Raheem Mohamed and Kadeeja Mohamed v Union of India and others

Case / Petition Number:
WP(C).No. 5859 of 2009(B)
Neutral Citation::null

Case Synopsis & Summary

Two farmers from Thrissur approached the Kerala High Court seeking directions to prevent recall of the Capital Investment Subsidy under the Government of India’s scheme for Development/Strengthening of Agriculture Marketing Infrastructure, Grading and Standardisation. The petitioners had sought 25% investment subsidy under Ext.R1(a) and relied on the operational guidelines Ext.R1(g), which allowed modification or withdrawal by government order. They had applied for subsidies while the scheme was in force for purchasing Combine Harvesters valued around Rs. 18.5 lakhs. The scheme was withdrawn by Ext.R1(b) on 28/11/2006, but loans were sanctioned in 2007 (Exts.R1(e), R1(f)) and machines delivered in 2007. On 30/01/2008 the scheme was reinstated (Ext.R1(d)); however, government clarifications in Ext.R3(e) and Ext.R3(g) indicated the reinstatement had prospective effect only. Respondents refunded subsidies already paid to some and argued that the petitioners cannot claim under a non-existent scheme during the loan sanction. The petitioners invoked promissory estoppel and legitimate expectation, relying on government assurances. The court, however, held that at the time of loan sanction the scheme was not in force, thus promissory estoppel/legitimate expectation could not obligate payment. The petition was dismissed, though the court left open avenues to seek relief outside the ruling.

Precedent Explorer

Find Cases Like This

Explore other judgments dealing with similar legal situations, facts, or statutory provisions.

Case Details & Bench

Court
High Court of Kerala
Hon'ble Judges
  • Antony Dominic, J.
Judgment Date
2009-09-29
Court Decision / Holding
Writ petition dismissed. The court held that the subsidy scheme was not in force at the time the loans were sanctioned and therefore neither promissory estoppel nor legitimate expectation could compel payment; petitioners may pursue remedies outside this judgment.
Final Disposition
Writ petition dismissed.

Parties to the Case

Appellants / Petitioners

  • Raheem Mohamed
  • Kadeeja Mohamed

Respondents

  • Union of India (Secretary, Ministry of Agriculture)
  • Directorate of Marketing and Inspection
  • National Bank for Agriculture and Rural Development (NABARD)
  • NABARD Kerala Regional Office
  • Indian Overseas Bank
  • Canara Bank

Legal Representation & Advocates

Counsels for Petitioners

  • • Sri V.M.Krishnakumar

Counsels for Respondents

  • • Sri S. Krishnamoorthy, CGC (for R1)
  • • Sri P.B. Suresh Kumar (for R3-4)
  • • Sri Leo George (for R3-4)
  • • Sri P. Gopinath Menon (for R6)
  • • Sri K.P. Sujesh Kumar (for R3-4)
  • • Sri K.N. Sasidharan Nair (for R3-4)
  • • Smt. Sandhya Radhakrishnan (for R3-4)
  • • Sri P.B. Suresh Kumar (for R5)

Provisions of Law Cited

Capital Investment Subsidy Scheme (Ext.R1(a))Operational Guidelines (Ext.R1(g))Guidelines/clarifications (R3 e, R3 g)

Legal Doctrines & Maxims

  • Promissory estoppel
  • Legitimate expectation

Submissions & Arguments

Contentions of Appellants / Petitioners

The petitioners contended that the Government’s representations extending the subsidy under Ext.R1(a) created promissory estoppel and legitimate expectation, and that their reliance on these assurances justified grant of the subsidy despite the 2006 withdrawal and 2008 prospective reinstatement. They argued the Scheme’s reinstatement could not be retroactively denied to those who acted on it.

Contentions of Respondents

The respondents argued that the subsidy scheme was withdrawn in 2006 and reinstated only prospectively in 2008; loans sanctioned in 2007 were under a non-existent scheme at the time, so promissory estoppel or legitimate expectation could not bind the State to grant subsidy. They contended the subordinate offices were guided by clarifications (R3 e, R3 g) that limited retroactive effects and that relief could not be granted under a non-existent scheme.

Legal Doctrine & Issue Explorer

Explore This Legal Issue

Find relevant judgments and authoritative positions on the legal questions discussed here.

Cited Precedents (2)

Case NameCitationTreatmentExplanation
Kerala State Beverages Corporation v. McDowell & Co. Ltd.1998(2) KLT 1087Mentioned OnlyCited by petitioners to support promissory estoppel/legitimate expectation but not adopted in the court’s dispositive reasoning.
MRF Ltd., Kottayam v. Asstt.Commission (Assessment) Sales Tax and Others2006(8) SCC 702Mentioned OnlyCited by petitioners; the court did not rely on it to grant relief under a non-existent scheme.
Case Applicability Diagnostic

Apply This to My Facts

Share your situation and test whether this judgment governs, supports, or challenges your case.

Official Judgment Record
•1,428 words•~7 min read

In The Court Record

Raheem Mohamed and Kadeeja Mohamed v Union of India and others

## **IN THE HIGH COURT OF KERALA AT ERNAKULAM** **PRESENT :** ## **THE HONOURABLE MR. JUSTICE ANTONY DOMINIC** **TUESDAY, THE 29TH SEPTEMBER 2009 / 7TH ASWINA 1931** **WP(C).No. 5859 of 2009(B)** **-------------------------** ## **PETITIONER(S):** ## **---------------** **1. RAHEEM MOHAMED, S/O.MOHAMED, AGED 30 YEARS, THERUVIL HOUSE, PUTHENCHIRA NORTH, THRISSUR DISTRICT.** **2. KADEEJA MOHAMED, THERUVIL HOUSE, PUTHENCHIRA NORTH, THRISSUR DISTRICT.** **BY ADV. SRI.V.M.KRISHNAKUMAR** ## **RESPONDENT(S):** - **---------------** **1. UNION OF INDIA, REPRESENTED BY SECRETARY, MINISTRY OF AGRICULTURE, DEPARTMENT OF AGRICULTURE AND CO-OPERATION, DIRECTORATE OF MARKETING AND INSPECTION, HEAD OFFICE, NHIV, FARIDABAD.** **2. DIRECTORATE OF MARKETING AND INSPECTION REPRESENTED BY THE SENIOR MARKETING OFFICER, EAST THAMPANOOR, TRIVANDRUM-1.** **3. NATIONAL BANK FOR AGRICULTURE AND RURAL DEVELOPMENT (NABARD), REPRESENTED BY CHIEF GENERAL MANAGER, PLOT NO. C-24, G-BLOCK, BANDRA-KURLA COMPLEX, BANDRA (EAST), MUMBAI-400051.** **4. NATIONAL BANK FOR AGRICULTURE AND RURAL DEVELOPMENT (NABARD), KERALA REGIONAL OFFICE REPRESENTED BY GENERAL MANAGER, PUNNAN ROAD, THIRUVANANTHAPURAM-39.** **5. INDIAN OVERSEAS BANK, REPRESENTED BY THE BRANCH MANAGER, INDIAN OVERSEAS BANK, VELLANGALLORE BRANCH, VELLANGALLORE POST, THRISSUR-680 662.** ## **WPC NO.5859/2009** **6. CANARA BANK, REPRESENTED BY THE BRANCH MANAGER, CANARA BANK, KONATHUKUNNU BRANCH, THRISSUR DISTRICT.** **ADV. SRI.P.B.SURESH KUMAR FOR R5 SRI.P.GOPINATH MENON FOR R6 SRI.S.KRISHNAMOORTHY, CGC FOR R1 SRI.P.B.SURESH KUMAR FOR R3-4 SRI.LEO GEORGE FOR R3-4 SRI.K.P.SUJESH KUMAR FOR R3-4 SRI.K.N.SASIDHARAN NAIR FOR R3-4 SMT.SANDHYA RADHAKRISHNAN FOR R3-4** **THIS WRIT PETITION (CIVIL) HAVING BEEN FINALLY HEARD ON 29/09/2009, THE COURT ON THE SAME DAY DELIVERED THE FOLLOWING:** ## **WPC NO.5859/2009** ## **APPENDIX** ## **PETITIONER'S EXHIBITS** ## **P1 : COPY OF CIRCULAR DATED 30/01/2008 ISSUED BY R1.** **P2 : COPY OF JOINT INSPECTION REPORT DATED 27/03/2008 WITH REGARD TO 1ST PETITIONER.** **P3 : COPY OF JOINT INSPECTION REPORT DATED 27/03/2008 WITH REGARD TO 2ND PETITIONER.** **P3(a) : COPY OF PHOTOGRAPH SHOWING THE SING BOARD ON THE MACHINES OF THE PETITIONERS.** **P3(b) : COPY OF PHOTOGRAPH SHOWING THE SIGN BOARD ON THE MACHINES OF THE PETITIONERS.** **P4 : COPY OF LETTER SENT BY R4 TO R5 BANK DATED 21/07/2008.** **P5 : COPY OF LETTER SENT BY R4 TO R6 BANK DATED 22/07/2008.** **P6 : COPY OF LETTER ISSUED BY ASSISTANT GENERAL MANAGER OF R4 OFFICE TO R5 BANK DATED 09/01/2009.** **P7 : COPY OF REPRESENTATION FILED BY 1ST PETITIONER BEFORE THE MINISTER OF AGRICULTURE, GOVT. OF KERALA DATED 22/01/2009.** **P8 : COPY OF REPRESENTATION FILED BY 2ND PETITIONER BEFORE THE MINISTER OF AGRICULTURE, GOVT. OF KERALA DATED 22/01/2009.** ## **RESPONDENT'S EXHIBITS** **R1(a) : COPY OF LETTER ISSUED BY THE MINISTRY OF AGRICULTURE, GOVT. OF INDIA BEARING NO.M-16011/1/2002-MII DATED 18/02/2005.** **R1(b) : COPY OF RELEVANT PORTION OF THE MEETING HELD ON 14/11/2006.** **R1(c) : COPY OF MINUTES OF THE MEETING (RELEVANT PORTION) DATED 14/12/2007.** **R1(d) : COPY OF LETTER / ORDER NO.M-11011/117/PPCH/2008-MI DATED 30/1/2008 OF HEAD OFFICE, DIRECTORATE OF MARKETING & INSPECTION, FARIDABAD.** **R1(e) : COPY OF SANCTION ORDER DATED 28/09/2007, OF THE INDIAN OVERSEAS BANK, VELLANGALLORE.** **R1(f) : COPY OF SANCTION ORDER DATED 29/01/2007 OF CANARA BANK, TRICHUR.** ## **WPC NO.5859/2009** ## **R1(g) : COPY OF RELEVANT PORTION OF THE OPERATIONAL GUIDELINE AT PARA 8(vii).** **R3(a) : COPY OF OPERATIONAL GUIDELINES OF THE SCHEME ISSUED BY THE MINISTRY OF AGRICULTURE, DEPARTMENT OF AGRICULTURE AND CO-OPERATION, GOVERNMENT OF INDIA AS MODIFIED ON 26/6/2008.** **R3(b) : COPY OF COMMUNICATION ISSUED BY MINISTRY OF AGRICULTURE, GOVERNMENT OF INDIA IN CONENCTION WITH THE CONSTITUTION OF the REGIONAL COMMITTEE DATED 15/02/2007.** **R3(c) : COPY OF THE CIRCULAR NO.212 DATED 15/12/2006 COMMUNICATED BY NABARD.** **R3(d) : COPY OF COMMUNICATION ISSUED BY GOVERNMENT OF INDIA TO NABAD DATED 30/01/2008.** **R3(e) : COPY OF COMMUNICATION ISSUED BY THE HEAD OFFICE OF NABARD TO THE REGIONAL OFFICES OF NABAD DATED 14/07/2008.** **R3(f) : COPY OF COMMUNICATION ISSUED BY THE HEAD OFFICE OF NABARD TO THE REGIONAL OFFICE OF NABARD AT THIRUVANANTHAPURAM DATED 31/12/2008.** ## **R3(g) : COPY OF COMMUNICATION ISSUED BY THE DIRECTORATE OF MARKETING AND INSPECTION, GOVERNMENT OF INDIA DATED 03/12/2008.** //TRUE COPY// PA TO JUDGE. jg ## ANTONY DOMINIC, J. ------------------ WP(C) No.5859 of 2009-B -------------------------Dated, this the 29[th] day of September, 2009 ------------------------------ ## J U D G M E N T The petitioners are two farmers, who have approached this Court praying for a direction to respondents 1 to 4 not to recall the benefit of Capital Investment Subsidy Scheme sanctioned in their favour as per Exts.P4 & P5. 2. By Ext.R1(a) order issued by the Government of India, a Subsidy Scheme for the Development/Strengthening of Agriculture Marketing Infrastructure, Grading and Standardisation was introduced. Ext.R1(g) is the operational guidelines, which include a provision enabling the Government to modify or even withdraw the Scheme. As per the provisions of Ext.R1(a) Scheme and Ext.R1(g) guidelines issued therein, those who are eligible for the benefit were entitled to get 25% of the investment as subsidy. 3. It would appear that when the Scheme was in force, the petitioners made applications for acquiring Combine Harvesters, the cost of which was around Rs.18.5 lakhs. It is stated that when the WP(C) No.5859/2009 -2- applications were being processed, by Ext.R1(b) order dated 28/11/2006, the Scheme was withdrawn with effect from 14/11/2006. After the Scheme was thus withdrawn, by Exts.R1(e) and R1(f) orders dated 28/09/2007 and 29/01/2007 respectively, loans were sanctioned to the petitioners for acquiring Combine Harvesters. It is stated that accordingly, Combine Harvesters were delivered to the petitioners on 18/11/2007 and 02/04/2007 respectively. 4. Subsequently, by Ext.R1(d) dated 30/01/2008, which is also produced as Ext.P1, the Scheme was reinstated. According to the petitioners, subsequently, in March 2008, the machineries were inspected by the Officers of respondents 2, 4 & 6, and the 4[th] respondent also released the subsidy amount due under Ext.P1 Scheme, to respondents 5 & 6 as per Exts.P4 & P5, in July, 2008. However, it is pointed out by respondents 3 & 4 that subsequently the Government of India issued Ext.R3(g) clarifying the position that the reinstatement of the Scheme was effective only from 30/01/2008 and accordingly, the Head Office of the 3[rd] respondent also issued Ext.R3(e) clarifying the position as above to their WP(C) No.5859/2009 -3- subordinate officers. Acting upon the aforesaid clarifications, the 5[th] respondent refunded the subsidy amount they had received to NABARD, the Channelising Agency. It was at that stage, this writ petition was filed, and it is stated that following the interim order that is passed, the 6[th] respondent did not refund the amount, unlike the 5[th] respondent. 5. The learned counsel for the petitioners relied on the judgments in Kerala State Beverages Corporation v. McDowell & Co. Ltd. (1998(2) KLT 1087) and MRF Ltd., Kottayam v. Asstt.Commissioner (Assessment) Sales Tax and Others (2006(8) SCC 702) and contended that the petitioners having acted upon the promise made by the Government of India to extend them the benefit of subsidy and they having altered their position to their detriment and suffered prejudice, the Government of India cannot now be permitted to deny the benefit of Ext.R3(a) scheme. It is contended that both on the principles of promissory estoppal and also on the ground of legitimate expectation, they are entitled to get the subsidy amount released. 6. However, a closer examination of the facts stated above WP(C) No.5859/2009 -4- would show that though the petitioners did make applications in anticipation of receiving the benefit of subsidy under Ext.R1(a) Scheme, fact remains that long before the loans were sanctioned as per Exts.R1(e) and R1(f) orders dated 28/09/2007 and 29/01/2007, the Scheme was withdrawn by Ext.R1(b) order dated 28/11/2006. The Scheme was reinstated only by Ext.R1(d) order dated 30/01/2008, which as clarified as per Exts.R3(e) and Ext.R3(g) has only prospective effect. Therefore, at the time when the loans were sanctioned, the Scheme was not in force and hence, they had sufficient opportunity to safeguard themselves against any possible prejudice or detriment. If that be so, the fact that the petitioners had already made applications in anticipation of the benefit of Ext.R1(a) Scheme by itself, will not enable them to set up a case based on the principles of promissory estoppal or legitimate expectation. Therefore, in the light of the fact that, at the time when loans were availed of, the Scheme was not in force, I am not persuaded to think that on the aforesaid principles, the respondents are bound to extend them the benefit of a non-existing scheme. If that be so, this Court will not be justified in issuing any direction as WP(C) No.5859/2009 -5- sought for. Be that as it may, this judgment will not stand in the way of the petitioners in approaching the respondents and seeking the benefit, which they have already claimed. The writ petition fails, and is accordingly dismissed. (ANTONY DOMINIC, JUDGE) jg
End of Judgment Record
Browse All High Court of Kerala (2009) Decisions
2009-06-26

Nishana Mol.N v Alappuzha Municipality & Secretary, Alappuzha Municipality

This writ petition concerns the registration of a marriage under the Kerala Registration of Marriages (Common) Rules, 2008 (Common Rules). The petitioner Nishana Mol.N, whose marriage was solemnized on 8 March 2009, sought registration of her marriage by the Local Registrar. Her husband was abroad, and she submitted Form No. 1 along with documents; however, the Local Registrar demanded the presence of both spouses for registration, a point contested by the petitioner. The court recalls the apex court’s directions in Seema v. Ashwani Kumar (2006) to frame rules ensuring compulsory registration to protect women and provide evidence of marriage, while noting that registration under the Rules does not itself create a marriage but evidences one solemnized otherwise. The Rules specify that registration is mandatory for marriages solemnized within the state, with various procedural requirements (Rules 5, 6, 9, 10, 11, 13, 16, 17) and mechanisms for correction, appeal, and re-registration. The court clarifies that the presence of both parties is not ordinarily required; the registrar may require appearance only in cases where there is reasonable doubt about identity, and even then as an exception rather than a rule. Ultimately, the court directs that registration and certificate issuance be completed within one month from copy of the judgment, without insisting on joint appearance, provided the memorandum is in order.

2009-07-27

Abdul Majeed Kalathil v. District Collector, Malappuram & Others

This batch of writ petitions concerns the constitutional validity of Section 17 of the Kerala Anti-Social Activities (Prevention) Act, 2007, and the power of District Magistrates to confiscate vehicles used in anti-social activities. The petitions challenge the absence of a substantive prohibition against using vehicles for anti-social activities and the lack of a defined procedure for confiscation or an appellate remedy. In W.P.C. No. 9925 of 2009 (the lead case), Abdul Majeed Kalathil contends that his goods carriage KL 11-B/6651 was seized by the Sub Inspector of Pandikkad Police and reported to the District Collector, Exts.P1–P2. The court scrutinizes Section 17's scope, defining anti-social activity (Section 2(a)) and whether the District Collector’s power to confiscate is constitutionally tenable. It finds Section 17 to be vague and violative of Articles 14, 19(1)(g) and 21, as it rests on subjective police satisfaction with no clear standards or process. It also notes environmental objectives but concludes that fundamental rights must prevail. The court does not sustain confiscation under Section 17; instead, it directs that such vehicles be dealt with under the Kerala Protection of River Banks and Regulation of Removal of Sand Act, 2001 and Rules, with interim release under specified conditions. It further directs initiation of Sand Act proceedings within a month and finalization within another month. The writ petitions are disposed of accordingly, preserving the rule of law and environmental protection.

2009-06-11

WA No. 671 of 2006 (Fertilizers and Chemicals Travancore Ltd v Union of India)

This writ appeal concerns the pay revision and pensionary benefits of employees of the Fertilizers and Chemicals Travancore Ltd (FACT). The long-term settlement covering terms of employment expired on 31 December 1996. A fresh settlement was concluded (notified 28 August 2001) and made retroactive to 1 January 1997, with revisions in wages and benefits. Clause 29 of Ext. P1 provides that arrears relating to wage revision and dearness allowance for the period 1 January 1997 to 30 June 2001 will be reviewed and decided by management/government only when the company earns profits for at least three consecutive years; Clause 33.1 provides that employees who retired on or after 1 January 1997 will be eligible for arrears calculated from 1 January 1997 to the date of retirement, subject to adjustments for interim relief already paid, with any unclaimed amount transferred to a Welfare Fund. The appellants—the retirees who fall in the 1 January 1997 to 1 July 2001 window—argue that they were denied arrears and were paid pensionary benefits at pre-revised rates, creating discrimination. Respondents contend Ext. P1 binds the parties and arrears depend on profits, and that pay revision administered to others does not compel retroactive change. The court held that Ext. P1 terms survive as terms of employment and directed the management to consider terminal benefits at revised rates within two months and to release arrears when paid to current workers, with connected matters following."

2009-05-29

M/S. Palm Fibers & Yars Trading Co. v. State of Kerala & Others

The petitioner, a Small Scale Industrial unit, ran two LT power connections (No.13070 and No.13427) with commercial production starting in July 1994 and July 1995. On 06/02/1992, the Government issued Ext.P1 guaranteeing concessional tariffs (pre-1992 tariff) for five years from the date of commencement or substantial capacity expansion, certified by the District Industries Centre. Ext.P2 certified eligibility for this concession. Subsequently, the petitioner increased power demand to 300 KVA and was reclassified/advised to HT status from 15/05/1998, converting LT supply to HT. The petitioner argued that Ext.P1 benefits should extend for the full five-year period, covering the LT quantities certified in Ext.P2, and that the HT conversion was a mere reclassification directed by the Board, not a cessation of eligibility. The Board argued Ext.P1 targets only those who commenced production during 1992–1996 and that HT conversion from 15/05/1998 falls outside the Ext.P1 window, rendering the petitioner eligible only up to 15/05/1998. Earlier orders (Ext.P3) had set aside a cut-off date for merits, and Ext.P6/Ext.P4 handled appeals. Ultimately, the Court held that the HT conversion was outside Ext.P1’s period, but directed that the LT benefits for the two LT connections be extended only until 23/05/1998 (LT dismantling date) and without reimbursement from the Industries Department, as held in OP No.7622/1998. The petition was disposed of as above.