PUNJAB STATE ELECTRICITY BOARD AND OTHERS v. LUDHIANA STEELS PRIVATE LTD.

Case / Petition Number:
Civil Appeal No. 5137 of 1992

Case Synopsis & Summary

The Punjab State Electricity Board (and others) challenged a billing dispute with Ludhiana Steel Private Limited arising from meter readings and a subsequent check-meter installation. The Board claimed Rs. 28,56,854 for energy consumed between 6.10.1986 and 16.5.1988, which Ludhiana Steel disputed and sought to restrain recovery. Temporary injunctions were granted and vacated; Ludhiana Steel sought action under Section 26(6) of the Indian Electricity Act, requesting the Electrical Inspector determine meter accuracy and liability beyond payments already made. The Electrical Inspector refused to proceed due to pendency of the suit. After revisions, this Court directed the dispute to arbitration by a retired judge (Justice A.D. Koshal) with technical assistance. The Arbitrator found that the main dispute concerned the 6.10.1986 to 16.5.1988 period and limited his decision to that period, stating that liability beyond the readings of the first meter would depend on an Electrical Inspector’s decision under Section 26(6). The Board objected to the arbitrator’s scope, but the Court held that the reference covered the main dispute and that the award may be treated as the decree of the Court. The Court directed the Electrical Inspector to decide the remaining issues expeditiously and disposed of the suit with no costs. The award between the parties was thus made the Rule of the Court.

Precedent Explorer

Find Cases Like This

Explore other judgments dealing with similar legal situations, facts, or statutory provisions.

Case Details & Bench

Court
Supreme Court of India
Hon'ble Judges
  • B.P. Jeevan Reddy
  • G.N. Ray
  • H.P. Jeevan Reddy
Judgment Date
1992-12-01
Court Decision / Holding
The award made by Sri Justice A.D. Koshal (retired) on February 18, 1992 is made the Rule of the Court. The suit is disposed of in terms of the said award. The Electrical Inspector shall decide the dispute referred to him expeditiously in accordance with law. There shall be no order as to costs.
Final Disposition
Appeal disposed of.

Parties to the Case

Appellants / Petitioners

  • Punjab State Electricity Board and others

Respondents

  • Ludhiana Steel Private Limited

Legal Representation & Advocates

Counsels for Petitioners

  • • S.P. Goel
  • • R.S. Sodhi

Counsels for Respondents

  • • A.K. Goel

Provisions of Law Cited

Constitution of India, 1950 - Article 136-AIndian Electricity Act, 1910 - Section 26(6)Indian Electricity Act, 1910 - Sub-section (6) of Section 26Indian Electricity Act, 1910 - Sub-section (1) of Section 26Section 16
Legal Doctrine & Issue Explorer

Explore This Legal Issue

Find relevant judgments and authoritative positions on the legal questions discussed here.

Case Applicability Diagnostic

Apply This to My Facts

Share your situation and test whether this judgment governs, supports, or challenges your case.

Official Judgment Record
•3,064 words•~14 min read

In The Court Record

PUNJAB STATE ELECTRICITY BOARD AND OTHERS v. LUDHIANA STEELS PRIVATE LTD.

.. ' PUNJAB STATE ELECTRICITY BOARD AND OTHERS _v._ # LUDHIANA STEELS PRIVATE LTD. DECEMBER 1, 1992 [B.P. JEEVAN REDDY AND G.N. RAY, JJ.] _Constitution of India, 1950-Artic/e 136-Appeal by special leave-_ ' _Supreme Court referring dispute to Arbitrator-Participation by parties in ar-_ bitratio~Award _made on merit-Whether party can question._ The respondent • plaintiff entered into· an agreement with the Eleciricity Board for supply of energy and was availing it. On 6.4.1987, when the meter installed at the respondent's premises was checked, it was found that it was recording lower consumption than what was actually being consumed. c D On 16.5.1988 a check meter was installed. The respondent paid the charges on the basis of the readings recorded by the check-meter. For the period commencing 6.10.1986 upto 16.5.1988 the Board sent a bill dated 16.8.1988 for Rs.28,56,854 towards the energy said to have been consumed by the respondent, though not recorded by the meter. E The respondent instituted a suit disputing the bill and asked for a permanent injunction restraining the Board and its officials from recovering the amount or any part thereof on the basis of the bill. A Temporary injunction was granted initially on his application and later it was vacated. Meanwhile, the respondent applied to the Electrical Inspector under sub-section (6) of Section 26 of the Indian Electricity Act requesting him to decide whether the meter was correct and whether he was liable to pay any amount over and above that paid by him already with respect to the G said period. The Electrical Inspector refused to proceed with the application on the ground of pendency of the suit. Against the order vacating the temporary injunction, the respondent H 275 SUPREME COURT REPORTS [1992] SUPP. 3 S.C.R. 276 ## A filed a revision before the High Court. The High Court dis posed of the rev1S1on petition directing the Electrical Inspector to decide the matter referred to him in accordance with law within four months. B The respondent filed a review petition which was dismissed on 29tl't August 1991, against which the present appeal was preferred by special leave. c > When the Special Leave Petition came up for orders this Court directed to refer the dispute to the arbitration of a retired Judge of this Court. In accordance with this Court's order, the Arbitrator entered upon the reference. D E > The Arbitrator held that the suit in which reference to arbitration was made pertained only to the period from 6.lr 1986 to 16.5.1988. He > refused to pronounce upon the respondent's claim With respect to the periods, 17 .5.1988 to 10.8.1990 and 10.8.1990 onwards. He held that the Board was not entitled to any amount for supply of electrical energy to the company over and above that computed in accordance with the readings recorded by the first meter except in so far as an Electrical Inspector might allow it in a decision given in conformity with the provisions of sub-section (6). The ·Board filed objections in this Court to the award. The Board F urged that the award be sent to the trial court which would consider and decide whether, it should be made the Rule of the Court; that what could have been referred to the Arbitrator was .only the dispute which was involved in· the Special Leave Petition; that the main dispute pending in the suit was never intended to be nor was it actually referred to the G Arbitrator; that the Arbitrator had not decided the question which he was asked to decide, inasmuch as he had relegated the dispute over again to the Electrical Inspector; that sub-section (6) of Section 26 empowered the Electrical Inspector to estimate the amount of energy supplied to the consumer for a period six months prior to the check; that the agreement between the pa!"1ies provided to the contrary, as contemplated by subH section (1) of Section 26 and for that reason the agreement prevailed over 277 ELECTRICITY BOARD _v._ LUDHIANASIBELS the provisions of the statute. Disposing of the case, this Court HELD: 1.1. The very dispute between the parties pending in the suit was referred by this Court. At no stage before the Arbitrator did the Board raise the objection that he had no authority to go into the main dispute and that he must confine himself to the correctness of the High Court's order directing the Electrical Inspector to proceed with the application under Section 26(6). Having consented to the order dated November 14, 1991 and having participated in the proceedings before the Arbitrator on the merits of the main dispute, it is not now open to the Board to raise the said objection merely because the award has gone against it. [281-D] B c 1.2. The order referring the dispute to the Arbitrator expressly states that "the award may be sent to the Registry of this Court." There is nothing in the order to show that this Court contemplated transmitting the award to the trial court for consideration. It is evident from a reading of the order D that the acceptance or rejection of the award lies with this Court and this· Court alone. [280-H], 281-A] 1.3. There is no warrant for remitting the award under Section 16 nor does the award suffer, from any error apparent on the face of the record. [282-A] E 1.4. This Court never intended that the Arbitrator should substitute himself for the Electrical Inspector and render a decision under Section 26(6). [281-G] 1.5. The Arbitrator has proceeded to consider the Board's claim for F the disputed period. The reference to Electrical Inspector too is for the very same period i.e. 6.10.1986 to 16.5.1988, the date on which the checkmeter was installed. [282-C] 1.6. The Arbitrator has decided that the Board is not entitled to recover any amount for supply of electrical energy to the plaintiff over and above that computed in accordance with the readings recorded by the first meter except in so far as an Electrical Inspector may allow it in a decision given under sub-section (6) of Section 26. He has further clarified that if and when Electrical Inspector renders his decision, it shall prevail over his award subject, of course, to any appeal therefrom. [281-G-H) G H SUPREME COURT REPORTS [1992] SUPP. 3 S.C.R. 278 A 1.7. The award made by the Arbitrator on February 18, 1992 is made the Rule of the Court. It is to be treated as the decree in the Suit. The Suit is disposed . of in terms of the said award. The Electrical Inspector· is directed •o decide the dispute referred to him expeditiously in accordance with law. [2_83-A) ' B CIVIL APPELLATE JURISDICTION : Civil Appeal No. 5137 of 1992. c From the Judgment and Order dated 29.8.91 of the Punjab and Haryana. High Colirt in R.A. No.40 C-11/91 in Civil Revision No.1206 of ·1991.· ## S.P. Goel and R.S. Sodhi for the Appellants. A.K. Goel for Ms. Sheela Goel for Respondents. D The Judgment of the Court was delivered by ## H.P. JEEVAN REDDY, J. Leave granted. The respondent, Ludhiana Steel Private Limited is a consumer of electricity. It had entered into an agreement with the Punjab State Electricity Board for supply of energy and was availing it. The meter E installed at the respondent's premises was checked on 6.4.1987. It was found .that it was recording lower consumption than what was actually being consumed. Sometime later, a check meter was installed (on 16.5.1988) and, we are told, the petitioner has been paying the ,charges on the basis of the readings recorded by the check-meter. For the period F commencing 6.10.1986 (Six months prior to the date of check) upto 16.5.19~ (the date on which the check-meter was installed) the Board sent a bill dated 16.S.1988 in a sum of Rs.28,56,854 towards the energy said to have been consumed by the plaintiff but not recorded by the meter. Contesting the said bill, the plaintiff instituted a suit asking for a permanent G injunction restraining the Board and its officials from recovering the said amount ·or any part· thereof on the basis of the said bill. In that suit, he applied for a temporary injunction which was granted initially but vacated later. Meanwhile, the respondent applied to the Electrical Inspector under sub.section ( 6) of Section 26 of the Indian Electricity Act requesting him to decide whether the meter was not correct and whether he is liable to H pay any amount over and a"ove that paid by him already with resp~ct to 279 ELECTRICfIY BOARD _v._ LUDHIANA STEELS [JEEV AN REDDY, J.] the said period. The Electrical Inspector refused to proceed with the said A application on the ground of pendency of the suit aforementioned. Against the order vacating the temporary injunction, the respondent filed a revision before the High Court of Punjab and Haryana. The High Court disposed of the revision petition directing the Electrical Inspector to decide the matter referred to him in accordance with law as expeditiously as possible, preferably within four months. It clarified tliat the pendency of the suit is no ground for him not to proceed with the said application. The plaintiff/respondent filed a review petition which was dismissed on 29th August, 1991. The present appeal is pre~red against the order in the review petition. B C When the Special Leave Petition came up for orders before a Bench coiµprisiug of Ranganath Misra, C.J. and one of us, G.N. Ray, J., the following order was passed: "By the consent of parties we direct that the dispute be referred to the arbitration of Mr. Justice A.D. Koshal, a retired Judge of this Court. He may take the assistance of a technical assessor and may consult the Chief Inspector. We would suggest that the Arbitrator may fix his terms . and would try to make his award within four months from now. The award may be sent to the Registry of this Court. Expenses shall be apportioned fifty-fifty." D E In accordance with this order, Sri Justice A.D. Koshal entered upon the reference and passed his award on February 18, 1992. Before the Arbitrator, the plaintiff/respondent split up its claim into three parts, each relating to a specific period as stated in the table below: (extracted from the award). F |the award).)..||| |---|---|---| |Designation<br>ofpart|Period|Claim| |Part A|6.10.1986The Boards demand containedinBill dated<br>to<br>16.8.88for Rs.28,56,854 and surcharge for non-<br>16.5.1988payment of that amount must be rejectedinfull,<br>subject only to the decision of C.E.I. regarding<br>the accuracy of the first meter under sub-section<br>(6)of Section26of the1910Act.|| {' ;; SUPREME COURT REPORTS [1992] SUPP. 3 S.C.R .. ; 280 _/_ I c |A|Part B|17.5.1988|TheBoardhaschargedtheCompanyin:;| |---|---|---|---| |||to|accordance with readings recordedbythe second;\| |||10.8.1990|meterwhichisa very defective and wholly!| ||||unreliable instrument.<br>~| ||Part C|10.8.199Q|10.8.199QThe Board claims that second meterisalso:;| |B||onwards running|onwards runningslow.This the Company denies andthe;:| ||||dispute has been referred to C.E.I. The Board::| ||||can charge only in accordance with readings:;| ||||recordedbythe first meter or, in any case, those!| ||||by the second meter.| c '; The learned Arbitrator held that the suit in which reference to ' arbitration has been made pertains only to period mentioned under Part-A i.e., from 6.10.1986 to 16.5.1988~ He, therefore, refused to pronounce upoq the plaintiffs claim with respect to periods mentioned under Parts-B and, 1 C. So far as Part-A is concerned, he rendered.the following decision: ' D "14. In the result, the claim of the Company relating to period A succeeds in full and it is held that the Board is not entitled to any amount for supply of electrical energy to the Company over and above that computed in accordance with the readings recorded by the first meter except E in so far as an Electrical Inspector may allow it in a decision given in conformity with the provisions of subsection ( 6) above extracted. If and when such a decision 'is announced, it shall prevail subject to the result of any appeal therefrom." F ·The Board has filed objections to the said award. We have hear<t both the counsel for the appellant-Board as well as counsel for the responf, dent/plaintiff. · •i " G The first objection urged by Sri Goel, learned counsel for the Board is that the award must be sent to the trial court which . will consider and . ' decide whether it should be made the Rule of the Court. He submitted that it is not for this court to consider whether the said award should b~ made the Rule of the Court. We are not prepared to agree. The ordei; referring the dispute to the Arbitrator expressly states that "the award ma~ · H be sent to the Registry of this Court." There is nothing in the order tQ,show 281 ELECfRICITY BOARD _v._ LUDHIANA SfEELS [JEEVAN REDDY, J.) E that this court contemplated transmitting the award to the trial court for A consideration. It is evident from a reading of the order that the acceptance or rejection of the award lies with this court and this court alone. - The second objection of the learned counsel for the appellant i~ that what could have been referred to the Arbitrator was only the dispute which B was involved in the Special Leave Petition .. The main dispute pending in the suit was never intended to be nor was it actually referred to the Arbitrator. This again is an objection which we cannot countenance. It is· rather ridiculous to suggest that what was referred to the Arbitrator was whether the Electrical Inspector should be asked to proceed with the application under Section 26( 6) pending the suit. It is evident from the C order that the very dispute between the parties pending in the suit was referred and that is how the Arbitrator and the parties understood it. At no stage before the Arbitrator did the Board raise the objection that he had no authority to go into the main dispute and that he must confine himself to the correctness of the High Court's order directing the Electrical D Inspector to proceed with the application under Section 26(6). Having consented to.the order dated November 14, 1991 and having participated in the proceedings before the Arbitrator on the merits of the main dispute, it is not now open to the Board to raise the said objection merely because the award has gone against it. Sri Goel then submitted that the Arbitrator has not decided the question which he was asked to decide, inasmuch as he has relegated the dispute over again to the Electrical Inspector. We cannot agree with this contention either. The case of the Board was that it is entitled to recover the said sum of Rs.28,56,854 straight-away even before the Electrical F Inspector decides upon the correctness of the meter and the liability of the plaintiff to pay additional amount. And that dispute the Arbitrator has now decided. This court never intended that the Arbitrator should substitute himself for the Electrical Inspector and render a decision under Section 26(6). The Arbitrator has _decided that the Board is not entitled to recover any amount for supply of electrical energy to the plaintiff over and above G that computed in accordance with the readings recorded by the first meter except in so far as an Electrical Inspector may allow it in a decision given under sub-section ( 6) of Section 26. He has further clarified that if and when Electrical inspector renders his decision, it shall prevail over his · award subject, of course, to any appeal therefrom. We, therefore, see no H SUPREME COURT REPORTS [1992] SUPP. 3 S.C.R. 282 - A warrant for remitting the award under Section 16 nor are we satisfied that the award suffers· from any error apparent on the face of the record. The error apparent, according to the Board, is the very same failure to decide the issue of the plaintiffs liability fully and finally. Yet another argument urged by Sri Goel pertains to the interpretaB tion of sub-section ( 6) of Section 26. According to him, the said sub-section empowers the Electrical inspector to estimate the amount of energy supplied to the consumer for a period six months prior to the check in addition to the period subsequent to the check. We need not pronounce upon this submission inasmuch as the Arbitrator has proceeded to consider the , C Board's claim for the very same_ period. The reference to Electrical Inspector too is for the very same period i.e., 6.10.1986 to 16.5.1988, the date on which the check-meter was installed. I - Lastly, it was submitted by Sri Goel that the agreement between the - parties provides to the contrary, as contemplated by sub-section (1) of - D Section 26 and that for that reason the agreement prevails ove~ the provisions of the statute. He relies upon the opening words in sub-section (1) of Section 26 which reads as follows: "(i) _In the absence of an agreement to the contrary,_ the amount of energy supplied to a consumer or the electrical E quantity contained in the supply shall be ascertained by means of a correct meter, and the Jj,censee shall, if required by the consumers, cause the consumer to be supplied with such a meter; F Provided that the licensee may require the consumer to give him security for the price of a meter and enter into an agreement for the hire thereof, unless the consumer elects to !Jllrchase a meter." It is not brought to our notice that the agreement contains any G provision inconsistent with the one contained in sub-section ( 6) of Section 26. It is not even show that the agreement provides for a method (for ascertaining the amount of energy consumed by the respondent) different than the one provided in sub-section (1) of Section 26. In such a situation, the contention urged by the learned counsel must be held to be a misplaced H one. 283 ELECTRICITY BOARD _v._ LUDHIANA SfEELS [JEEVAN REDDY, J.) Accordingly, we make the award made by Sri Justice AD. Koshal A (retired) on February 18, 1992, th(i __ Rule of the Court. k shall be treated as the decree in the suit. The suit is disposed of in terms of the said award. The Electrical Inspector shall decide the dispute ref erred to him expeditiously in accordance with law. There shall be no order as to costs. V.P.R. Appeal disposed of.
End of Judgment Record
Browse All Supreme Court of India (1992) Decisions
1992-01-07

Jaiswal v. Debi Mukherjee

Dr. P. K. Jaiswal challenged a UPSC process for the post of Assistant Director General (Prevention of Food Adulteration). The Union Government had initially asked UPSC to fill the post by direct recruitment but, before advertisements, informed it to withhold the process while examining possible promotion from Assistant Secretary and amending recruitment rules to create higher tiers. Despite this, the UPSC advertised the post and the appellant was interviewed. Debi Mukherjee, then Assistant Secretary and seeking promotion upon the rule-amendment, obtained an interim stay from the Central Administrative Tribunal and later a direction to provide promotional avenues. In the meantime, two higher-pay tiers were created, without separate designations, under an amendment directed by the Court in a related matter. The appellant argued that once the selection process begins, the Government and Tribunal cannot freeze it and that the Commission should complete the selection; and that overlooking the two new layers amended later was erroneous. The respondents contended on points of vested rights and the proper policy- and rule-based framework for promotions versus direct recruitment. The Supreme Court held that the Government can withdraw the requisition before the advertisement if it intends to amend rules to permit promotion, that the Government’s pre-advertisement decision is permissible, and that a right to be considered for selection crystallizes only after advertisement and interview. The appeal was dismissed.

1992-09-24

S.B. Dogra v. State of Himachal Pradesh and Ors.

This Civil Appeal concerns the seniority of S.B. Dogra in the Himachal Pradesh Police Service in the wake of the demobilised armed forces concession. After HP State was formed, Rule 5(1) of the Demobilised Armed Forces Personnel (Reservation of Vacancies in the HP State Non-Technical Services) Rules, 1972, provided that the seniority of officers appointed against reserved vacancies shall be determined on the assumption that they joined the service at the first opportunity after their military service or training prior to commission. Dogra, who had military service and later joined the HP Police Service against a reserved vacancy for Demobilised Armed Forces Personnel, was placed with a notional entry year (1964) and thus ahead of some officers, including Durga Shanker Amist. The dispute escalated through High Court proceedings and a Central Administrative Tribunal decision relying on earlier cases. The Supreme Court, comparing Rule 5(1) with Punjab/Haryana rules and distinguishing the applicable statutory framework, held that the Tribunal erred in confining the seniority to the period of actual military service during the emergency. It noted that the rules are not pari materia with Haryana’s rules and that the language of Rule 5(1) permits a broader interpretation for notional entry. The Court distinguished certain earlier rulings (A.S. Parmar; Narendra Nath Pandey) as inapplicable here, while applying the State of Madhya Pradesh v. Rameshwar Prasad approach to preserve fair seniority. Ultimately, the appeal was allowed, the Tribunal’s seniority order was set aside, and the prior position was restored with directions for implementation of the judgment.

1992-12-11

State of Maharashtra v. Rattanlal

This is a Supreme Court decision interpreting the revisional powers of the State Government under the Maharashtra Agricultural Land (Ceiling and Holdings) Act, 1961. The respondent-declarant had a declaration under Sec. 12; the Surplus Land Determination Tribunal found surplus land (9 acres 8 guntas). On appeal, the Revenue Tribunal modified the resumption from Survey No. 11 to Survey No. 29, which was upheld. Later, after undisclosed lands came to light, the Additional Commissioner issued a show cause, remitted the matter to the primary Tribunal for redetermination and delimitation, and the High Court held that once an appeal under Sec. 21 is filed and an order is made, the Commissioner or the State Government lacks jurisdiction to determine the ceiling area. The State Government challenged this view. The Court held that under Sec. 45(2) and (3), the Commissioner has revisional powers, either suo motu or on an aggrieved person’s application, to call for records of inquiries under Secs. 17–21 and to pass orders after a hearing, subject to provisos including time limits and restrictions when appeals are pending. The decision also clarifies that suo motu revisional action can correct fraud or suppression of material facts, and that finality does not bar such action in cases of concealed lands. The High Court’s view was set aside and the Commissioner's order restored, with the appeal allowed along with costs.

1992-10-13

State of Madhya Pradesh and Anr. v. Syed Naseem Zahir and Others

State of Madhya Pradesh and Anr. v. Syed Naseem Zahir and Others concerns the legality and timing of the 'sealed cover' procedure used by the Departmental Promotion Committee (DPC) for recommending promotions when disciplinary proceedings were contemplated. Syed Naseem Zahir, who rose to Superintending Engineer, was included in a 1987 panel for promotion to Chief Engineer, but his name was kept in sealed cover due to potential misconduct. A charge-sheet was issued in 1988. The Madhya Pradesh Administrative Tribunal later directed promotion based on the sealed-cover recommendation, prompting the State's special leave appeal. The Supreme Court held that the departmental enquiry had been completed and the charges proved, and while it emphasized that Jankiraman's case governs sealed-cover use, the peculiar facts allowed keeping the sealed cover unopened until the disciplinary proceedings concluded. The Court outlined that if exonerated, the sealed-cover would be opened and the respondent would be notionally promoted from the date a junior was promoted, with consequential benefits, including back wages; if punished, action would be taken in accordance with Jankiraman's guidelines. The Court set aside the Tribunal's order and allowed the State's appeal, directing that no promotion be granted until proceedings end, and that the sealed-cover mechanism be used consistent with the facts.