had significant content; and even if considered under Section 164 CrPC rather than as a strict dying declaration, it remained corroborated by the testimony of the eye-witnesses. The Court found overwhelming evidence on record supporting the prosecution’s case and concurred with the concurrent findings of the Sessions Judge and the High Court. Accordingly, the appeal was dismissed, bail bonds cancelled, and the appellants were to serve the remainder of their sentences.

2002-10-10

Alla China Apparao and Ors. v. State of Andhra Pradesh

Alla China Apparao and six co-accused were convicted by the trial court under Sections 302/149 and 148 of the IPC, and each was sentenced to life imprisonment, with a concurrent one-year term on the 148 IPC count and a fine. The High Court affirmed the convictions against the appellants while acquitting three others. The prosecution’s case rests on four eyewitnesses who say the deceased was attacked near his house, dragged to a wall, and slain by multiple appellants; medical and objective evidence were said to corroborate the eyewitnesses. The appellants contend that the three acquitted co-accused show the same evidence cannot justify conviction of the others; the witnesses were partisan, and there was no independent corroboration; the lack of injuries beyond what witnesses described and alleged dragging marks undermine the case; and a delay in forwarding the FIR to the Magistrate merits acquittal. The State argues the eyewitnesses were credible, corroborated by medical evidence and police findings, that non-examination of other witnesses is not fatal, and that the absence of dragging marks or blood on weapons does not negate the prosecution. The Court holds that eyewitness credibility is supported by evidence, the delay was within reasonable limits given workload, and the case remains trustworthy. The appeal is dismissed and the convictions upheld.