## **IN THE HIGH COURT OF KERALA AT ERNAKULAM**
## **PRESENT**
**THE HONOURABLE MR.JUSTICE V.G.ARUN**
**MONDAY, THE 18[TH] DAY OF MARCH 2024 / 28TH PHALGUNA, 1945 CRP NO. 184 OF 2018**
**AGAINST THE ORDER/JUDGMENT DATED 23.10.2017 IN OPELE NO.333 OF 2010 OF ADDITIONAL DISTRICT COURT, KOZHIKODE REVISION PETITIONER/S:**
**POWER GRID CORPORATION OF INDIA LTD REPRESENTED BY ITS ADDITIONAL GENERAL MANAGER, UGRAPURAM, AREACODE, MALAPPURAM DISTRICT. BY ADV SRI.E.M.MURUGAN**
## **RESPONDENT/S:**
**ABDUL AZEEZ S/O.KUTTIASSAN, PARASSERIMANNIL HOUSE, MANALVAYAL, P.O., MAYILALLAMPARA, PUTHUPPADI VILLAGE, KOZHIKODE TALUK, KOZHIKODE DISTRICT673001.**
**BY ADVS. SRI.V.V.SURENDRAN SRI.P.A.HARISH**
**THIS CIVIL REVISION PETITION HAVING BEEN FINALLY HEARD ON 20.12.2023, ALONG WITH CRP.230/2018, 236/2018, THE COURT ON 18.03.2024 DELIVERED THE FOLLOWING:**
CRP Nos.184, 230 & 236 of 2018
-2-
**IN THE HIGH COURT OF KERALA AT ERNAKULAM**
## **PRESENT**
**THE HONOURABLE MR.JUSTICE V.G.ARUN**
**MONDAY, THE 18[TH] DAY OF MARCH 2024 / 28TH PHALGUNA, 1945**
**CRP NO. 230 OF 2018**
**AGAINST THE ORDER/JUDGMENT DATED 23.10.2017 IN OPELE NO.227 OF 2009 OF ADDITIONAL DISTRICT COURT, KOZHIKODE I REVISION PETITIONER/S:**
**POWER GRID CORPORATION OF INDIA LTD. REP.BY ITS ADDITIONAL GENERAL MANAGER, UGRAPURAM, AREACODE MALAPPURAM DT. BY ADV SRI.E.M.MURUGAN**
## **RESPONDENT/S:**
**K.J. MATHEWS S/O. K.P.JACOB, KIZHAKKEKUNNATH, P.O.PUTHUPPADI, PUTHUPPADI VILLAGE, KOZHIKODE TALUK, KOZHIKODE DISTRICT.**
**BY ADVS. SURENDRAN V.V. HARISH P.A.**
**THIS CIVIL REVISION PETITION HAVING BEEN FINALLY HEARD ON 20.12.2023, ALONG WITH CRP 184/2018 AND 236/2018, THE COURT ON 18.03.2024 DELIVERED THE FOLLOWING:**
CRP Nos.184, 230 & 236 of 2018
-3-
**IN THE HIGH COURT OF KERALA AT ERNAKULAM**
## **PRESENT**
**THE HONOURABLE MR.JUSTICE V.G.ARUN**
**MONDAY, THE 18[TH] DAY OF MARCH 2024 / 28TH PHALGUNA, 1945 CRP NO. 236 OF 2018**
**AGAINST THE ORDER/JUDGMENT DATED 23.10.2017 IN OPELE NO.256 OF 2010 OF ADDITIONAL DISTRICT COURT, KOZHIKODE REVISION PETITIONER/S:**
**POWER GRID CORPORATION OF INDIA LTD REP BY ITS ADDITIONAL GENERAL MANAGER, UGRAPURAM, AREACODE, MALAPPURAM DT. BY ADV SRI.E.M.MURUGAN**
**RESPONDENT/S:**
**MUHAMMED HAJI S/O. ABDULLA HAJI, NARIKKATTUMMAL HOUSE,ELETTIL VATTOLI P.O, PUTHUPPADI, PUTHUPPADI VILLAGE,KOZHIKODE TALUK, KOZHIKODE DISTRICT. BY ADVS. SURENDRAN V.V. HARISH P.A.**
**THIS CIVIL REVISION PETITION HAVING BEEN FINALLY HEARD ON 20.12.2023, ALONG WITH CRP 184/2018 AND 230/2018, THE COURT ON 18.03.2024 DELIVERED THE FOLLOWING:**
CRP Nos.184, 230 & 236 of 2018
-4-
## **ORDER**
Dated this the 18[th] day of March, 2024
The revision petitioner, Power Grid
Corporation of India Ltd ('the Corporation' for short) is aggrieved by the enhanced compensation ordered to be paid to the respondents towards the value of the trees cut as also diminution in
land value, consequent upon the drawing of 400 KV Electric Lines across the respondents' properties by the Corporation. The essential facts are as under;
The Corporation drew 400 KV lines over the
property of the respondents for completing the Mysore-Kozhikode sector. For the purpose of drawing the lines, yielding trees like arecanut, rubber, coconut trees and pepper veins had to be cut down. Thereupon, the respondents filed original petitions claiming compensation towards value of trees cut as well as diminution in land
CRP Nos.184, 230 & 236 of 2018
-5-
value. Even though enhanced compensation was awarded, the respondents were not satisfied with the quantum of enhancement and hence, filed civil revision petitions before this Court. Finding merit in the grievance raised, the civil revision petitions were allowed and the cases remanded to the court below, with a direction to consider the matters afresh. Accordingly, the claims were reconsidered and further enhancement granted towards value of trees cut and diminution in land value.
2. By the impugned order, the court below directed to pay additional compensation in each case under the following heads;
## **Total compensation**
|e under the following heads;|e under the following heads;|e under the following heads;|e under the following heads;|e under the following heads;|
|---|---|---|---|---|
|**Total compensation**|||||
|Case<br>Nos.|Compensati<br>on towards<br>cutting of<br>trees|Compensation<br>towards<br>non<br>yielding<br>trees<br>and<br>others|Diminution<br>of<br>land<br>value|Grand<br>total|
|OP<br>227/2009|31030.56|3862.5|86800|121693.06|
|OP<br>256/2010|248559.52|-|274000|522559.52|
|OP<br>333/2010|95068.84|185|117600|212853.84|
CRP Nos.184, 230 & 236 of 2018
-6-
As far as yield of trees is concerned, the court below found the deduction of 60% towards cultivation expenses of rubber to be excessive and following the decision of this Court in
## _**Petronet v. Thresiamma [2012 (1) KLT 959]**_ ,
reduced the deduction to 40%. In the case of
pepper, areacanut and coconut, the deduction of 43.75% is found to be reasonable. The court below has also granted 50% of the compensation
already paid as additional compensation towards cocoa, jack fruit and the non-yielding trees, following the annuity method.
3. Although respondents had relied on Exts.A11 and A12 documents for the purpose of
fixing land value, the court below found that the
property involved in Exts.A11 and A12 documents and the petition schedule properties are not similar or similarly situated, considering the proximity to the PWD road, distance between the properties and the nature of transactions in
CRP Nos.184, 230 & 236 of 2018
-7-
Exts.A11 and A12 documents. Instead, reliance was placed on the Advocate Commissioner's report and plan to hold that the properties in OP Nos.227/2009 and 333/2010 are garden lands and the property in OP No.227/2009 is situated at a distance of about 300 metres away from NH212 as also the West Puthuppadi-Ambalakandi tarred Panchayat road abuts the property. The court below also took note of the fact that the property in OP No.256/2010 is situated on the southern side of the NH 212 and similarly the property in OP No.333/2010, is at a distance of about 800 metres from NH212. In the case of OP No.333/2010, the court below found that the petition schedule property is situated on the side of Puthuppadi-Ottakkara tarred Panchayat road. The court below also took note of the fact that, going by the manner in which the lines were drawn, the properties were substantially affected. Based on the said findings, the land
CRP Nos.184, 230 & 236 of 2018
-8-
value was fixed at Rs.35,000/- per cent in OP Nos.227/2009 and 333/2010 and Rs.50,000/- per cent in O.P.No.256/2010.
4. Heard learned Counsel appearing on
either side.
5. Learned Counsel for the revision
petitioner Corporation contended that the court below grossly erred in granting enhanced compensation towards the value of trees cut, even after finding that the respondents had not produced any evidence to prove that the
assessment made by the Special Tahsildar regarding the age, future age, yield etc. are not correct. It is submitted that the land value fixed is also not based on legal evidence, as the court below found the properties in Exts.A11 and A12 documents, produced by the respondents for fixation of the land value, are not similar or similarly situated to that of the petition schedule properties. Therefore, the additional
CRP Nos.184, 230 & 236 of 2018
-9-
compensation awarded is unreasonable and the diminution in land value, far in excess of the percentage fixed by the Government. Per contra, learned Counsel for the respondents argued that the enhancement is reasonable and has been granted after considering all relevant factors.
6. On careful scrutiny of the impugned order, it is seen that the enhancement of
compensation towards trees cut was made after considering the evidence in detail and following the decisions of this Court as also the
compensation due towards diminution of land value was fixed based on factors like situs of the land, the extent to which the land is adversely affected and consequent diminution in the value of the land. It is clear that the court below had considered the nature of lands, road access and locational features individually.
7. The contention of the Corporation that the Government having fixed 15% as diminution of
CRP Nos.184, 230 & 236 of 2018
-10-
land value for the properties in that area, the court below could not have fixed the higher percentage is liable to be rejected since the court, while assessing the damage sustained and fixing the compensation, is not bound by the guidelines issued by the Government. The court below having granted only 9% interest, the challenge against the rate of interest is also rejected.
For the aforementioned reasons, I am of the definite opinion that there is no illegality or material irregularity in the impugned order warranting this Court's interference in exercise of the revisional power under Section 115 of the Code of Civil Procedure.
If any amount is deposited pursuant to an order of this Court or otherwise, the same shall forthwith be released to the respondents on their filing appropriate applications. The entire enhanced compensation shall be paid to the
CRP Nos.184, 230 & 236 of 2018
**==> picture [23 x 9] intentionally omitted <==**
respondents within three months of receipt of a copy of this order. The civil revision petitions are dismissed accordingly.
Sd/- **V.G.ARUN JUDGE**
Scl/