Case Synopsis & Summary

This is a Civil Revision Petition (CRP No. 167 of 2008) against an order of the Additional District Judge, Pathanamthitta (OP(ELE) No. 54/2003) arising from compensation for the cutting and removal of valuable trees and for injurious affectation of land due to the drawing of a Kayamkulam–Pallom 220 kV line. The Power Grid Corporation challenged enhanced compensation awarded by the court below under Sections 10 and 16 of the Indian Telegraph Act and Section 51 of the Indian Electricity Act, arguing the amount was not just and reasonable. The claimants contended for higher compensation, taking into account the loss to trees (yielding coconut and arecanut) and diminution of land value, as well as injurious affectation. The court below reassessed compensation, applying an annuity rate of 5% for eight yielding trees and fixing land diminution and injurious affection based on a commissioner's report and comparable land values, ultimately awarding enhanced compensation. The Corporation relied on older precedents like Kumba Amma v. K.S.E.B and argued against universally applying Livisha’s criteria (situs, proximity to office buildings). The Kerala High Court, while noting that Kumba Amma’s framework has been superseded in some respects by Livisha, upheld the lower court’s enhanced compensation as just and reasonable, and dismissed the revision for lack of merit. The decision emphasizes considering situs and contextual factors but ultimately affirms the lower award.

Precedent Explorer

Find Cases Like This

Explore other judgments dealing with similar legal situations, facts, or statutory provisions.

Case Details & Bench

Court
High Court of Kerala
Hon'ble Judges
  • S. S. Satheesachandran
Judgment Date
2010-02-23
Court Decision / Holding
Revision lacks merits and is dismissed.
Final Disposition
Revision lacks merits and is dismissed.

Parties to the Case

Appellants / Petitioners

  • Thomas Thomas
  • Sosamma Thomas

Respondents

  • Power Grid Corporation of India Ltd., Local Office, Kayamkulangara, Kayamkulam

Legal Representation & Advocates

Counsels for Respondents

  • • Sri M.A. Shafik
  • • Sri J. Om Prakash

Provisions of Law Cited

Section 10 of the Indian Telegraph ActSection 16 of the Indian Telegraph ActSection 51 of the Indian Electricity Act

Legal Doctrines & Maxims

  • Injurious affection
  • Situs of land as a relevant factor in compensation
  • Annuit y method for compensation (5% vs 10%)
  • Livisha principles on situs/proximity considerations
  • Kumba Amma v. K.S.E.B principles (distinguishable in light of Livisha)

Submissions & Arguments

Contentions of Appellants / Petitioners

The claimants contended for enhanced compensation under the Telegraph and Electricity Acts, arguing the loss from tree felling and land diminution, including injurious affectation, required reassessment; they relied on Livisha’s factors (situs, proximity to buildings) and the need to reflect the true value of the land and trees.

Contentions of Respondents

The Corporation contended the compensation awarded by the lower court was just and reasonable, emphasized adherence to earlier precedents (including Kumba Amma) and cautioned against universal application of Livisha’s approach; it disputed the necessity of revising the lower award beyond what was determined by the court below.

Legal Doctrine & Issue Explorer

Explore This Legal Issue

Find relevant judgments and authoritative positions on the legal questions discussed here.

Cited Precedents (2)

Case NameCitationTreatmentExplanation
Kumba Amma v. K.S.E.B2000(1) KLT 542 FBDistinguishedThe court notes that the principles in Kumba Amma have been found unsuitable and cannot be applied universally, as clarified by Livisha.
K.S.E.B. v. Livisha and others2007(3) K.L.T. 1PositiveApex Court directed consideration of situs, proximity to office buildings, and other factors in determining compensation; the High Court applies this approach to assess the present case.
Case Applicability Diagnostic

Apply This to My Facts

Share your situation and test whether this judgment governs, supports, or challenges your case.

Official Judgment Record
•1,256 words•~6 min read

In The Court Record

Power Grid Corporation of India Ltd. v. Thomas Thomas and Sosamma Thomas

IN THE HIGH COURT OF KERALA AT ERNAKULAM PRESENT : THE HONOURABLE MR. JUSTICE S.S.SATHEESACHANDRAN TUESDAY, THE 23RD FEBRUARY 2010 / 4TH PHALGUNA 1931 **CRP.NO. 167 OF 2008()** --------------------- {OP(ELE.) NO.54/2003 OF THE ADDL. DISTRICT COURT, PATHANAMTHITTA} .................... REVN. PETITIONER(S): 1ST RESPONDENT: ----------------------------------------------- POWER GRID CORPORATION OF INDIA LTD., LOCAL OFFICE, NANGIARKULANGARA, KAYAMKULAM, REPRESENTED BY ITS DEPUTY GENERAL MANAGER. BY ADV. SRI.M.A.SHAFIK RESPONDENT(S): PETITIONER: -------------------------- 1. SRI.THOMAS THOMAS, AGED 45 YEARS, S/O.GEORGE, KATTUNILATHU HOUSE, NIRANAM VILLAGE, NIRANAM SOUTH MURI, THIRUVALLA TALUK, PATHANAMTHITTA DISTRICT. 2. SMT.SOSAMMA THOMAS, AGED 57 YEARS, W/O.THOMAS THOMAS, KATTUNILATHU HOUSE, NIRANAM VILLAGE, NIRANAM SOUTH MURI, THIRUVALLA TALUK, PATHANAMTHITTA DISTRICT. 1ST RESPONDENT REP. BY THE POWER OF ATTORNEY HOLDER OF THE 2ND RESPONDENT. R2 BY ADV. SRI.J.OM PRAKASH THIS CIVIL REVISION PETITION HAVING BEEN FINALLY HEARD ON 23/02/2010, THE COURT ON THE SAME DAY PASSED THE FOLLOWING: ## S.S.SATHEESACHANDRAN, J. ---------------------------------------------------C.R.P.No.167 of 2008 --------------------------------------------------Dated this the 23rd day of February, 2010 ## O R D E R Revision is directed against the order dated 27.06.2004 in O.P.(Ele)No.54 passed by the Additional District Judge, Pathanamthitta. The respondents in the above petition (hereinafter referred to as the Corporation) have filed this revision. Petitioners in the application (hereinafter referred to as the claimants), dissatisfied with the compensation fixed and awarded by the Corporation towards the cutting and removal of valuable trees from their property for the drawing of overhead lines, filed the above petition seeking enhanced compensation under Section 10 and 16 of the Indian Telegraph Act and Section 51 of the Indian Electricity Act. The Corporation resisted that application contending that compensation awarded was just ## C.R.P.No.167 of 2008 ## :: 2 :: and reasonable. The court below, after enquiry on the basis of the materials produced and on hearing the counsel on both sides, passed an order awarding enhanced compensation of Rs.83,360/- directing the Corporation to pay such sum with 6% interest per annum from the date of petition till the date of realisation. Propriety and correctness of the order awarding such enhanced compensation is challenged by the Corporation in this revision. 2. I heard counsel on both sides. 3. Perusing the impugned order and after hearing the counsel on both sides, it is seen that the Corporation has ascertained the loss and damages sustained to the claimants only with respect to the trees cut and removed from their property. A sum of Rs.1,11,604/was awarded by the Corporation as compensation. Admittedly compensation was ## C.R.P.No.167 of 2008 ## :: 3 :: adjudged in respect of the trees cut and removed by the Corporation by adopting the annuity return of 10%, which has been found not proper and correct by a series of judicial pronouncements rendered by this court. This court in Kumba Amma v. K.S.E.B {2000(1) KLT 542 FB} has directed for ascertaining the compensation in respect of the loss sustained by tree cutting for the purpose of drawing overhead lines by adopting annuity return of 5%. The court below, it is seen, had assessed compensation with respect to the trees following the guidelines given by this court in the above decision, that too only in respect of 8 yielding coconut trees and yielding arecanut trees. In respect of those trees, the Corporation had assessed compensation of Rs.60,528.60. Adopting annuity return of 5%, on re-assessment of the compensation, the court below found that ## C.R.P.No.167 of 2008 ## :: 4 :: enhanced compensation of Rs.49,579,67/- was due to the claimants and that sum was accordingly awarded. True, the principles laid down by this court in Kumba Amma's case have been found to be unsuitable and cannot be applied universally by the Apex Court as held in K.S.E.B. v. Livisha and others {2007(3) K.L.T. 1}. The Apex Court directed for taking into consideration the situs of the land, its proximity with the office buildings and such other relevant factors in determining the compensation payable in such cases. However, taking note that the total extent of the property covered is 18.80 Ares and the number of trees cut and removed both yielding and non-yielding, much less I find that a reassessment of the compensation with reference to Livisha's case {2007(3) K.L.T. 1} is uncalled for. More so, in the present case, the trees were cut and removed at least one ## C.R.P.No.167 of 2008 ## :: 5 :: decade before. By no stretch of imagination, it can be stated, the enhanced compensation as refixed by the court below adopting annuity return fo 5% in respect of the yielding coconut and arecanut trees is excessive and unreasonable. At any rate, no ground has been made out in the present case for interference with the re-assessments so made in respect of the enhanced compensation awarded for the trees cut and removed. 4. Corporation has admittedly not paid any sum towards the diminution of the land on account of the drawing of overhead lines. The lines have been drawn for the purpose of Kayamkulam-Pallom 220 KV line. Needless to point out, when 220 KV electric lines are drawn through the property, sufficient area has to be kept on both sides to prevent mishap and also for ensuring free flow of energy through those lines without any ## C.R.P.No.167 of 2008 ## :: 6 :: hindrance. The advocate commissioner deputed by the court, after local inspection, has determined the area affected by the drawing of lines as 33.78 cents. Second claimant who was examined as a witness in her evidence has stated that the affected area is only 25 cents is highlighted by the learned counsel for the Corporation to contend that the report of the Commissioner showing a larger extent which had been accepted by the court and on which determination of land value was also fixed, was not correct and it warrants interference. The learned counsel for the claimants inviting my attention to the averments made in the original petition submitted that the claimants have asserted even in their petition that an area of 35 cents was injuriously affected by the drawing of overhead lines. Having referred to the report filed by the commissioner over which, admittedly, no ## C.R.P.No.167 of 2008 ## objection was raised by the Corporation, I find the statement given by the second claimant in her evidence that a lesser extent was affected is only a slip of the tongue and it cannot be given much significance. The report collected through the commissioner in the present case on its acceptance was a relevant piece of evidence and that could be safely acted upon to determine the affected area. Perusing the order passed by the learned District Judge, it is seen that the land value has also been fixed with reference to the value fo adjoining land on the basis of a registered sale deed. The injurious affection of the land by the drawing of the line has been fixed at 20% by the court below. The assessment so made, it is seen, is reasonable. Towards injurious affection, the court below has awarded a sum of Rs.33,781/-. It is also seen from the order that the ## C.R.P.No.167 of 2008 ## :: 8 :: evidence let in in the case indicated the property of the claimants has commercial importance as well. When that be so, I find no interference with the compensation fixed towards diminution of land value emerge for consideration. Suffice to state that the enhanced compensation awarded by the court below is only just and reasonable and it does not warrant any modification. Revision lacks merits and is dismissed. Sd/(S.S.SATHEESACHANDRAN) JUDGE sk/- //true copy//
End of Judgment Record
Browse All High Court of Kerala (2010) Decisions
2010-09-09

T.K. Biju and Gangaprasad S. v. State of Kerala and The Director, Institute of Human Resources Development (IHRD)

This batch of writ petitions challenges the Institute of Human Resources Development’s (IHRD) recruitment process for the Last Grade Service under notification RECT/03/09/HRD (dated 21.1.2009). The core questions concern the validity of the 23.8.2009 written test, the 23.10.2009 short list (main and supplementary) drawn therefrom, and the 19.3.2010 rank list published after interviews. Petitioners—mostly former daily wage/ad hoc employees—also pursue regularisation, arguing that the selection framework and weightage for past service were either discriminatory or inadequately applied. Ext.P4 had disposed of earlier petitions by directing IHRD to finalise recruitment under a resolution dated 9.7.2007, and Ext.P5 laid down the recruitment rules: an objective written test (70 marks) and an interview (30 marks) with category-wise cut-offs (Rule 5.3) and a rank list valid for three years (Rule 5.4). The court holds that deviations such as clause 8 in the hall ticket do not render the process void in the absence of prejudice, and upholds the short-list’s legality to a large extent. However, drawing on Umadevi (3) and Satya Prakash, the court ultimately directs a limited revisiting of the rank list to grant weightage under Rule 5.2 to those petitioners who would have been included, while denying general regularisation. All petitions are disposed with these directions.

2010-01-21

State of Kerala and District Collector, Kollam v. K. Raghavan

This is a review petition filed by the State of Kerala and the District Collector, Kollam, challenging the High Court’s 23 March 2009 judgment in W.P.(C).29695 of 2005, which directed the Government to consider a freedom fighter’s pension claim and to grant pension from the date of application. The petition traces a long history: the applicant, aged about 75 at the time of filing on 29.12.1995, faced earlier adverse orders in 1987 and 1989; after litigation, the 2005 judgment directed reconsideration and culminated in a 2009 order granting pension in December 2009 but from the date of sanction rather than from the date of application. The review petition contends that the Supreme Court’s decision in State of M.P. and Another v. Devkinandan Maheshwari (2003) and a Division Bench decision followed in W.A. Nos.1419/2006 & 1818/2006 require pension from the date of sanction, not the application date, and thus the judgment should be recalled. It also relies on Dokka Samuel v. Dr. Jacob Lazarus Chelly (1997) to assert that omitting authorities is not a ground for review. The Court, however, finds that omission to cite authorities cannot ground a review and that the government’s delay in compliance violates the Court’s directions, warranting dismissal of the review petition with costs.

2010-02-23

Anitha Rajan v. Revenue Divisional Officer, Thrissur; Thasildar, Chavakkad; Village Officer, Nattika; Sub Registrar, Thriprayar

Anitha Rajan, the petitioner, purchased 50 cents of land in Re-Survey No.166/1, Nattika village, Thrissur district, from the legal heirs of late Gangadharan via Ext.P3 sale deed registered at Triprayar. The conveyance, through power of attorney documents Ext.P1 (executed by Ajayan in Dubai in favor of his mother Rathnabhai) and Ext.P2 (executed by Usha in India), prompted mutation proceedings before the Revenue Divisional Officer (RDO). The RDO refused to effect mutation unless the original Ext.P1 POA was produced for adjudication of stamp duty under the Kerala Stamp Act, 1959, claiming non-compliance with stamping and the need to determine stamp duty under sections 31 and 32. The petitioner contends that it is not mandatory to submit every PoA executed outside India for adjudication; only instruments chargeable with duty which cannot be stamped by private persons must be taken to the Collector under section 18(2). Ext.P1, though executed abroad, is on Indian stamp paper and was presented at registration, having been stamped Rs.150 under Article 44(f). The court analyzed sections 18(1), 18(2), 31 and 32 and held that section 18 applies to instruments executed outside India; since Ext.P1 is duly stamped, Section 18 has no application and Sections 31-32 cannot be invoked to compel production. Relying on Madras High Court decisions Manoharan v. Velu and R.B.K. Rajeswari Nachiar, the court held the Village Officer erred in requiring Ext.P1 before the RDO, quashed Exts.P4 and P6, and directed mutation actions to be completed within two months of certified judgment copy.

2010-03-23

V. Mohanan Nair v. Babu Pillai and others

This writ petition arises from a complex land dispute in Nedumangad where the petitioner, V. Mohanan Nair, challenged a trial court order that set aside a commissioner's report and remitted for a fresh report. In O.S. 380/2005 the plaintiff sought a permanent injunction; in O.S. 542/2005 the second respondent sought declaration of title and possession based on deeds executed in 2005. To resolve the location of the plaint schedule property, a commission was appointed, and Ext. P2 report and plan were filed. Subsequently, I.A. 4808/2009 was filed by the second respondent seeking to set aside the commission report and plan and remit for a fresh report. The trial court remitted the matter; Ext.P8 records the order, which the petitioner challenged in this Writ Petition. The respondents relied on a decision in Sarojini v. Karthiyani Amma to contend that Article 227 petitions against commission reports are not maintainable, while the petitioner argued lack of justification for remitting and the undue delay in filing the petition. The Kerala High Court, while recognizing the normal reluctance to exercise visitorial jurisdiction, held that exceptional circumstances permit interference under Article 227 and remanded the matter for fresh consideration, directing that the trial court assess sufficiency of Exts. C1, C1(a), C1(b) and allow further inspection if needed. The result is a remand to ensure a fair adjudication on the commission report."