PILLAYAR P.K.V.K.N. TRUST THRU RAMANATHAN v. KARPAGA N.N.U.S. REP. BY SECRETARY

Case / Petition Number:
Civil Appeal Nos. 7305-7306 of 2010
Neutral Citation:[2010] 11 S.C.R. 1

Case Synopsis & Summary

Pillayar P.K.V.K.N. Trust, established in 1924 to oversee religious and social activities of Pillayarpatti Koil and the Nagarathar community, challenged a government de-reservation order affecting a 76.12-acre landholding at Tallakulam, Madurai, which had been subdivided into 910 plots with 40 plots reserved for public use (primarily a school). The Trust had sold most plots but retained the 40 for its own use. Following municipal merger, plan numbers 21/72, 1/75 and 12/80 governed the land use, with 40 plots later shown as residential in Plan 12/80. The State issued G.O. Ms. No. 244 (23.9.1994) de-reserving 2.5 acres including the 40 plots, subject to road handover conditions to the Madurai Corporation. The Trust challenged the GO, alleging malafides and excess of power; the High Court quashed the GO and directed the de-reservation be reversed, holding that the 40 plots were to remain reserved for public purposes under Plan No. 1/75. The Supreme Court reversed the High Court, holding that malafides and excess power findings were unfounded, that Section 38 (Tamil Nadu Town & Country Planning Act, 1971) deeming release can apply where land is not acquired within three years, and that Section 250 of the Madurai Corporation Act was inapplicable to this dispute. The Court upheld de-reservation and allowed the appeals, with periodic road-handling obligations clarified.

Precedent Explorer

Find Cases Like This

Explore other judgments dealing with similar legal situations, facts, or statutory provisions.

Case Details & Bench

Court
Supreme Court of India
Hon'ble Judges
  • V.S. SIRPURKAR
  • CYRIAC JOSEPH
Judgment Date
2010-09-01
Court Decision / Holding
Appeals allowed; High Court judgment set aside; Government GO 244 dated 23.9.1994 held valid; de-reservation of 2.5 acres including the 40 plots affirmed; the 40 plots to be treated as residential area subject to roads being handed over to the Municipal Corporation as required.
Final Disposition
Appeals allowed

Parties to the Case

Appellants / Petitioners

  • Pillayar P.K.V.K.N. Trust Thru Ramanathan

Respondents

  • Karpaga N.N.U.S. Rep. by Secretary

Legal Representation & Advocates

Counsels for Petitioners

  • • K. Ramamoorthy
  • • N. Shoba
  • • Sriram Thalapathy

Counsels for Respondents

  • • Dayan Krishnan
  • • Gautam Narayan
  • • Nikhil Menon
  • • Nikhil Nayyar
  • • S. Thananjayan
  • • T. Harish Kumar

Provisions of Law Cited

Tamil Nadu Town and Country Planning Act, 1971 – ss. 37, 38, 25, 27, 29, 33Madurai City Municipal Corporation Act, 1971 – ss. 250(2), 250(4)

Legal Doctrines & Maxims

  • Principles of natural justice
  • Right to private property and protection against deprivation without due process

Submissions & Arguments

Contentions of Appellants / Petitioners

The Trust contends that the 1994 de-reservation GO was not valid, as the plan rights crystallized under the Tallakulam Panchayat-turned-Madurai Corporation framework, and the earlier plan (PR No.21/72 and 12/80) reserved plots for residential or public purposes; de-reservation and conversion to residential use breach the Trust’s vested rights, as no acquisition occurred and the three-year deeming provision under Section 38 should have released the land only where conditions met. The High Court’s reliance on Section 250(2) of the Madurai Act was erroneous; the Trust had already alienated substantial land and handed over roads; de-reservation should not override vested rights already crystallized through prior plans.

Contentions of Respondents

The residents’ representatives argued that the de-reservation was a proper executive action grounded in the Director of Town Planning’s recommendation and the Government’s GO; the High Court’s reading misinterpreted the scope of the judgment in W.P. No. 1565/87 and the plan No. 9/92. They maintained that the land was not acquired by agreement and that de-reservation under Section 38 is legitimate where the public purpose is not pursued within the statutory period, and that Section 250(2) of the Madurai Act was not applicable to this (private land) case.

Legal Doctrine & Issue Explorer

Explore This Legal Issue

Find relevant judgments and authoritative positions on the legal questions discussed here.

Cited Precedents (3)

Case NameCitationTreatmentExplanation
Raju S. Jethmalani & Ors. v. State of Maharashtra & Ors.2005 (11) SCC 222DistinguishedHigh Court’s reliance on a similar fact pattern was rejected; the decision was distinguished on grounds of differing factual scenario, particularly about applicability of Section 250.
Bangalore Medical Trust v. B.S. Muddappa & Ors.1991 (4) SCC 54DistinguishedCited and distinguished in the Court’s analysis relative to property rights and prerequisites for a state to restrict private land use.
Balakrishna H. Sawant & Ors. v. Sangli Miraj & Kupwad City Municipal Corporation & Ors.2005 (3) SCC 61DistinguishedUsed to illustrate comparative jurisprudence but distinguished due to different statutory frameworks and facts.
Case Applicability Diagnostic

Apply This to My Facts

Share your situation and test whether this judgment governs, supports, or challenges your case.

Official Judgment Record
•7,697 words•~35 min read

In The Court Record

PILLAYAR P.K.V.K.N. TRUST THRU RAMANATHAN v. KARPAGA N.N.U.S. REP. BY SECRETARY

A ## [2010] 11 S.C.R. 1 ## PILLAYAR P.KV.K.N. TRUST THRU RAMANATHAN _v._ KARPAGA N.N.U.S. REP. BY SECRETARY & ORS. (Civil Appeal Nos. 7305-7306 of 2010) ## SEPTEMBER 1, 2010 B [V.S. SIRPURKAR AND CYRIAC JOSEPH, JJ.] _Urban Development_ - _Town planning_ - _Trust_ acquiring~ - - _certain land Dividing of the land into plots Approval of layout plan for the land_ - _Trust selling off the plots except forty_ C - _Plots On revalidation of the plan, the forty plots shown as_ - _reserved for public purpose A subsequent layout plan, which cancelled the previous plan, demarcated the forty plots as_ - _residential area Denial to make construction on two of the forty plots by Municipal Corporation on the ground that the_ o _plots were reserved for public purpose_ - _Later in subsequent_ - _plan the forty plots shown as reserved for public purpose The same being questioned, the State de-reserved the area_ - _earmarked for public purpose Order of de-reservation setaside by High Court_ - _On appeal, held: Order of the High_ E - _Court is erroneous Challenge to the order of de-reservation_ - _was not correct Madurai City Municipal Corporation Act,_ - - _1971 s. 250(2) Tamil Nadu Town and Country Planning_ - _Act, 1971 ss. 37 and 38._ Appellant-Trust acquired certain land to the extent of F 76.12 acres. It divided the same into 910 plots and prepared a layout plan for the entire extent of the land. The plan contained provisions for roads which area was to the extent of 21 acres. This layout plan was approved by Town Panchayat in the year 1972 in P.R.No. 21172. The G Trust sold the plots, retaining 40 plots for its own use. After merger of the Town Panchayat with the City Municipal Corporation,. the original plan (21/72) was revalidated as Plan No. 1/75 wherein the 40 plots were 1 . H . H 2 SUPREME COURT REPORTS [201 OJ 11 S.C.R. - A shown as reserved for school. Thereafter in 1979-80, the local Planning Authority prepared a detailed development plan which also included the lands covered by the layout plan of the Trust and the same was approved as Plan No. 12/80. In this plan the 40 plots were demarcated as - B residential area. It was later informed to the Municipal Corporation that Plan No. 1/75 was to be treated as cancelled and Plan No. 12/80 alone would be valid. - The Municipal Corporation granted approval to the - C Trust for construction on one of the plots. But when the Trust sought approval for construction on other two of the plots, it was denied on the ground that the area was reserved for public purpose i.e. for school building. The denial of approval was held to be illegal by the High Court in a writ proceeding initiated by the Trust. The High Court - D observed that the approval in respect of the area comprising of the 40 plots could be denied by Municipal Corporation only if the area would be classified as 'reserved for public purposes' within a period of three months from the date of the judgment. No action was - E taken, as per rules, to covert the area 'reserved for public purposes'. When the Trust applied for approval of construction on other plots, the same was again denied on the ground that the area was reserved for construction of the school. The representation of the - F Trust, questioning the Plan No. 9/92, was accepted1Jy the State Government. The State, accordingly passed G.O. Ms. No. 244 dated 23.9.1994, whereby it granted permission to de-reserve 2.5 acres of land earmarked for the school in the plan No. 1/75 and held that the same - G would be residential area subject to the condition that all the roads in the layout area were handed over to the Municipal Corporation. The Trust had pointed out that it had already surrendered all the roads to the Panchayat by executing a gift deed. H ## PILLAYAR P.K.V.K.N. TRUSTTHRU RAMANATHAN _v._ KARPAGA N.N.U.S. REP. BY SECRETARY ## The order of de-reservation passed by the State A Government vide G.O. Ms. No. 244 dated 23.9.1994 was challenged. The High Court took notice of the facts that in the earlier writ petition filed by the appellant-Trustee, the High Court had not dealt with the development Plan No. 9/92, and thus the G.O. Ms. 244 dated 23.3.1994 was B illegal and vitiated by _ma/afides_ and was in excess of powers of the Government; and that the Municipal Corporation had made a demand u/s. 250(4) of Madurai City Municipal Corporation Act from the appellant and the said demand was quashed by the High Court. Therefore, c the instant appeals were filed by the appellant-Trust. ## Allowing the appeals, the Court HELD: 1. The High Court was wrong in deducing that on the basis of the reading of the judgment passed in the D earlier writ petition, G.0.No. 244 dated 23.3.1994 was illegal, vitiated by _malafides_ and was in excess of powers of the Government. The said order also could not be faulted as being in violation of principles of natural justice. It is true that a reference to the High Court E j:.idgment is made in the order dated 23.9.1994 which was impugned before the High Court. However, that is not the only thing on which the Government has relied upon. In fact, the judgment of the High Court was studied by the Director of Town and Country Planning, who F recommended the case for de-reservation, subject to the conditions that trustees may be required to hand-over all the roads to the Municipal Corporation. There is no reason to doubt the correctness of this recommendation made by the Director, who was aware of the earlier position. He was aware that this layout was part of 21/72 G plan and it was duly approved by the Town Panchayat and it then continued to be so, vide plan No.12/80 to the exclusion of the plan of 1975. It is presumed that the D F G H 4 SUPREME COURT REPORTS [2010] 11 S.C.R. - A Director did consult the earlier correspondence on the subject. [Paras 13 and 14] [14-B-F] 2. Even if it is presumed that the 40 plots were included under the plan of 1992, yet since the land was not acquired either by agreement or by acquisition, they 8 would be deemed to have been released from reservation. In view of the admitted position that the land is not acquired by agreement till the date of the judgment of the High Court, the deeming clause as provided u/s. 38 of Tamil Nadu Town and Country Planning Act, 1971 would C certainly come into force and, therefore, the concerned land would certainly be deemed to have been released. [Paras 14 and 15) [15-A-C] _Raju_ S. _Jethmalani and_ Ors. vs. _State of Maharashtra_ 0 _and_ Ors. 2005(11) SCC 222; _Bangalore Medical Trust_ vs. _B._ S. _Muddappa and_ Ors.1991 (4) SCC 54; _Balakrishna H. Sawant and_ Ors. vs. _Sangli Miraj and Kupwad City Municipal Corporation and_ Ors. 2005 (3) SCC 61, distinguished. E 3. Reliance on Section 250(2) of Madurai City Municipal Corporation Act, 1971 by the High Court was completely uncalled for in the instant controversy. In the instant case, the Writ Petition was filed before the High Court challenging the G.O.Ms. 244 dated 23.9.1994. In fact, in the three questions which the High Court had posed, F Section 250 did not find place. Section 250 speaks about the obligation on the part of the owner to make a street while disposing of the lands as building sites. Subsection (2) on which a heavy reliance was placed by the High Court, speaks about the owner's liability to reserve G 10% of the lay-out for the common purpose in addition to the area provided for laying out streets. It is nobody's case that the area of the 40 plots, in all, comes to 10% of the total area besides the area which was reserved for the streets. The High Court completely ignored the fact that H PILLAYAR P.K.V.K.N. TRUST THRU RAMANATHAN _v._ KARPAGA N.N.U.S. REP. BY SECRETARY the appellant-trust had already parted with more than 21 A acres of its land while getting the approval from the Town Panchayat for the layout. There is clear correspondence on the record to the effect that the appellant-Trust had not only parted with 21 acres, but had also effected a gift deed in respect of that land. It is nobody's case and indeed the B High Court has also not found that the 40 plots would be the aforementioned 10% of the total lay-out area. There is absolutely no basis for the High Court to invite the applicability of Section 250(2) by making reference to 10% of the area. Therefore, the factual background, on which C the provision is tried to be made applicable, itself, is not established and the finding to that effect is incorrect. The question as regards applicability of s. 250 had been decided by High Court in the writ petition filed by the Trust, and as such there was no question of invoking 0 Section 250. This decision was also affirmed in appeal by the High Court. [Paras 18 and 19] [18-D-H; 19-A-E] > 4. The High Court has also erroneously compared the provisions of Section 37 and 38 of the Tamil Nadu Town and Country Planning Act and Section 250 of the E Madurai Corporation Act. There is no question of any such comparison. There was no necessity to consider as to whether Section 250 of the Madurai Corporation Act repealed the provisions of Tamil Nadu Town and Country Planning Act, 1971 for the simple reason that such F question could never have fallen for consideration. Section 250 was not applicable to the controversy at all. It operates into an entirely different field and the factual basis for inviting that Section was also not available in the circumstances of the instant case. [Para 20] [19-F-H] G 5. It cannot be contemplated that once the land, even if it was reserved for public purpose lik~construction of school in the plan of 1992 and got released, because it H 6 SUPREME COURT REPORTS [2010] 11 S:C.R. A was not acquired for more than three years in terms of Section 38 of Tamil Nadu Town and Country Planning Act, could be then taken away from the owner on the plea u/s. 250 of the Madurai Corporation Act. [Para 21] [20-AB] . B > 6. The High Court went on to record its comments on the judgment of the High Court passed in the earlier writ petition which was filed by the Trust. The original writ petitioner in the instant case was a party to that writ petition and to the judgment whereby specific permission C was granted for the construction in plot Nos. 276 and 269 which was part of the 40 plots. [Para 23] [20-G] 7. The High Court gave the direction that the plots covered in LP/MR 1n5 cannot be used for any purpose D other than public purpose mentioned therein with the exception of the plot Nos. 276 and 369. This was a completely incorrect direction particularly because way back in 1982, plan No.1/75 was treated as cancelled and th.ere was no revival of that plan. Morever, respondent E No.1 has also filed a suit in the Court of Additional District Munsif, in his capacity as a resident of Karpaga Nagar Colony, wherein he had sought for an injunction restraining the Trust from selling or using the property for any purpose other than the purpose for which it was F reserved in LP MR 1/75. Therefore, the judgment of the High Court cannot be affirmed. The Writ Petition filed by the respondent is directed to be dismissed with costs of Rs.50,000/-. [Paras 25, 26 and 27] [21-D-H] Case Law Reference: G 2005 (11) sec 222 distinguished. Para 16 1991 (4) sec 54 distinguished. Para 16 2005 (3) sec 61 distinguished. Para 16 H PILLAYAR P.K.V.K.N. TRUST THRU RAMANATHAN _v._ KARPAGA N.N.U.S. REP. BY SECRETARY 7 CIVIL APPELLATE JURISDICTION : Civil Appeal Nos. 7305-7306 of 2010. A From the Judgment & Order dated 27.4.2007 of the High Court of Judicature at Madras in W.P. No. 5051 & 19015 of 1996. B K. Ramamoorthy, N. Shoba, Sriram J. Thalapathy for ti1e Appellant. Dayan Krishnan, Gautam Narayan, Nikhil Menon, Nikhil Nayyar, S. Thananjayan, T. Harish Kumar for the Respondents. c The Judgment of the Court was delivered by **V.S. SIRPURKAR, J.** 1. Leave granted .. 2. The appellant-a religious Trust challenges the judgment of the Division Bench of the High Court whereby the High Court allowed the Writ Petition filed by the respondent No.1 herein. The respondent No.1 claims to be the representative body of the residents of the area called Karpaga Nagar. The High Court while allowing the Writ Petition issued the following direction: D E "We allow the writ petitions and direct that the plots covered in LP/MR 1/75 cannot be used for any purpose other than the public purposes mentioned in such LP/MR 1/75." The High Court, however, did not include two plots, namely, plot Nos. 276 and 369, meaning thereby that those plots could be used for any other purpose. I 3. Some ~factual background would be necessary before w~_approach the controversy. The appellant is a Trust formed ·in the year 1924 to look after religious and secular activities of Pillayarpatti Koil situated at Pillayarpatti and for the welfare of Nagarathar community. The Trust acquired properties in Tallakulam village in Madurai District including lands in S. No. 92, 94, 120 to 126, 130 to 133, 176/1 and 178. These F G H SUPREME COURT REPORTS [2010] 11 S.C.R. 8 A properties were sub-divided into 910 plots and they are named as Karpaga Nagar. The Trust thereafter prepared a detailed layout plan for the entire extent of 76.12 acres in all, in which the provision was made for 60 feet, 50 feet and 40 feet roads. The road area was to the extent of about 21 acres. This layout B plan was submitted to Tallakulam Town Panchayat which was the appropriate authority in the year 1972. This layout plan was · approved by Tallakulani Town Panchayat vide its order dated 19.5.1972 in P.R. No. 21 of 1972 under Rule 3 of the Tamil Nadu Panchayats Building Rules, 1970. Pursuant thereto, C majority of the plots were sold by the Trust retaining about 40 plots for its use. The said Tallakulam Town Panchayat along with other Town Panchayats merged with Madurai City Municipal Corporation on 30.1.1974 and, therefore, the laws applicable to Madurai Corporation were made applicable to Tallakulam. The Madurai Corporation insisted to r~validate the plan. The 0 Trust again applied for revalidation of the original plan in 21/ 72. Plan No.1/75 showed 40 plots as re~erved for school. The appellants herein claimed that as per the savings clause the Corporation was bound by all rights and liabilities created by the erstwhile Town Panchayat before the date of merger. E 4. Thereafter, in the year 1979-80, the Local Planning Authority of Madurai prepared a detailed development plan which also included the lands covered by the appellant's layout plan. This detailed development plan was approved as DTP F (MR) 12/80. In this plan the area relating to the 40 plots which were retained by the appellant Trust, was demarcated and shown as residential area. Finding that they were contrary to plan No.1 of 75, clarification was sought and it is claimed that the Deputy Director, Regional Town & Country Planning, by his G letter ROC No. 4589/82 dated 30.8.1982 informed the Corporation of Madurai that plan No.1/75 may be treated as cancelled and plan No.12/80 alone would be valid. 5. Thereafter when the Trust proposed to make some constructions in plot No.342, Madurai Corporation granted its H PILLAYAR P.K.V.K.N. TRUSTTHRU RAMANATHAN _v._ KARPAGAN.N.U.S. REP. BY SECRETARY [VS. SIRPURKAR, J.] approval by order No. K.3/PR 533/82. However, when the fresh A application was submitted for putting up construction in plot No. 276 and 369, the Corporation by its order dated 16.12.1986, rejected the application on the ground that this area was reserved for public purpose of putting up school building. Thereafter, the appellant filed a Writ Petition No. 1565 of 1987 B for quashing the order of rejection and for a direction to the Madurai Corporation for grant of approval for putting up the ·construction. In this, the plea was taken by the Corporation that the detailed development plan bearing No.12/80 was sought to be modified and hence the plan could not be approved. The C High Court by its order dated 21.11.1991 allowed this petition and held that the rejection of the plan was illegal. The High Court restored the applications in respect of plot Nos. 276 and 369 and directed Madurai Corporation to pass orders expeditiously. It was further stated that if the orders were not 0 passed within three months of the said date, the application for sanction of construction would be deemed to have been granted. It was, however, made clear by the High Court that the /"'applications could be rejected only if this area comprising of 40 plots was in the meantime classified as 'reserved for the public purposes' in the detailed development plan. A B C E 6. It seems nothing was done for inclusion of this area into the detailed development plan as per the procedure laid down under Section 25, 27, 29 and 33 of the Tamil Nadu Town & Country Planning Act, 1971 read with Rule 13,14 and 16 of the Preparation, Publication and Sanction of Detailed. Development Plan Rules. The appellant thereafter applied for approval of plan in respect of four other plots bearing No.326, 331, 336 and 340 of the layout plan. However, by its order dated 27.4.1993, the Corporation rejected the said application on the ground that the plots were forming part of the area reserved for construction of a school and hence the application for construction could not be allowed. Quoting all these facts, the appellant made a representation to the Director, Town and Country Planning No.807 Annasalai, Madras dated 15.6.1993 F G H 10 [201 O] 11 S.C.R. SUPREME COURT REPORTS A and pointed out that the stance taken by the Corporation was not correct and that this new plan No. 9 cf 92 would be completely illegal and against law. The appellant reminded the concerned authority that the plans were approved in the year 1972 itself by Tallakulam Town Panchayat by its order dated B 19.5.1972 and the rights of the respective parties had been crystallized at that time itself and it would not be just to disturb it after a lapse of 20 years by introducing new modifications in the detailed development plan and, therefore, the stand taken by the Corporation that the said area was reserved for school C purpose, was clearly in contravention of plan 12/80. In that' representation the Trust gave the whole history which has been stated above by us. It was pointed out that the whole area was reserved for residential purpose under the ::ipproved plan and on that strength, several plots were sold to several persons and they would also be affected if the modified plan No. 9/92 is 0 approved as it is. A prayer, therefore, was made that this petition to the proposed detailed plan No. 9 of 92 was liable to be considered in favour of the Trust on the basis of the detailed development plan No. 12 of 80, so that the Trust could utilize 40 plots for constructions. It seems that this representation was E accepted by the State Government which passed G.O.Ms. No.244 dated 23.9.1994. In this order it was suggested that the Government accepted the recommendation by the Director, Town and Country Planning and the permission was accorded to de-reserve 2.5 acres of land earmarked for school in the F approved layout LP/MR 1/75 in T.S. No.92/94 etc. and the same would be deemed to be residential area in Madurai Corporation subject to the condition that all the roads in the layout area should be handed over to the Madurai Corporatior by Pillayarpatti Karpaga Vinayagar Koil Nagarthar Trust. G 7. It appears that immediately after this order was passed, the appellant Trust pointed out that it had already surrendered before Tallakulam Panchayat all the roads in the Karpaga Nagar layout by executing a gift deed dated 11.5.1972. A copy of the H aforesaid gift deed was also sent by the Trust. It was thereafter / PILLAYAR PK.V.K.N. TRUSTTHRU RAMANATHAN _v._ KARPAGAN.N.U.S. REP BY SECRETARY [V.S. SIRPURKAR, J.] 11 informed by the Trustee on 28.2.1995 that the aforementioned gift deed was also registered and the roads were handed over to the Madurai Corporation. 8. It seems that this order of de-reservation passed by the State Government came to be challenged before the Madras High Court and by the impugned judgment, the Madras High Court set aside that order and directed that reserved area shown in the earlier plan LP/MR 1/75 cannot be used for any other purpose other than public purpose. The High Court, however, made an exception in case plots 276 and 369, perhaps because the earlier orders of the High Court were finalized in Writ Petition 1565 of 1987 to which reference has already been made earlier. 9. It is this judgment which has been challenged before us by the appellant Trust. Shri K. Ramamoorthy, learned Senior Counsel appearing on behalf of the appellant Trust, pointed out the earlier history starting right from 1972 and pointed out that out of that total 76.12 acres owned by the Trust, the Trust had already parted with 21.62 acres of land which was reserved for public purpose by way of a gift deed dated 11.5.1972 which was later reiterated in favour of the Corporation also. The learned Senior Counsel pointed out that it is only out of the remaining land that the Trust created as many as 832 plots out of which 40 plots were retained by the Trust. He then pointed out that after the whole plan was approved by the Tallakulam Town Panchayat on the basis of the Tamil Nadu District Municipalities Act, 1920 and Tamil Nadu Panchayat Act, 1958 as also under TN Panchayat Building Rules, 1970 framed by the Government by virtue of Section 178 of the Madras Panchayat Act, 1958. He then pointed out that the petitioners were the residents of the same plots and they had purchased the plots from the Trust and they were residing on the same plots. He also pointed out that on the merger (by taking recourse to Section 3 of Madras Corporation Act) of Tallakulam Panchayat in Madurai City Municipal Corporation on A B C D E F G H 12 SUPREME COURT REPORTS [2010] 11 S.C.R. - A 30.1.197 4, the matter went into the regime of the corporation. It was further pointed out that in the year 1975, the Trust applied for granting permission for layout which in fact was already granted by the Town Panchayat. The learned Senior Counsel further pointed out that in the year 1979-80, detailed draft plan B was prepared by Madurai Local Planning Authority under the Town & Country Planning Act, 1971 wherein the plots retained by the temple were shown as residential area. He also invited our attention to the communication dated 30.8.1982 on the consent by the Deputy Director of Town Planning to c Commissioner, Municipal Corporation, Madurai to the effect that the earlier lay out plan bearing No. 1 of 75 stood cancelled and the Commissioner was directed to proceed as per the approved scheme plan bearing No.12 of 80 wherein 40 plots were earmarked as residential area. The learned Senior D Counsel also invited our attention to the earlier Writ Petition No.1565 of 1987 dated 21.11.1991. The learned Senior Counsel invited our attention to the further representations made by the Trust to the Government and the ultimate order passed by the Government. The learned Senior Counsel E contended in this backdrop that it was absolutely incorrect on the part of the High Court to have revived the earlier plan of 1975. Learned Senior Counsel also pointed out that there was no _locus standi_ to the respondents (petitioners before the High Court) as in fact they had themselves granted permission in respect of plot No.342, which is one of the 40 plots reserved F for the Trust. It was further pointed that that for all these years nothing has happened nor has the area been acquired by the government and, therefore, in fact the whole area has become de-reserved as per Section 38 of the Town Planning Act. G 10. As against this, Shri Dayan Krishnan, learned Counsel appearing on behalf of the original writ petitioners and the respondents herein contended that the very look of the impugned order dated 23.9.1994 would suggest that it has been passed under a misnomer and is a result of H misunderstanding the High Court's judgment in W.P. No.1565/ PILLAYAR PK.VK.N. TRUSTTHRU RAMANATHAN _v._ KARPAGAN.N.U.S. REP BY SECRETARY [VS. SIRPURKAR, J.] 13 87. According to the learned Counsel, the order gives an A impression as if there is a direction contained in that judgment to de-reserve the concerned area of 40 plots. According to the learned Counsel, such direction was never given by the High Court. He further pointed out that in the absence of the amenities like school etc., the citizens would suffer. He also B pointed out that no basic amenities like roads etc. were provided though the Corporation was collecting road costs from the plot owners as and when they applied for permission for construction. 11. It is on these rival claims that we have to .see as to whether the High Court was justified in allowing the petition as it did. The High Court formulated the following points: C - (1) Whether the challenged order G.O.Ms.244 dated 23.9.94 was vitiated by _ma/a tides_ and in excess D of the powers of the first respondent in violation of principles of natural justice? - (2) Whether the modification issued under Section 27 of the Town and Country Planning Act reserving E disputed 40 plots for the public purpose under detailed development plan had become null and void in the absence of any final orders passed within three years from the date of publication under Section 38 of the Town and Planning Act? F - (3) What is the effect of the approval of the earlier plan P.R. No.21 of 72? 12. It also took notice of the fact that when Madurai Corporation had demanded Rs.80,69,784/- under Section 250 (4) of Madurai City Municipal Corporation Act from the present appellant, the said demand notice was quashed as per order in W.P. No.8962of1988. The High Court also made reference to the order passed in W.P. No.1565 of 1987 and found that in that judgment the High Court had not dealt with the G H 14 SUPREME COURT REPORTS [201 O] 11 S.C.R. - A development plan No. 9 of 92. The High Court then came to the conclusion that G.O.Ms. 244 dated 23.3.1994 was illegal, vitiated by _ma/a tides_ and was in excess of powers of the Government. 13. In our opinion, this deduction on the part of the High 8 Court on the basis of the reading of the judgment in W.P. No.1565 of 1987 is wholly incorrect. There is nothing to suggest that the G.O.Ms. 244 was hit by _ma/a tides_ or was in excess of the power of the Government. This finding has no basis. We also do not understand as to how the said order could be C faulted as being in violation of principles of natural justice. It is absolutely true that a reference to the High Court judgment is made in the impugned order dated 23.9.1994. However, that is not the only thing on which the 'Government has relied upon. In fact, the judgment of the High Court was studied by the D Director of Town and Country Planning who recommended the case for de-reservation subject to the conditions that trustees may be required to hand over all the roads in Madurai Corporation. There is no reason for us to doubt the correctness of this recommendation made by the Director, Town & Country E Planning, who was aware of the earlier position. He was aware that this layout was part of 9/72 plan and it was duly approved by the Tallakulam Town Panchayat and it then continued to be so vide plan No.12/80 to the exclusion of the plan of 1975. F 14. We also presume that the Director did consult the earlier correspondence on the subject and, therefore, the High Court was completely in error in deducing that the order was in excess of the power of the Government or was hit by _ma/a tides_ or was in violation of the principles of natural justice. In our opinion, the deductions reached by the High Court in G paragraph 11.5 are baseless. In the latter part of its judgment, the High Court has taken stock of the whole Act right up to Section 38. We have nothing to say about it excepting that the reference to all the provisions of the Act was no~ at all necessary. _The_ High Court then referred to the argument made H PILLAYAR PKV.KN. TRUSTTHRU RAMANATHAN _v._ KARPAGAN.N.U.S. REP. BY SECRETARY [VS. SIRPURKAR, J.] 15 that admittedly 40 plots were private land and, therefore, even if it is presumed that it was included under the plan of 1992, yet since the land was not acquired either by agreement or by acquisition, they would be de~med to have been released from reservation. 15. The High Court has undoubtedly posed this question up to paragraph 16 but has chosen not to answer it till last. We, therefore, put the same question to the Counsel for the respondent as also to the Counsel for the Government and both the Counsel fairly conceded that the land is still not acquired. A B c > 16. Section 38 of The Tamil Nadu Town & Country Planning Act, 1971 runs as under:- 38. **Release of land:-** If within three years from the date of the publication of the notice in the Tamil D Nadu Government Gazette under section2 6 or section 27- (a) no declaration as provided in subsection (2) of section 37 is published in respect of any land reserved, allotted or designated for any purpose specified in a regional plan, master plan, E detailed development plan or new town development plan covered by such notice; or - (b) such land is not acquired by agreement, such land shall be deemed to be released from such reservation, allotment or designation. In view of the admitted position that the land is not acquired by agreement till the date of the judgment of the High Court, the deeming clause would certainly come into force and, therefore, the concerned land would certainly be deemed t9 G have been released. The High Court has also referred to thi:!:, reported decision in _Raju_ S. _Jethmalani_ & _Ors. Vs._ State of _Maharashtra_ & _Ors._ [2005 (11) SCC 222], where this Court has clearly held that the owner of the special land cannot be prohibited from using it since it is the private property and H 16 SUPREME c6URT.[4] REPORTS . [201or11 s:c.R. ' ' • ;." ' ii _:_ (, ;,: '<"" ' ' ', ' '-< ~~ _f_ • • 'I I ',• ). : - A G6vernniehfcannot deprive .the 'persons from usihg their private 1 - property· and,:therefore; th'e ·:acquisiti6ri cit the ·prdl)erty'is a must before ariy"su'Gh. p'erson is r'esfrained from'usihg'tHe'land1<Th·e High[1] Courti'f'ias· again'e'xtenshiely"lfeferred to' the e'arlier two decisions of this Court in _Bangalore Medical TrusF\/s"_ B.'S. - 8 f11~cf,~?PP5',, ·~rC![S.: [1991 (4) -~S.9 151!,?~~.~/Jl~~risQ7a _H._ S~wa1[~! ][!~ ][,Qr's: ][.. ][V~., ][Sar1f!li:11Jr~(~j~4p'fad'/;(f ] _[!Y. ]_[~~'ni~iP?I ] _C6rpoiation '&.Ors._ [2Q05 (3) SCC 61]. However,' we do not find ~ny a'fi·~Wer' in th~se j~C:fgmeni1L Tti~'·,:~;p8nd-~ht~i1i~d sbedtica1ly~ralse1i"these .que~iioD$ in vievl ofth&~att-.tli~1-'the - c cont~h?J~f pro'perty h~sbn~t '~tff~-r ·ti~en ~2q~lred: fll'e 1refore: it i~ cl~~_rJhaj Section 38 will GO[le in-the:'1'ay._of the:Gc)Ver{lment, and the appellant Trust could not have been stopped from using the property on the spacious ground that the said property was reserved for~construction!of,school way.:.back:iri:tli'e year 1975 and thereafter-lri--1992. :: •1. 1 . :11, "' ,,·r. - D i _'\i_ 1i,.:_JCJ(:~ -, ~.:J:··· 1 -r ")\:· :·l·! ... "' ,· 17.~ljgwev~r.-Jhe_Higl:\_C,qu_rt,seHj!ms"" toJ1~¥!3 proceeded - on ,the, ,pa sis t:<>fi :$ectiOf!, 25_j1,qf •Thei;!v'la"durai- _City Municipal Corporation .Act, - , , ._,,..__, ,. •·~..;.-· .... .. 19V. , 1Section 250-runs as .under:-. ~ ,,__,. _,J •• 1·,_ . ._.. ,,J-·<_ - -.i•I. E - (1) , If the owner :··.·-)1)1')-1:.u~: .· .~ of ,-. 1_:.;~_.J1 any land utilizes, sells, leases , . .;n: · ·· n - ·.1._j:J2 1'.. or otherwise disposes of such land or any portion or - . l'' tJ ,·, cpo,rtionsJ_of the s_~me_.a~_:l'ites,for th~c,construction - F 1[1ciOf.~uJlgings,!he ][shaltsave inst,Jcjl ][e<!S~_s ][as the site ] or sites may abut on an existing public or private - •. ·~'street: ·l~yout 1and _make_ a streetto'r streets giving ; ' access to the'site<or sites and· conhettin'g with an - .'.[1 ] •, ·' ·' existing pUblic'Ot priv::ttestreetpr~w1 ··i 1; ; _J_ 0 - G _r•_ 1,' •If ;:.t. : ! \..','li~.' ·,_' ,•I ,-, / _{•_ b1 ~~---\1'• J;:).', ~; • _·_t ··--!"'q_ .. " t>1(2) ,. Jn regard to th13 laying.ol!_Lor IJlJlK\ng-"of any sych - ,, ' ;; , _i_ .str@eJorstreets, thep-rovls!ons 9f1 ~~ptiori. 251 s_h~ll •.. -·, , appJy.,.,s,1,1b~ect to-the condi~j()Jl~ tl?aJ the owoer,sflall •. 'I , r~n:iit .Ci sur:n not ~XC\?E:idJng3 5PtP~! cent ?ffJhe - H . , ~.,stirnated cost of lay~ovUl!lPJOY~menJ~ iri Jh13 land .51 J l?ILUAYAR PK.V.K.N. TRUST THRl;I RArv1ANP.;.ItlAN:y.::'. t1 7 KARPAGAN.N.U.S. REP. BY SECRETARY [V.S. SIRPURKAR, J.] rnm1>isilF' and that,thepwnertshall also reserv!3,!)9t·w~~§tji!}g ,A tnn s1ev- do10•per.cent of,theclay-outfor,the cq!l}mPJ1,Pl.lrp9~e ~!'1t b~1.1ul ,. in addition io,the -area provi(jed, for, l9yi11g1 c,0,4,! !1'.Ju& .. >off •,streets. If, any ·o~ner,,contq:ivE?nes, ~8Y;"<?,~ 1 Jh@ •o t·):::.~ac .conditions specif_iedi.-ab.oven ·.~e ,shall,; b~diat:!lt? 1 Jqr ''WO• mul.'prosecution. , , ,, ion " 3•J r'• ~,, ,, '>' •:s,, · yilsqo:q a11 18 8!1 '(l J• ···~·C'·.,· :~ _:_ I , )It t..· ·SJ t :-:1· ~~ .. "--!·f.! ts 1f:.fi:in2c1 _ 1 n,, 0 (~) 1~ in. any ,,c~s.e,, tr;, pr9~isi~r~~9f if.\l..~-S.eft'? .. ns J 11~ · and (2) have not been ·complied with/ fhe r<>~·., r,c.,CommissionEH may, -by notice, requJ;~e the ,,v,,,,, , defaultingi owner,J.o~layouhandim;:tkE_:i,~. ~tr!:!et or .c ,,, streets on such .land and ir:i such m~mner and,within '' such time as may be specified in the notice'l - , (4) 1 If such.street Of7streets.are·not)aid out and made - • , ; in the manner and ,within U1e time spec~fi~d ii,n"t!;i§ ., ··' ~' . 1notice, the Commissioner may lay;OYt. a:ndcmaJ<e D · .. , .. , • .. the street or stree~s, and tl;ie expem~es-~n<:;urred sb§!ll - ,,,,j ·, · .. be recovered frorri tbe defaulting QY<,n~(; : , '':'"'2 ~i _'.<·_ ~t-. ~. ~\• ' · . • • '···:. C.' • ::;~ • ., ; \ ... .: t ;:·.:; _,7:_ .:.:. ·,~~· f!U11f- r ··1l.,. - 1[.. ][, ][·. ][(5) ] , The Comn:uss1oner may in li1s d,1scretion, issue the **.** •.. J . ,. _r,,_ ' ...... . . · > ~ ,expenses notice referred '... I /eferre;~ ~- ' 'J'.11• to'Tn. ,to Ir su'b"..'$e'tstion'(3)C6·r Ln .~9.b.:~,,e;~\io~,/4 _.f'.'_ :_:· ._r ,· ..... ·~ t recove'r' to' "~· _p,r :_ ,_ fro~ tti\;~ _,.r;:: =F_ r the owners orany .. buiJd}n~s or,i;;w~~(~j~u~ting q,n.t~T - ,, _,:_ . ~treet or. stre~t~ co_~:9;e~red.ibu.t any. sue~ c~~~rr - _'u_ .. , . , shallbe entitledJo. recover all reasonable e;!penses incurred ~ by;h.i.m .··-. _,.'_;,:;.:-,( .o~ ajl.te~r,~~Y,y.~ ..,.! _b_ ~._j P,~jd b~') 1 ~X, _.._ 1f~1· ~i~ _.._ .. -""IJl~~[01] \~~ ' F ._ ,, ~ b ..... ?ase .n:iay b~, fy;<?fll. th,~_,d.~~~l01~,~~-~j'f;n,E(.r.rmers~~ 1t9 .. ". ,,,. , 'D ,sub-Sect~Qn,J~l-'~.p. 'l•!l [i tft•t:; ·;L.r'·.·. L,r, "-·' lo - ' "Relying 'on 'this SeCC3tion[9] an~d, more: particuiarly~·~sub'­ Sectioris (1 )'ancf(2)'.'the High"C'c5'urf was 5Hfie 'viev/that:oefdre - 't~7 'usurp 1f)~e ·1iQ~}vit~i~"~~ ,,Mu'n.i~~e~~, 1~?rp·~ra~.~ri' f?_f :~ , G layout, 10% of such land was bound to'bereserved forcommon purposes'.' The High c6[frt firstircame to'the 'conclUsio'n' tl'ial th"e Trust itseif sought the approval. of ttie 1ay6ut :pian 'from the Corporation after Tallakulam Tow'n~Panchc'.lyat 1 merged with tfie Madurai Corporation. The High' Court· ma8e a refefe'nce to· the H 18 SUPREME COURT REPORTS [2010) 11 S.C.R. - A earlier plan being P.R. No. 21/1972 approved by the Tallakulam Town Panchayat, wherein the aforementioned 40 plots were not shown as reserved for the public purpose. It refuted the submission made by the appellant Trust to the effect that such plan which has crystallized the rights of the Trust in respect of - B its property, was bound to be honoured after the Tallakulam Town Panchayat became a part of the Madurai Corporation by its merger. The High Court observed in para 19 of its judgment:- - "19. . ........ To the extent any alienation or construction had been made by virtue or Tallakulam Town Panchayat - c P.R. 21/1972, such acts are of course required to be protected." 18. In our opinion, the reference to Section 250 (2) was completely uncalled for in this controversy. This was a Writ D Petition for challenging the G.O.Ms. 244 dated 23.9.1994. In fact, in the three questions which the High Court had posed, Section 250 did not find place. Section 250 speaks about the obligation on the part of owner to make a street while disposing of the lands as building sites. Sub-Section (2) on which a heavy E reliance was placed by the High Court, speaks about the owner's liability to reserve 10% of the lay-out for the common purpose in addition to the area provided for laying out streets. It is nobody's case that the area of these 40 plots, in all, comes to 10% of the total area besides the area which was reserved - F for the streets. The High Court completely ignored the fact that the appellant trust had already parted with more than 21 acres of its land while getting the approval from the Tallakulam Town Panchayat for this layout. There is clear correspondence on the record to the effect that the appellant Trust had not only parted - G with 21 acres, but had also effected a gift deed in respect of that land. It is nobody's case and indeed the High Court has also not found that these 40 plots would be the aforementioned 10% of the total lay out area. There is absolutely no basis for the High Court to invite the applicability of the Section 250(2) - H by making reference to 10% of the area. Therefore, the factual PILlAYAR PK.V.K.N. TRUSTTHRU RAMANATHAN _v._ KARPAGAN.N.U.S. REP BY SECRETARY [VS. SIRPURKAR, J.] 19 background, on which the provision is tried to be made A applicable, itself, is not established and the finding to that effect is incorrect. 19. In this behalf it is to be seen that earlier also this question under Section 250 had cropped up in between the Madurai Corporation and the Trust. The Madurai Corporation had sought the payment of 50% of the sum of Rs. 80,69,784/being the total cost for laying roads in the area. The Trust had approached the High Court by way of a Writ Petition whereby the Learned Single Judge of the Madras High Court held that the roads shown in the lay out plan had already been handed over to the Tallakulam Town Panchayat and ultimately it was found that the roads were laid and it is only thereafter that Tallakulum Panchayat got merged with the Madurai Corporation and as such there was no question of invoking Section 250 of the Madurai City Municipal Corporation Act. This decision was also affirmed in appeal filed before the Madras High Court. The High Court just had quoted this issue by saying that the question regarding the land to be kept apart for the common use had not fallen for consideration in that appeal. We do not think that is the position. We have already shown that this question could not have come via Section 250 which was only inapplicable to the factual situation. B C D E 20. The High Court has also erroneously gone and compared the provisions of Section 37 and 38 of the Tamil Nadu Town and Country Planning Act and Section 250 of the Madurai Corporation Act. There is no question of any such comparison. There was no necessity to consider as to whether Section 250 of the Madurai Corporation Act repealed the provisions of Tamil Nadu Town and Country Planning Act, 1971 for the simple reason that such question could never have fallen for consideration. We have already shown that Section 250 was not applicable to the controversy at all. It operates into an entirely different field and the factual basis for inviting that Section was also not available in the circumstances of the case. F G H - _20_ SUPR~ME: COl'..IRT REPORTS 1 , [201'.tl] 11 .S:C.R. :. L Y1~fl.S.'lj:{ ;'»·,~.,:·, _"?_ \ ~ ~ {.1/: ··,.-·· , _·_/.\C_ :·\, _'"">·1fv_ - _fii_ clGL21.~Wcannot b'e contemplated that;olice the land,1 even-if it Was1reserved :fb'r.lptlJbHc purp~se like constructiono6f ·school in the plan of 1992 and got released because it was n6tacquired; for more than three years in tarms of Section 38 of Tamil Nadu fdWn (and c'bUfiff)' 1P1~nRlng Ac( c'6u1a be t~en t;fken away' from - B tti~\owhe~~Bn' th'e' spa'Cii'.>'us tple1a under 'section 250;' of'the rli1~Hur~Cco'rri8ra'ii?i'r1 . .Pf)\ l..-· _rtj **.2.l't-tL** ' 1 L~ fct: .• .rt . ·~ t .... ·" c\J'-~, '" · **1.** •- "\ · · J. · t 1 1~· .... ,. ~ ' .... _.r,_ L\;;::-~ \ · - t'srt 22! i Besit:les-"'afl this,· ittls clear that on ~19,5~.1972·,[1] 1the - Tallal<:ularti Towni Pancnayat'had·approved the plan submitted by the temple' for76:12·.·acres thereby 91 o plots were shown in - C the' plan and' 40r:pf6ts'were~retained' and the, balance •plots appeant0ihaVel!beeh S'old:iF-fowever,,;in the yekr 1972, whenthe'.Ta:rnil,Nad'li Ti:5wn<& CC>untry1Planr:iing Act, 1971 came into' f()foe;ras·'Act'No[1] 25 ofi.1972,'the ·whole area became 'part lof the Madurai ·corpofatiol'I w.e.f. i30'.1174: It was then"liat>1e·to be - G seenrtf.lat·afterithe plfln of.1975·was prepared:· that 1plan· ·wa·s· specificaHy •teferr.e'cts in tHe-:icdmmunication. dated 18:6:82 whe~eoy the[1] cornmissioher,·1Matiurai corporaticm1sought cl<Hifit:atidns ffom rt-ne !Deputy Directbr; Regional: Town -and: Country ·Pfanl1ing1fa0ol'.il me ·effecrol DDP ·on the layout in ·LR - E 1'175 _·aria_ '6HC·30.8!821' ffle=Geputf Director,· Regional• town &· C:Ot:Jntly'Pla'nninginadrspeCific1:111y:conveyed that the approved layout plan 1 of 75 required1if1iodifications and it should ·be treated cancelled and that the Corporation may act as per the approved pl~~ N"o.'12i8b. This sp~cific 'position was· completely - F ignored (i:iy'the 'H(ghl;CCo.urt~ file'High Court merely went on to retard its coit1thents on the'judgment ofthe'Madras High Court iri w.P. Nd'.156si87.'(• · · · · . ; ,r· . . I 'L ,- ·~I· c' I I Y.. ~, ' **l** '· 23'. We have ·nothing toJsay about those comments. However, the fact of:the _matter_ is'-tnat· the respondent here iii G andthe·original Writ Petitioner was a party to that•Writ<Petition and t<:i':the~udgnient whereby 'specific permission was granted foi"the-constructibn in Jjlot Nos. 276 and 269 which was partof the··aforementroned 40 plotS: · ?£·. ·, .. .-- _.:_;-,_ t,,j.4 i **.. ;J •.** it.-.~?"[1 H 24. Further an application was filed as WMP 3338/92 for PILLAYAR PK.VK:N. TRl;:J.STTHRURAfl1ANATHAN _v._ 21 KARPAGAN.N.U.S. REP. BY SECRETARY [VS. SIRPURKAR, J.] extension of time(.t,o ta~e1apR,fi9priate.de9ision in terms of the _A_ direction of the High Court which had given three months' time. It is specifically pgi[!ted O\IJ ,that, ~he·i~PPli~ation for sanction could be rej~9!,e,d ~nlyuo ·c(!SE1, th~_ qetaile_d_;~.evelopment for this area, the two plots came under the classification 'reserved for public purpose'. Even g'iving tflre~ 'rfi.dnftis; time, such step could , B no~ e~ t~~;~f!.d !r:'.-GJ~~~Ji!; c.g~!!~. "1~~;!'3Y~J>~nAa.~~.nJ!.n.G'}ew of the earlier factual scenario, more particularly, because of the decision dated 30.8.82 whereby the approved plan 12/80 was '''re·i~W'ENtto' pee-'CO\~_,,., pr'-f."\t'4 tl~lf.'N'o.1/75 _1c_ 11';{~<· 1flio~,· :;,'-.. 9~_ h. we)Heed · -:~, ' .. ,_,' ngti ... ~-\·r· 7d~Ynfo ,., '. the i•' further ~uestion 'as .to whether tlie d~cision' irfW .P.No.1565/87 .c V;.i8t1a·Be·i~s"''6ciicata··~s"'"\/eW'6t'h~rWise.it is ·cffi~Hl-iartife st~te · G'6Q~?~;ih~nf~~ai~~g11 ·~ ~l~h1 1~t~'nce'in';pa·~~ir19'ttie\arcier ci~teci "2·3"E9;·94'"il':'d" ~~.,,·,: . . . VI ... ·,r:.in.r..-~~u e,l:1. •r,i... Jt:.o '0"·.[1] w"·"·. ''.,;--':",b S. ·2·4··4-· . . · - · \-. ··,\ -,.., , ... ~ ~~ " '.1.··:> . .. ··"~·-·~; ·", ·. ·,. . , •~" ~ .. -:\ '~"'"'"' -t •. '°"" , "~J ., , ... 1• 025~ The\ High court irflhei1ast, ha·s given tt\€!'.<:lirectiot'l that the ··lr~ ri11,n_oel· plots covered ·- . .,(;\\i\.·\'-,\_ in[1 ] _LP/MR · .':.~\'R :-1\0~.· 1175 · cannot ?~1 ·.l-:~[1] ·_ 1 c~ be (·''1-1 used _.._ ~_.,,0': for 1 any ~D ~11tP.Pn~'~V1~~ ~ **.** ~Q,.p.~,~1t1Jl1,rf ~?e rn~pt1~n,e~( t~7r~,1~.w\t~}~~ excepuon of the·plot No~. _Li?_ a~:d-(?9'., _I~~· oxf-P~')N~2· tti:~.-'f"~S a completely incorrect d1rect1on particularly because way back .incl:%~?.!R!~'b~e:Y?.51~~siJma~~tj:'!!§ ... ~l1C.e!!~d.:~!1 .... 4t~~r~ was £1.9,[eyjv<!L<?Ht!~t;;.1?!?1t?ic .19vonrn1 s!dsxs1 aJi ni at.Ji st .:i E ;:)'i)p12''"5·~:\ trl~b•e,tt "t<)t·h'.}!31110'.lt bF;rl ·~9dr• .• <;?l;N· ·~s1erl:l 1."irl'K' l'HHIOl .,,, , ..,i,,a$t , u _po_ . e ~.as." respon . en o.. n~rern, -~rpag_~ ,.,._1i-;1i:;(.9~ ~~01.," t' '!in ._s1u h . ;'A"' N[. ] . agar[.oq ][, ][Nso] ,,a~ 1[. ][9fl, ] urii:n~r[~9or.i..] . 5 a,r~am.,.rew,ese~ -~u., uY . .,., 8- .~1 . Shania9a~gr11'ad'rn&i.~h 'bfigl1ia1 Suit N6'.1t 1o6t861h''the{ c6Ult of Ad8i'Hb~~r6i~~i~i1;xuR§ifca'(Nt rViaci8~i'r6v51rfiifhfs::sfpcrci!Y 0 F g~~ ~I r~,JillMfii• ~f 1<1Hh,Cga '.Na,~·~v f ,,~io~y whir~t~ Ii 11\? tia'..,lf ~8~ght .f Of If> .. an 9 ~IJJ~n~UOIT ,11. JO !:' ,,(l res rarrll")Q, e pr 'trt•.,O ! "'lh~i?.j-"-fit ru~ .f _r?m_ ny ~fl S~ 11,l[l!:J .9n11>11. 0£,..~Smg .rin'th1 . e r tropgrtftdr diW1>°uiW>s~etti~l?~h~ P.Wrpoge"'ti:fr'Wllicti it'W~~ f.e~efv~8:id''f.p' NiR''1??5~:··' 'luns~9r,., SHJJ '{C• Tis~qqs 1::in:1u ~ Jn"' :-; o9m ~saa ·aas sn i •:mudn n()r i>xs isi:isq<'.! vb;,;., _:•·_ •[1] Y21.rF=dr.a11' ffiese·reasonsFwe cahnoFattirm:hiefjudgmetit P 6fttl&"'rligh GoUrt~i lfi$ ·set raside:aha ·m'e1Writlf:>~tition'filed <by the respondent is directed·!to1Be-rdishii$sea~withrcosts36f Rs.50,0:JO/-. t111o:J srU ,al5!Jq1 1 b 9rl1 g11iaairnefl K.K.T. ~~ Appeals allowed. H
End of Judgment Record
Browse All Supreme Court of India (2010) Decisions
2010-09-24

Department of Telecommunications v. Gujarat Co-operative Milk Marketing Federation Ltd.

This Supreme Court decision concerns a billing dispute arising from two bi-monthly telephone bills totaling Rs. 4,54,652 raised against the Managing Director of the Gujarat Co-operative Milk Marketing Federation Ltd. for calls categorized as international “party” or “sex talk” calls. The respondent subscriber alleged mischarging and that calls were made from another number, prompting a complaint to the Department. Verification upheld the bills; an administrative appeal was dismissed; the matter was referred to arbitration under section 7B of the Indian Telegraph Act, 1885, following a High Court direction. The arbitrator, Vineet Bhatia, concluded the bills were proper. The respondent challenged this award by writ petition, which the High Court (Single Judge) quashed, holding that the arbitrator was junior to the appellate authority, and proceeded to find the award invalid on presumptions and inferences unsupported by evidence; a Letters Patent Appeal was dismissed. The Supreme Court reversed, holding that the High Court exceeded its judicial review scope, misapplied the standard for review of arbitral awards under section 7B, and erred in imputing bias based on rank. It affirmed that the arbitrator’s findings were grounded in the department’s records and meters, and that independence was maintained. The appeal is allowed and the writ petition dismissed, with the High Court orders set aside.

2010-11-23

BHAGWAN BUDHA PRATHMIK TECHNICAL TRAINING COLLEGE NIRMALI v. STATE OF BIHAR

This is a consolidated Supreme Court decision in Civil Appeal Nos. 9896 and 9897 of 2010 arising out of Bihar. Bhagwan Budha Prathmik Technical Training College, Nirmali, a minority Buddhist institution established in 1987, challenged Bihar’s and other authorities’ recognition/approval decisions for its teacher-training course in light of the National Council for Teacher Education Act, 1993 (NCTE Act). The central issue is whether, after the NCTE Act’s appointed day (1 July 1995), State Governments retain power to grant recognition to teacher-education institutes and whether students of unrecognized colleges may sit for qualifying examinations. The matter traces a long litigation history: initial directions in the early 1990s required the Government to decide recognition while allowing students to appear at their own risk; subsequent orders and representations culminated in a 16 March 2007 order recognizing the college from 1987-89 on the ground that inspection warranted it, followed by a 2 September 2008 order withdrawing that recognition in light of NCTE’s sole jurisdiction post-appointed day. The High Court affirmed the sequence, but this Court held that a power to issue an order includes a power to withdraw it for valid reasons, and that recognition is vested in the NCTE after the appointed day. The judgment emphasizes that the NCTE Act must be implemented with full force to protect standards in teacher education. Ultimately, the Supreme Court dismissed the appeals, modified a cost order, and held there should be no further costs in these appeals, while acknowledging the students’ plight and the need for orderly implementation of the regulatory regime.

2010-06-03

State of Punjab & ors. v. G.S. Randhawa

This Civil Appeal arises from a petition challenging a demand for additional price under the Punjab Urban Estate (Sale of Sites) Rules, 1965. The Supreme Court hears counsel for the appellant and notes that the respondent did not enter appearance. Relying on the decision in Smt. Fuljit Kaur v. State of Punjab & Ors., (2010) 7 SCR 317, the Court states that, for the reasons recorded in Civil Appeal No. 5292 of 2004 (the Fuljit Kaur decision) decided on this date, the appeal must be allowed. The High Court’s December 6, 2006 order is set aside and the Demand Notice is upheld. The appellant is entitled to recover the additional price in accordance with law. The decision clarifies that liability to pay additional price under the Punjab Urban Estate Rules can be enforced consistent with the Fuljit Kaur framework, upholding the validity of the demand and permitting recovery by the State. The judgment thus resolves the previous split on allotment price adjustments and prescribes a uniform approach for enforcing such recoveries in analogous cases going forward.

2010-07-15

Harish Singh Nagra & Ors. v. Kapil Sibal & Ors.

Mehfil-e-Wukala, a Supreme Court cultural-literal association of lawyers, published a souvenir containing messages, articles, and poems by judges and senior advocates. Kapil Sibal, a senior advocate and then a candidate for President of the Supreme Court Bar Association, sent a message criticizing the junior Bar and urging reforms, which was circulated within Mehfil’s members but not released to the press or sold publicly. Petitioners, five practicing advocates from the Punjab and Haryana High Court, filed criminal contempt proceedings under Article 215 of the Constitution alleging that Sibal conspired with others to bring the administration of justice into disrepute. The High Court transferred the case to this Court. The central issue was whether the message, read in its proper context, amounted to contempt under Section 2(c) of the Contempt of Courts Act, 1971. The Court held that the message, read in its prospective context, did not scandalize or tend to scandalize any court, nor obstruct the administration of justice; it was a fair critique aimed at improving the system. Citing P.N. Duda, Mulgaokar, Ambard, Vishwanath, and others, the Court reaffirmed that freedom of expression under Article 19(1)(a) protects fair, reasoned criticism of judgments and judicial institutions. It noted that the Times of India article excerpt misrepresented the message, but the souvenir’s limited internal distribution and the respondent’s apology supported dismissal. Accordingly, the contempt petition was dismissed and notices discharged.