P.K. Singh v. S.N. Kanungo and Ors.

Case / Petition Number:
Civil Appeal No. 6551 of 2002
Neutral Citation:[2010] 2 S.C.R. 1040

Case Synopsis & Summary

The case concerns a contempt petition arising from a dispute over an arbitration award related to extension of Port Blair Airport runway. A contract between the respondent-contractor and the Andaman and Nicobar Administration (through the Union of India) led to arbitration. The arbitrator awarded the contractor Rs. 2,81,83,305 with 12% interest from the withholding date. The Union of India challenged the award under Section 34 of the Arbitration and Conciliation Act, 1996; the High Court of Calcutta, Circuit Bench at Port Blair, modified the award and confirmed the principal amount with interest up to payment. Subsequently, the executive engineer sent letters (5.3.2001; 30.3.2001; 2.4.2001) seeking partial settlement – adjusting the decree and requesting the contractor to accept the principal amount in full and final settlement while negotiating interest. The contractor filed Contempt Application under Section 14 of the Contempt of Courts Act, 1971, alleging willful and deliberate disobedience. The High Court held the appellant guilty of contempt and imposed costs after accepting an unconditional apology. The Supreme Court examined whether such adjustment letters fall within Order XXI, Rule 2, and whether they constitute contempt. It held that an adjustment of a decree is a permissible mode of settlement, not contempt, and that the High Court erred in presuming contempt without a clear finding. The appeal was allowed, the impugned judgment set aside, costs refunded, and the appeal disposed of.

Precedent Explorer

Find Cases Like This

Explore other judgments dealing with similar legal situations, facts, or statutory provisions.

Case Details & Bench

Court
Supreme Court of India
Hon'ble Judges
  • J.M. Panchal
  • Dr. B.S. Chauhan
Judgment Date
2010-02-18
Court Decision / Holding
Appeal succeeds. The impugned judgment is set aside. The costs, if any, recovered from the appellant, shall be refunded to him. The appeal is disposed of. There shall be no order as to costs.
Final Disposition
Appeal disposed of; impugned judgment set aside; no order as to costs.

Parties to the Case

Appellants / Petitioners

  • P.K. Singh

Respondents

  • S.N. Kanungo and Ors.

Legal Representation & Advocates

Counsels for Petitioners

  • • Jayasree Singh
  • • Swati Sinha
  • • Fox Mandal & Co.

Counsels for Respondents

  • • Jena Kalyan Das

Provisions of Law Cited

Contempt of Courts Act, 1971, s. 14Code of Civil Procedure, 1908, Order XXI Rule 2Code of Civil Procedure, 1908Arbitration and Conciliation Act, 1996, Section 34

Legal Doctrines & Maxims

  • Adjustment is not the same as satisfaction of the decree; an adjustment is a method of settling a decree not provided for in the decree itself and must be recorded under Order XXI Rule 2.
  • The right of the judgment debtor to make an attempt to adjust the decree is independent and cannot be treated as contempt of court.

Submissions & Arguments

Contentions of Appellants / Petitioners

The letters of 30.3.2001 and 2.4.2001 were attempts to adjust the decree under Order XXI Rule 2 and not acts of willful disobedience. They show a good-faith effort to reach settlement on the award and interest. The High Court erred by presuming contempt without a clear finding; even if there was any violation, it was not willful or deliberate, and the unconditional apology should not have been punished by costs.

Contentions of Respondents

Contempt proceedings were warranted as the appellant’s conduct appeared to amount to willful and deliberate disobedience of the decree; the letters sought to modify the terms of payment after the decree and underscored noncompliance with the court’s directions. The High Court’s finding of contempt and the imposition of costs were proper.

Legal Doctrine & Issue Explorer

Explore This Legal Issue

Find relevant judgments and authoritative positions on the legal questions discussed here.

Case Applicability Diagnostic

Apply This to My Facts

Share your situation and test whether this judgment governs, supports, or challenges your case.

Official Judgment Record
•2,489 words•~12 min read

In The Court Record

P.K. Singh v. S.N. Kanungo and Ors.

A 8 # [2010] 2 S.C.R. 1040 ## P.K. SINGH _v._ M/S. S.N. KANUNGO AND OTHERS (Civil Appeal No. 6551 of 2002) FEBRUARY 18, 2010 # **[J.M. PANCHAL AND DR. B.S. CHAUHAN, JJ.]** _Contempt of Courts Act, 1971:_ _s. 14_ - _Contempt petition alleging wilful and deliberate_ C _violation of judgment of High Court_ - _In an appeal arising out of_ a _contract, High Court directing the Department to pay_ , - _decretal amount to the contractor, along with interest Officer concerned writing to contractor_ . _for settlement as regart:Js_ , · _interest component_ - _High Court holding the officer concerned_ D · _guilty of contempt of court and while accepting unconditional apology, imposing cost on him_ - _HELD: Order 21, r. 2 CPC relates to the payment of amount to_ a _decree-holder out of_ . - _court An agreement, which extinguishes· the decree as sucll in whole or in part and results in the satisfaction of the decree_ E _in respect of the particular relief or relieves granted by the decree, is an 'adjustment' within the meaning of r.2_ - _It is open to the parties to enter into_ a _contract or compromise with_ - _reference to their rights under the decree Adjustment is not the same as satisfaction of the decree but is some method_ F _of settling decree which is not provided for in the decree itself_ - _·The right of the judgment-debtor to make an attempt to_ . _adjust the decree is independent and cannot be treated as_ - _contempt of court Having regard to the interest of the_ . _department, the officer concerned had addressed letters to the_ G . _contractor to adjust the award_ - _The letters for adjustment of award could not have been treated as contempt of court within_ - _the meaning of the provisions of the Act The tenor of letters do not indicate that there was any willful disobedience on the_ · _part of the officer in not complying with the judgment of the_ H 1040 1040 P.K. SINGH _v._ S.N. KANUNGO AND ORS. 1041 _High Court_ - _The error of law committed by High Court is that_ A · _without answering the question whether violation of the judgment amounts to contempt of court, it presumed that violation of the judgment amounts to contempt of court, and proceeded to examine the question whether violation of the judgment was willful or deliberate_ - _After reaching the_ B _conclusion that the violation is neither willful nor deliberate, the High Court should have at once dropped the contempt proceedings and could not have accepted the unconditional apology tendered by the officer nor could have imposed cost on him_ - _Further, the High Court itself came to the conclusion_ c _that_ a _Jetter being written by the officer would not amount to willful and deliberate disobedience of the decree of the court_ - _In any view of the matter, the High Court, after accepting the unconditional apology tendered by the officer, should not have imposed cost on him_ - _On the facts and in the_ D . _circumstances of the case, the judgment impugned cannot_ - _be sustained and is set aside Code of Civil Procedure, 1908_ - _Or. 21, r.2. [Para_ 7 _and 10]_ CIVIL APPELLATE JURISDICTION : Civil Appeal No. 6551 of 2002. E From the Judgment & Order dated 9.4.2001 of the High Court of Calcutta, Circuit Bench at Port Blair in contempt Application No. 1 O of 2001. Jayasree Singh, Swati Sinha, Fox Mandal & Co., for the Appellant. F Jena Kalyan Das for the Respondents. The Order of the Court was delivered ## **ORDER** G The instant appeal is directed against the judgment dated April 9, 2001 rendered by the High Court at Calcutta in Contempt Application No. 010 of 2001 by which the appellant is held guilty of contempt of court and is directed to pay the cost . of the application to the respondent which is assessed at 200 H 1042 SUPREME COURT REPORTS [2010) 2 S.C.R. ## A GMs. 2. From the record of the case it is evident that a contract was entered into between the respondent-contractor and the Andaman and Nicobar Administration through Union of India for execution of the work of extension of runway by 1542 meters B (5000 ft.) at Port Blair Airport on 29.12.1995. During the course of the execution of the said contract, dispute arose between the parties regarding payments of bills. The dispute was referred to sole arbitration of Mr. O.P. Goel. The arbitrator made his Award on March 22, 1999 and directed the Andaman and - C Nicobar Administration to pay to the respondent a sum of · Rs.2,81,83,305/- (Rupees two crores eighty one lacs, eighty three thousand, three hundred and five only) with 12% interest per annum from the date of withholding of the amount of Rs.41,42,000/- (Rupees forty one lacs forty two thousand only) - D till the date of payment. 3. Feeling aggrieved, the Union of India, through the Exe·cutive Engineer, Andaman and Nicobar Public Works Department, filed an application under Section 34 of the Arbitration and Conciliation Act, 1996 on 17th June, 1999 for E setting aside the Award. By judgment dated 29.9.2000 the learned District Judge, Andaman and Nicobar Island, Port Blair, dismissed the application with cost of Rs.500/-. Thereupon, Union of India, through the Executive Engineer, preferred an appeal, i.e., FAT No. 4220 of 2001, before the High Court at F Calcutta. The Division Bench of the High Court dismissed the appeal by judgment dated 26.2.2001. However, the High Court clarified that the claim No. 4 of the Award dated 22.3.1999 would stai1d modified and the respondent-contractor would be entitled to interest @ 12% per annum from the date of reference G of the dispute to arbitration till the date of payment of the said amount. 4. Thereafter, the appellant, who is Executive Engineer, Construction Division II, APWD, South Andaman, addressed a letter to the Superintending Engineer, Construction Circle No. H 1, Andaman Public Works Departme,nt, on 5.3.2001 giving \ P.K. SINGH _v._ S.N. KANUNGO AND ORS. 1043 details of the financial implication of the Award dated 22.3.1999. The appellant received a letter dated March 30, 2001 from the Executive Engineer (PLG), CE's Office, APWD, Port Blair stating that the principal component of the Award might be released to the agency, i.e., the respondent herein, immediately. The appellant thereupon wrote a letter dated 30.3.2001 to the Chief Engineer, APWD requesting that the acceptance of the Award should be communicated with details re~rding amount/principal component to be paid. It was also mentioned in the-said letter that for delay, if any, in payment of the amount, he would not be responsible. The appellant thereafter addressed another letter on the same day to the respondent requesting it to intimate its acceptance of the Award amount to Rs.2,81,83,305/- in full and final settlement of its claim. The respondent thereupon replied by a letter dated 30.3.2001 to the appellant that it was not willing to accept the amount statPd in the aforesaid letter. The appellant, therefore, wrote another letter on 30.3.2001 to the respondent informing that the principal component of the Award of Rs.2,81,83,305/would be released on the same day and requested the respondent to reconcile with the appellant for mutual understanding about payment of interest. The respondent wrote a letter to the appellant on March 31, 2001 mentioning that it was willing to accept the principal amount of the Award "at present" but the remaining amdunt of the interest etc. should be released within a fortnight. Thereupon, the appellant addressed a letter dated 2.4.2001 to the Chief Engineer, APWD, Port Blair, forwarding a copy of the letter received by him from the respondent and pointed out that the respondent was unwilling to accept the amount of the Awa(d without interest. The appellant addressed another letter dated 2.4.2001 to the Chief Engineer informing him about the changed stand of the respondent regarding its willingness to accept the principal component of the Award and requested him to communicate the decision regarding payment of interest without further delay. A B - c. 0 E F G 5. The respondent filed Contempt Application No. 010 of H 1044 SUPREME COURT REPORTS [2010] 2 S.C.R. A 2001 in the month of April, 2001 under Section 14 of the Contempt of Courts Act, 1971 complaining about willful and deliberate violation of the judgment and decree dated February 26, 2001 passed in First Appeal T. No. 4220 of 2001. The High Court issued notice to the respondent. On notice being served, s the appellant filed a reply denying that there was willful and deliberate breach of the decree passed by the court. By impugned judgment the Division Bench of the High Court at Calcutta, Circuit Bench at Port Blair, found the respondent guilty of contempt of court and while accepting the unconditional , c apology of the appellant, imposed cost of 200 GMs upc:in him to be paid within a week. This judgment has given rise to the instant appeal. 6. This Court has heard the learned counsel for the appellant and considered the documents forming part of the D instant appeal. 7. From the facts mentioned above, it is evident that, after Award of the arbitrator was confirmed by Division Bench of the Calcutta High Court, the appellant had made an attempt to adjust the decree in terms of Order XX.I Rule 2 of Code of Civil E Procedure by requesting the respondent to accept the principal amount and waive the interest awarded thereon. The contents of the two letters written by the appellant to the respondent do not show that any attempt was made by the appellant to sit in appeal over the judgment of the High Court. Those two letters F do not indicate that the appellant had criticized the High Court for awarding interest in favour of the respondent. The record would indicate that within the framework of law, the appellant had mctde an attempt to persuade the respondent to forego claim relating to interest. Order XXI Rule 2 of Code of Civil G Procedure relates to the payment of amount to a decree holder out of court and inter alia provides that when any wrong payment under a decree of any other kind is paid out of court to the decree holder, the decree holder has to certify payment · made as required by the said Rule. An agreement, which H extinguishes the decree as such in whole or in part and re;:,u:ts P.K. SINGH _v._ S.N. KANUNGO AND ORS. 1045 in the satisfaction of the decree in respect of the particular relief A or reliefs granted by the decree, is an 'adjustment' within the· meaning of this Rule. It is open to the parties to enter into a contract or compromise with reference to their rights under the decree. If the contract or the compromise amounts to an 'adjustment' of the decree, it must be recorded under this Rule B and unless so recorded cannot be recognized by the executing court. Adjustment is not the same as satisfaction of the decree but is some method of settling decree which is not provided for in the decree itself. The right of the judgment debtor to make an attempt to adjust the decree is independent and cannot be c treated as contempt of court. Having regard to the interest of the department concerned, the appellant had addressed letters to the ;,respondent to adjust the Award. The letters for · ~djustment of Award could not have been treated as contempt of cou~f within the meaning of the provisions of the Contempt D of Courts Act, 1971. The tenor letters do not indicate that there was any willful disobedience on the part of the appellant ih not ;bomplying with the judgment of the High Court. , 8. Even if it is assumed for. the sake of argument that 1 writing of the letter dated 30.3.2001 amounts to contempt, this Court finds that the two letters dated 30.3.2001 and 2.4:2001 1 addressed by the appellant to the Chief Engineer, APWD, Port Blair, indicate that the appellant had taken all possible steps to comply with the Award confirmed by the High Court. According to the High Court, asking the respondent to accept only the principal amount vide letter dated 30.3.2001 amounts to violation of the judgment of the High Court. Having held so, the High Court prpceeded to examine the question whether the violation of judgment of the High Court would amount to the con1empt of court. The High Court also considered the question whether violation of judgment by the appellant was willful and deliberate. The High Court noticed that after addressing letter dated 30:3.2001, another letter on the same day was addressed by ·th.e appellant inviting the respondent for negotiation with reference to the rate of interest payable to the E F G H .. > 1046 SUPREME COURT REPORTS (2010] 2 S.C.R. - A respondent and concluded that even if previous letter amounted to violation of the judgment of the court, the appellant did not do so willfully and deliberately. Though the High Court ostensibly proceeded to examine the question whether violation of the judgment of the High Court would amount to contempt of court, - B the said question is neither determined nor answered one way or the other. The error of law committed by the High Court is that without answering the question whether the violation of the judgment amounts to the contempt of court, the High Court presumed that the violation of the judgment amounts to - c contempt of court and proceeded to examine the question whether the violation of judgment was willful or deliberate. After reaching the conclusion that the violation is neither willful nor deliberate, the High Court should have at once dropped the contempt proceedings and could not have accepted the unconditional apology tendered by the appellant nor could have _/_ - 0 imposed cost on the appellant. In any view of the matter, the High Court, after accepting the unconditional apology tendered by the appellant, should not have imposed cost on the appellant for negligence and reckless manner in which it had allegedly acted in the instant case. E 9. Further, the High Court itself came to the conclusion that a letter being written by the Executive Engineer would not amount to willful and deliberate disobedience of the decree of the court. > F 10. On the facts and in the circumstances of the case, this Court is of the opinion that the judgment impugned cannot be sustained and is liable to be set aside. 11. For the foregoing reasons, the appeal succeeds. The G impugned judgment is set aside. The cost, if any, recovered from the appellant be refunded to him. The appeal stands, accordingly, disposed of. 12. There shall be no order as to costs. H RP. Appeal disposed of.
End of Judgment Record
Browse All Supreme Court of India (2010) Decisions
2010-09-24

Department of Telecommunications v. Gujarat Co-operative Milk Marketing Federation Ltd.

This Supreme Court decision concerns a billing dispute arising from two bi-monthly telephone bills totaling Rs. 4,54,652 raised against the Managing Director of the Gujarat Co-operative Milk Marketing Federation Ltd. for calls categorized as international “party” or “sex talk” calls. The respondent subscriber alleged mischarging and that calls were made from another number, prompting a complaint to the Department. Verification upheld the bills; an administrative appeal was dismissed; the matter was referred to arbitration under section 7B of the Indian Telegraph Act, 1885, following a High Court direction. The arbitrator, Vineet Bhatia, concluded the bills were proper. The respondent challenged this award by writ petition, which the High Court (Single Judge) quashed, holding that the arbitrator was junior to the appellate authority, and proceeded to find the award invalid on presumptions and inferences unsupported by evidence; a Letters Patent Appeal was dismissed. The Supreme Court reversed, holding that the High Court exceeded its judicial review scope, misapplied the standard for review of arbitral awards under section 7B, and erred in imputing bias based on rank. It affirmed that the arbitrator’s findings were grounded in the department’s records and meters, and that independence was maintained. The appeal is allowed and the writ petition dismissed, with the High Court orders set aside.

2010-11-23

BHAGWAN BUDHA PRATHMIK TECHNICAL TRAINING COLLEGE NIRMALI v. STATE OF BIHAR

This is a consolidated Supreme Court decision in Civil Appeal Nos. 9896 and 9897 of 2010 arising out of Bihar. Bhagwan Budha Prathmik Technical Training College, Nirmali, a minority Buddhist institution established in 1987, challenged Bihar’s and other authorities’ recognition/approval decisions for its teacher-training course in light of the National Council for Teacher Education Act, 1993 (NCTE Act). The central issue is whether, after the NCTE Act’s appointed day (1 July 1995), State Governments retain power to grant recognition to teacher-education institutes and whether students of unrecognized colleges may sit for qualifying examinations. The matter traces a long litigation history: initial directions in the early 1990s required the Government to decide recognition while allowing students to appear at their own risk; subsequent orders and representations culminated in a 16 March 2007 order recognizing the college from 1987-89 on the ground that inspection warranted it, followed by a 2 September 2008 order withdrawing that recognition in light of NCTE’s sole jurisdiction post-appointed day. The High Court affirmed the sequence, but this Court held that a power to issue an order includes a power to withdraw it for valid reasons, and that recognition is vested in the NCTE after the appointed day. The judgment emphasizes that the NCTE Act must be implemented with full force to protect standards in teacher education. Ultimately, the Supreme Court dismissed the appeals, modified a cost order, and held there should be no further costs in these appeals, while acknowledging the students’ plight and the need for orderly implementation of the regulatory regime.

2010-06-03

State of Punjab & ors. v. G.S. Randhawa

This Civil Appeal arises from a petition challenging a demand for additional price under the Punjab Urban Estate (Sale of Sites) Rules, 1965. The Supreme Court hears counsel for the appellant and notes that the respondent did not enter appearance. Relying on the decision in Smt. Fuljit Kaur v. State of Punjab & Ors., (2010) 7 SCR 317, the Court states that, for the reasons recorded in Civil Appeal No. 5292 of 2004 (the Fuljit Kaur decision) decided on this date, the appeal must be allowed. The High Court’s December 6, 2006 order is set aside and the Demand Notice is upheld. The appellant is entitled to recover the additional price in accordance with law. The decision clarifies that liability to pay additional price under the Punjab Urban Estate Rules can be enforced consistent with the Fuljit Kaur framework, upholding the validity of the demand and permitting recovery by the State. The judgment thus resolves the previous split on allotment price adjustments and prescribes a uniform approach for enforcing such recoveries in analogous cases going forward.

2010-07-15

Harish Singh Nagra & Ors. v. Kapil Sibal & Ors.

Mehfil-e-Wukala, a Supreme Court cultural-literal association of lawyers, published a souvenir containing messages, articles, and poems by judges and senior advocates. Kapil Sibal, a senior advocate and then a candidate for President of the Supreme Court Bar Association, sent a message criticizing the junior Bar and urging reforms, which was circulated within Mehfil’s members but not released to the press or sold publicly. Petitioners, five practicing advocates from the Punjab and Haryana High Court, filed criminal contempt proceedings under Article 215 of the Constitution alleging that Sibal conspired with others to bring the administration of justice into disrepute. The High Court transferred the case to this Court. The central issue was whether the message, read in its proper context, amounted to contempt under Section 2(c) of the Contempt of Courts Act, 1971. The Court held that the message, read in its prospective context, did not scandalize or tend to scandalize any court, nor obstruct the administration of justice; it was a fair critique aimed at improving the system. Citing P.N. Duda, Mulgaokar, Ambard, Vishwanath, and others, the Court reaffirmed that freedom of expression under Article 19(1)(a) protects fair, reasoned criticism of judgments and judicial institutions. It noted that the Times of India article excerpt misrepresented the message, but the souvenir’s limited internal distribution and the respondent’s apology supported dismissal. Accordingly, the contempt petition was dismissed and notices discharged.