Tenetowl LogoTenetowl
Landmark CasesDivision BenchDismissed

Pathapati Subba Reddy (Died) by L.Rs. & ORS. v. The Special Deputy Collector (LA), Telugu Ganga Project, Podalakur

Case / Petition Number:
Special Leave Petition (Civil) No. 31248 of 2018

Case Synopsis & Summary

This Special Leave Petition arises from a land- acquisition dispute under the Land Acquisition Act, linked to compensation for land taken in 1989 for the Telugu Ganga Project in Gandluru, Guntur district, Andhra Pradesh. The 16 initial claimants were part of LAOP No. 38 of 1990; during pendency, claimants 1, 3, and 11 died, and no substitution of their heirs was effected. The reference was dismissed in 1999 with a common judgment upholding the collector’s award. Years later, only the heirs and legal representatives of claimant No. 11 sought to file an appeal under Section 54, while the others did not pursue independent appeals. Their appeal was filed after an inordinate delay of 5659 days, and the High Court declined to condone the delay, dismissing the application as barred by time in 2017. The Supreme Court reviews whether delay in filing the appeal can be condoned under Section 5 of the Limitation Act given the mandatory nature of Section 3, the public policy of finality, and the need for substantial justice. It surveys land- acquisition case law, including Katiji, Basawaraj, Lanka Venkateswarlu, and others, and concludes that liberal condonation cannot override the strict limitation regime. The Special Leave Petition is dismissed for lack of merit, upholding the High Court’s refusal to condone the delay.

Precedent Explorer

Find Cases Like This

Explore other judgments dealing with similar legal situations, facts, or statutory provisions.

Case Details & Bench

Court
Landmark Cases
Hon'ble Judges
  • Pankaj Mithal
  • Bela M. Trivedi
Judgment Date
2024-04-08
Court Decision / Holding
The Special Leave Petition, as such, lacks merit and is dismissed.
Final Disposition
Dismissed

Parties to the Case

Appellants / Petitioners

  • Pathapati Subba Reddy (deceased) represented by LRs & ORs

Respondents

  • The Special Deputy Collector (Land Acquisition) Telugu Ganga Project, Podalakur, Nellore

Provisions of Law Cited

Land Acquisition Act, Section 18Land Acquisition Act, Section 54Limitation Act, Section 3Limitation Act, Sections 4 to 24 (inclusive)Limitation Act, Section 5

Legal Doctrines & Maxims

  • Interest reipublicae ut sit finis litium
  • Dura lex sed lex

Submissions & Arguments

Contentions of Appellants / Petitioners

The petitioners contended that delay in filing the appeal should be condoned under Section 5 of the Limitation Act in the interests of substantial justice, given that heirs learned about the reference only in 2015 and that the delay stems from lack of knowledge and substitution issues of deceased claimants. They relied on liberal interpretations of Section 5, citing decisions like Dhiraj Singh, Imrat Lal, Basawaraj, and Lanka Venkateswarlu to argue for relief despite the lengthy delay.

Contentions of Respondents

The respondents argued that Section 3 of the Limitation Act is mandatory and bar of limitation cannot be defeated except under Section 5 with strict standards. They emphasized negligence, lack of due diligence, and the failure of most claimants to pursue remedies. They maintained that conditionally condoning delay would undermine finality and the legislative intent, and that merits of the case are not to be considered when deciding condonation.

Legal Doctrine & Issue Explorer

Explore This Legal Issue

Find relevant judgments and authoritative positions on the legal questions discussed here.

Cited Precedents (8)

Case NameCitationTreatmentExplanation
Collector, Land Acquisition, Anantnag and Ors. v. Katiji and Ors.AIR 1987 SC 1353 (2 SCC 107)PositiveUsed to justify liberal interpretation in condoning delay under Section 5, while acknowledging Section 3’s mandatory nature.
Basawaraj and Anr. v. Special Land Acquisition Officer2013 (14) SCC 81PositiveSupports the need for judicious exercise of Section 5 discretion and cautions against liberalism overriding Section 3.
Lanka Venkateswarlu v. State of Andhra Pradesh & Ors.2011 (4) SCC 363DistinguishedCited to caution against a liberal approach that overrides the statutory limitation regime.
State of Jharkhand & Ors. v. Ashok Kumar Chokhani & Ors.AIR 2009 SC 1927PositiveMerits not to be considered in delay-condonation decisions; focuses on procedural aspects.
Dhiraj Singh (Dead) through LRs. & Ors. v. State of Haryana & Ors.2014 (14) SCC 127DistinguishedCondonation in other matters not controlling here; not applicable on facts.
Imrat Lal & Ors. v. Land Acquisition Collector & Ors.2014 (14) SCC 133DistinguishedSimilar relief not extended; not binding in the present facts.
Brijesh Kumar and Ors. v. State of Haryana and Ors.2014 (4) SCALE 50PositiveCited to discuss parity and timing of relief; cautions against belated relief.
Ramlal, Motilal and Chhotelal v. Rewa Coalfields LtdA.I.R. 1962 SC 361DistinguishedOlder strict view on condonation distinguished in current context.
Case Applicability Diagnostic

Apply This to My Facts

Share your situation and test whether this judgment governs, supports, or challenges your case.

Official Judgment Record
•4,154 words•~19 min read

In The Court Record

Pathapati Subba Reddy (Died) by L.Rs. & ORS. v. The Special Deputy Collector (LA), Telugu Ganga Project, Podalakur

2024 INSC 286 **REPORTABLE** **==> picture [68 x 68] intentionally omitted <==** ## **IN THE SUPREME COURT OF INDIA** ## **CIVIL APPELLATE JURISDICTION** **SPECIAL LEAVE PETITION (CIVIL) NO. 31248 OF 2018** **PATHAPATI SUBBA REDDY (DIED) BY L.Rs. & ORS.** ## **…PETITIONER(S)** ## **VERSUS** ## **THE SPECIAL DEPUTY COLLECTOR (LA) …RESPONDENT(S)** ## **J U D G M E N T** ## **PANKAJ MITHAL, J.** **1.** Some land in village Gandluru, District Guntur, Andhra Pradesh was acquired some time in 1989 for Telugu Ganga Project. Not satisfied by the compensation offered under the award, the claimants (16 in number) preferred a reference under Section 18 of Land Acquisition Act (hereinafter for short the ‘Act’) i.e., L.A.O.P. No. 38 of 1990 titled Juvvala Gunta China Chinnaiah (dead) and Ors. vs. Special Deputy Collector (Land Acquisition) Telugu Ganga Project, Podalakur Signature Not Verified Digitally signed by RAVI ARORA Date: 2024.04.08 18:04:57 IST Reason: **1 | 2 2** at Nellore. Out of the 16 claimants in the above reference, claimants No. 1, 3 and 11 died during the pendency of the reference before the Court of Addl. Senior Civil Judge, Gudur. No steps were taken to substitute the heirs and legal representatives of the above deceased persons. The said reference was dismissed on merits along with some other references vide common judgment and order dated 24.09.1999 upholding the award of the collector. **2.** After the lapse of more than 5/6 years, an appeal was proposed to be filed in the High Court Under Section 54 of the Act challenging the dismissal of the reference. The said appeal was proposed to be filed only by some of the heirs and legal representatives of the deceased claimant No. 11 in the reference i.e., Pathapati Subba Reddy. No other claimant or their legal heirs from amongst the other 15 who were parties in the reference joined the heirs and legal representatives of claimant No. 11 in filing the appeal. They did not even prefer any separate or independent appeal of their own. In other words, out of the 16 claimants, 15 of them impliedly accepted the judgment and order of the reference court and it is only **2 | 2 2** the heirs and legal representatives of claimant No. 11, who feel aggrieved and have proposed to file the appeal. **3.** The above appeal, as stated earlier, was preferred with the delay of 5659 days. Accordingly, an application supported by an affidavit of the surviving daughter of the deceased claimant No. 11 was filed for condoning the delay in filing the proposed appeal. It was averred in the said application that the proposed appellants are the heirs and legal representatives of the deceased claimant No. 11 i.e. Pathapati Subba Reddy, who died on 15.05.1995 during the pendency of the reference but they were not brought on record before the decision of the reference. The said deceased claimant No.11 was survived by his two daughters. The elder one died and that the proposed appellants are the surviving second daughter and her descendants. Since she was living in her matrimonial house, she had no knowledge of the above reference. It was only on 28.05.2015 when one of the grandsons of the said daughter of the deceased claimant visited the office of the L.A.O. for the purpose of obtaining submersion certificate to secure a job that he came to know **3 | 2 2** that there was a reference which was dismissed on 24.09.1999, whereupon the proposed appeal was immediately filed along with an application to condone the delay in its filing. **4.** There is no dispute to the fact that in L.A.O.P. No. 38 of 1990 there were 16 claimants in all. During the pendency of the aforesaid reference, claimants No. 1, 3 and 11 were dead but the heirs and legal representatives of none of them were brought on record. None of the other claimants or their heirs and legal representatives made any effort to challenge the order of the dismissal of the reference except the proposed appellants which indicates that the others have accepted the same. It is only one of the surviving daughters of the deceased claimant No. 11 and her descendants who have sought to prefer the proposed appeal against the judgment and order dated 24.09.1999 with an inordinate delay of 5659 days. The High Court not being satisfied by the explanation furnished in preferring the proposed appeal beyond limitation, refused to condone the delay in filing the proposed **4 | 2 2** appeal and consequently dismissed it as barred by time by the order impugned dated 18.01.2017. **5.** The present Special Leave Petition has been filed challenging the judgment and order dated 18.01.2017 of the High Court passed in L.A.A.S.M.P. No. 714 of 2016 in L.A.A.S. (SR) No. 6950 of 2015 whereby the High Court has dismissed the application of the petitioners herein for condoning the delay of 5659 days in filing the proposed appeal. **6.** The moot question before us is whether in the facts and circumstances of the case, the High Court was justified in refusing to condone the delay in filing the proposed appeal and to dismiss it as barred by limitation. **7.** The law of limitation is founded on public policy. It is enshrined in the legal maxim “ _interest reipublicae ut sit finis litium”_ i.e. it is for the general welfare that a period of limitation be put to litigation. The object is to put an end to every legal remedy and to have a fixed period of life for every litigation as it is futile to keep any litigation or dispute pending indefinitely. Even public policy requires that there should be an end to the litigation otherwise it would be a **5 | 2 2** dichotomy if the litigation is made immortal _vis-a-vis_ the litigating parties i.e. human beings, who are mortals. **8.** The courts have always treated the statutes of limitation and prescription as statutes of peace and repose. They envisage that a right not exercised or the remedy not availed for a long time ceases to exist. This is one way of putting to an end to a litigation by barring the remedy rather than the right with the passage of time. **9.** Section 3 of the Limitation Act in no uncertain terms lays down that no suit, appeal or application instituted, preferred or made after the period prescribed shall be entertained rather dismissed even though limitation has not been set up as a defence subject to the exceptions contained in Sections 4 to 24 (inclusive) of the Limitation Act. **10.** Section 3(1) of the Limitation Act, for the sake of convenience, is reproduced hereinbelow: “ **3. Bar of limitation.** - (1) Subject to the provisions contained in sections 4 to 24 (inclusive), every suit instituted, appeal preferred, and application made after the prescribed period shall be dismissed, although limitation has not been set up as a defence.” **6 | 2 2** **11.** Though Section 3 of the Act mentions about suit, appeal and application but since in this case we are concerned with appeal, we would hereinafter be mentioning about the appeal only in context with the limitation, it being barred by time, if at all, and if the delay in its filing is liable to be condoned. **12.** In view of the above provision, the appeal which is preferred after the expiry of the limitation is liable to be dismissed. The use of the word ‘shall’ in the aforesaid provision connotes that the dismissal is mandatory subject to the exceptions. Section 3 of the Act is peremptory and had to be given effect to even though no objection regarding limitation is taken by the other side or referred to in the pleadings. In other words, it casts an obligation upon the court to dismiss an appeal which is presented beyond limitation. This is the general law of limitation. The exceptions are carved out under Sections 4 to 24 (inclusive) of the Limitation Act but we are concerned only with the exception contained in Section 5 which empowers the courts to admit an appeal even if it is preferred after the prescribed period provided the proposed appellant gives ‘sufficient cause’ for not preferring the appeal within the **7 | 2 2** period prescribed. In other words, the courts are conferred with discretionary powers to admit an appeal even after the expiry of the prescribed period provided the proposed appellant is able to establish ‘sufficient cause’ for not filing it within time. The said power to condone the delay or to admit the appeal preferred after the expiry of time is discretionary in nature and may not be exercised even if sufficient cause is shown based upon host of other factors such as negligence, failure to exercise due diligence etc. **13.** It is very elementary and well understood that courts should not adopt an injustice-oriented approach in dealing with the applications for condonation of the delay in filing appeals and rather follow a pragmatic line to advance substantial justice. **14.** It may also be important to point out that though on one hand, Section 5 of the Limitation Act is to be construed liberally, but on the other hand, Section 3 of the Limitation Act, being a substantive law of mandatory nature has to be interpreted in a strict sense. In _**Bhag Mal alias Ram Bux**_ **8 | 2 2** _**and Ors. vs. Munshi (Dead) by LRs. and Ors**_ .[1] , it has been observed that different provisions of Limitation Act may require different construction, as for example, the court exercises its power in a given case liberally in condoning the delay in filing the appeal under Section 5 of the Limitation Act, however, the same may not be true while construing Section 3 of the Limitation Act. It, therefore, follows that though liberal interpretation has to be given in construing Section 5 of the Limitation Act but not in applying Section 3 of the Limitation Act, which has to be construed strictly. **15.** It is in the light of the public policy upon which law of limitation is based, the object behind the law of limitation and the mandatory and the directory nature of Section 3 and Section 5 of the Limitation Act that we have to examine and strike a balance between Section 3 and Section 5 of the Limitation Act in the matters of condoning the delay. **16.** Generally, the courts have adopted a very liberal approach in construing the phrase ‘sufficient cause’ used in Section 5 of 1 (2007) 11 SCC 285 **9 | 2 2** the Limitation Act in order to condone the delay to enable the courts to do substantial justice and to apply law in a meaningful manner which subserves the ends of justice. In _**Collector, Land Acquisition, Anantnag and Ors. vs. Katiji and Ors.[2]**_ , this Court in advocating the liberal approach in condoning the delay for ‘sufficient cause’ held that ordinarily a litigant does not stand to benefit by lodging an appeal late; it is not necessary to explain every day’s delay in filing the appeal; and since sometimes refusal to condone delay may result in throwing out a meritorious matter, it is necessary in the interest of justice that cause of substantial justice should be allowed to prevail upon technical considerations and if the delay is not deliberate, it ought to be condoned. Notwithstanding the above, howsoever, liberal approach is adopted in condoning the delay, existence of ‘sufficient cause’ for not filing the appeal in time, is a condition precedent for exercising the discretionary power to condone the delay. The phrases ‘liberal approach’, ‘justice- 2 (1987) 2 SCC 107 = AIR 1987 SC 1353 **10 | 2 2** oriented approach’ and cause for the advancement of ‘substantial justice’ cannot be employed to defeat the law of limitation so as to allow stale matters or as a matter of fact dead matters to be revived and re-opened by taking aid of Section 5 of the Limitation Act. **17.** It must always be borne in mind that while construing ‘sufficient cause’ in deciding application under Section 5 of the Act, that on the expiry of the period of limitation prescribed for filing an appeal, substantive right in favour of a decree-holder accrues and this right ought not to be lightly disturbed. The decree-holder treats the decree to be binding with the lapse of time and may proceed on such assumption creating new rights. **18.** This Court as far back in 1962 in the case of _**Ramlal, Motilal**_ _**And Chhotelal vs. Rewa Coalfields Ltd[3]**_ has emphasized that even after sufficient cause has been shown by a party for not filing an appeal within time, the said party is not entitled to the condonation of delay as excusing the delay is 3 A.I.R. 1962 SC 361 **11 | 2 2** the discretionary jurisdiction vested with the court. The court, despite establishment of a ‘sufficient cause’ for various reasons, may refuse to condone the delay depending upon the _bona fides_ of the party. **19.** In _**Maqbul Ahmad and Ors. vs. Onkar Pratap Narain**_ - _**Singh and Ors.[4]** ,_ it had been held that the court cannot grant an exemption from limitation on equitable consideration or on the ground of hardship. The court has time and again repeated that when mandatory provision is not complied with and delay is not properly, satisfactorily and convincingly explained, it ought not to condone the delay on sympathetic grounds alone. **20.** In this connection, a reference may be made to _**Brijesh**_ _**Kumar and Ors. vs. State of Haryana and Ors.[5]**_ wherein while observing, as above, this Court further laid down that if some person has obtained a relief approaching the court just or immediately when the cause of action had arisen, other persons cannot take the benefit of the same by 4 A.I.R. 1935 PC 85 5 2014 (4) SCALE 50 **12 | 2 2** approaching the court at a belated stage simply on the ground of parity, equity, sympathy and compassion. ## **21.** In _**Lanka Venkateswarlu vs. State of Andhra Pradesh &**_ _**Ors.**_[6] _,_ where the High Court, despite unsatisfactory explanation for the delay of 3703 days, had allowed the applications for condonation of delay, this Court held that the High Court failed to exercise its discretion in a reasonable and objective manner. High Court should have exercised the discretion in a systematic and an informed manner. The liberal approach in considering sufficiency of cause for delay should not be allowed to override substantial law of limitation. The Court observed that the concepts such as ‘liberal approach’, ‘justice-oriented approach’ and ‘substantial justice’ cannot be employed to jettison the substantial law of limitation. **22.** It has also been settled vide _**State of Jharkhand & Ors. vs.**_ _**Ashok Kumar Chokhani & Ors.[7] ,**_ that the merits of the 6 (2011) 4 SCC 363 7 AIR 2009 SC 1927 **13 | 2 2** case cannot be considered while dealing with the application for condonation of delay in filing the appeal. **23.** In _**Basawaraj and Anr. vs. Special Land Acquisition**_ _**Officer**_[8] , this Court held that the discretion to condone the delay has to be exercised judiciously based upon the facts and circumstances of each case. The expression ‘sufficient cause’ as occurring in Section 5 of the Limitation Act cannot be liberally interpreted if negligence, inaction or lack of _bona fide_ is writ large. It was also observed that even though limitation may harshly affect rights of the parties but it has to be applied with all its rigour as prescribed under the statute as the courts have no choice but to apply the law as it stands and they have no power to condone the delay on equitable grounds. **24.** It would be beneficial to quote paragraph 12 of the aforesaid decision which clinches the issue of the manner in which equilibrium has to be maintained between adopting liberal 8 (2013) 14 SCC 81 **14 | 2 2** approach and in implementing the statute as it stands. Paragraph 12 reads as under: “ **12.** It is a settled legal proposition that law of limitation may harshly affect a particular party but it has to be applied with all its rigour when the statute so prescribes. The Court has no power to extend the period of limitation on equitable grounds. “A result flowing from a statutory provision is never an evil. A Court has no power to ignore that provision to relieve what it considers a distress resulting from its operation." The statutory provision may cause hardship or inconvenience to a particular party but the court has no choice but to enforce it giving full effect to the same. The legal maxim _dura lex sed lex_ which means "the law is hard but it is the law", stands attracted in such a situation. It has consistently been held that, “inconvenience is not” a decisive factor to be considered while interpreting a statute.” **25.** This Court in the same breath in the same very decision vide paragraph 15 went on to observe as under: “ **15.** The law on the issue can be summarised to the effect that where a case has been presented in the court beyond limitation, the applicant has to explain the court as to what was the “sufficient cause” which means an adequate and enough reason which prevented him to approach the court within limitation. In case a party is found to be negligent, or for want of bona fide on his part in the facts and circumstances of the case, or found to have not acted diligently or remained inactive, there cannot be a justified ground to condone the delay. No court could be justified in condoning **15 | 2 2** such an inordinate delay by imposing any condition whatsoever. The application is to be decided only within the parameters laid down by this Court in regard to the condonation of delay. In case there was no sufficient cause to prevent a litigant to approach the court on time condoning the delay without any justification, putting any condition whatsoever, amounts to passing an order in violation of the statutory provisions and it tantamounts to showing utter disregard to the legislature.” (emphasis supplied) **26.** On a harmonious consideration of the provisions of the law, - as aforesaid, and the law laid down by this Court, it is evident that: - (i) Law of limitation is based upon public policy that there should be an end to litigation by forfeiting the right to remedy rather than the right itself; - (ii) A right or the remedy that has not been exercised or availed of for a long time must come to an end or cease to exist after a fixed period of time; - (iii) The provisions of the Limitation Act have to be construed differently, such as Section 3 has to be construed in a strict sense whereas Section 5 has to be construed liberally; **16 | 2 2** - (iv) In order to advance substantial justice, though liberal approach, justice-oriented approach or cause of substantial justice may be kept in mind but the same - cannot be used to defeat the substantial law of limitation contained in Section 3 of the Limitation Act; - (v) Courts are empowered to exercise discretion to condone the delay if sufficient cause had been explained, but that exercise of power is discretionary in nature and may not be exercised even if sufficient cause is established for various factors such as, where - there is inordinate delay, negligence and want of due diligence; - (vi) Merely some persons obtained relief in similar matter, - it does not mean that others are also entitled to the same benefit if the court is not satisfied with the cause shown for the delay in filing the appeal; - (vii) Merits of the case are not required to be considered in condoning the delay; and - (viii) Delay condonation application has to be decided on the - parameters laid down for condoning the delay and **17 | 2 2** condoning the delay for the reason that the conditions have been imposed, tantamounts to disregarding the statutory provision. **27.** It is in the light of the above legal position that now we have to test whether the inordinate delay in filing the proposed appeal ought to be condoned or not in this case. **28.** The submission of learned counsel for the petitioners is that in somewhat similar situation, delay in filing appeal for the enhancement of compensation had been condoned by this Court. He placed reliance upon the case of _**Dhiraj Singh**_ ## _**(Dead) through Legal Representatives & Ors. vs. State of**_ _**Haryana & Ors.[9]**_ . In this case, delay in filing appeal was condoned as in other appeals compensation awarded at the rate of Rs.200/- per sq. yd. was upheld and the proposed appellants were also held entitled to the same benefit of compensation at the rate of Rs.200/- per sq. yd. instead of Rs.101/- per sq. yd. as awarded but with the rider that they 9 (2014) 14 SCC 127 **18 | 2 2** will not be entitled for interest for the period of delay in approaching the High Court. **29.** The other decision relied upon in this regard is the case of ## _**Imrat Lal & Ors. vs. Land Acquisition Collector & Ors.[10]** ._ In this case also the matter was regarding determination of compensation for the acquired land and there was a delay of - 1110 days in filing the appeal for enhancement of compensation. Despite findings that no sufficient cause was shown in the application for condoning the delay, this Court condoned the delay in filing the appeal as a large number of similarly situate persons have been granted relief by this Court. **30.** The aforesaid decisions would not cut any ice as imposition of conditions are not warranted when sufficient cause has not been shown for condoning the delay. Secondly, delay is not liable to be condoned merely because some persons have been granted relief on the facts of their own case. Condonation of delay in such circumstances is in violation of 10 (2014) 14 SCC 133 **19 | 2 2** the legislative intent or the express provision of the statute. Condoning of the delay merely for the reason that the claimants have been deprived of the interest for the delay without holding that they had made out a case for condoning the delay is not a correct approach, particularly when both the above decisions have been rendered in ignorance of the earlier pronouncement in the case of _**Basawaraj** (supra)._ **31.** Learned counsel for the petitioners next submitted on the basis of additional documents that in connection with the land acquisition in some other Special Leave Petitions, delay was condoned taking a lenient view and the compensation was enhanced with the rider that the claimants shall not be entitled for statutory benefits for the period of delay in approaching this Court or the High Court. The said orders do not clearly spell out the facts and the reasons explaining the delay in filing the appeal(s) but the fact remains that the delay was condoned by taking too liberal an approach and putting conditions which have not been approved of by this Court itself. In the absence of the facts for getting the delay condoned in the referred cases, _vis-à-vis,_ the facts of this **20 | 2 2** case, it cannot be said that the facts or the reasons of getting the delay condoned are identical or similar. Therefore, we are unable to exercise our discretionary power of condoning the delay in filing the appeal on parity with the above order(s). **32.** Moreover, the High Court, in the facts of this case, has not found it fit to exercise its discretionary jurisdiction of condoning the delay. There is no occasion for us to interfere with the discretion so exercised by the High Court for the reasons recorded. First, the claimants were negligent in pursuing the reference and then in filing the proposed appeal. Secondly, most of the claimants have accepted the decision of the reference court. Thirdly, in the event the petitioners have not been substituted and made party to the reference before its decision, they could have applied for procedural review which they never did. Thus, there is apparently no due diligence on their part in pursuing the matter. Accordingly, in our opinion, High Court is justified in refusing to condone the delay in filing the appeal. **33.** In the above situation, we do not deem it proper and necessary to interfere with the decision of the High Court **21 | 2 2** refusing to condone the inordinate delay in filing the proposed appeal. **34.** The Special Leave Petition, as such, lacks merit and is dismissed. **……………………………….. J. (BELA M. TRIVEDI)** **……………………………….. J. (PANKAJ MITHAL)** **NEW DELHI; APRIL 8, 2024.** **22 | 2 2**
End of Judgment Record
Browse All Landmark Cases Judgments
2019-01-22

State of Himachal Pradesh & Anr. v. Pinju Ram & Others; State of Himachal Pradesh & Ors. v. Ganesh Dutt & Anr.

This batch of appeals concerns regularisation and monetary benefits of part‑time employees in Himachal Pradesh who were converted to daily‑wage status. The State had issued a policy on 27 February 2004: part‑time Class‑IV employees who had completed ten years of continuous service as on 31 December 2003 would be made daily wagers with prospective effect, and posts vacated by such employees would stand abolished; Education and Ayurveda were excluded from the policy. Revenue Chowkidars, engaged by Panchayats, were not covered by that policy and received separate treatment. Following writ petitions and an order of the Himachal Pradesh High Court and in light of later developments, the State drew‑up directions in 2011 (22 September) to give seniority to Revenue Chowkidars on the basis of ten years of service, but with wages from the date of actual appointment and without back‑dated monetary benefits; 7 July 2012 further instructions reiterated this stance for remaining part‑time employees, with monetary benefits not guaranteed in the interregnum. The respondents pressed for back wages dating from 1 January 2007 and broader coverage. The Supreme Court held that the 2007 back‑pay direction was unsustainable, clarified that seniority would count from ten years without past benefits, and that the 2011 policy and Moti Singh principle should guide the approach. The appeals are allowed; no costs. The related writ petitions are to be disposed of consistent with these directions.

2018-08-14

Union Bank of India and Others v. C.G. Ajay Babu and Anr.

This is a Supreme Court of India appeal concerning the forfeiture of gratuity under the Payment of Gratuity Act, 1972. The respondent was a branch manager of the appellant bank and was dismissed on 3 June 2004 after disciplinary proceedings. A show-cause notice sought to forfeit gratuity due to misconduct involving moral turpitude, which was ordered on 20 April 2004. The High Court upheld the dismissal but held that gratuity could be paid since there was no financial loss to the bank, and that a bipartite settlement between the bank and employees permitted forfeiture only where misconduct caused financial loss. The Division Bench, however, held that forfeiture under Section 4(6) must be read together with Section 4(5) and that no loss was proven, thus entitling the employee to gratuity in accordance with the bipartite settlement. The Supreme Court agreed with the High Court that forfeiture is not automatic; it is controlled by Sections 4(5) and 4(6) of the Act and by the bipartite settlement, which requires loss to justify forfeiture. The Court emphasized that an act must constitute an offence involving moral turpitude and that conviction is generally required for forfeiture under 4(6)(b)(ii). The appeal is dismissed with no costs.

2018-09-25

Reema Salkan v. Sumer Singh Salkan

This is a Supreme Court of India criminal appeal under the Criminal Appellate Jurisdiction arising from a maintenance dispute under Section 125 Cr.P.C. The parties, married in 2002, had a protracted litigation history. The Family Court granted maintenance to the wife from 17 July 2003 to 8 December 2010, and held no maintenance thereafter. The High Court, in revision, partly allowed the application, directing Rs.9,000 per month from 9 December 2010 onward, while upholding the earlier period’s Rs.10,000 per month. This Court had earlier granted interim maintenance of Rs.20,000 per month in 2014 (Criminal Appeal Nos. 2347-2349 of 2014). The appellant contends there has been no change in circumstances since the interim order and that the respondent’s substantial assets, education, and overseas earnings establish the capacity to pay higher maintenance. The respondent defends the High Court’s reasoning, arguing that the Family Court’s assessment, demeanor observations, and the principle that maintenance should not be perpetual require careful scrutiny, and that the notional minimum wage approach used by the High Court is flawed. The overarching issue is the quantum of monthly maintenance payable to the appellant and whether the interim amount should be augmented beyond the period up to 2010.”

2019-12-03

M/s Embassy Property Developments Pvt. Ltd. v State of Karnataka & Ors.

This judgment concerns three Civil Appeals filed by a Resolution Applicant, the Corporate Debtor (through its Resolution Professional) and the Committee of Creditors, challenging an Interim Order of the Karnataka High Court staying an NCLT order in proceedings under the Insolvency and Bankruptcy Code, 2016. The NCLT Chennai had admitted an application under Section 7 of the IBC against M/s Tiffins Barytes Asbestos & Paints Ltd. and directed a moratorium under Section 14. The Interim Resolution Professional then sought a deemed extension of a mining lease under MMDR Act, 1957 and the Government of Karnataka rejected it. The NCLT, by an order dated 11.12.2018, set aside the Government’s order and directed execution of Supplement Lease Deeds for the period up to 31.03.2020. The Government of Karnataka challenged this in a High Court writ petition, which stayed the impugned NCLT order. The core issues were: (i) whether the High Court may interfere under Article 226/227 with an NCLT order in IBC when an appeal lies to the NCLAT, and (ii) whether fraud can be inquired into by NCLT/NCLAT in CIRP. The Court reiterates that IBC is a complete, umbrella code with a three‑tier mechanism (NCLT, NCLAT, Supreme Court) and that public‑law disputes arising from MMDR Act obligations lie outside IBC. It ultimately holds that while NCLT/NCLAT may inquire into fraud, they cannot adjudicate MMDR‑related public legal disputes; and the High Court’s writ jurisdiction in public‑law contexts remains permissible. The appeals are dismissed.