Supreme Court of IndiaSupreme Court · 1991Division BenchPetition dismissed.

PRATIBHA CO-OPERATIVE HOUSING SOCIETY LTD. AND ANR. v. STATE OF MAHARASHTRA AND ORS.

Case / Petition Number:
Special Leave Petition (Civil) No. 5383 of 1990.
Neutral Citation:[1991] 2 S.C.R.

Case Synopsis & Summary

Pratibha Co-operative Housing Society Ltd. v. State of Maharashtra concerns illegal constructions in a 36-storey Bombay building. The Bombay Municipal Corporation issued a showcause notice on 7 August 1984 demanding demolition of the upper eight floors to bring the structure within the permissible Floor Space Index (FSI), since the society allegedly gained 2773 sq mts of FSI. The Administrator of the Corporation ordered demolition of 24,000 sq ft on the eight upper floors (21 September 1984). The society challenged the orders, and the High Court dismissed the petition, while granting liberty to the society to propose alternatives within the four corners of the rules and regulations within one month. The society submitted alternative proposals on 21 November 1985 and pursued a Special Leave Petition before this Court, which was dismissed on 17 January 1986. The society later asserted that it had submitted further proposals (17 February 1986; 27 December 1988) and that hearings were scheduled; it claimed that, in January 1989, municipal officers agreed to consider vertical demolition to keep the building within the FSI. The Municipal Commissioner later rejected the vertical-demolition proposal on 13 November 1990. The Court held that the housing society had broken the FSI by more than 24,000 sq ft, that the administrative decision was within jurisdiction, and that High Court interference was unwarranted. The case underscores public-interest considerations and the duty to obey regulatory rules; the petition was dismissed.

Precedent Explorer

Find Cases Like This

Explore other judgments dealing with similar legal situations, facts, or statutory provisions.

Case Details & Bench

Court
Supreme Court of India
Hon'ble Judges
  • N. M. Kasliwal
  • M. M. Punchhi
Judgment Date
1991-05-09
Court Decision / Holding
Petition dismissed.
Final Disposition
Petition dismissed.

Parties to the Case

Appellants / Petitioners

  • Pratibha Co-operative Housing Society Ltd.
  • Anr.

Respondents

  • State of Maharashtra
  • Bombay Municipal Corporation

Legal Representation & Advocates

Counsels for Petitioners

  • • K. K. Venugopal
  • • G. L. Sanghi
  • • Sudhir Shah
  • • P. N. Misra

Counsels for Respondents

  • • K. K. Singhvi
  • • N. B. Shetye
  • • D. N. Mishra
  • • A. S. Bhasme

Provisions of Law Cited

Bombay Municipal Corporation ActArticle 136 of the Constitution of IndiaArticle 226 of the Constitution of India

Legal Doctrines & Maxims

  • High Court under Article 226 is not an appellate court for administrative decisions.
  • Unauthorised constructions are against public interest and hazardous to safety; citizens must obey rules/regulations.

Submissions & Arguments

Contentions of Appellants / Petitioners

The Housing Society contends that the alternative proposal of vertical demolition to bring the entire building within the permissible F.S.I. should have been considered on merits. It submitted multiple proposals (21 Nov 1985; 17 Feb 1986; 27 Dec 1988; 29 Oct 1990) and claimed the Municipal Corporation fixed hearings and promised to decide but did not. It argued that the order should be examined in light of due process, and that the Court earlier directed consideration of alternatives within the four corners of rules. It asserts that the vertical demolition solution could remedy the violation without demolishing eight floors; it asserts that the decision lacked merits and that the administrative authority failed to exercise discretion in a fair manner.

Contentions of Respondents

The respondents contended that the Housing Society illegally constructed beyond the permissible F.S.I. by about 24,000 sq ft. The order for demolition of eight floors was a valid exercise of jurisdiction to enforce F.S.I. compliance. They argued the High Court correctly refused to intervene in administrative decision, that the High Court is not an appellate court under Article 226, and that the corporation’s decision was supported by technical evaluation and finality. They noted the ongoing process to consider alternatives failed; the case emphasized public interest, safety concerns, and that unauthorised constructions undermine the statutory framework.

Legal Doctrine & Issue Explorer

Explore This Legal Issue

Find relevant judgments and authoritative positions on the legal questions discussed here.

Case Applicability Diagnostic

Apply This to My Facts

Share your situation and test whether this judgment governs, supports, or challenges your case.

Official Judgment Record
•2,694 words•~13 min read

In The Court Record

PRATIBHA CO-OPERATIVE HOUSING SOCIETY LTD. AND ANR. v. STATE OF MAHARASHTRA AND ORS.

A _-j._ # PRATIBHA CO-OPERATIVE HOUSING SOCIETY LTD. AND ANR. _v._ ## STATE OF MAHARASHTRA AND ORS. MAY 9, 1991 B [N.M. KASLIWAL AND M.M. PUNCHHI, JJ.] _Bombay Municipal Corporation Act-Housing Society-Violation of building laws-Rule 51 violation-Demolition orderedWhether valid._ The appellant Co-operative Housing Society Ltd. made some unauC thorised constructions in a 36 storeyed building. The Bombay Municipal Corporation issued a show catise notice calling upon the society to show cause as to why the upper eight floors of the building should not be 'liemolished so as to limit the development to the permissible Floor Space Index (F .S.I.) since the additional Floor Space Index to the extent O of 2773 sq. mts. was gained by the appellant. The appellants submitted a reply to the show-cause notice. The Administrator of the Municipal Corporation made an order on 21st September, 1984 requiriag the appellant to demolish 24,000 sq. ft. on the eight upper floors of the building on the basis of 3000 sq. ft. on each floor. The Administrator as well as the State Government dismissed the representation and appeal E by the appellant. So the appellant ftled a writ petition in the High Court which was also dismissed with the observation that the appellant be given a choice to reduce the construction upto permissible limit by any alternative proposal within the four corners of the rules and regulations within one month from 28th October 1985 the Municipality may consider. F The appellant made application to the Municipal Corporation giving several alternative p,roposals on 21st November 1985. But it also preferred a special leave petition before this court against the High Court Judgment. The special leave petition was dismissed on January 17, 1986. The appellants alleged that they submitted another proposal to G the Municipal Corporation on 17th February, 1986 and a meeting for hearing alternative proposals was fixed up by the Municipal Commissioner and put forward its case in support of the new proposals and the Municipal Commissioner said he would consider the proposals and take decision. On 27th December 1988 the appellant w·rote a letter to the Municipal Commissioner to consider the alternative proposals i.e. of H 745 746 [1991] 2 S.C.R. SUPREME COURT REPORTS - A vertical demolition of the building instead of demolishing the eight upper fioors. In January, 1989 the officers of the corporation agreed that demolition can be made vertically so as to bring the entire con- - . struction within the permissible Floor Space Index where as the work of demolition of upper eight fioors of the building were entrusted to a - B company by the Municipal Commissitiner. So the appellant again filed a writ in the High Court. It was dismissed by the Single Jndge as well as by the Division Bench dated Sth March, 1990. The appellants came by Special Leave Petition in this Court; The main grievance of the appellant being that vertical demolition proposal was not considered. lnspite of orders of this Court in this regard to the C Mnnicipal Corporation no agreeable solution could fructify. The proposal was examined by the Municipal Commissioner but rejected on 13th November, 1990 and submitted the detailed report to this Court. ## Dismissing the petition the Court ## D HELD: The appellant bad made illegal constructions in violation of Floor Space Index to the extent of more than 24000 sq. ft. The decision taken by the Municipal Commissioner does not suffer from any want of jurisdiction nor is violative of any law or rules. It is well settled that the High Court under Article 226 of the Constitution is not an E appellate Court on the administrative decision taken by the authorities. Since the tendency of raising unlawful constructions and unauthorised encroachments is increasing in the entire country and such activities are required to be dealt with by ill'm bands. Such unlawful constructions are against public interest and hazardous to the safety of occupiers and residents of the multistoreyed buildings. [749F, 7SOB, E·F] F This case should be a pointer to all the builders that making of unauthorised construction never pays and is against the interest of the society at large. The rules, regulations and by laws are made by the cor· porations or development authorities taking in view the larger public interest of the society and it is the bounden duty of the citizens to obey G and follow such rules which are made for their own benefits. [750H-751B] CIVIL APPELLATE JURISDICTION: Special Leave Petition (Civil) No. 5383 of 1990. • From the Judgment and Order dated 9.3.1990 of the Bombay H High Court in Appeal No. 231of1990 in W.P. No. 3016 of 1989. HOUSING SOCIETY _v._ STATE OF MAHARASHTRA [KASLIWAL, J.] 747 K.K. Venugopal, G.L. Sanghi, Sudhir Shah and P.N. Misra for the Petitioners. K.K. Singhvi, N.B. Shetye, D.N. Mishra and A.S. Bhasme for the Respondents. - ·· The Judgment of the Court was delivered by B KASLIWAL, J. This petition under Article 136 of the Constitution of India is directed against the order of Bombay High Court dated 9th March, 1990. Facts necessary and shorn of details are given as under. Pratibha Cooperative Housing Society Ltd. (hereinafter referred to as 'the Housing Society') made some unauthorised constructions in a 36 storeyed building in a posh and important locality of the city of Bombay. The Bombay Municipal Corporation issued a showcause notice dated 7th August, 1984 calling upon the Housing Society to showcause within 7 days as to why the upper eight floors of the buildD ing should not be demolished so as to limit the development to the permissible Floor Space Index (F.S.I.). In the notice it was stated that additional F.S.I. to the extent of 2773 sq. mts. was gained by the Housing Society and that the construction work had already reached 36 floors and that on the basis of the actual area of the building, the upper eight floors were beyond the permissible F.S.I. limit and as such E were required to be removed. The Housing Society submitted a reply to the showcause notice by their letter dated 13th August, 1984. The Administrator of the Bombay Municipal Corporation made an order on 21st September, 1984 requiring the Housing Society to demolish 24,000 sq. ft. on the eight upper floors of the building on the basis of 3000 s(j. ft. on each floor. The Housing Society made a representation F but the same was dismissed by the Administrator by order dated 31st October, 1984. An appeal submitted by the Housing Society was also dismissed by the State Government on 7th October, 1985. The Housing Society then filed a writ petition No. 4500 of 1985 in the High Court. A Division Bench of the High Court dismissed the writ petition on 28th October, 1985. However, the High Court while dismissing the G writ petition also observed as under: c D E "It W02_ld, however, be fair and just in the circumstances of the case to give a choice to the society to reduce the construction up to permissible limit or whatever other method they can think of. It is of course for the society to come H I 1991] 2 S.C.R. 748 SUPREME COURT REPORTS -~ A forward with a proposal in that behalf. We therefore direct that in case the society comes with any such alternative proposal within the four corners of the rules and regula!ions within one month from today the Municipality may **consider."** - B The case of the Housing Society is that in pursuance to the said order it submitted application to the Municipal Corporation giving several alternative proposals on 21st November, 1985. It may be noted.at this stage that the Housing Society had preferred a special leave petition No. 17351 of 1985 before this Court against the judgment of the High Court dated 28th October, 1985 and the said special leave petition was dismissed by this Court on 17th January, 1986. Further allegation of - c the Housing Society was that it submitted another proposal to the Municipal Corporation on 17th February, 1986 and thereafter wrote to the Municipal Council on 14th August, 1986 to consider their altemative proposals. A similar letter was also written to the Chief Minister of Maharashtra. On 29th August, 1986 the Municipal Commissioner - D fixed up a meeting for hearing the alternative proposals of the Housing Society. It has been alleged that in the said meeting the Housing Society had put forward its case in support of the new proposals and the Municipal Commissioner had thereafter informed the Housing Society that he would consider the said proposals and take decision. However, no decision was taken till the filing of the present special - E leave petition before this Court. it has been further alleged that on 27th December, 1988 the Housing Society wrote a letter to the Municipal Commissioner to consider the alternative proposals mainly of vertical demolition of the building instead of demolishing the eight upper floors. It has been alleged that a meeting took place between the architects of the Housing Society as well as the officers of the Munici- - F pal Corporation in January, 1989 wherein the officers of the Corporation agreed that instead of demolishing eight upper floors, deiflblition can be made vertically so as to bring the entire construction within the permissible F.S.I. It has been further alleged that immediately thereafter the Housing Society was informed that ·henceforth it should contact the Municipal Commissioner directly and not any officers of the - G Corporation. It has been further alleged that the Corporation without considering the proposals of the Housing Society entrusted the work of demolition of the upper eight floors of the building to a company. In these circumstances the Housing Society filed writ petition No. 3016 of 1989 in the High Court. Learned Single Judge dismissed the writ petiti on by order dated 19th December, 1989 and the appeal preferred - H against the said order was dismissed by the Division Bench of the High 749 HOUSING SOCIETY _v._ STATE OF MAHARASHTRA [KASL!WAL. J.] A • ## Court by order dated 9th March, 1990. In view of the fact that the main grievance of the Housing Society was that its alternative proposal of demolishing the building vertically instead of eight upper floors was not considered on merits by the Corporation, a serious effort was made by this Court to get the feasibility of such proposal examined by the Corporation. Orders in this regard were passed by this Court on several occasions but ultimately no agreeable solution could fructify. The proposal was got examined at the highest level by the Municipal Corporation and ultimately the Commissioner rejected the proposal on 13th November, 1990 and submitted a detailed report in writing for the perusal of this Court. In the above report it has been stated that in pursuance to the order of this Court dated 22nd October, 1990, the proposals submitted by the Housing Society on 27th October, 1990 and 29th October, 1990 in supersession of all alternative proposals, to demolish vertically one bedroom and servant quarters on all the floors to bring the building in tune with the F.S.I. was considered but on the grounds stated in the report the proposal submitted by the Housing Society cannot be approved. In the circumstances mentioned above on the request of learned counsel for both the parties to decide the case on merits, we heard the arguments in detail on 23.4.1991. Thereafter, in order to clarify some points we directed the Chief Engineer cum Architect and the Municipal Commissioner to remain present on the next date namely, 1.5.1991 and to keep the record of the case also ready for our perusal. We have heard learned counsel for the parties at great length and have thoroughly perused the record. It may be noted that the Housing Society had made illegal constructions in violation of F.S.I. to the extent of more than 24,000 sq. ft. and as such an order for demolition of eight floors was passed by the Administrator, Municipal Council as back as 21st September, 1984. The writ petition filed against the said order was dismissed by the High Court on 28th October, 1985 and special leave petition against the said order of the High Court was also dismissed by this Court. The High Court in its order dated 28th October, 1985 had granted an indulgence to the Housing Society for submitting an alternative proposal within the four corners of the rules aud regulations within one month and the municipality to consider the same. The proposal was submitted on 21st November, 1985 but in the said proposal there was no mention.of any vertical demolition of the building. The proposal with regard to the demolition vertically of one B c D E F G H I 1991] 2 S.C.R. 750 SUPREME COURT REPORTS - bedroom and servant quarters on all the floors was submitted for the - A first time on 27th December, 1988. During the pendency of the special leave petition before this Court, this proposal was got examined by the Municipal Corporation. The Municipal Commissioner submitted a report on 13th November, 1990 giving detailed reasons for rejecting such proposal. It is well settled that the High Court under Article 226 - B of the Constitution is not an Appellate Court on the administrative decisions taken by the authorities. It cannot be sa.id that the decision taken by the Municipal Commissioner suffers from any want of jurisdiction or is violative of any law or rules. The proposal submitted by the Housing Society was got examined by the architects and engineers and thereafter the order was passed by the Municipal Commissioner. It cannot be said that the action of the Municipal Corporation is - c tainted with _ma/a [ides._ It was submitted by the learned counsel for the Corporation that the Corporation has entrusted the matter for investigation by the CBI and suitable action is being processed against the guilty officers of the Corporation with whose connivance these illegal constructions were made by the Housing Society. D It is an admitted position that six floors have been completely demolished and a part of seventh floor has also been demolished. It was pointed out by Mr. K.K. Singhvi, learned counsel for the Corporation that the tendency of raising unlawful constructions by the builders in violation of the rules and regulations of the Corporation was E rampant in the city of Bombay and the Municipal Corporation with its limited sources was finding it difficult to curb such activities. We are also of the view that the tendency of raising unlawful constructions and unauthorised encroachments is increasing in the entire country and such activities are required to be dealt with by firm hands. Such unlawful constructions are against public interest and hazardous to the safety F of occupiers and residents of multistoreyed buildings. The violation of F.S.I. in the present case was not a minor one but was to an extent of more than 24,000 sq. ft. Such unlawful construction was made by the Housing Society in clear and flagrant violation and disregard of F.S.I. and the order for demolition of eight floors had attained finality right upto this Court. The order for demolition of eight floors has been G substantially carried out and we find no justification to interfere in the order passed by the High Court as well as in the order passed by the Municipal Commissioner dated 13th November, 1990. In the result we find no force in the petition and the same is dismissed with no order as to costs. Before parting with the case we H would like to observe that this case should be a pointer to all the HOUSING SOCIETY _v._ STATE OF MAHARASHTRA [KASLIWAL, J.l 751 builders that making of unauthorised construdions never pays and is A against the interest of the society at large. The rules, regulations and bylaws are made by the Corporations or development authorities taking in view the larger public interest of the society and it is the bounden duty of the citizens to obey and follow such rules which are made for their own benefits. B S.B. Petition dismissed. -l
End of Judgment Record
Browse All Supreme Court of India (1991) Decisions
1991-04-16

Municipal Corporation, Raipur v. Ashok Kumar Misra

This Supreme Court decision concerns the termination of a probationer, Ashok Kumar Misra, who was appointed as a Lower Division Clerk in the Raipur Municipal Corporation for a two-year probation. Three months after the two-year period, he received a one-month termination notice, prompting a civil suit for declaration that the termination without enquiry violated Rule 9A of the Madhya Pradesh Civil Services Classification, Control and Appeal Rules, 1966, and that he became a permanent employee with continuity of service and arrears of salary. The Trial Court dismissed the suit; the first appellate court upheld the dismissal; the High Court, however, decreed the suit in the respondent’s favor. The appellant Corporation contends that a probationer attains permanent status only on express confirmation, and that termination before confirmation, drawn under Rule 8 of the Madhya Pradesh Government Servants’ General Conditions of Service Rules, 1961, is legally valid if effected with proper notice; the High Court incorrectly held that expiry of probation automatically confers deemed confirmation under Rule 14 (now superseded). The respondent argues that recruitment rules under the Central Provinces and Berar Municipality Act, 1922 (including Rule 14) applied, and absence of action at the end of two years implies deemed confirmation, hence an enquiry would be required for termination. The Supreme Court reverses, holding that deemed confirmation does not arise from mere expiry; confirmation requires express order following prescribed examinations; the appointed authority may terminate during probation with one month’s notice. The rules governing service, not the old Rule 14, apply after the Municipal Corporation adopted government rules.”

1991-07-09

B.P. Singh v. Director General, Ordnance Factories and Ors.

This Supreme Court case concerns the retirement age of teachers employed in central government schools run by Ordnance Factories under the Defence Department. The petitioners, led by B.P. Singh, challenged their retirement at 58 years, arguing that similarly situated teachers in other central government departments were retired at 60, and that such differential treatment violated Articles 14 and 16 of the Constitution. They relied on memoranda that had previously raised the retirement age to 60 for Delhi School Teachers and for Railway school teachers (Sept. 6, 1983 and March 9, 1984). The petition contended there was no rational justification to fix 58 years for Ordnance Factory teachers, and sought to fix the age at 60. The respondents presented an Office Memorandum dated March 10, 1989 issued by the Ministry of Personnel, which announced a de novo review and stated that the age of retirement for all central government employees would be uniformly fixed at 58, with limited exceptions. The memorandum explained that teachers who had joined before 1 April 1989 would continue to enjoy the existing benefit of 60, and that no new appointments to 60-year posts would be made between the memorandum date and 1 April 1989. On these grounds, the Court held there is a uniform policy fixing 58 for central government teachers and dismissed the petition, thus standardizing retirement at 58 across departments.

1991-04-03

Burn Standard Company Limited v. McDermott International Inc. and Another

This is a Supreme Court of India decision addressing whether a Technical Collaboration Agreement (TCA) between Burn Standard Company Ltd. (a Government of India undertaking) and McDermott International Inc. (foreign collaborator) is void ab initio for want of RBI permission under the Foreign Exchange Regulation Act, 1973 (FERA) and whether the arbitration clause can survive if the agreement itself is void. The agreement, executed after approvals by the Secretariat for Industrial Approvals (SIA) and later taken on record by the Government, involved payment in foreign exchange for technical know-how and services. The key dispute centers on what constitutes valid RBI permission under section 28(1) and whether the Exchange Control Manual provisions (paragraphs 24A.11 and 25A.2) can substitute for statutory RBI permission, or if failure to follow the prescribed forms invalidates the contract under section 28(2). The High Court held that the arbitration clause could survive even if the contract were void, and emphasized that RBI permission had been granted after due consideration. The Supreme Court ultimately held that RBI permission under section 28(1) had in fact been granted and that the agreement could not be voided under section 28(2); accordingly, the appeal was dismissed, and the arbitration clause remained enforceable. The decision underscores substance over form and the importance of the RBI’s substantive decision rather than mere procedural lapses.

1991-10-29

Sub-Committee on Judicial Accountability v. Union of India

These writ petitions address the constitutional framework for removal of a Judge under Articles 124(4) and 124(5) and the Judges (Inquiry) Act, 1968, in the wake of a notice of motion by 108 MPs for the removal of Justice V. RamamSwami. The Lok Sabha was dissolved shortly after the Speaker admitted the motion and constituted an Inquiry Committee. Petitioners contended that dissolution of the House lapses the motion and that courts should not intrude in a political process; they pressed for enforcement of the statute and, if required, restraint of the Judge from judicial functions during pendency. The Union of India argued that dissolution causes lapse of all pending business, including the motion, and that Parliamentalone can decide the matter; it also contended that Article 124(5) is merely enabling and that the prevailing parliamentary rules govern the process. The Court, by a majority, held that the motion does not lapse on dissolution and the Court retains jurisdiction to adjudicate the lawfulness of the Speaker’s action. It held that Article 124(5) creates a two-part process: investigation and proof outside Parliament under the statute, followed by a parliamentary motion; the Parliament’s enactment under Article 124(5) overrides the Rules framed under Article 118. The judgment clarifies standing, procedural propriety, and the constitutional balance between judicial independence and political accountability, while declining to grant interim restraining orders and disposing of the petitions accordingly.