P.K. SHAHI v. G.D.A.

Case / Petition Number:
Civil Appeal No. 5875 of 1999

Case Synopsis & Summary

This is an MRTP Act dispute arising from a plot allotment in Ghaziabad under the Indrapuram scheme. The appellant, P.K. Shahi, paid the registration (Rs 42,000) and reservation (Rs 63,000) amounts, and later installments totaling more than Rs 5 lakh, but no possession was handed over as delays persisted. The respondent Ghaziabad Development Authority (GDA) issued a 28 February 1995 notice demanding the balance amount with interest, stating that if payment was not made by 30 May 1995 penal interest would be charged. The appellant admitted delay in payments in a letter but requested not to cancel the allotment and expressed willingness to pay the balance due. Subsequent payments were partial, and the GDA maintained demand for penal interest. The appellant filed an unfair trade practices complaint under sections 36A, 36B(a) and 36D of the MRTP Act before the Commission. The MRTP Commission dismissed the complaint, holding that there was no unfair trade practice and that the calculations were consistent with the allotment brochure. On appeal, the Supreme Court asserted that while liability to pay interest hinges on who caused the delay, the determination must be based on facts; even if delay occurred, the appellant could not avoid payment for the balance. The Court distinguished Bihar State Housing Board v. Lalit Ram as inapplicable, upheld the Commission’s order, and dismissed the appeal, holding the appellant liable to pay the due amount before possession."

Precedent Explorer

Find Cases Like This

Explore other judgments dealing with similar legal situations, facts, or statutory provisions.

Case Details & Bench

Court
Supreme Court of India
Hon'ble Judges
  • S. Saghir Ahmad
  • R. P. Sethi
Judgment Date
2000-04-03
Court Decision / Holding
Appeal dismissed. The appellant is held liable to pay the amount demanded from him before the delivery of possession of the plot. No costs.
Final Disposition
Appeal dismissed

Parties to the Case

Appellants / Petitioners

  • P.K. Shahi

Respondents

  • Ghaziabad Development Authority

Legal Representation & Advocates

Counsels for Petitioners

  • • Vikas Singh
  • • Yunus Malik
  • • Reetesh Singh
  • • Ms. Richa Kachhwaha
  • • Lakshmi Raman Singh

Counsels for Respondents

  • • Raju Ramachandran
  • • Rakesh Uttamchandra Upadhyay

Provisions of Law Cited

Monopolies and Restrictive Trade Practices Act, 1969Section 36-ASection 36-B(a)Section 36-D

Submissions & Arguments

Contentions of Appellants / Petitioners

The appellant contends that the respondent-authority was responsible for the delay in delivery of possession. Consequently, penal interest should not be charged for the period prior to 30 May 1995. The allotment letter and brochure set the terms for payment and interest; the appellant admitted delay but sought not to cancel the allotment and offered to clear the dues. He argues that the delay caused by the Authority and cost escalations should not fall on the allottee, and that the concession granted in the 28 February 1995 letter did not justify charging interest from a date earlier than the specified concession period, nor let the Authority collect interest for the pre-concession period. The appellant emphasizes that he had already paid substantial sums and that the Commission correctly recognized the absence of unfair trade practices.

Contentions of Respondents

The respondent Authority asserts that the appellant delayed payments despite inspection and notices; the liability to pay interest arises from the terms of the allotment letter and the brochure, which authorise interest and charges if payment is late. It argues that the Commission properly calculated the outstanding amount in light of those terms and that the delay in project completion was due to factors including financial constraints and delays caused by allottees themselves; the authority was prepared to facilitate possession on clear payment and denied unfair trade practices as alleged. The authority maintains that the delay could not absolve the appellant of liability for the balance due under the agreement.

Legal Doctrine & Issue Explorer

Explore This Legal Issue

Find relevant judgments and authoritative positions on the legal questions discussed here.

Cited Precedents (1)

Case NameCitationTreatmentExplanation
Bihar State Housing Board v. Lalit Ram[1997] 10 SCC 339DistinguishedThe Court held that this case is inapplicable to the facts of the present case; the delay and liability were distinguished on facts, so it could not control the decision.
Case Applicability Diagnostic

Apply This to My Facts

Share your situation and test whether this judgment governs, supports, or challenges your case.

Official Judgment Record
•2,545 words•~12 min read

In The Court Record

P.K. SHAHI v. G.D.A.

A # PRASHANT KUMAR SHARI _v._ ## GHAZIABAD DEVELOPMENT AUTHORITY APRIL 3, 2000 B [S. SAGHIRAHMAD AND R.P. SETHI, JJ.] _Monopolies and Restrictive Trade Practices Act, 1969:_ c _Section 36-A-Unfair Trade Practice-Plot of land-Allotment ofAllottee failed to pay timely instalments in respect of a plot of land-Allottee did not deny his liability to pay balance amount with interest-Development Authority therefore, demanded amount with penal interest handing over possession of plot-Validity of-Held: Development Authority's demandjustifiedNo case of unfair trade practice made out against Development AuthorityAllottee 's complaint rightly dismissed-Urban Development._ D > _Allotment of plot of land-Delay in delivery of possession-Balance amount-Interest on-Held: If the Development Autliority is responsible for the delay, the allottee cannot be burdened with the interest on the balance amount._ E F The. respondent-Authority allotted a plot of land to the appellant after he had paid the registration and reservation amounts. Subsequently, the appellant paid the first and second instalments. Five instalments became due thereafter. The respondent-Authority, by a letter dated 28.2.1995, called upon the appellant to pay the balance amount together with other charges latest by 30.5.1885. It was also stated in the said latter that if payment was not made within the due date penal interest would be charged. G The appellant himself, through his letter, admitted the delay in payments and requested not to cancel the allotment and also indicated his willingness to pay the entire amount outstanding against him. However, the appellant paid only a part of the balance amount due. The respondentAuthority, therefore, did not not hand over possession of the plot and demanded penal interest as per its letter dated 28.2.1995. Being aggrieved the appellant filed a complaint of unfair trade practice before the MRTP Commission under Sections 36-A, 36-B(a) and 36-D H of the. Monopolies and Restrictive Trade Practices Act, 1969. The MRTP 896 897 P.K. SHAHI _v._ G.D.A. [SETHI, J.] A Commission dismissed the complaint. Hence this appeal. On behalf of the appellant it was contended that the respondentAuthority was responsible for the delay in delivery of possession of the plot and, therefore, the appellant was not liable to pay penal interest for the period prior to 30.5.1995. B Dismissing the appeal, this Court HELD : 1.1. It is true that if the Authority is found to be responsible for the delay in delivery of possession of the plot in terms of the agreement arrived at or according to the assurance given in the brochure, the _allottee_ cannot be burdened with the interest on the balance amount not paid by him. However, it has to be found on facts as to whether the Authority or the allottee was responsible for the alleged delay. [900-F-G] 2. Having failed to perform his part of the contract, the appellant cannot be permitted to urge that he is not liable to pay the balance amount along with interest as according to him the respondent-Authority had failed to deliver possession as per the terms of the brochure. The Authority was not expected to deliver possession in the absence of payment of the agreed amount. Having failed to perform his part of the agreement, the appellant cannot be permitted to urge, at this stage, that he was not liable to pay the interest as agreed to by him at the time of accepting the allotment of the plot in his favour. By the letter dated 28.2.1995 the appellant was given further opportunity to make the payment of the balance amount along with other charges mentioned therein by a specified date, failing which interest was to be charged from him. The letter did not envisage that such interest was to be charged from a date subsequent to 30.5.1995 and not prior to it. The mention of the date was only to intimate the appellant of the concession given to him and upon his failure to avail ·of the benefit by the specified date, he was liab!e to pay the interest as agreed upon. [901-F-H; 902-A-BJ _Bihar State Housing Board_ v. _La/it Ram,_ [1997] 10 SCC 339, held inapplicable. c D E F CIVIL APPELLATE JURISDICTION: Civil Appeal No. 5875 of 1999. From the Judgment and Order dated 29.6.99 of the M.R.T.P. Commissioner, New Delhi in U.T.P.E. No. 92 of 1997. H 898 [2000) 2 S.C.R. A ## SUPREME COURT REPORTS Vikas Singh, Yunus Malik, Reetesh Singh, Ms. Richa Kachhwaha and Lakshmi Raman Singh for the Appellant. Raju Ramachandran and Rakesh Uttamchandra Upadhyay for the Respondent. B c D E F G H The Judgment of the Court was delivered by SETHI, J. The appellant applied for the allotment of a plot measuring 350 sq.mtrs. under the Scheme of "Indrapuram" and paid registration amount of Rs.42,000 on 28th July, 1989. A further sum of Rs.63,000 being the reservation amount was paid and plot allotted to him vide letter of the respondent-authority dated 5th November, 1989. The first instalment of Rs.76,125 was paid by him on 16th August, 1990. Further instalments during 1990-95 were not paid allegedly on the ground that the respondent-authority had not made any development at the site. The appellant further stated that he was made to believe that the possession of the plot would be handed over to him by the year 1991. Vide letter dated 28th February, 1995, the appellant was informed that if the balance amount is not paid by him_ by 30th November, 1995, interest would be charged on the balance amount due: The appellant's contention is that in terms of the aforesaid letter the interest, if any, can be charged for the period commencing from 30th November, 1995 and not earlier to it. He had already paid a total sum of Rs.5,74,993 but the respondents were allegedly wrongly insisting for the payment of an additional amowit of Rs.2,34, 127 before delivery of possession of the plot. As the plot was not delivered to him, the appellant filed a complaint under Sections 36A, 36B(a) and 360 of the Monopolies & Restrictive Trade Practices Act (hereinafter referred to as "the MRTP Act") before the Monopolies and Restrictive Trade Practices Commission (herein3.fter referred to as "the Commission") which was registered as Unfair Trade Practice Enquiry No.92197. Notice of enquiry under the provisions of the MRTP Act was issued to the respondent who appeared before the Commission and contended that the appellant himself through his letter dated 13th December, 1996 admitted the delay in payments and indicated his willingness to pay the entire amount outstanding against him with the request not to cancel the allotment due to delayed payments. The amount liable to be paid by the appellant was stated to have been calculated strictly in accordance with the terms and conditions 899 P.K. SHAHI _v._ G.D.A. [SETHI, J.] of the brochure circulated. The respondents could have cancelled the allotment in terms of the regulations contained in the brochure but it was not done to facilitate the appellant to make the payment of the balance amount. It was contended that the necessary facilities of sewerage, drainage, water supply and electricity connections were made available to the plot-holders including the appellant in Indrapuram Scheme. Regarding delivery of possession, it was contended on behalf of the respondent-authority, that in the brochure only estimated time of completion of scheme was indicated and delay in completion had occurred due to various factors including the constraints of funds. It was further pleaded that the paucity of financial resources had been caused due to delay or default in payment by the allottees like the appellant. A B _c_ On the basis of the pleadings of the parties, the Commission framed the following issues: "I. Whether .the respondent has been indulging in unfair trade practices as afleged in the NOE? D 2. Whether these unfair trade practices are prejudicial to the interest of the complainant/ other members of the public? 3. Whether he is entitled to relief/compensation claimed made by him in the compensation application? E 4. Relief, if any?" After referring to the pleadings and the evidence produced, the Commission concluded: F "It transpires that the applicant/complainant has of his own accord, approached the respondent and indicated his willingness to pay the amount due from him. Not only has he shown his desire to clear the dues, he has also acknowledged that there has been delay on his part in making the payment. Perusal of the allotment letter reveals that there is a stipulation with regard to payment of interest and penal interest if the payment is not made within the prescribed time limit. As both the applicant/complainant as well as the respondent are relying on the allotment letter, it stands to reason that the outstanding amount including interest should be calculated in the light of this letter of 5.11.1989. It ~ppears from the affidavit of evidence filed on G H 900 [2000] 2 S.C.R. A ## SUPREME COURT REPORTS B c D E F G behalf of the respondent that the calculations have been made on the basis of fu,at letter and the respondent has accordingly, indicated the amount to the applicant/complainant. In that view of the matter, the applicant/complainant's contention that interest should be charged after 30th May, 1995 is not tenable. It is also quite apparent that there has been delay in the completion of the project but delay seems to have been caused by circumstances beyond the control of the respondent. It is also common knowledge that there has been cost escalation and cost etimates of 1989 need revision and the revised estimate is bound to be much higher than the original estimate. It appears that development of infrastructure and provision of utilities like water supply and electricity connection have also contributed to the hike in the estimated cost and demand for additional charges for sewerage, lease rent, etc., cannot be construed or considered to be an unfair trade practice on the part of the respondent. It also transpires that the respondent is charged with the responsibility of developing land for plots/flats and making the same available to the allottees like the applicant/complainant on actual cost value basis and the total cost incurred by it is required to be recovered from the allottees. Iii that· view of the matter, there is no escape from the conclusion that no case of unfair trade practices by and on behalf of the respondent has been made out and no prejudice seems to have been caused to the applicant/ complainant as a consequence thereof." Learned counsel appearing for the appellant relying upon a judgment of this Court in _Bihar State Housing Board and Ors._ v. _Lalit Ram,_ [1997] 10 sec 339 submitted that as the respondent-authority has been proved to be responsible for the delay in delivering possession of the plot, the appellant could not be burdened to pay the penal interest for the period anterior to 30th .May, 1995. It is true that if the authority is found to be responsible for the delay in delivery of the possession of the plot in terms of the agreement arrived at or according to the assurance given in the brochure, the allottee cannot be burdened with the interest on the balance amount not paid by him. However, it has to be found on facts as to whether the authority or the allottee was responsible for the alleged delay. According to the available records and the submissions made on behalf of the appellant it transpires that the schedule for payment of the total estimated cost of the plot being Rs.4,29,000 and registration amount of Rs.42,000 was to be paid in the following instalments: H P.K. SHAID _v._ G.D.A. [SETHI, J.J 901 A ||P.K. SHAID_v._G.D.A. [SETHI, J.J|G.D.A. [SETHI, J.JJ.J<br>901|A| |---|---|---|---| |_"S.No._|_Instalment Description_|_Due dateofpayment_|A| |1.|Reservation Amount|4.12.1989|| |2.|InstalmentNo.1|4.5.1990|| |3.|Instalment No.2|4.11.1990|| |4.|Instalment No.3|4.5.1991|B| |5.|Instalment No.4|4.11.1991|| |6.|Instlament No.5|4.5.1992|| |7.|Instalment No.6|4.11.1992"|| > It further transpires that after paying the initial amount of Rs. 42,000 the appellant paid the first instalment of Rs. 63,000 on 3.1.1990 and second instalment of Rs.76,125 on 16th August, 1990 total being Rs.1,81,125. Amounts of instalment due on 4.11.1990, 4.5.1991, 4.11.1991, 4.5.1992 and 4.11.1992 were, admittedly, not paid on the due dates. The respondentauthority vide its letter dated 28th February, 1995 called upon the appellant to make upto date payments and 10% of premium of his plot as lease rent and Rs.4800 as sewer connection and water connection charges latest by 30th May, 1995. It was pointed out that "if the payment is not made within the due_ date interest shall be charged @ 18% & chokidata fee Rs.5 per day shall be charged after 30.5.95". Admittedly, till 16.10.1996 no amount was paid. Even ' on that date a sum of Rs.72,188, the amount of instalment payable on 4.11.1990 was actually paid. The appellant thereafter paid a sum ofRs.2 lakhs on 7.1.1997 and Rs),29,600 on 13.1.1997 before filing his complaint in the Commission on 28th February, 1997. Having failed to perform his part of the contract, the appellant cannot be permitted to urge that he is not liable to pay the balance amount along with interest as according to him the respondentauthority had failed to deliver possession as per terms of the brochure. The authority was not expected to deliver possession in the absence of the payment of the agreed amount. Having failed to perform his part of the agreement, the appellant cannot be permitted to urge, at this stage, that he was not liable to pay the interest as agreed to by him at the time of accepting the allotment of the plot in his favour. The reliance of the learned counsel on the letter dated 28th February, 1995 is also misplaced inasmuch as by that letter he was given further opportunity to make the payment of the balance amount alongwith charges mentioned therein by a specified date, failing which interest and chokidata was to be charged from him. The letter did not envisage that such interest and chokidata was to be charged from a date subsequent to C D · E F G , H 902 [2000] 2 S.C.R. ## SUPREME COURT REPORTS A B 30th May, 1995 and not prior to it. The mention of the date was only to intimate the appellant of the concession given to him and upon his failure to avail of the benefit by the specified date, he was liable to pay the interest as agreed upon. The judgment of this Court in _Bihar State Housing Board and Ors._ v. _Lalit Ram_ (supra) is also of no help to him. In that case the allottee was found to have been intimating the Board time and againfor completion of the construction of the plot but despite his request the same was not completed and it was held that without completion of the construction, tlie :.foresaid allottee could not be asked to execute the agreement and upon his failure to execute the agreement, charged with the liability of paying the interest. The facts of the .present case are altogether different and distinguishable. c D After going through the whole record produced before us, we find that no ground is made out to interfere with the order of the Commission in this appeal. The appeal is, therefore, dismissed. The appellant is held liable to pay the amount demanded from him before the delivery of the possession of the plot. No costs. Appeal dismissed. v.s.s.
End of Judgment Record
Browse All Supreme Court of India (2000) Decisions
2000-04-11

State of Uttar Pradesh v. Babu Ram

This is a Supreme Court judgment arising from Criminal Appeal Nos. 279-281 of 1995, challenging an acquittal by a Division Bench of the Allahabad High Court in a triple murder case. The prosecution alleged that Babu Ram, the elder son, murdered his father, mother and younger brother on 25 November 1990, and buried the bodies in a pit in the verandah after an attempt to secure a larger share of property. The Sessions Judge convicted him under Section 302 IPC and awarded the death penalty; the High Court acquitted, doubting the prosecution’s motive and criticizing the site-plan and the handling of an alleged extra-judicial confession. The State preferred special leave to appeal. The Supreme Court held that motive is a relevant factor in all criminal cases, including those based on circumstantial evidence, and that failure to prove motive does not automatically weaken the prosecution’s case. It rejected the High Court’s reasons for discounting the disinterment evidence, found the circumstantial chain credible, and concluded that the trial court’s conviction was warranted. However, the Court refrained from imposing the death sentence, substituting life imprisonment under Section 302 IPC. The judgment emphasizes that motive cannot be treated as a fatal flaw and that defence evidence must be given due weight in evaluating credibility.

2000-12-01

M.G. Badappanavar v. State of Karnataka and Ors.

This judgment concerns the seniority and promotional rights of general versus reserved candidates within the Karnataka government service, specifically focusing on roster-based promotions. General and reserved candidates started as Junior Engineers and moved through levels via roster promotions (Level 1: Junior Engineer/Assistant Engineer; Level 2: Assistant Executive Engineer; Level 3: Executive Engineer) before reaching Level 4 (Superintending Engineer). The roster system was used to ensure backward-class representation at certain levels, but there was a dispute whether seniority could be counted from roster-point promotions for subsequent promotions. The general candidates argued that, once they and the reserved candidates reached Level 3, the general candidates should be eligible for promotion to Level 4 as seniors to reserved candidates who had already reached Level 3 earlier, a position supported by the Ajit Singh II decision. The Karnataka Administrative Tribunal (KAT) had held that roster-point promotees would be senior from the date of roster promotion and that reserved candidates promoted to Level 3 could be treated as senior to general candidates at Level 3–thus denying relief to general candidates. The Supreme Court, relying on Ajit Singh II and Sabharwal, held that seniority cannot be counted from roster promotions and that promotions must follow normal channels; it directed a review of seniority lists and promotions, with limited protections for certain pre-1996 promotions and no arrears, and emphasized the basic-structure principle. The judgment ultimately allows the appeals, sets aside the Tribunal’s order, and lays out instructions for expeditious implementation of its directions within six months.

2000-09-21

Janatha Bazar v. Secretary, Sahkari Noukarara Sangha

This Supreme Court decision concerns four employees of Jana Tha Bazar, a Karnataka-based cooperative society, who were dismissed after being charged with breach of trust and misappropriation of goods. The Labour Court, while accepting the charges, exercised its discretion under Section 11-A of the Industrial Disputes Act, 1947 to reinstate the workers with 25% back wages, along with continuity of service but with a penalty of five increments stoppage. The Karnataka High Court affirmed this award. The Society challenged the High Court’s order in appeal to the Supreme Court, arguing that it is unjust to reinstate employees whose proven misconduct includes misappropriation, and that the Labour Court cannot substitute the employer’s penalty nor reward misappropriation by extending back wages. The Court emphasizes that a proved act of misappropriation cannot be rewarded or legalized by reinstatement or back wages, regardless of past records or goodwill. It notes that the charges were clearly established by documentary evidence and audit reports, and that the Labour Court’s discretionary interference was unwarranted. Relying on well-settled jurisprudence, including Municipal Committee, Bahadurgarh v. Krishnan Behari, UP State Road Transport Corporation v. Basudev Chaudhary, and Punjab Dairy Development Corporation v. Kala Singh, the Court reverses the lower courts’ conclusions. The appeals are allowed, the High Court’s order is set aside, and there is no order as to costs.

2000-05-12

U.P. STATE ELECTRICITY BOARD v. UPPER JAMUNA VALLEY ELECTRICITY SUPPLY CO. LTD.

This appeal concerns the constitutional validity of the Indian Electricity (U.P. Amendment and Validation) Act, 1976, which amended Section 7-A of the Indian Electricity Act, 1910 to fix the purchase price of a licensee’s undertaking at its book value rather than its market value. The Uttar Pradesh State Electricity Board had given a notice to purchase the Upper Jamuna Valley Electricity Supply Co. Ltd. upon expiry of the licence, and the takeover was effectuated under the nationalisation policy. The respondent challenged the amendment, contending that it violated Articles 19(1)(f) and 31(2) and that the law amounted to extinguishing a right to the market price, i.e., a chose in action, or to a retroactive deprivation of property, and thus did not relate to a public purpose in a direct nexus with Article 39(b). The Calcutta High Court accepted the challenge; the issue then rose to the Supreme Court. The Court held that what is acquired is the undertaking, not a mere chose-in-action; the amendment simply changes the method of computing compensation and remains integral to nationalisation. Book value is an accepted accounting concept and cannot be said to be illusory. If several valuation principles are appropriate, Parliament may choose among them; the court should not challenge the selection. The law prevailing at takeover governs compensation; the appeal is allowed, and the lower courts’ judgments are set aside, with writ petition dismissed.