High Court of KeralaSingle JudgeRemanded to trial court for disposal de novo wi...

P.E. Bhaskara Kurup v. Palakunath Nangolath Sarojini Amma and Others

Case / Petition Number:SA NO. 243 OF 2002

Case Details & Bench

Court
High Court of Kerala
Hon'ble Judges
  • Sathish Ninan
Judgment Date
2022-07-08
Court Decision / Holding
The decree and judgment of the courts below are set aside. The matter is remanded back to the trial court for disposal de novo in light of the observations, with the sole issue being the width of the C schedule way. The court directs that the properties be identified and located with reference to Ext.A1 (title deed). A fresh commission report and plan should be obtained identifying the width in accordance with the remand order of 11.08.1993 (AS 184/1989). The nine-month period from the date of receipt of a copy of this judgment is set for disposal, with parties to appear before the trial court on 01.08.2022.
Final Disposition
Remanded to trial court for disposal de novo with focus on identifying the width of the C schedule way, based on Ext.A1; nine-month timeline.

Parties to the Case

Appellants / Petitioners

  • P.E. Bhaskara Kurup

Respondents

  • Palakunath Nangolath Sarojini Amma
  • Palakunath Nangolath Sukumaran Nair
  • Palakunath Nangolath Mohandas Nair

Legal Representation & Advocates

Counsels for Petitioners

  • • Sri.T.Krishnan Unni (Sr.)
  • • Sri.Anish S. Ambady
  • • Smt.Bijimol Jose
  • • Sri.Jaykar.K.S.
  • • Smt.M.R.Mini
  • • Smt.Meena.A.
  • • Smt.Preethi Karunakarann
  • • Sri.R.Rajesh Kormath
  • • Sri.Rahul Varma
  • • Sri.V.S.Robin
  • • Smt.Sanjana R.Nair

Counsels for Respondents

  • • Sri.T.Sethumadhavan (Sr.)
  • • Sri.A.P.Chandrasekharan
  • • Smt.Deepak Narayanan
  • • Smt.Preethi.P.V.
  • • Sri.M.Krishnakumar
  • • Sri.M.V.Balagopal
  • • Smt.Prabha R.Menon
  • • Sri.Pushparajan Kodoth

Case Synopsis & Summary

This is a second appeal arising from a dispute over a common pathway (plaint C schedule nadavaramba) between plaint A schedule properties and plaint B schedule property of the Nangolath Tarwad in Kozhikode. The appellant-defendant, P.E. Bhaskara Kurup, challenges a decree that, after remand, found difficulty in establishing a 7-foot wide C schedule way and resulted in directions for demolition of a portion of the boundary wall based on Ext.C6. The original suit sought both a mandatory injunction to restore the C schedule way and a prohibitory injunction to prevent obstruction. The trial court’s decree was set aside by the first appellate court, which remanded for fresh disposal with directions to identify A and B schedules as per Exts.A1 and A2 (title deeds) and survey. On remand, the Commissioner and Surveyor produced Exts.C5 (report) and C6 (plan), but the trial court held that the C schedule way’s width and user rights were not proved; the appellate court, depending on Ext.C6, directed partial demolition of a boundary wall. The High Court ultimately held that the C schedule way is not owned outright by either party but is a shared pathway with mutual user, and that the crucial question is the width of the C schedule way. Exts.C5 and C6 do not identify the width as per the remand order, necessitating a fresh identification. The matter is remanded to the trial court for disposal de novo with a nine-month deadline focused solely on the width of the C schedule way, based on Ext.A1.

Submissions & Arguments

Contentions of Appellants / Petitioners

The appellant-defendant submits that the central issue is whether the plaint C schedule way has been properly identified as per the remand order. Exts.C5 and C6 cannot determine the width of the nadavaramba because they were not prepared strictly in accordance with the title deeds (Ext.A1) and Ext.A2 and the remand directive. The width of the C schedule way, a common pathway, must be identified by locating the properties on Ext.A1 and Ext.A2 and then surveying to establish the exact breadth. Reliance on possession or survey alone would be improper; the remand court directed identification with reference to the basic title deeds. The appellant contends that the trial court failed to remand for fresh identification in strict compliance with Ext.A1’s parameters and that the appellate remand directions must be followed to identify the width and avoid encroachment. The remedy of demolition cannot be predicated on incomplete and improperly identified plans.

Contentions of Respondents

The respondent-plaintiff counters that the C schedule way is a common Nadavaramba, used by sharers, and its existence and continuity are established by the surrounding description of plaint A and B schedules. While Ext.C6 is relied upon by the appellate court, the width remains uncertain. The plaintiff asserts a right to use the C schedule way and argues for preservation of the way; the department’s role is to ensure a correct identification of the properties vis-à-vis Ext.A1. The plaintiff seeks to uphold the appellate decree directing removal of encroached portions and argues for a width that allows for user by both parties, while recognizing that the C schedule way cannot appear to belong exclusively to either party. The remand was for precise measurement as per title deeds, not merely by survey or possession; the court should not compromise on the corrective identification of the title-based width.

Cited Precedents (2)

Case NameCitationTreatmentExplanation
State v. Kodakkat Pocker & Ors[1987 (1) Klt 714]Mentioned OnlyCited as authority for principles on identification based on title deeds and remand procedures; used as a reference point rather than as a binding ruling in this case.
Subash Soman v. State of Kerala[2019 (2) KlJ 729]Mentioned OnlyCited similarly to support the remand/identification approach; not expressly treated as part of a binding distinction or reversal here.

Diagnostic Tool

Beta

Does this judgment govern your specific facts?

Don't risk relying on a distinguishable precedent. Enter your facts or proposition below. We will test it against P.E. Bhaskara Kurup v. Palakunath Nangolath Sarojini Amma and Others and instantly map out authorities that support, challenge, or govern your position.

Extracted Judgment Text

Exact text extracted from official judgment records.

## **IN THE HIGH COURT OF KERALA AT ERNAKULAM** # **PRESENT** **THE HONOURABLE MR. JUSTICE SATHISH NINAN** **FRIDAY, THE 8[TH] DAY OF JULY 2022 / 17TH ASHADHA, 1944** **SA NO. 243 OF 2002** **AGAINST THE JUDGMENT IN AS 85/1998 OF II ADDITIONAL SUB COURT,KOZHIKODE (JUDGMENT DATED 27.05.1998 IN OS 187/1985 OF PRINCIPAL MUNSIFF COURT, KOZHIKODE-II)** **-----** ## **- APPELLANT [DEFENDANT RESPONDENT]:** P.E. BHASKARA KURUP, S/O.RAGHAVAN NAIR, 'PRASANTHI', KOVUR, NELLIKODE VILLAGE P.O., CHEVAYOOR, KOZHIKODE-17,KOZHIKODE DISTRICT. BY ADVS. SRI.T.KRISHNAN UNNI (SR.) SRI.ANISH S.AMBADY SMT.BIJIMOL JOSE SRI.JAYKAR.K.S. SMT.M.R.MINI SMT.MEENA.A. SMT.PREETHY KARUNAKARAN SRI.R.RAJESH KORMATH SRI.RAHUL VARMA SRI.V.S.ROBIN SMT.SANJANA R.NAIR ## **- RESPONDENT (PLAINTIFF APPELLANT):** 1 PALAKUNNATH NANGOLATH SAROJINI AMMA, (DIED) D/O.PARVATHY AMMA, KOVUR AMSOM AND DESOM, P.O.CHEVAYOOR, KOZHIKODE-17, KOZHIKODE DISTRICT. **[L.R's impleaded]** ## * **ADDL. RESPONDENTS** 2 PALAKUNNATH NANGOLATH SUKUMARAN NAIR, AGED 66, S/O.SAROJINI AMMA, NELLIKODE AMSOM,KOVUR DESOM KOZHIKODE TALUK, P.O.CHEVAYOOR, KOZHIKODE-17, KOZHIKODE-673 017. **SA NO. 243 OF 2002 -2-** 3 PALAKUNNATH NANGOLATH MOHANDAS NAIR, AGED 64, S/O.SAROJINI AMMA, NELLIKODE AMSOM,KOVUR DESOM KOZHIKODE TALUK, P.O.CHEVAYOOR, KOZHIKODE-17, KOZHIKODE-673 017. *(LEGAL HEIRS OF DECEASED SOLE RESPONDENT ARE IMPLEADED AS SUPPLEMENTAL RESPONDENTS 2 AND 3 AS PER ORDER DATED 13.01.2020 IN IA.1/2019.) BY ADVS. SRI.T.SETHUMADHAVAN (SR.) SRI.A.P.CHANDRASEKHARAN SR. SMT.DEEPA NARAYANAN SMT.PREETHI. P.V. SRI.M.KRISHNAKUMAR SRI.M.V.BALAGOPAL SMT.PRABHA R.MENON SRI.PUSHPARAJAN KODOTH THIS SECOND APPEAL HAVING COME UP FOR ADMISSION ON 08.07.2022, THE COURT ON THE SAME DAY DELIVERED THE FOLLOWING: ## **SATHISH NINAN, J.** **= = = = = = = = = = = = = = = = = = S. A. No.243 of 2002** **= = = = = = = = = = = = = = = = = = Dated this the 8[th] day of July, 2022** ## **J U D G M E N T** The defendant in a suit for prohibitory and mandatory injunction, is the appellant. The dispute involved centers around the plaint 'C' schedule way. The suit was dismissed by the trial court. The decree was interfered with in appeal, and the suit was decreed in part. 2. Plaint 'A' schedule property belongs to the plaintiff. 'A' schedule consists of three items. On the southern side of plaint 'A' schedule item Nos.1 and 2, is the disputed plaint 'C' schedule way, and to its south is the plaint ‘B’ schedule property belonging to the defendant. To the east of plaint 'A' schedule item Nos.1 and 2, and the 'B' and 'C' schedules is the plaint 'A' schedule item No.3. The Tarwad house of the plaintiff is situated there. **S. A. No.243 of 2002** -: 2 :- 3. A larger extent of property, including the plaint scheduled properties, belonged to the Nangolath Tarwad. The plaintiff and the defendant belong to the family and are first cousins. The plaintiff is the daughter of one Parvathy Amma and the defendant is the son of Parvathy Amma's brother Raghavan Nair. Ext.A1 is the Partition Deed of the year 1965 entered in the family. In the said partition, the plaintiffs branch formed a group and were allotted item Nos.48, 49 and 77 therein. The said properties are the plaint 'A' schedule item nos.1, 2 and 3 respectively. Ext.A2 is the subsequent partition in the plaintiff's branch. In Ext.A1 partition, the defendant’s group, was allotted item No.15 to the said deed. The said property is the plaint 'B' schedule property. In between the plaint 'A' schedule item Nos.1 and 2 and the plaint 'B' schedule property is the plaint 'C' schedule way leading up to plaint 'A' item No.3 property on the east from the western public road. The suit is filed alleging that the **S. A. No.243 of 2002** -: 3 :- defendant trespassed over the plaint 'C' schedule way, which had a width of 7 feet, and reduced a portion of it by putting up a compound wall. The reliefs sought for are, mandatory injunction for restoration of the way, and for prohibitory injunction from obstructing the way. 4. The suit was originally decreed by the trial court declaring a 7 feet wide way. On appeal by the defendant, the first appellate court found that the trial court has based its decree on surmises and that there was no material to find that the plaint 'C' schedule way had a width of 7 feet. The decree and judgment of the trial court was set aside and the matter was remanded back for fresh disposal, with a direction to have the plaint 'A' and 'B' schedules identified based on Ext.A1 Partition Deed and survey. 5. After remand, a Commissioner and Surveyor were deputed, who prepared Exts.C5 report and C6 plan, identifying the properties. Thereafter the trial court found that the existence of the way as claimed by the **S. A. No.243 of 2002** -: 4 :- plaintiff has not been established. It was further held that the plaintiff has not proved the right to use the plaint 'C' schedule way. The plaintiff challenged the same before the first appellate court. The appellate court though found that there is no evidence to find that the 'C' schedule pathway has a width of 7 feet, proceeded to rely on Ext.C6 plan and directed demolition of a portion of the boundary wall constructed by the defendant. It is aggrieved thereby that the second appeal has been filed. 6. Heard learned Senior Counsel Sri.T.Krishnanunni on behalf of the appellant-defendant and Sri.S. Sethumadhavan, learned Senior Counsel on behalf of the respondent-plaintiff on the following substantial questions of law:- (i) Has the plaint 'C' schedule way been identified in Exts.C5 and C6 Commissioner's Report and Plan in tune with the directions in the remand order dated 11.08.1993 in AS 184/1989? **S. A. No.243 of 2002** -: 5 :- (ii) When Exts.C6 plan has been prepared solely based on survey number and possession, is the direction for demolition of the wall sustainable? 7. Though it appears that originally there was a rival claim of title over the plaint 'C' schedule way, the same was not pursued by the parties. Even on the merits, the southern boundary description of plaint 'A' schedule item Nos.1 and 2, and the northern boundary description of the plaint 'B' schedule leaves no room of doubt regarding the existence of a 'nadavaramba'-plaint ‘C’ schedule, in between and also that it doesn’t form part of either the plaint ‘A’ or ‘B’ schedules. The plaint 'C' schedule leads to plaint 'A' schedule item No.3 on the east. It is a pathway that is left in common for the sharers. Though the trial court has entered a finding that the plaintiff has not proved his right over the 'C' schedule way, evidently, on the facts as above, the right of the parties to Ext.A1 for usage of the plaint C schedule-‘nadavaramba' cannot be disputed. Thus **S. A. No.243 of 2002** -: 6 :- it is held that, the plaint 'C' schedule property does not belong either to the plaintiff or to the defendant absolutely, but is a common pathway. It is further held that, both the plaintiff and the defendant have a right of user over the pathway. In fact, as of now, there is practically no dispute on the said aspects. The dispute between the parties is presently confined to, the width of plaint 'C' schedule way. 8. Though Ext.A1 Partition Deed describes plaint 'C' schedule as a 'nadavaramba', it does not mention the width of the 'nadavaramba'. The plaintiff claims that it had a width of 7 feet, which is denied by the defendant. 9. The parties are bound by the remand order dated 11.08.1993 in AS 184/1989, the earlier round of litigation. In the remand order, the first appellate court had specifically directed to have the plaint 'A' and 'B' schedule properties measured as per the title deeds-Exts.A1 and A2, and as per survey. This is to identify the width of the ‘C’ schedule that lies in **S. A. No.243 of 2002** -: 7 :- between. It was so ordered since neither parties have title over the ‘C’ schedule way which lies in between and its width could be ascertained by having the plaintiff's and defendant's properties located on the basis of the basic document of title deed namely, Ext.A1. 10. Exts.C5 and C6 are the report and plan after remand. It does not reveal the existence of a 7 feet width ‘nadavaramba’ in between 'A' and 'B' schedules. The eastern portion of the compound wall constructed by the defendant is seen situated beyond the survey boundary of his property. The first appellate court held that portion to be an encroachment, and accordingly directed removal of that portion. But here it is to be noted that, if survey boundary is to be the basis then, on the western portion, the ‘C’ schedule way is in defendant’s survey number. Therefore, survey boundary cannot be the basis for determination. **S. A. No.243 of 2002** -: 8 :- 11. In the remand order, the appellate court had categorically directed that the properties are to be identified and located with reference to the basic title deed, Ext.A1. It is the document under which the parties trace title and the way is left out. A perusal of Exts.C5 report and C6 plan do not indicate that the properties were so identified. The report and plan seem to suggest that the properties were located based on possession and survey. It is true that the defendant had filed IA 2144/1998 seeking to have Exts.C5 report and C6 plan remitted and that in the said application he did not have a case that the properties were not measured based on the title deed. But it is evident that the properties have not been located as per the title deed and in terms of the directions in the remand order. The mere fact that either of the parties did not raise any objection to the commissioner’s report and plan is of no significance. It is for the Courts to look into the correctness or otherwise of the Commissioners report and **S. A. No.243 of 2002** -: 9 :- plan while granting a decree. (See _**State v. Kodakkat Pocker & Ors [1987 (1) Klt 714]**_ , _**Subash Soman v. State of Kerala [2019 (2) KlJ 729]**_ . It can only be found that Exts.C5 and C6 report and plan have not been prepared based on title and in accordance with the directions in the remand order dated 11.08.1993 in AS 184/1989. A fresh commission report and plan needs to be obtained. The suit needs to be remanded back to the trial Court for the said purpose. Incidentally it is to be noticed that, even in the first appellate Court, the respondent plaintiff had requested for a remand of the suit for a proper identification of the plaint ‘C’ schedule. The request is reflected in paragraph 12 of the appellate Court judgment and it reads thus, _“The learned counsel for appellant submits that at least the suit can be remanded to afford an opportunity to clarify the width of the 'C' schedule property”._ 12. At this point learned senior counsel on either sides would submit that, in Ext.A1, the extent of the **S. A. No.243 of 2002** -: 10 :- properties have been mentioned in cents and in Ares, in addition to the description by middle measurements and that all the three does not seem to tally. Direction could be issued to have the properties identified on the basis of all the three and the one found to be true and correct could be accepted. Anyway, these are matters for the trial court to consider. The trial court could give appropriate directions to the Commissioner and Surveyor. Learned Senior Counsel appearing for the respondentplaintiff would contend that on the western side of the entire property, at the time of Ext.A1, there was only an 'edavazhi' and that the same is now lying as a public road. Possibly portions of the properties of the plaintiff and defendant have been utilised for widening the said way, it is submitted. The trial court can direct the Commissioner to take the same also into consideration while ordering fresh identification of the properties. Substantial questions of law are answered as above. **S. A. No.243 of 2002** -: 11 :- 13. In the result, the decree and judgment of the courts below are set aside. The matter is remanded back to the trial court for disposal de novo in the light of the observations as made above. It is made clear that the issue that survives for determination is only the width of the ‘C’ schedule way. Considering the fact that the suit is of the year 1985, let every endeavour be made to have the suit tried and disposed of within a period of nine months from the date of receipt of a copy of this judgment. Parties to appear before the trial court on 01.08.2022. Sd/- **SATHISH NINAN** **JUDGE** kns/- //True Copy// P.S. to Judge