Tenetowl LogoTenetowl
High Court of KeralaKerala High Court · 2009Single JudgeWrit petition disposed of with a directions to ...

RadhaKrishnan and Mohammed Rafi v. Puduppariyaram Grama Panchayath; Kerala State Pollution Control Board; C.I. of Police, Hemambika Nagar Police Station, Palakkad; Malampuzha Steels Private Ltd.

Case / Petition Number:
WP(C).No. 32657/2008

Case Synopsis & Summary

The petition challenges the operation of Malampuzha Steels Private Ltd. without proper licence and consent from Puduppariyaram Grama Panchayath and the Kerala State Pollution Control Board, alleging nuisance and health hazards to residents. The petitioners point out that the 4th respondent runs the industry despite lack of renewal of the local licence and the consent to operate, with the Panchayat licence (Ext.R4(a)) valid only up to 31 March 2008 and the Board’s consent (Ext.R4(d)) valid up to 30 June 2009; renewal applications were pending. The 4th respondent contends renewal was withheld due to the pendency of this writ petition, while inspections on renewal were reportedly satisfactory. The petition references a Division Bench decision in Pepsico India Holdings Limited v. State of Kerala (2007(2) KLT 835), arguing that industrial areas declared by the State government fall outside the Kerala Panchayat Raj Act 1994, implying the Panchayat cannot control licences for industries within such areas. The respondents counter that renewal depends on the writ petition’s status, and that registration under the Industrial Single Window Clearance Board & Industrial Township Development Act 1999 may be required for functioning. The High Court ultimately directs the second respondent to decide on renewal within two months after a hearing, and to consider ISWB registration, disposing of the petition without granting further relief beyond a mandated decision.

Precedent Explorer

Find Cases Like This

Explore other judgments dealing with similar legal situations, facts, or statutory provisions.

Case Details & Bench

Court
High Court of Kerala
Hon'ble Judges
  • C.K. Abdul Rehim
Judgment Date
2009-08-18
Court Decision / Holding
Directs the second respondent to take a final decision on renewal of Ext.R4(d) consent within two months from receipt of a copy of the judgment, after affording an opportunity of hearing to the petitioners, and to consider the requirement for registration under the Industrial Single Window Clearance Board & Industrial Township Development Act 1999.
Final Disposition
Writ petition disposed of with a directions to the second respondent to decide renewal of consent and consider ISWB registration within two months after hearing the parties.

Parties to the Case

Appellants / Petitioners

  • RadhaKrishnan (S/o Late Krishnan Nair)
  • Mohammed Rafi

Respondents

  • Puduppariyaram Grama Panchayath
  • Kerala State Pollution Control Board
  • C.I. of Police, Hemambika Nagar Police Station, Palakkad
  • Malampuzha Steels Private Ltd.

Legal Representation & Advocates

Counsels for Petitioners

  • • K. K. DheerendraKrishnan

Counsels for Respondents

  • • N. Raghuraj
  • • A. V. Ravi
  • • K. Amminikutty
  • • P.K. Radhika
  • • K. Sanil Kumar
  • • Babu Joseph Kuruvathazha

Provisions of Law Cited

Kerala Panchayat Raj Act 1994Air ActWater ActIndustrial Single Window Clearance Board & Industrial Township Development Act 1999 (Ker.)Section 1(2)

Submissions & Arguments

Contentions of Appellants / Petitioners

The petitioners contend that the 4th respondent operates without a renewed licence and without valid consent to operate, causing nuisance and potential health hazards. They assert that the Panchayat licence for 2007-08 had expired (31.3.2008) and the Board’s consent expired (30.6.2009) with renewal pending due to the writ petition. They rely on Pepsico India Holdings Limited v. State of Kerala to argue that the SIDCO-declared industrial area may be outside the purview of the Kerala Panchayat Raj Act 1994, potentially exempting the 4th respondent from Panchayat licensing. They submit that the unit should either obtain renewal or be governed by registration under the Industrial Single Window Clearance Board & Industrial Township Development Act 1999, given the pre-existence of the industry prior to certain enactments. The petition seeks a direction to the authorities to decide renewal after hearing objections and to consider required registrations.

Contentions of Respondents

The respondents contend renewal was not granted because of pendency of the writ petition and that a final decision regarding renewal is required from the second respondent Board. They note that an inspection was conducted and precautions were deemed adequate. The respondents also emphasize the need to consider registration under the Industrial Single Window Clearance Board & Industrial Township Development Act 1999 for the continued functioning of the 4th respondent’s industry, within the context of the area being possibly outside the Panchayat’s direct purview as argued by the petitioners.

Legal Doctrine & Issue Explorer

Explore This Legal Issue

Find relevant judgments and authoritative positions on the legal questions discussed here.

Cited Precedents (1)

Case NameCitationTreatmentExplanation
Pepsico India Holdings Limited vs. State of Kerala2007(2) KLT 835Mentioned OnlyCited by the parties to discuss the outside-panchayat-exemption principle; the court discusses the proposition but does not adopt or overrule it, using it as a point of reference rather than as binding precedent in the present decision.
Case Applicability Diagnostic

Apply This to My Facts

Share your situation and test whether this judgment governs, supports, or challenges your case.

Official Judgment Record
•1,138 words•~6 min read

In The Court Record

RadhaKrishnan and Mohammed Rafi v. Puduppariyaram Grama Panchayath; Kerala State Pollution Control Board; C.I. of Police, Hemambika Nagar Police Station, Palakkad; Malampuzha Steels Private Ltd.

## **IN THE HIGH COURT OF KERALA AT ERNAKULAM** **PRESENT :** **THE HONOURABLE MR. JUSTICE C.K.ABDUL REHIM** ## **TUESDAY, THE 18TH AUGUST 2009 / 27TH SRAVANA 1931** ## **WP(C).No. 32657 of 2008(K)** **---------------------------------** **PETITIONER(S):** - **------------------------** **1. RADHAKRISHNAN, S/O. LATE KRISHNAN NAIR, RESIDING AT INDUSTRIAL ESTATE PUDUPPARIYARAM PALAKKAD.** **2. MOHAMMED RAFI, S/O. SAIDALAVI CHEENIKKAL HOUSE, INDUSTRIAL ESTATE, PUDUPPARIYARAM, PALAKKAD.** **BY ADV. MR.K.K.DHEERENDRAKRISHNAN** ## **RESPONDENT(S):** **------------------------** **1. PUDUPPARIYARAM GRAMA PANCHAYATH, REP. BY ITS SECRETARY, PANCHAYATH OFFICE, PUDUPPARIYARAM, PALAKKAD.** **2. KERALA STATE POLLUTION CONTROL BOARD, DISTRICT OFFICE, NEAR CIVIL STATION, PALAKKAD.** **3. C.I OF POLICE, HEMAMBIKA NAGAR POLICE STATION, PALAKKAD.** **4. MALAMPUZHA STEELS PRIVATE LTD., INDUSTRIAL ESTATE, REP. BY ITS MANAGING DIRECTOR, MOHAMMEDALI, S/O. BAVA, RESIDING AT PARRYS GARDEN, KADUKKAMKUNNAM, PALAKKAD.** **R1 BY ADVS.MR.N.RAGHURAJ,** - **MR.A.V.RAVI,** - **SMT.K.AMMINIKUTTY** - **R2 BY SMT.P.K.RADHIKA R3 BY GOVT. PLEADER MR.K.SANIL KUMAR** - **R4 BY MR.BABU JOSEPH KURUVATHAZHA** **THIS WRIT PETITION (CIVIL) HAVING BEEN FINALLY HEARD ON 18/08/2009, THE COURT ON THE SAME DAY DELIVERED THE FOLLOWING:** ## **W.P.(C) NO.32657/2008** ## **APPENDIX** ## **PETITIONER'S EXHIBITS** **P1:- COPY OF THE PHOTOGRAPHS.** **P2:- COPY OF THE WRITTEN STATEMENT IN OS. 648/06.** **P3:- COPY OF THE PETITION DTD. 16.8.08.** **P4:- COPY OF THE PETITTION DTD. 29.8.08.** **P5:- COPY OF THE REPORT DTD. 2.11.06.** **P6:- COPY OF THE REPLY GIVEN BY IST RESPONDENT.** **P7:- COPY OF THE CIRCULAR DTD. 9.8.04.** **P8:- COPY OF THE JUDGMENT IN OS. 648/06.** **R2(a):- COPY OF THE CONSENT NO.PCB/PLKD/IC/CO/F/-137/08 DTD. 23.6.08.** **RESPONDENT'S EXHIBITS** **R4(a):- COPY OF THE LICENCE BEARING NO.A2.186/02 ISSUED BY THE IST RESPONDENT WHICH WAS RENEWED AND VALID UP TO 31.3.08.** **R4(b):- COPY OF THE MINUTES OF THE MEETING OF THE BOARD OF DIRECTORS OF THE 4TH RESPONDENT COMPANY HELD ON 4.6.08.** **R4(c):- COPY OF THE RENEWAL APPLICATION DTD. 24.6.08 SUBMITTED BY THE 4TH RESPONDENT COMPANY BEFORE THE IST RESPONDENT.** **R4(d):- COPY OF THE CONSENT NO.PCB/PLKD/IC/CO/F/137/2008 ISSUED BY THE KERALA STATE POLLUTION CONTROL BOARD BEARING, WHICH IS VALID UP TO 30.6.09.** **TRUE COPY** **P.S. TO JUDGE** **tss** C.K.ABDUL REHIM,J. -------------------------------------------WP(C).No. 32657 of 2008 --------------------------------------------Dated this the 18th day of August, 2009. ## JUDGMENT Grievance of the petitioners is that the 4[th] respondent company is functioning without obtaining proper licence and consent from the first respondent Grama Panchayat and the second respondent State Pollution Control Board, in a manner causing nuisance and health hazards to the petitioners and their family members. The allegation is that inspite of repeated complaints the authorities of the Panchayat and the State Pollution Control Board are not taking any effective steps for preventing the 4[th] respondent from continuing with their illegal functioning. 2. Ext.R4(a) is the licence issued by the first respondent Panchayat for the year 2007-08, which was valid upto 31.3.2008. According to the 4[th] respondent renewal of licence was not granted inspite of applications made in this regard. Ext.R4(d) is the “consent to operate” issued by the second respondent, under the provisions of the Air Act and Water Act. WPC.32657/2008 2 The said consent was valid upto 30.6.2009. Learned Standing Counsel appearing for the second respondent on instructions submitted that inspite of application for renewal submitted by the 4[th] respondent no renewal is granted because of pendency of this writ petition. Learned counsel appearing for the 4[th] respondent submitted that the authorities of the second respondent Board had already conducted inspection on the basis of application for renewal submitted and they were satisfied about the precautionary measures taken for averting any apprehended nuisance. 3. Contention of the petitioner is that the 4[th] respondent is not entitled to continue functioning because the Panchayat had not renewed the licence. It is an admitted fact that the industry of the 4[th] respondent is situated in a declared industrial area promoted by the Governmental agency, SIDCO. On that basis the 4[th] respondent contended that the industry is outside the purview of the provisions of the Kerala Panchayat Raj Act 1994. Learned counsel had pointed out a Division Bench decision of this court in **Pepsico India Holdings Limited vs. State of Kerala (2007(2) KLT 835)** , in which this court found that WPC.32657/2008 3 industrial areas declared by the State Government will fall outside the purview of the Kerala Panchayat Raj Act 1994, in view of section 1(2) of the said Act, and consequently the Panchayat cannot exercise any power with respect to issuance of licence to any industries situated within the premise of an industrial area declared by the State Government. Therefore it is clear that the 4[th] respondent Industry being situated in an industrial area is outside the purview of the Kerala panchayat Raj Act 1994 and notwithstanding non-renewal of the licence by the first respondent Panchayat they are entitled to function the industry. 4. Learned counsel for the petitioners points out that even in cases of industrial unit situated within any declared industrial area licence/registration under the provisions of the Industrial Single Window Clearance Board & Industrial Township Development Act 1999 (Ker.) need be obtained. Contention of the 4[th] respondent is that the unit was established prior to enactment of the said legislation and therefore they could not get registration/licence under the provisions of the said Act. 5. As stated above, it is evident that the consent to operate obtained by the 4[th] respondent stood expired as on 30.6.2009. WPC.32657/2008 4 According to second respondent the consent was not renewed because of pendency of this writ petition. The unit cannot be functioned without consent to operate obtained from the second respondent. Therefore it is obligatory on the part of the second respondent to take a decision as to whether the consent to operate granted to the 4[th] respondent is liable to be renewed or not. Since the application for renewal has already been submitted and the required formalities had already been complied with they are entitled to continue functioning of the unit under the deeming provisions contained in the relevant statute, is the contention of the 4[th] respondent. 6. Under the above circumstances it is only just and proper in the interest of justice to direct the second respondent to take a final decision with respect to renewal of “consent to operate”, considering the factual situation prevailing at the premises of the 4[th] respondent and after hearing objection if any of the petitioners. The second respondent will also take note of the requirement for registration under the provisions of the Industrial Single Window Clearance Board & Industrial township Development Act 1999 with respect to functioning of the 4[th] WPC.32657/2008 5 respondent's industry. 7. Hence the writ petition is disposed of directing the 4[th] respondent to take a final decision with respect to renewal of Ext.R4(d) consent, within a period of two months from the date of receipt of a copy of this judgment, after affording an opportunity of hearing to the petitioners, taking into consideration of the observations made above. ## C.K.ABDUL REHIM, JUDGE Pmn/ WPC.32657/2008 6
End of Judgment Record
Browse All High Court of Kerala (2009) Decisions
2009-06-26

Nishana Mol.N v Alappuzha Municipality & Secretary, Alappuzha Municipality

This writ petition concerns the registration of a marriage under the Kerala Registration of Marriages (Common) Rules, 2008 (Common Rules). The petitioner Nishana Mol.N, whose marriage was solemnized on 8 March 2009, sought registration of her marriage by the Local Registrar. Her husband was abroad, and she submitted Form No. 1 along with documents; however, the Local Registrar demanded the presence of both spouses for registration, a point contested by the petitioner. The court recalls the apex court’s directions in Seema v. Ashwani Kumar (2006) to frame rules ensuring compulsory registration to protect women and provide evidence of marriage, while noting that registration under the Rules does not itself create a marriage but evidences one solemnized otherwise. The Rules specify that registration is mandatory for marriages solemnized within the state, with various procedural requirements (Rules 5, 6, 9, 10, 11, 13, 16, 17) and mechanisms for correction, appeal, and re-registration. The court clarifies that the presence of both parties is not ordinarily required; the registrar may require appearance only in cases where there is reasonable doubt about identity, and even then as an exception rather than a rule. Ultimately, the court directs that registration and certificate issuance be completed within one month from copy of the judgment, without insisting on joint appearance, provided the memorandum is in order.

2009-07-27

Abdul Majeed Kalathil v. District Collector, Malappuram & Others

This batch of writ petitions concerns the constitutional validity of Section 17 of the Kerala Anti-Social Activities (Prevention) Act, 2007, and the power of District Magistrates to confiscate vehicles used in anti-social activities. The petitions challenge the absence of a substantive prohibition against using vehicles for anti-social activities and the lack of a defined procedure for confiscation or an appellate remedy. In W.P.C. No. 9925 of 2009 (the lead case), Abdul Majeed Kalathil contends that his goods carriage KL 11-B/6651 was seized by the Sub Inspector of Pandikkad Police and reported to the District Collector, Exts.P1–P2. The court scrutinizes Section 17's scope, defining anti-social activity (Section 2(a)) and whether the District Collector’s power to confiscate is constitutionally tenable. It finds Section 17 to be vague and violative of Articles 14, 19(1)(g) and 21, as it rests on subjective police satisfaction with no clear standards or process. It also notes environmental objectives but concludes that fundamental rights must prevail. The court does not sustain confiscation under Section 17; instead, it directs that such vehicles be dealt with under the Kerala Protection of River Banks and Regulation of Removal of Sand Act, 2001 and Rules, with interim release under specified conditions. It further directs initiation of Sand Act proceedings within a month and finalization within another month. The writ petitions are disposed of accordingly, preserving the rule of law and environmental protection.

2009-06-11

WA No. 671 of 2006 (Fertilizers and Chemicals Travancore Ltd v Union of India)

This writ appeal concerns the pay revision and pensionary benefits of employees of the Fertilizers and Chemicals Travancore Ltd (FACT). The long-term settlement covering terms of employment expired on 31 December 1996. A fresh settlement was concluded (notified 28 August 2001) and made retroactive to 1 January 1997, with revisions in wages and benefits. Clause 29 of Ext. P1 provides that arrears relating to wage revision and dearness allowance for the period 1 January 1997 to 30 June 2001 will be reviewed and decided by management/government only when the company earns profits for at least three consecutive years; Clause 33.1 provides that employees who retired on or after 1 January 1997 will be eligible for arrears calculated from 1 January 1997 to the date of retirement, subject to adjustments for interim relief already paid, with any unclaimed amount transferred to a Welfare Fund. The appellants—the retirees who fall in the 1 January 1997 to 1 July 2001 window—argue that they were denied arrears and were paid pensionary benefits at pre-revised rates, creating discrimination. Respondents contend Ext. P1 binds the parties and arrears depend on profits, and that pay revision administered to others does not compel retroactive change. The court held that Ext. P1 terms survive as terms of employment and directed the management to consider terminal benefits at revised rates within two months and to release arrears when paid to current workers, with connected matters following."

2009-05-29

M/S. Palm Fibers & Yars Trading Co. v. State of Kerala & Others

The petitioner, a Small Scale Industrial unit, ran two LT power connections (No.13070 and No.13427) with commercial production starting in July 1994 and July 1995. On 06/02/1992, the Government issued Ext.P1 guaranteeing concessional tariffs (pre-1992 tariff) for five years from the date of commencement or substantial capacity expansion, certified by the District Industries Centre. Ext.P2 certified eligibility for this concession. Subsequently, the petitioner increased power demand to 300 KVA and was reclassified/advised to HT status from 15/05/1998, converting LT supply to HT. The petitioner argued that Ext.P1 benefits should extend for the full five-year period, covering the LT quantities certified in Ext.P2, and that the HT conversion was a mere reclassification directed by the Board, not a cessation of eligibility. The Board argued Ext.P1 targets only those who commenced production during 1992–1996 and that HT conversion from 15/05/1998 falls outside the Ext.P1 window, rendering the petitioner eligible only up to 15/05/1998. Earlier orders (Ext.P3) had set aside a cut-off date for merits, and Ext.P6/Ext.P4 handled appeals. Ultimately, the Court held that the HT conversion was outside Ext.P1’s period, but directed that the LT benefits for the two LT connections be extended only until 23/05/1998 (LT dismantling date) and without reimbursement from the Industries Department, as held in OP No.7622/1998. The petition was disposed of as above.