Case Synopsis & Summary

The writ petition challenges Ext.P8, the Addl. Munsiff Kasaragod order referring the OS 342/2007 disputes to arbitration under Section 8(1) of the Arbitration and Conciliation Act, 1996. The petitioner, Prakash K., alleges the arbitration agreement exists but its execution is disputed; the trial court’s Ext.P6 order referred the matter to arbitration, a decision set aside by this Court in WP(C) 9831/2008, which remanded for fresh consideration in light of its directions. After remand, the Munsiff again passed Ext.P8 upholding arbitration. The High Court finds Ext.P8 inconsistent with its remand directions and with the central principle that the civil court must first decide the validity and execution of the arbitration agreement before a reference under Section 8. Relying on SBP & Co. v. Patel Engineering Ltd. (2005) 8 SCC 618 and Hindustan Petroleum Corp. Ltd. v. Pinkcity Midway Petroleums (2003) 6 SCC 503, the court reiterates that where execution or validity is disputed, the court must determine those issues before ordering arbitration. Ext.P8 is set aside; the Munsiff is directed to decide Ext.P3 after full hearing, following the judgment’s directions, and to do so within one month. The decision underscores the limited scope of Section 8 and preserves supervisory jurisdiction under Article 227. Not expressing any opinion on the merits, the bench clarifies that the substantive disputes will be adjudicated by the trial court after proper compliance with the directions.

Precedent Explorer

Find Cases Like This

Explore other judgments dealing with similar legal situations, facts, or statutory provisions.

Case Details & Bench

Court
High Court of Kerala
Hon'ble Judges
  • S.S.Satheesachandran
Judgment Date
2009-10-19
Court Decision / Holding
Ext.P8 order quashed; writ petition disposed in part. The Munsiff is directed to follow theSuperior Court’s prior judgment, decide Ext.P3 after hearing, and determine the execution/validity of the arbitration agreement in accordance with law, within one month. The court also directs the registry to place the judgment before the administrative judge for compliance of directions, and clarifies that the present order does not express any opinion on merits.
Final Disposition
Writ petition disposed in part; Ext.P8 set aside; matter remitted for fresh adjudication in light of the directions; Munsiff to decide Ext.P3 after hearing within one month; compliance to be overseen by administrative supervisor.

Parties to the Case

Appellants / Petitioners

  • PRAKASH K, S/O.K. RAGHUVEERA RAO, R/AT. BADIADKA HOUSE, PERDALA POST, BADIADKA VILLAGE, KASARGOD

Respondents

  • M/S SRIRAM TRANSPORT FINANCE CO. LTD., Paradigm Plaza, Ist Floor, Near A.B.SHETTY CIRCLE, Manglore-1, Karnataka
  • M/S SRIRAM TRANSPORT FINANCE CO. LTD., 160-A/31,2ND FLOOR, LAND MARK CENTRE, OPP. NEW BUS STAND, Kasaragod

Legal Representation & Advocates

Counsels for Petitioners

  • • Mr. Kodoth Sreedharan

Counsels for Respondents

  • • Mr. Rajesh Nambiar

Provisions of Law Cited

Section 8(1) of the Arbitration and Conciliation Act, 1996Article 227 of the Constitution of India

Legal Doctrines & Maxims

  • Limited scope of Section 8 of the Arbitration and Conciliation Act, 1996; procedure to be aligned with Section 11 where applicable
  • Civil court must decide the execution/validity of arbitration agreement before referring to arbitration under Section 8

Submissions & Arguments

Contentions of Appellants / Petitioners

The petitioner contends Ext.P8 contravenes the prior judgment and fails to decide the execution/validity of the arbitration agreement. It asserts that, where execution of the agreement is disputed, the civil court must first determine the existence and validity of a binding arbitration agreement before any reference under Section 8. Relying on SBP & Co. v. Patel Engineering Ltd. and Hindustan Petroleum v. Pinkcity Midway Petroleums, the petitioner seeks set aside of Ext.P8 and remand for fresh consideration with directions to examine the arbitration clause’s validity, execution, and potential stay of proceedings until resolution.

Contentions of Respondents

The respondents contend that the arbitration clause exists and the disputes should be referred to arbitration under Section 8(1). They rely on the earlier Ext.P6 order and the remand proceedings, arguing that arbitration is the proper mechanism to resolve the disputes given the clause, and that the court should not look beyond the existence and execution of the arbitration agreement when such a clause is applicable.

Legal Doctrine & Issue Explorer

Explore This Legal Issue

Find relevant judgments and authoritative positions on the legal questions discussed here.

Cited Precedents (3)

Case NameCitationTreatmentExplanation
SBP & Co. v. Patel Engineering Ltd. and another(2005) 8 SCC 618PositiveCited to elucidate the limited scope of Section 8 and to support the parallel procedure to Section 11 when dealing with execution/validity of arbitration agreements.
Hindustan Petroleum Corpn. Ltd. v. Pinkcity Midway Petroleums(2003) 6 SCC 503PositiveCited to reinforce that the civil court must decide on the execution/validity of the arbitration agreement before referring to arbitration.
Extract of Judgment reported in 2008 (3) KLT SN 972008 (3) KLT SN 97Mentioned OnlyReferenced as an exhibit; not key to the central ratio here.
Case Applicability Diagnostic

Apply This to My Facts

Share your situation and test whether this judgment governs, supports, or challenges your case.

Official Judgment Record
•1,902 words•~9 min read

In The Court Record

Prakash K v. Sriram Transport Finance Co. Ltd.

## **IN THE HIGH COURT OF KERALA AT ERNAKULAM** **PRESENT :** **THE HONOURABLE MR. JUSTICE S.S.SATHEESACHANDRAN** **MONDAY, THE 19TH OCTOBER 2009 / 27TH ASWINA 1931** ## **WP(C).No. 1641 of 2009(U)** **----------------------------------** **OS.342/2007 of ADDL.MUNSIFF, KASARAGOD** **....................** ## **PETITIONER(S):** **------------------------** **PRAKASH K, S/O.K. RAGHUVEERA RAO, R/AT. BADIADKA HOUSE, PERDALA POST, BADIADKA HOUSE, PERDALA POST, BADIADKA VILLAGE, KASARGOD.** ## **BY ADV. MR.KODOTH SREEDHARAN** ## **RESPONDENT(S):** **-------------------------** **1. M/S SRIRAM TRANSPORT FINANCE CO. LTD., PARADIGM PLAZA, IST FLOOR, NEAR A.B.SHETTY CIRCLE, MANGLORE-1, KARNATAKA,** **2. M/S SRIRAM TRANSPORT** **FINANCE CO. LTD., 160-A/31,2ND FLOOR, LAND MARK CENTRE, OPP. NEW BUS STAND, KASARGOD.** ## **R1 & R2 BY ADV. MR.RAJESH NAMBIAR** **THIS WRIT PETITION (CIVIL) HAVING BEEN FINALLY HEARD ON 19/10/2009, THE COURT ON THE SAME DAY DELIVERED THE FOLLOWING:** ## **W.P.(C) NO.1641/2009** ## **APPENDIX** ## **PETITIONER'S EXHIBITS** ## **P1:- COPY OF THE OBJECTION CERTIFICATE DTD. 30.12.04 ISSUED BY THE UTI BANK, BANGLORE TO THE RTO, KASARAGOD.** **P2:- COPY OF THE PLAINT DT. 5.11.07 BEFORE THE ADDL. MUNSIFF COURT, KASARAGOD.** **P3:_ COPY OF THE APPLICATION FILED BY THE RESPONDENTS DTD. 14.1.08.** **P4:- COPY OF THE AGREEMENT DTD. 1.4.07 EXECUTED BY THE PETITIONER AND RESPONDENT.** **P5:- COPY OF THE COUNTER IN IA. 270/08 FILED BY THE PETITIONER BEFORE THE COURT OF ADDL. MUNSIFF OF KASARAGOD.** **P6:- COPY OF THE ORDER IN IA. 270/08 DTD. 31.1.08 BY THE COURT OF ADDL. MUNSIFF OF KASARAGOD.** ## **P7:- COPY OF THE EXTRACT OF JUDGMENT IS REPORTED IN 2008 (3) KLT SN 97.** ## **P8:- COPY OF THE ORDER DTD. 28.11.08 IN IA. 270/08 IN OS. 342/07 OF ADDL.MUNSIFF COURT, KASARAGOD.** ## **RESPONDENT'S EXHIBITS** **R1(A):- COPY OF THE ORDER DTD. 16.1.09 IN CMP. 7081/09 AND CMP. 7082/08 IN CMP. 7023/08 IN CMP. 7013/08 OF JFMC-I, KASARAGOD.** ## **TRUE COPY** ## **P.A. TO JUDGE** **tss** ## **S.S.SATHEESACHANDRAN, J.** ## **-----------------------------** ## **W.P.(C).No.1641 OF 2009 -------------------------Dated this the 19[th] day of October 2009 -------------------------------------** ## **JUDGMENT** **The writ petition is filed seeking the following reliefs.** _**i) Issue a writ of certiorari or any other appropriate writ order or direction quashing Ext.P8 order.**_ _**ii) An order of stay of all further proceedings pursuant to Ext.P8 order including the arbitration proceedings pursuant to Ext.P8.**_ _**iii) Any other appropriate writ, order or direction as the Hon'ble Court may pleased to grant in the circumstances of the case.**_ ## **2. Petitioner is the plaintiff in O.S** **No.342 of 2007 on the file of the Additional Munsiff Court, Kasaragod. Suit is for permanent** W.P.(C).No.1641 OF 2009 Page numbers **prohibitory injunction, and the respondent is the defendant. Respondent/defendant, on appearance moved an application under Section 8(1) of the Arbitration and Conciliation Act contending that the parties are governed by an arbitration agreement, and as such, the disputes have to be referred to arbitration. That application was opposed to by the plaintiff filing a counter. The court below after hearing both sides disposed that application vide order dated 31/01/2008 upholding the case canvassed by the respondent that an arbitration agreement had been entered into by the parties and thereby the disputes have to be resolved by arbitration. Ext.P6 is the order referring the parties to arbitration. That suit was closed. Against Ext.P6 order, plaintiff preferred a writ petition before this court numbered as W.P No.9831/2008. That writ petition was disposed by judgment dated 16/07/2008 setting aside Ext.P6 order and directing the learned Munsiff to examine the matter afresh taking note of** W.P.(C).No.1641 OF 2009 Page numbers **the observations and directions given by this court. Pursuant thereto after such remission, the learned Munsiff heard the parties again and disposed the application moved by the respondents/defendants vide Ext.P8 order upholding the contention of the defendant that the disputes have to be referred to arbitration. Propriety and correctness of Ext.P8 order is challenged in the writ petition invoking the supervisory jurisdiction vested with this court under Article 227 of the Constitution of India.** **3. I heard the counsel on both sides. After having heard the counsel at length and after examining the exhibits tendered and more particularly Ext.P8 order impugned in the writ petition, I find the learned Munsiff has not taken care to understand the directions issued in the judgment passed by this court while setting aside his previous order. This court has held in its earlier judgment in the previous writ petition that** W.P.(C).No.1641 OF 2009 Page numbers **if the validity of an arbitration agreement is challenged the civil court has to enter a finding thereof and then only a reference can be made under Section 8 of the Arbitration and Conciliation Act 1996. It will be profitable to take note of the observations made by this court while disposing of the previous writ petition setting aside the earlier order passed by the learned Munsiff, which read thus:** **“Hence in all cases, when a petition is filed under Section 8(1) of the Act and an agreement is produced which contains an arbitration clause, if one of the parties dispute the execution, it is for the court to enter a finding whether the agreement was executed by the parties. What is to be decided by the court is whether there exists a valid agreement executed by the parties and if executed whether it is vitiated. Court is also to enter a finding whether that agreement contains an arbitration clause or not. Once these findings are answered and it is found that there is an agreement executed by the parties containing an arbitration clause court shall refer the parties to arbitration as provided under Section 8(1) of the Act. The enquiry contemplated under Section 8(1) of the Act is only to find out whether the agreement produced by one of the parties is an agreement executed by the parties. If it is admitted by the parties that it is an** W.P.(C).No.1641 OF 2009 Page numbers **agreement, no other evidence is necessary. Then what is to be looked into is whether the agreement contains an arbitration clause. If one party produces an agreement and the other party disputes the execution of the agreement, court has to enter a finding whether the agreement so produced was executed by the parties or not. It could be by recording necessary evidence or based on the affidavits or other sufficient materials. If it is found that the agreement produced is the one executed by the parties, and its execution is not vitiated and that agreement contains an arbitration clause, court shall refer the parties to arbitration, as provided under Section 8(1).** **4. In the above decision setting aside** **the order passed by the learned Munsiff and remitting the question involved for fresh consideration with the directions/observations as above, this Court has expressed in unambiguous terms that the learned Munsiff was not justified in referring the parties to an arbitration without deciding the question of execution of the agreement, which was disputed. A specific direction was also given that since the agreement produced was not decided on materials, the learned** W.P.(C).No.1641 OF 2009 Page numbers **Munsiff has to reconsider the application of the defendant seeking reference to arbitration in the light of the observations made by this Court and to pass appropriate orders in accordance with law. It has also to be pointed out that referring to and analysing the decision rendered by the apex court in** _**SBP & Co. v. Patel Engineering Ltd. and another ((2005) 8 SCC 618),**_ **whereunder a constitutional bench considered the question with respect to the function of the Honourable Chief Justice when an application filed under Section 11 of the Act arises for consideration, this court has observed that having regard to the limited scope of Section 8 of the Act, the same procedure laid down for consideration of the application under Section 11 of the Act would also govern the question posed for consideration under Section 8 of the Act as well. In a case where the execution of the validity of the agreement was disputed, even under Section 8 of the Act, that question has to be gone into by the** W.P.(C).No.1641 OF 2009 Page numbers **civil court, was the view expressed by this Court. At this juncture, it has to be pointed out that the above view was expressed by this Court, to be followed by the learned Munsiff in the present case, after analysing and taking note of the decisions rendered by the apex court including that of** _**Hindustan Petroleum Corpn. Ltd. v. Pinkcity Midway Petroleums ((2003) 6 SCC 503)**_ **.** **5. Surprisingly, showing scant respect for the directions/orders issued and without even adverting to nor referring to the remand made under the judgment of this Court, the learned Munsiff has passed impugned Ext.P8 order discarding the specific directions/orders to be followed in determining the question involved. Banking upon the dictum laid down by the apex court in** _**Hindustan Petroleum Corpn. Ltd. v. Pinkcity Midway Petroleums ((2003) 6 SCC 503)**_ **, which as already indicated, had been considered by this Court while** W.P.(C).No.1641 OF 2009 Page numbers **directing the court below to examine the validity of the arbitration agreement, the execution of which had been disputed, the learned Munsiff discarding the directions/orders, disposed the application once again holding that if there is an arbitration clause in the agreement, it is mandatory for the civil court to refer the dispute to an arbitrator. In doing so, the learned Munsiff has flagrantly flouted the directions/orders passed** **by this Court, the judgment rendered in the previous writ petition. The court below cannot flout the directions/orders passed by this Court when the matter had been remitted for reconsideration indicating in what way the question posed for consideration should be analysed and decided. Other than the reliance placed in the above decision the only other material which appears to have impressed the learned Munsiff was the purported admission stated to have been made by the plaintiff in the caveat application, copy of which was produced as Ext.A1, but, on that point** W.P.(C).No.1641 OF 2009 Page numbers **also there is no discussion in Ext.P8 order other than stating that there was an admission as to execution of an agreement, which on no account would lead to admission of a valid arbitration agreement. To say the least, the learned Munsiff has not examined the disputed question with reference to the directions given by this court in the judgment rendered in the writ petition. Ext.P8 order in the circumstance cannot be sustained and it is liable to be set aside. I do so. The learned Munsiff is directed to strictly follow the directions given in the judgment rendered by this court in the previous writ petition and decide the question involved in accordance with law. I make it clear that, I am not expressing any opinion on the merit of the disputes emerging for adjudication before the Munsiff which is canvassed by the respondents/ defendants under Ext.P3 application nor of the challenge raised thereto by the plaintiff. Court below is directed to dispose of Ext.P3 application after hearing both sides, within** Page numbers W.P.(C).No.1641 OF 2009 **one month from the date of receipt/production of a copy of this judgment.** **6. Registry is directed to place a copy of the judgment before the administrative judge in charge of the district for consideration whether further directions/instructions, as deemed fit and proper, on the administrative side require to be issued to the officer concerned for strict compliance of directions/orders passed by superior forums.** **Sd/S.S.SATHEESACHANDRAN, JUDGE** ## **//TRUE COPY//** **P.A TO JUDGE** vdv
End of Judgment Record
Browse All High Court of Kerala (2009) Decisions
2009-06-26

Nishana Mol.N v Alappuzha Municipality & Secretary, Alappuzha Municipality

This writ petition concerns the registration of a marriage under the Kerala Registration of Marriages (Common) Rules, 2008 (Common Rules). The petitioner Nishana Mol.N, whose marriage was solemnized on 8 March 2009, sought registration of her marriage by the Local Registrar. Her husband was abroad, and she submitted Form No. 1 along with documents; however, the Local Registrar demanded the presence of both spouses for registration, a point contested by the petitioner. The court recalls the apex court’s directions in Seema v. Ashwani Kumar (2006) to frame rules ensuring compulsory registration to protect women and provide evidence of marriage, while noting that registration under the Rules does not itself create a marriage but evidences one solemnized otherwise. The Rules specify that registration is mandatory for marriages solemnized within the state, with various procedural requirements (Rules 5, 6, 9, 10, 11, 13, 16, 17) and mechanisms for correction, appeal, and re-registration. The court clarifies that the presence of both parties is not ordinarily required; the registrar may require appearance only in cases where there is reasonable doubt about identity, and even then as an exception rather than a rule. Ultimately, the court directs that registration and certificate issuance be completed within one month from copy of the judgment, without insisting on joint appearance, provided the memorandum is in order.

2009-07-27

Abdul Majeed Kalathil v. District Collector, Malappuram & Others

This batch of writ petitions concerns the constitutional validity of Section 17 of the Kerala Anti-Social Activities (Prevention) Act, 2007, and the power of District Magistrates to confiscate vehicles used in anti-social activities. The petitions challenge the absence of a substantive prohibition against using vehicles for anti-social activities and the lack of a defined procedure for confiscation or an appellate remedy. In W.P.C. No. 9925 of 2009 (the lead case), Abdul Majeed Kalathil contends that his goods carriage KL 11-B/6651 was seized by the Sub Inspector of Pandikkad Police and reported to the District Collector, Exts.P1–P2. The court scrutinizes Section 17's scope, defining anti-social activity (Section 2(a)) and whether the District Collector’s power to confiscate is constitutionally tenable. It finds Section 17 to be vague and violative of Articles 14, 19(1)(g) and 21, as it rests on subjective police satisfaction with no clear standards or process. It also notes environmental objectives but concludes that fundamental rights must prevail. The court does not sustain confiscation under Section 17; instead, it directs that such vehicles be dealt with under the Kerala Protection of River Banks and Regulation of Removal of Sand Act, 2001 and Rules, with interim release under specified conditions. It further directs initiation of Sand Act proceedings within a month and finalization within another month. The writ petitions are disposed of accordingly, preserving the rule of law and environmental protection.

2009-06-11

WA No. 671 of 2006 (Fertilizers and Chemicals Travancore Ltd v Union of India)

This writ appeal concerns the pay revision and pensionary benefits of employees of the Fertilizers and Chemicals Travancore Ltd (FACT). The long-term settlement covering terms of employment expired on 31 December 1996. A fresh settlement was concluded (notified 28 August 2001) and made retroactive to 1 January 1997, with revisions in wages and benefits. Clause 29 of Ext. P1 provides that arrears relating to wage revision and dearness allowance for the period 1 January 1997 to 30 June 2001 will be reviewed and decided by management/government only when the company earns profits for at least three consecutive years; Clause 33.1 provides that employees who retired on or after 1 January 1997 will be eligible for arrears calculated from 1 January 1997 to the date of retirement, subject to adjustments for interim relief already paid, with any unclaimed amount transferred to a Welfare Fund. The appellants—the retirees who fall in the 1 January 1997 to 1 July 2001 window—argue that they were denied arrears and were paid pensionary benefits at pre-revised rates, creating discrimination. Respondents contend Ext. P1 binds the parties and arrears depend on profits, and that pay revision administered to others does not compel retroactive change. The court held that Ext. P1 terms survive as terms of employment and directed the management to consider terminal benefits at revised rates within two months and to release arrears when paid to current workers, with connected matters following."

2009-05-29

M/S. Palm Fibers & Yars Trading Co. v. State of Kerala & Others

The petitioner, a Small Scale Industrial unit, ran two LT power connections (No.13070 and No.13427) with commercial production starting in July 1994 and July 1995. On 06/02/1992, the Government issued Ext.P1 guaranteeing concessional tariffs (pre-1992 tariff) for five years from the date of commencement or substantial capacity expansion, certified by the District Industries Centre. Ext.P2 certified eligibility for this concession. Subsequently, the petitioner increased power demand to 300 KVA and was reclassified/advised to HT status from 15/05/1998, converting LT supply to HT. The petitioner argued that Ext.P1 benefits should extend for the full five-year period, covering the LT quantities certified in Ext.P2, and that the HT conversion was a mere reclassification directed by the Board, not a cessation of eligibility. The Board argued Ext.P1 targets only those who commenced production during 1992–1996 and that HT conversion from 15/05/1998 falls outside the Ext.P1 window, rendering the petitioner eligible only up to 15/05/1998. Earlier orders (Ext.P3) had set aside a cut-off date for merits, and Ext.P6/Ext.P4 handled appeals. Ultimately, the Court held that the HT conversion was outside Ext.P1’s period, but directed that the LT benefits for the two LT connections be extended only until 23/05/1998 (LT dismantling date) and without reimbursement from the Industries Department, as held in OP No.7622/1998. The petition was disposed of as above.