Tenetowl LogoTenetowl
High Court of KeralaKerala High Court · 2009Single JudgeArbitration allowed; appointment of arbitrator;...

R. George Pereira v. St. Joseph's International Academy

Case / Petition Number:
AR.No. 25 of 2007

Case Synopsis & Summary

This is an arbitration petition (A.R. No. 25 of 2007) filed in the Kerala High Court under Section 11(6) of the Arbitration and Conciliation Act, 1996, seeking appointment of an independent arbitrator to adjudicate various claims arising from a contractual work for construction of St. Joseph's International Academy, Kollam. The applicant, a contractor, contends disputes arose due to the respondent’s alleged reluctance to permit completion of work and nonpayment of nearly Rs. 68.57 lakh for works executed in seven part-bills, with the balance reflecting adjustments for windows supplied and later retaken. Clause 17 of the agreement designates the Academy Manager as sole arbitrator, whose decision is final and non-challengeable in court. The applicant argues this violates natural justice (nemo debet esse judex in propria causa) and proposes a panel of three nominees or joint engineers to facilitate a fair settlement, with a view to avoid litigation. The respondent counters that the Manager and the agreement’s signatory are one and the same person and that a typographical error in the last page of the agreement misidentifies the signatory; they claim consensus exists, but concede dispute resolution through arbitration. The court, considering waiver of independence concerns and the lack of fatal noncompliance, appoints Sri.E.K. Muraleedharan (retired District and Sessions Judge) as arbitrator, directing him to proceed and publish an award without undue delay.

Precedent Explorer

Find Cases Like This

Explore other judgments dealing with similar legal situations, facts, or statutory provisions.

Case Details & Bench

Court
High Court of Kerala
Hon'ble Judges
  • Pius C. KuriaKose
Judgment Date
2009-05-08
Court Decision / Holding
The Arbitration Request is allowed. The court did not dismiss the arbitrator-nomination objections but held that the agreement and conduct of the parties show waiver of the right to insist on the nominated arbitrator. Accordingly, Sri. E.K. Muraleedharan, Retired District and Sessions Judge, is appointed as arbitrator to resolve all claims and counter-claims, with directions to enter on arbitration and publish the award without undue delay.
Final Disposition
Arbitration allowed; appointment of arbitrator; proceedings to follow; award to be published without undue delay

Parties to the Case

Appellants / Petitioners

  • R. George Pereira
  • George Michael Associates

Respondents

  • St. Joseph's International Academy, Kollam (represented by Managing Director Joseph Fernandez)

Legal Representation & Advocates

Counsels for Petitioners

  • • K. L. Varghese, Advocate

Counsels for Respondents

  • • Madhu Radhakrishnan, Advocate

Provisions of Law Cited

Arbitration and Conciliation Act, 1996 – Section 11(6)Arbitration and Conciliation Act, 1996 – Section 7(2)Arbitration Scheme for Appointment of an Arbitrator by the Chief Justice of the Kerala High CourtKerala Arbitration Rules

Legal Doctrines & Maxims

  • Nemo debet esse judex in propria causa (no one shall be a judge in his own cause)

Submissions & Arguments

Contentions of Appellants / Petitioners

The applicant contends that clause 17 makes the Academy Manager the sole arbitrator, raising concerns of bias and denial of natural justice. Since the Manager’s actions could preclude fair adjudication, the applicant sought appointment of an independent arbitrator under Section 11(6). Annexures A4–A7 show attempts to involve neutral mechanisms (panel of three nominees and joint engineers) to facilitate settlement. The applicant also argues that production of the entire contract is not mandatory under the statutory scheme; the arbitration clause suffices for referral.

Contentions of Respondents

The respondent argues that the Manager and the agreement’s signatory are the same person; a typographical error on the last page misidentifies the signatory, but there is consensus that arbitration should proceed. They challenge the implied need for a neutral arbitrator and rely on the provisions of the Arbitration Act to permit finality of the nominated arbitrator, while asserting there is no real prejudice to the respondent from a retired judge acting as arbitrator.

Legal Doctrine & Issue Explorer

Explore This Legal Issue

Find relevant judgments and authoritative positions on the legal questions discussed here.

Cited Precedents (6)

Case NameCitationTreatmentExplanation
ACE Pipeline Contracts (P) Ltd. v. Bharat Petroleum Corpn. Ltd.(2007) 5 SCC 304Mentioned OnlyCited by counsel to discuss independence and impartiality but not adopted in the court’s reasoning.
Bihar State Mineral Development Corpn. v. Encon Builders (I) (P) Ltd.(2003) 7 SCC 418Mentioned OnlyReferenced in submissions as authority on arbitration bias but not relied upon in the decision.
Tata Cellular v. UOI(1994) 6 SCC 651Mentioned OnlyCited to illustrate general arbitral principles; not central to the judge’s ruling.
Pragati Engineering (P) Ltd. v. T.N.Water Supply & Drainage BoardAIR 1992 Cal 139Mentioned OnlyUsed in argument on interim biases; not adopted by the court’s final order.
International Airport Authority of India v. K.D. Bali(AIR 1988 SC 1099)Mentioned OnlyCited to discuss standard for apprehension of bias; not controlling in the disposition.
Jain Studios Ltd. v. Shin Satellite Public Co. Ltd.(2006) 5 SCC 501Mentioned OnlyCited in argument for bias considerations; not capital in the court’s decision.
Case Applicability Diagnostic

Apply This to My Facts

Share your situation and test whether this judgment governs, supports, or challenges your case.

Official Judgment Record
•3,313 words•~16 min read

In The Court Record

R. George Pereira v. St. Joseph's International Academy

IN THE HIGH COURT OF KERALA AT ERNAKULAM PRESENT : THE HONOURABLE MR. JUSTICE PIUS C.KURIAKOSE THURSDAY, THE 11TH OCTOBER 2007 / 19TH ASWINA 1929 AR.No. 25 of 2007() ------------------- APPLICANT ---------------- R.GEORGE PEREIRA, GEORGE MICHAEL ASSOCIATES, TC 30/1877(2), VAS VILAS, KANNAMMOOLA, PETTAH P.O., THIRUVANANTHAPURAM-695 024. BY ADV. SRI.K.L.VARGHESE OPPOSITE PARTY/RESPONDENT --------------------------------------- ST.JOSEPH'S INTERNATIONAL ACADEMY, KUMBALAM P.O., KOLLAM-691 503, REPRESENTED BY THE MANAGING DIRECTOR, JOSEPH FERNANDEZ. THIS ARBITRATION REQUEST HAVING COME UP FOR ADMISSION ON 11/10/2007, THE COURT ON THE SAME DAY PASSED THE FOLLOWING: ## **PIUS C. KURIAKOSE, J.** ----------------------------------------------- A.R. No. 25 OF 2007 ----------------------------------------------Dated this the 8th day of May, 2009 ## **O R D E R** This is an application under section 11(6) of the Arbitration and Conciliation Act, 1996 and the Scheme for Appointment of an Arbitrator by the Chief Justice of the Kerala High Court. The application seeks appointment of an independent and impartial arbitrator for adjudicating upon the various claims of the applicant against the respondent The applicant was contractor of the respondent for the construction of an school building at Kumbalam in Kollam under the name and style “St. Joseph International Academy”. It is alleged that disputes and differences arose between the parties on account of what is described as the recalcitrant attitude of the respondent to allow the applicant to complete the work which had neared completion. It is claimed that the applicant has carried out works worth Rs.68,57,616/- in seven part bills whereas the respondent A.R. N0. 25/07 -2- has paid only Rs.45,68,712/-. The balance amount due under the part bill is Rs.22,88,904/-. Since the balance amount remained unpaid, the windows which had been supplied by the applicant to the respondent had to be taken back and deducting the value of those windows, the balance amount due to the applicant is Rs.22,12,087/-. According to the applicant, in order to avoid payment of the above amount the respondent sought to terminate the contract. The disputes and differences which was thus arisen are to be settled by resorting to arbitration proceedings. Annexure A8 is copy of the agreement between the applicant and the respondent for construction of St. Joseph International Academy and clause 17 thereof is quoted as follows: “(17) If there is any dispute relating to any matter regarding the construction of the building or any matter related to this contract, the Manager, St.Joseph's International Academy, Kollam will be the sole Arbitrator for this purpose and his decision shall be final, and the second party will have no right to A.R. N0. 25/07 -3- challenge this decision in the court of law”. It is submitted that as per clause 17, the Manager of the respondent is to be the sole arbitrator. But since disputes have arisen on account of the actions and inactions of the Manager, he is not entitled to function as arbitrator since the same will be against the fundamental principle of natural justice, _nemo debet esse judex in propria causa (no one shall be a judge in his own cause)._ It was under such circumstances that the applicant sent Annexure A4 letter indicating a panel of three names for selection of one among them as arbitrator by the respondent. To Annexure A4, the respondent's Advocate sent Annexure A5 reply without selecting any of the nominee arbitrators but suggesting for appointment of two Civil Engineers, one to be appointed by each party who could jointly verify the records and files and assess the quantity and quality of the work done in order to avoid a litigation and to come to a fair settlement. The A.R. N0. 25/07 -4- applicant obliged and appointed his nominee under Annexure A6. The respondent also appointed its Engineer. By Annexure A7, the applicant requested both the Engineers to take up the assignment and pave way for a settlement. Though the applicant called for nominee Engineer of the respondent and furnished all measurement books and connected records and made necessary follow up, nothing materialized. In the meanwhile, the applicant's nominee Engineer met with an accident and passed away. Hence no useful purpose will be served by waiting further and that is the circumstances under which the applicant has filed this application under section 11(6) of the Arbitration and Conciliation Act, 1996 invoking the statutory appointment procedure of arbitrators. 2 _._ On the basis that no counter affidavit was filed the A.R. was allowed by order dated 11-10-2007. Later R.P. No. 233 of 2008 was filed and the above order was recalled. A.R. N0. 25/07 -5- 3. The contentions of the respondent as discernible from the RP. 233/08 filed by him and also the reply affidavit filed by him in the said RP are as follows: The arbitrator who has been appointed by this court under the order dated 11-10-07 (Sri.E.K.Muraleedharan, Retired District and Sessions Judge) is incapable of acting as arbitrator between the parties in the light of the legal bar under the provisions of the Arbitration and Conciliation Act, 1996. It is submitted that contrary to what has been projected in the A.R. the Manager envisaged under clause 17 of the arbitration clause who is to act as the sole arbitrator in the event of disputes and the signatory to the agreement are one and the same person. In order to convince this court that the Manager of St.Joseph 's International Academy and the executant to the agreement are one and the same, the applicant has produced Annexure A8, but Annexure A8 does not contain the last page of the agreement. The last page of the A.R. N0. 25/07 -6- agreement will disclose that the Manager was not the executant of the agreement. On the contrary the executant of the agreement was the General Manager. Annexure B1 full text of the agreement is produced. It is pointed out that it will be seen from Annexure B1 last page that there was a typing mistake where the 1[st] party was indicated and instead of General Manager the word Manager was mistakenly used. Since the party noticed the mistake at the time of execution of the agreement, the first party to the agreement, the General Manager, St.Joseph's International Academy did not sign and instead he signed as the General Manager only where the first party was indicated. This was deliberately and intentionally done in order to avoid confusion as the Manager, St.Joseph's International Academy was appointed as the arbitrator under clause 17 of the agreement. It is submitted that there is absolute consensus with regard to the arbitrator by A.R. N0. 25/07 -7- both parties to the agreement. It is then contended that the General Manager and the Manager of St.Joseph's International Academy are two different persons. Annexure B2 certificate issued by Mr.Joseph J. who was the Manager of St.Joseph Academy during the period from 1[st] June 2002 to May 31, 2007 is produced. The present Manager of St.Joseph Academy is one S.Sundaresan and Annexure B3 certificate issued by him is produced. 4. Annexure – B4 dated 22-11-2004 was caused to the applicant by the respondent claiming Rs.39,43,330/- from the applicant on various counts and requested that if the claim was disputed the matter be referred to the Manager, St, Joseph's International Academy who alone is the arbitrator. Again Annexure B5 dated 30-8-2005 was issued on behalf of the respondent by way of reply to a lawyer notice dated 16-10-2005 sent at the instance of the applicant. Once again by Annexure B6 lawyer notice dated A.R. N0. 25/07 -8- 1[st] December 2005 the respondent's lawyer informed the applicant's lawyer in reply to applicant's notice dated 19-112005 that the Manager of the St. Joseph's International Academy is to be appointed as arbitrator and that it was not the Manager of the St. Joseph's International Academy who had signed the agreement. In the reply affidavit filed by the respondent to the counter filed by the applicant to RP.233/08, it is submitted that the respondent has never acted in a capacity as the Manager of St. Joseph's International Academy at any stage. The respondent has been styled as General Manager or as Managing Director or Director. This is on account of the fact that at the time of construction of the school, the organization was at a very nascent stage and therefore the respondent was styled as General Manager and later as Managing Director/Director. Similarly the then Manager Joseph John was styled as Manager and subsequently he continued as Manager who A.R. N0. 25/07 -9- was also styled as Administrator. He continued to be the Manager as well as Administrator. It is submitted that the respondent in the RP (applicant) is trying to take advantage of a typing mistake made in the agreement wherein the word Manager was used in the last page instead of General Manager. However, it is submitted that there is no scope for such confusion as in the last page, it is the General Manager who had signed at the portion where the first party is indicated. In the agreement the first party is described as General Manager. Hence there is no scope for confusion. Referring to the correspondence produced by the respondent it is submitted that the Manager Mr.Joseph John had signed on behalf of the General Manager and not in his capacity as the Manager of the school. It is pointed out that Ext.A9 is not addressed to the General Manager or to the institution. A10 is not addressed to the General Manager but to Joseph John, the Manager. It is reported that Joseph A.R. N0. 25/07 -10- John has functioned only as Manager and that the respondent has never styled or functioned as Manager. It is further pointed out that the present Manager is not Joseph John but is Mr. S. Sundareswaran and therefore there is no question of any prejudice being caused to the respondent. 6. I have heard the submissions of Sri. K.L. Varghese, learned counsel for the applicant and those Sri. Madhu Radhakrishnan, learned counsel for the respondent. Mr.K.L.Varghese submitted that the non-production of the last page of Annexure A8 is not fatal. The Arbitration Scheme and the Kerala Arbitration Rules require production of the arbitration agreement only along with the arbitration request and not the whole contract agreement. Reference was made to Section 7(2) of the Arbitration and Conciliation Act in this context. According to the counsel, this was why the applicant produced only clause 17 of A.R. N0. 25/07 -11- Annexure-A, which is the arbitration clause. Counsel submitted that a reading of Annexures A4 and A5 will show that this is not the first time that issue has cropped up. It is submitted that on behalf of the applicant it has been made clear that it was Sri.George Fernandez who signed the agreement in the capacity of the Manager, first party and disputes have arisen on account of actions and inactions on the part of Sri.George Fernandez, the signatory which were denied. Respondent maintained that the agreement was signed by the Managing Director and that the arbitrator was Manager. In Annexure A5 signatory is referred to as Managing Director and not as General Manager which is very significant. According to Mr.Varghese, last page of Annexure A8 would only strengthen the applicant's case. He pointed out that the last page shows that the first party is styled as Manager. The expression first party is repeated twice. It shows that the statement that the respondent A.R. N0. 25/07 -12- deliberately and intentionally did not sign the first line but only the second line is incorrect. If the signatory found that the first party is not Manager he should have definitely scored it off. If the Manager had signed as witness he should have scored off the word Manager as first party when he signed as witness, instead against the expression witness he should have styled himself as Manager. Annexures 1 and 2 produced along with the counter to the RP will show that there was a manager for the school and never a General Manager. A reading of Annexures 2 and 3 together shows that Sri. Joseph Fernandez himself was the Manager though while issuing Annexure 3 he is styled as Director. Mr. Varghese emphasized the words “I am happy to award” in Annexure 3. Mr.Varghese submitted that the witness Joseph.J. Was only the Administrator and his full name Joseph John is indicated in Annexures A5 and A6. Mr.Varghese highlighted that in the reply affidavit it is A.R. N0. 25/07 -13- admitted that Joseph. J. alias Joseph John turned to be the administrator. The letter pad in Annexures 3 and 5 to 11 shows that he was only “administrator” and not “Manager”. If so, his successor, the signatory to Annexure B4 also can be only an administrator and not the Manager. If under section 21, the commencement of arbitration proceedings is on the date of request to refer the disputes to arbitration then it should be deemed to be commenced after 22-112004, the date of Ext.B4. B2 will show that Joseph J. / Joseph John was working for the petitioner at that time as administrator which means that there was no Manager to function as arbitrator. This according to Mr. Varghese is precisely the reason why in Annexures B4 and B5 though repeatedly the respondent said that the matter / all relevant papers would be placed before the arbitrator and the matter will be decided by him. He did not do so because there was no manager at that time. According to A.R. N0. 25/07 -14- Mr.Varghese it is unbelievable that certificates like B2 and B3 could be issued by men of average intelligence and common sense. He submitted that those documents are fabricated and cooked up. He pointed out that the title “to whom it may concern” ( _sic)_ is conspicuous. He submitted that the same mistake is repeated in B2 and B3, though created and signed on different dates. He pointed out that the first para of both these annexures is identical. Para 2 of Annexure B2 and Paras 2 and 3 of B3 are identical. Para 4 of B2 and para 3 of B3 are identical. He asserted that B2 and B3 are dictated by one and the same person. Though B2 is dated 8-2-08 and B3 is 11-2-08 they are apparently made on the same date. The reason why the signatories on B2 and B3 had to issue such certificates is obscure, according to Mr.Varghese . Obviously the reason is only to help the respondent. By issuing such certificates both the signatories to B2 and B3prove their allegiance to the A.R. N0. 25/07 -15- respondent, making themselves disqualified to be independent and impartial arbitrator which is required under section 11(8)(b) of the Act even assuming that any one of them can be considered as arbitrator. Mr.Varghese would fortify his submissions on the authority of a catena of judicial precedents. He relied on paragraphs 4.030 and 4.031 of Russel on Arbitration 22[nd] Edition for the commentaries on apparent bias and real possibility test. He argued that actual bias is not necessary to be proved and that the knowledge at the time of appointment does not debar from applying on the ground that the arbitrator to be appointed in terms of the agreement may not be impartial. For this proposition he relied on page 215 of the Law of Practice of Commercial Arbitration by Mustill and Byod. To expatiate his argument regarding the concept of independence and impartiality of arbitrator he relied on commentaries contained in Comparative International A.R. N0. 25/07 -16- Commercial Arbitration by Julian D M Lew QC and others. He relied on the judgments of the Supreme Court in ACE Pipeline Contracts (P) Ltd. v. Bharat Petroleum Corpn. Ltd. (2007) 5 SCC 304, Bihar State Mineral Development Corpn. and others. v. Encon Builders (I) (P) Ltd. ((2003) 7 SCC 418 and in Tata Cellular v. UOI (1994) 6 SCC 651 in support of various propositions canvassed by him. 7. Sri. MadhuRadhakrishnan, learned counsel for the respondent also did not lag behind in citing authorities. The learned counsel relied on the judgment of the Calcutta High Court in Pragati Engineering (P) Ltd. v. T.N.Water Supply & Drainage Board, AIR 1992 Calcutta 139 to argue that where the parties entered into a contract with their eyes open and knew that the nominated arbitrator is an employee of one of the parties, none of the parties to the agreement should be allowed to allege that such nominated arbitrator being an officer of one of the parties to the contract, would be biased A.R. N0. 25/07 -17- or is likely to be biased. Mr. Madhu Radhakrishnan relied on the judgment of the Supreme Court in International Airport Authority of India v . K.D.Bali, (AIR 1988 SC 1099) to argue that the apprehension of bias must be judged from a healthy, reasonable and average point of view and the request for removal of the appointed arbitrator is not to be granted lightly. Mr.Madhu Radhakrishnan placed reliance on the judgment of the Supreme Court in Jain Studios Ltd. v. Shin Satellite Public Co. Ltd., (2006) 5 SCC 501 also. 8. The provisions contained in sections 12 and 13 of the Arbitration and Conciliation Act incorporate grounds for challenge and the challenge procedure against and in respect of arbitrators will reveal that partiality and bias or circumstances giving rise to justifiable doubts regarding the impartiality and independence can be valid grounds for challenging the appointment given to a certain persons as arbitrator. At the same time, a party should not be allowed A.R. N0. 25/07 -18- to wriggle easily out of agreements entered into by them with open eyes. In the instant case it is seen that the applicant had agreed to the appointment of a person in the service of the opposite party as an arbitrator in the event of disputes. That being the position I would have been ordinarily reluctant to accept the opposition of the applicant to the appointment of the nominated arbitrator on ground of bias and partiality. After all, it is a quasi judicial function which is being discharged by the arbitrator whose proceedings will be regulated by the provisions of the Arbitration and Conciliation Act. His award will be subjected to judicial scrutiny though on limited grounds and to a limited extent. But in the instant case I am not inclined to dismiss the arbitration request and to appoint the nominated arbitrator as the arbitrator for resolving the disputes which have admittedly arisen between the parties because it is seen from Annexures A4 and A5 that the A.R. N0. 25/07 -19- respondent also became agreeable to the idea of the disputes between the parties being resolved by persons other than the arbitrator nominated under the agreement. Annexures A6 and A7 will show that the parties had nominated an Engineer each and were willing to have the disputes between them resolved by a joint perusal of the relevant records by these two Engineers. To this extent, in my opinion the respondent has waived his right to insist that the arbitrator to be appointed has to be the arbitrator nominated under the agreement. Moreover, in my opinion no prejudice whatsoever will be occasioned to the respondent by appointing a Retired Judicial Officer known for his learning and integrity as the arbitrator for resolving the disputes which admittedly subsist. Therefore without deciding the issue whether appointment of the nominated arbitrator will be vitiated due to reasons of bias and partiality I allow the arbitration request and appoint A.R. N0. 25/07 -20- Sri.E.K.Muraleedharan, Retired District and Sessions Judge, presently at Ernakulam as arbitrator for settling all the claims and counter claims raised by the applicant and the respondent respondent as detailed in Annexures A1 to A4 as well as in the arbitration request. The arbitrator will enter on arbitration and make and publish his award without undue delay. **(PIUS C.KURIAKOSE, JUDGE)** ksv/
End of Judgment Record
Browse All High Court of Kerala (2009) Decisions
2009-06-26

Nishana Mol.N v Alappuzha Municipality & Secretary, Alappuzha Municipality

This writ petition concerns the registration of a marriage under the Kerala Registration of Marriages (Common) Rules, 2008 (Common Rules). The petitioner Nishana Mol.N, whose marriage was solemnized on 8 March 2009, sought registration of her marriage by the Local Registrar. Her husband was abroad, and she submitted Form No. 1 along with documents; however, the Local Registrar demanded the presence of both spouses for registration, a point contested by the petitioner. The court recalls the apex court’s directions in Seema v. Ashwani Kumar (2006) to frame rules ensuring compulsory registration to protect women and provide evidence of marriage, while noting that registration under the Rules does not itself create a marriage but evidences one solemnized otherwise. The Rules specify that registration is mandatory for marriages solemnized within the state, with various procedural requirements (Rules 5, 6, 9, 10, 11, 13, 16, 17) and mechanisms for correction, appeal, and re-registration. The court clarifies that the presence of both parties is not ordinarily required; the registrar may require appearance only in cases where there is reasonable doubt about identity, and even then as an exception rather than a rule. Ultimately, the court directs that registration and certificate issuance be completed within one month from copy of the judgment, without insisting on joint appearance, provided the memorandum is in order.

2009-07-27

Abdul Majeed Kalathil v. District Collector, Malappuram & Others

This batch of writ petitions concerns the constitutional validity of Section 17 of the Kerala Anti-Social Activities (Prevention) Act, 2007, and the power of District Magistrates to confiscate vehicles used in anti-social activities. The petitions challenge the absence of a substantive prohibition against using vehicles for anti-social activities and the lack of a defined procedure for confiscation or an appellate remedy. In W.P.C. No. 9925 of 2009 (the lead case), Abdul Majeed Kalathil contends that his goods carriage KL 11-B/6651 was seized by the Sub Inspector of Pandikkad Police and reported to the District Collector, Exts.P1–P2. The court scrutinizes Section 17's scope, defining anti-social activity (Section 2(a)) and whether the District Collector’s power to confiscate is constitutionally tenable. It finds Section 17 to be vague and violative of Articles 14, 19(1)(g) and 21, as it rests on subjective police satisfaction with no clear standards or process. It also notes environmental objectives but concludes that fundamental rights must prevail. The court does not sustain confiscation under Section 17; instead, it directs that such vehicles be dealt with under the Kerala Protection of River Banks and Regulation of Removal of Sand Act, 2001 and Rules, with interim release under specified conditions. It further directs initiation of Sand Act proceedings within a month and finalization within another month. The writ petitions are disposed of accordingly, preserving the rule of law and environmental protection.

2009-06-11

WA No. 671 of 2006 (Fertilizers and Chemicals Travancore Ltd v Union of India)

This writ appeal concerns the pay revision and pensionary benefits of employees of the Fertilizers and Chemicals Travancore Ltd (FACT). The long-term settlement covering terms of employment expired on 31 December 1996. A fresh settlement was concluded (notified 28 August 2001) and made retroactive to 1 January 1997, with revisions in wages and benefits. Clause 29 of Ext. P1 provides that arrears relating to wage revision and dearness allowance for the period 1 January 1997 to 30 June 2001 will be reviewed and decided by management/government only when the company earns profits for at least three consecutive years; Clause 33.1 provides that employees who retired on or after 1 January 1997 will be eligible for arrears calculated from 1 January 1997 to the date of retirement, subject to adjustments for interim relief already paid, with any unclaimed amount transferred to a Welfare Fund. The appellants—the retirees who fall in the 1 January 1997 to 1 July 2001 window—argue that they were denied arrears and were paid pensionary benefits at pre-revised rates, creating discrimination. Respondents contend Ext. P1 binds the parties and arrears depend on profits, and that pay revision administered to others does not compel retroactive change. The court held that Ext. P1 terms survive as terms of employment and directed the management to consider terminal benefits at revised rates within two months and to release arrears when paid to current workers, with connected matters following."

2009-05-29

M/S. Palm Fibers & Yars Trading Co. v. State of Kerala & Others

The petitioner, a Small Scale Industrial unit, ran two LT power connections (No.13070 and No.13427) with commercial production starting in July 1994 and July 1995. On 06/02/1992, the Government issued Ext.P1 guaranteeing concessional tariffs (pre-1992 tariff) for five years from the date of commencement or substantial capacity expansion, certified by the District Industries Centre. Ext.P2 certified eligibility for this concession. Subsequently, the petitioner increased power demand to 300 KVA and was reclassified/advised to HT status from 15/05/1998, converting LT supply to HT. The petitioner argued that Ext.P1 benefits should extend for the full five-year period, covering the LT quantities certified in Ext.P2, and that the HT conversion was a mere reclassification directed by the Board, not a cessation of eligibility. The Board argued Ext.P1 targets only those who commenced production during 1992–1996 and that HT conversion from 15/05/1998 falls outside the Ext.P1 window, rendering the petitioner eligible only up to 15/05/1998. Earlier orders (Ext.P3) had set aside a cut-off date for merits, and Ext.P6/Ext.P4 handled appeals. Ultimately, the Court held that the HT conversion was outside Ext.P1’s period, but directed that the LT benefits for the two LT connections be extended only until 23/05/1998 (LT dismantling date) and without reimbursement from the Industries Department, as held in OP No.7622/1998. The petition was disposed of as above.