Tenetowl LogoTenetowl
Supreme Court of IndiaSupreme Court · 2020Division BenchDismissed

PATEL ENGINEERING LTD. v. NORTH EASTERN ELECTRIC POWER CORPORATION LTD. (NEEPCO)

Case / Petition Number:
Special Leave Petition (C) Nos. 3584-3585 of 2020; with Special Leave Petition (Civil) Nos. 3438-3439, 3434-3435 of 2020
Neutral Citation:[2020] 4 S.C.R. 156

Case Synopsis & Summary

Patel Engineering Ltd. v. North Eastern Electric Power Corporation Ltd. (NEEPCO) concerns three arbitral awards dated 29 March 2016 under KaHEP Packages I-III. NEEPCO challenged these awards under Section 34 of the Arbitration and Conciliation Act, 1996 before the Additional Deputy Commissioner (Judicial) Shillong; the Common Judgment dated 27 April 2018 upheld the awards. NEEPCO filed appeals under Section 37 before the Meghalaya High Court, which allowed the appeals by judgment dated 26 February 2019 and set aside the 2018 judgment. After dismissal of the Special Leave Petitions by the Supreme Court on 19 July 2019, Patel Engineering filed review petitions before the High Court alleging error apparent on the face of the record for proceeding under amendments to the 1996 Act (Amendment Act 2015) introducing Section 34(2A) on patent illegality, and contending that Saw Pipes and Western Geco should no longer govern domestic awards. The Supreme Court held that the High Court’s approach was correct, aligning with Ssangyong Engineering and Associated Builders: a domestic arbitral award can be set aside under Section 34 if it is patently illegal or perverse. The Court acknowledged 2015 amendments and held consistency requires dismissing the review petitions when the main judgment is not attacked in the SLP. Accordingly, the petitions were dismissed with no order as to costs.

Precedent Explorer

Find Cases Like This

Explore other judgments dealing with similar legal situations, facts, or statutory provisions.

Case Details & Bench

Court
Supreme Court of India
Hon'ble Judges
  • R. Banumathi
  • Indu Malhotra
  • Aniruddha Bose
Judgment Date
2020-05-22
Court Decision / Holding
All Special Leave Petitions are dismissed with no order as to costs.
Final Disposition
Dismissed

Parties to the Case

Appellants / Petitioners

  • PATEL ENGINEERING LTD.

Respondents

  • North Eastern Electric Power Corporation Ltd. (NEEPCO)

Legal Representation & Advocates

Counsels for Petitioners

  • • Harish Salve
  • • Neeraj Kishan Kaul

Counsels for Respondents

  • • Tushar Mehta
  • • Huzeffa Ahmadi
  • • Syed Jafar Alam
  • • Ketan Gaur
  • • Ashish Bhan
  • • Rajendra Dangwal
  • • Mohit Rohatgi
  • • Aayush Mitruka
  • • Deepak Joshi
  • • Liz Mathew

Provisions of Law Cited

Arbitration and Conciliation Act, 1996 – Section 34, Section 3734(2A) added by Amendment Act 2015 (applicable to domestic arbitrations)Section 31(3) (reasons for award)Section 28(1)(a) and 28(3) (substantive law and contract terms)Constitution of India, Article 136Code of Civil Procedure, Order 47 Rule 7 (review not barred)

Legal Doctrines & Maxims

  • Patent illegality as a ground to set aside a domestic award (public policy of India)
  • Public policy of India and Fundamental Policy of Indian Law
  • Consistency and finality in judicial pronouncements (stare decisis)
  • Unjust enrichment contrary to the Fundamental Policy of Indian Law
  • Construction of contractual terms is primarily for arbitrator, unless terms are irrational or not possible view

Submissions & Arguments

Contentions of Appellants / Petitioners

The petitioner contends that the High Court’s 26.02.2019 judgment applied the pre-2015 regime and misread Saw Pipes and Western Geco; the dismissal of the earlier SLPs (19.07.2019) was a non-merits order, permitting a challenge under Article 136 of the Constitution. The amendments of 2015 introduced Section 34(2A) to permit patent illegality as a ground for domestic awards; post-amendment, the grounds and interpretation in Ssangyong and Associate Builders should govern. Consistency and finality require that reviews against the main judgment should not be entertained when the main judgment has not been challenged in the SLP, and that the High Court was correct in following the new law and in finding a patent illegality or perversity in the awards.

Contentions of Respondents

The respondent argues that the earlier SLP was disposed of after full hearing and not on merits; the principle from Bussa Overseas and Durga Shankar Mehta requires that challenges to the order in review do not unreasonably bypass the finality of judgments. They contend the 2015 Amendment Act applies; after 2015, Section 34(2A) governs domestic awards and limits re-litigation. The High Court’s decision to set aside the awards was based on a holistic view of the contract terms and the perverse reading by the Arbitrator, and the Supreme Court should not interfere with the review petition's dismissal given consistency and finality.

Legal Doctrine & Issue Explorer

Explore This Legal Issue

Find relevant judgments and authoritative positions on the legal questions discussed here.

Cited Precedents (12)

Case NameCitationTreatmentExplanation
Ssangyong Engineering and Construction Company Limited v. National Highways Authority of India (NHAI)(2019) 15 SCC 131PositiveCourt’s reasoning aligns with Ssangyong on patent illegality/patent ground post-amendment; supports the High Court’s approach.
Associate Builders v. Delhi Development Authority(2015) 3 SCC 49PositiveDefines patent illegality within 34(2)(b) and its sub-heads; upheld as controlling standard for domestic awards.
Bussa Overseas and Properties Private Limited and Another v. Union of India and Another(2016) 4 SCC 696PositiveUsed to discuss maintainability of SLPs against review and consistency/finality principle.
Durga Shankar Mehta v. Thakur Raghuraj Singh and Others(1955) 1 SCR 267PositiveConstitution Bench decision cited regarding Article 136 and plenary powers.
Shanker Motiram Nale v. Shiolalsing Gannusing Rajput(1994) 2 SCC 753PositiveCited for principle regarding Order 47 Rule 7 and non-curtailment of Article 136.
Thungabhadra Industries Ltd. v. Government of Andhra Pradesh(1964) 5 SCR 174Mentioned OnlyListed as authority; not central to the decision.
Oil & Natural Gas Corporation Ltd. v. Saw Pipes Ltd.(2003) 5 SCC 705OverruledNot good law post-2015 amendment; regard as superseded.
Oil & Natural Gas Corporation Ltd. v. Western Geco International Limited(2014) 9 SCC 263OverruledFound to be no longer good law after Amendment Act 2015.
HRD Corporation (Marcus Oil and Chemical Division) v. GAIL (India) Limited(2018) 12 SCC 471Mentioned OnlyCited in passing to support arguments; no binding treatment in this decision.
Board of Control for Cricket in India v. Kochi Cricket Private Limited and Others(2018) 6 SCC 287PositiveUsed to support application of Amendment Act to post-2015 S34 petitions.
State of A.P. v. A.P. Jaiswal(2001) 1 SCC 748PositiveCited for consistency and finality in judicial pronouncements.
Associated Builders v. Delhi Development Authority(2015) 3 SCC 49PositiveRepeated reference to patent illegality framework; reinforces central doctrine.
Case Applicability Diagnostic

Apply This to My Facts

Share your situation and test whether this judgment governs, supports, or challenges your case.

Official Judgment Record
•6,521 words•~30 min read

In The Court Record

PATEL ENGINEERING LTD. v. NORTH EASTERN ELECTRIC POWER CORPORATION LTD. (NEEPCO)

SUPREME COURT REPORTS[2020] 4 S.C.R. 156 [2020] 4 S.C.R. 156 A ## PATEL ENGINEERING LTD. v. ## NORTH EASTERN ELECTRIC POWER CORPORATION LTD. (NEEPCO) B (Special Leave Petition (C) Nos. 3584-3585 of 2020) ## MAY 22, 2020 ## **[R. BANUMATHI, INDU MALHOTRA AND ANIRUDDHA BOSE, JJ.]** _Arbitration and Conciliation Act, 1996 – ss. 34 and 37 – The_ C _respondent-North Eastern Electric Power Corporation Ltd. (NEEPCO) filed three applications u/s. 34 of the Act, 1996 challenging the three arbitral awards dated 29.03.2016 – The Additional Deputy Commissioner (Judicial) vide common judgment dated 27.04.2018 rejected the applications and upheld the three_ D _arbitral awards – The respondent-NEEPCO filed appeals u/s. 37 of the Act, 1996 before the High Court and the same were allowed by judgment dated 26.02.2019 and the judgment dated 27.04.2018 passed by the Additional Deputy Commissioner was set aside – Aggrieved, the petitioner preferred Special Leave Petitions, which were dismissed – After the dismissal of the SLPs, the petitioner filed_ E _review petitions before the High Court on the ground that the judgment of the High Court dated 26.02.2019 suffered from error apparent on the face of the record – The said review petitions were dismissed by the High Court by order dated 10.10.2019 – On appeal, held: In the instant case, the High Court in its judgment dated_ F _26.02.2019 has referred to the Supreme Court judgment in Associated Builders at length and arrived at the correct conclusion that an arbitral award can be set aside u/s. 34, if it is patently illegal or perverse – This finding of the High Court was in conformity with the Supreme Court judgment in Ssangyong Engineering – The High Court held that no reasonable person could have arrived at a_ G _different conclusion while interpreting clauses 2.7 and 3.4 of the BoQ and clauses 32(ii) (a) 33(iii) of the conditions of contract – The case was decided on the ground that the arbitral award is a perverse award and on a holistic reading of all the terms and conditions of the Contract, the view taken by the Arbitrator is not_ H 156 ## PATEL ENGINEERING LTD. v. NORTH EASTERN ELECTRIC 157 POWER CORPORATION LTD. (NEEPCO) _even a possible view – The view of the High Court was correct –_ A _Thus, the High Court rightly dismissed the review petitions by the impugned order dated 10.10.2019 – Resultantly, all the Special Leave Petitions are dismissed._ _Ssangyong Engineering and Construction Company Limited v. National Highways Authority of India (NHAI)_ **(2019) 15 SCC 131 : [2019] 7 SCR 522;** _Associate Builders v. Delhi Development Authority_ **(2015) 3 SCC 49; [2014] 13 SCR 895 – relied on.** _Bussa Overseas and Properties Private Limited and Another v. Union of India and Another_ **(2016) 4 SCC 696 : [2016] 1 SCR 266;** _Durga Shankar Mehta v. Thakur Raghuraj Singh and Others_ **[1955] 1 SCR 267;** _Shanker Motiram Nale v. Shiolalsing Gannusing Rajput_ **(1994) 2 SCC 753;** _Thungabhadra Industries Ltd. v. Government of Andhra Pradesh Represented by the Deputy Commissioner of Commercial Taxes, Anantapur_ **[1964] 5 SCR 174;** _Oil & Natural Gas Corporation Ltd. v. Saw Pipes Ltd._ **(2003) 5 SCC 705 : [2003] 3 SCR 691;** _Oil & Natural Gas Corporation Ltd. v. Western Geco International Limited_ **(2014) 9 SCC 263 : [2014] 12 SCR 1;** _HRD Corporation (Marcus Oil and Chemical Division) v. GAIL (India) Limted_ **(2018) 12 SCC 471: [2017] 11 SCR 857;** _Board of Control for Cricket in India v. Kochi Cricket Private Limited and Others_ **(2018) 6 SCC 287 : [2018] 2 SCR 829 – referred to.** B C D E F ## **Case Law Reference** |**[2016]**|**1 SCR 266**|**referred to**|**Para 8**|| |---|---|---|---|---| |**[1955]**|**1 SCR 267**|**referred to**|**Para 8**|| |**(1994)**|**2 SCC 753**|**referred to**|**Para 8**|G| |**[1964]**|**5 SCR 174**|**referred to**|**Para 10**|| |**[2003]**|**3 SCR 691**|**referred to**|**Para 13**|| |**[2014]**|**12 SCR 1**|**referred to**|**Para 13**|| |**[2017]**|**11 SCR 857**|**referred to**|**Para 13**|H| 158 SUPREME COURT REPORTS [2020] 4 S.C.R. |A|**[2019]**|**7 SCR 522**|**relied on**|**Para 13**| |---|---|---|---|---| ||**[2018]**|**2 SCR 829**|**referred to**|**Para 15**| ||**[2014]**|**13 SCR 895**|**relied on**|**Para 17**| CIVIL APPELLATE JURISDICTION: Special Leave Petition B (Civil) Nos. 3584-3585 of 2020. From the Judgment and Order dated 10.10.2019 of the High Court of Meghalaya at Shillong in Review Petition No. 16 of 2019 and MC (Review Petition) No. 14 of 2019 respectively. ## With ## C D Special Leave Petition (Civil) Nos. 3438-3439, 3434-3435 of 2020. Tushar Mehta, SG, Harish Salve, Neeraj Kishan Kaul, Huzeffa Ahmadi, Sr. Advs., Syed Jafar Alam, Ketan Gaur, Ashish Bhan, Rajendra Dangwal, Mohit Rohatgi, Aayush Mitruka, Deepak Joshi, Ms. Liz Mathew, Advs. for the appearing parties. The following Order of the Court was passed: ## **O R D E R** 1. These special leave petitions arise out of the impugned order dated 10.10.2019 passed by the High Court of Meghalaya at Shillong in E and by which the High Court declined to entertain the review petitions filed by the petitioner seeking review of the judgment and order dated 26.02.2019 in Arbitration Appeal Nos.3, 4 and 5 of 2018 on the ground that no ground for review is made out and that there is a delay in filing the application for review. F G H 2. We have heard Mr. Harish Salve and Mr. Neeraj Kishan Kaul, learned Senior counsel appearing on behalf of the petitioner. On behalf of the respondent, we have heard Mr. Tushar Mehta, learned Solicitor General and Mr. Huzeffa Ahmadi, learned Senior counsel at some length, even at the time of the admission. 3. The learned sole arbitrator has passed the arbitral award dated 29.03.2016 in respect of Package-I holding as follows:- _“Based on my findings above, I have no hesitation in coming to the considered finding that the contract itself provides rate(s) for payment of extra lead in item Nos.2.7 and 3.4 of the BOO for surface and underground structures_ PATEL ENGINEERING LTD. v. NORTH EASTERN ELECTRIC 159 POWER CORPORATION LTD. (NEEPCO) _respectively. Admittedly material had been transported from a lead much longer than that envisaged at the time of award of work in favour of the claimant. It is also an admitted case of the parties that the claimant is entitled to extra payment for the extra lead. The only point at issue is whether Clause 33(ii)(a) or Clause 33(iii) would be applicable for working out the rate payable for transportation. In view of my findings, I have no hesitation in holding that the payment of extra lead is to be determined in accordance with Clause 33(ii)(a) for the item which has deviated being already available in the contract._ _I, therefore, answer the reference as follows:_ _The rate for extra lead for transportation of sand and boulders from Government approved quarries to the work site for package-I works under KaHEP shall be decided in terms of Clause 33(ii)(a) of Part-III, Volume-I, Conditions of Contract of Book-II of Contract Agreement No.NEEPCO/ED/ QP/C&P/R/C/KaHEP/560 of 2004-05 dated 17.12.2004.”_ Similar Declaratory Arbitral Awards dated 29.03.2016 were passed by the learned sole arbitrator in respect of the other two Arbitral References in respect of contracts pertaining to Package-II and PackageIII of the project. 4. Respondent-North Eastern Electric Power Corporation Ltd. (NEEPCO) filed three applications under Section 34 of the Arbitration and Conciliation Act, 1996 before the Additional Deputy Commissioner (Judicial), Shillong challenging the three arbitral awards dated 29.03.2016 in respect of Packages-I, II and III. The Additional Deputy Commissioner (Judicial) vide common judgment dated 27.04.2018 rejected the applications under Section 34 of the Act and upheld all the three arbitral awards. The respondent-NEEPCO filed three appeals under Section 37 of the Act before the High Court in Arbitration Appeal No(s).3, 4 and 5 of 2018. By the common judgment dated 26.02.2019, the High Court allowed the respondent’s appeals and set aside the common judgment dated 27.04.2018 passed by the Additional Deputy Commissioner (Judicial). 5. Aggrieved by the common judgment dated 26.02.2019, the petitioner preferred special leave petitions before the Supreme Court in A B C D E F G H 160 SUPREME COURT REPORTS [2020] 4 S.C.R. - A SLP (C) Nos.13629-13631 of 2019. After hearing both the parties, the Supreme Court vide order dated 19.07.2019 dismissed all the three SLPs filed by the petitioner holding that the Court is not inclined to interfere in the matters. 6. After dismissal of the SLPs, the petitioner filed review petitions B before the High Court on the ground that the judgment of the High Court dated 26.02.2019 suffers from error apparent on the face of the record as it had not taken into consideration the amendments made to Arbitration and Conciliation Act, 1996 by Amendment Act of 2015. The said review petitions came to be dismissed by the High Court vide the impugned orders. ## C 7. We heard the matter at some length at the time of admission and carefully considered the submissions of the learned counsel appearing for the parties and the judgments relied upon by both the sides and the judgment of the High Court dated 26.02.2019 and other materials on record. ## D 8. Contention of the learned Senior counsel for the petitioner is that dismissal of the earlier SLP vide order dated 19.07.2019 is a nonspeaking order and not on merits and hence no objection could be taken for filing of the review petition. Placing reliance upon _Bussa Overseas[1]_ and Constitution Bench decisions in _Durga Shankar Mehta[2]_ , it was E submitted that Article 136 of the Constitution confers on the Supreme Court special or residuary powers which are exercisable outside the purview of the ordinary laws in cases where the needs of justice demand interference by the Supreme Court. It was submitted that in paragraph (30) of _Bussa Overseas[3]_ , the Supreme Court held that though the decision in _Shanker Motiram Nale[4 ]_ referred to Order 47 Rule 7 of the Code of F Civil Procedure bars an appeal against the order of the court rejecting the review, it is not to be understood that the court has curtailed the plenary jurisdiction under Article 136 of the Constitution by taking recourse to the provisions in the Code of Civil Procedure. ## G > 1 _Bussa Overseas and Properties Private Limited and Another v. Union of India and Another_ **(2016) 4 SCC 696** > 2 _Durga Shankar Mehta v. Thakur Raghuraj Singh and Others_ **(1955) 1 SCR 267** 3 _Bussa Overseas and Properties Private Limited and Another v. Union of India and Another_ **(2016) 4 SCC 696** - H 4 _Shanker Motiram Nale v. Shiolalsing Gannusing Rajput_ **(1994) 2 SCC 753** PATEL ENGINEERING LTD. v. NORTH EASTERN ELECTRIC 161 POWER CORPORATION LTD. (NEEPCO) 9. Mr. Tushar Mehta, learned Solicitor General also relied upon _Bussa Overseas[5]_ and contended that the appeal is not maintainable against the order rejecting the application for review of judgment and such appeal is not against the main judgment. In support of his contention, learned Solicitor General has placed reliance upon paragraph (22), which reads as under:- A B **“22.** Recently in _Sandhya Educational Society vs. Union of India_ (2014) 7 SCC 701, the Court referred to the decision in _Vinod Kapoor vs. State of Goa_ (2012) 12 SCC 378 and opined thus: (SCC p. 706, para 16) “ _16_ . This Court in _Vinod Kapoor_ v. _State of Goa_ (2012) 12 SCC 378, has categorically observed that once the special leave petition is dismissed as withdrawn without obtaining appropriate permission to file a special leave petition once over again after exhausting the remedy of review petition before the High Court, the same is not maintainable.” C D 10. After considering the Constitution Bench decision in _Durga Shankar Mehta[6 ]_ and number of other judgments, in _Bussa Overseas[7]_ , the Court held that consistency is the cornerstone of the administration of justice and courts have evolved and formulated a principle that if the basic judgment is not assailed and the challenge is only to the order passed in review, the Supreme Court is obliged not to entertain such special leave petitions. In paragraphs (30) and (31) of _Bussa Overseas[8]_ , the Supreme Court held as under:- **“30.** The decisions pertaining to maintainability of special leave petition or for that matter appeal have to be seemly understood. Though in the decision in _Shanker Motiram Nale Shiolalsing Gannusing Rajput_ (1994) 2 SCC 753, the two-Judge Bench referred to Order 47 Rule 7 of the Code of Civil Procedure that bars an appeal against the order of the court rejecting the review, it is not to be understood that the Court has curtailed the plenary jurisdiction under Article 136 of the Constitution by taking recourse E F G > 5 _Bussa Overseas and Properties Private Limited and Another v. Union of India and Another_ **(2016) 4 SCC 696** > 6 _Durga Shankar Mehta v. Thakur Raghuraj Singh and Others_ **(1955) 1 SCR 267** 7 _Bussa Overseas and Properties Private Limited and Another v. Union of India and Another_ **(2016) 4 SCC 696** H 162 SUPREME COURT REPORTS [2020] 4 S.C.R. A B C D to the provisions in the Code of Civil Procedure. It has to be understood that the Court has evolved and formulated a principle that if the basic judgment is not assailed and the challenge is only to the order passed in review, this Court is obliged not to entertain such special leave petition. The said principle has gained the authoritative status and has been treated as a precedential principle for more than two decades and we are disposed to think that there is hardly any necessity not to be guided by the said precedent. **31.** In this context, we may profitably reproduce a passage from _State of A.P._ v. _A.P. Jaiswal_ (2001) 1 SCC 748, wherein a threeJudge Bench has observed thus: (SCC p. 761, para 24) “ _24_ . Consistency is the cornerstone of the administration of justice. It is consistency which creates confidence in the system and this consistency can never be achieved without respect to the rule of finality. It is with a view to achieve consistency in judicial pronouncements, the courts have evolved the rule of precedents, principle of stare decisis, etc. These rules and principle are based on public policy….” (emphasis supplied) The Supreme Court held that the decision rendered in _Thungabhadra Industries Ltd.[9 ]_ is not correct. E 11. It was submitted by the learned Solicitor General and learned Senior counsel appearing on behalf of the respondent that the earlier SLP was heard at length and thereafter, the SLP came to be dismissed as there was no ground to interfere in the matters. After dismissal of the SLP and without seeking for liberty, the petitioner thereafter filed the review petition. F 12. In our considered view, it is not necessary to go into the question of maintainability of these SLPs preferred against the order rejecting the review, after the challenge to the main judgment had been rejected in the earlier SLPs. As noted earlier, in this case, the judgment of the High Court under Section 37 of the Act was challenged before the G Supreme Court and the SLPs were dismissed by the Supreme Court after hearing the Senior Counsel for the parties vide order dated > 8 _Bussa Overseas and Properties Private Limited and Another v. Union of India and Another_ **(2016) 4 SCC 696** > 9 _Thungabhadra Industries Ltd. v. Government of Andhra Pradesh Represented by the_ H _Deputy Commissioner of Commercial Taxes, Anantapur_ **(1964) 5 SCR 174** PATEL ENGINEERING LTD. v. NORTH EASTERN ELECTRIC 163 POWER CORPORATION LTD. (NEEPCO) 19.07.2019. Be it noted when the earlier SLPs were dismissed, no liberty A was taken to file the review before the High Court. Be that as it may, we are not inclined to go into this aspect any further. 13. On behalf of the petitioner, Mr. Harish Salve and Mr. Neeraj Kishan Kaul, learned Senior counsel mainly contended that in the judgment of the High Court dated 26.02.2019, the High Court erroneously applied the provisions as applicable prior to the Amendment Act, 2015 and the judgment of the High Court suffers from error apparent on the face of the record since the High Court relied upon the decision in _Saw Pipes Ltd.[10]_ and _Western Geco International Limited[11]_ , which are no longer good law after the Amendment Act, 2015 brought into effect from 23.10.2015. It is submitted that the judgment of the High Court dated 26.02.2019 suffers from error apparent on the face of the record and therefore, the petitioner is justified in seeking the review of the judgment dated 26.02.2019 and the High Court was not right in rejecting the review petition. In support of the contention of the petitioners, reliance was placed upon _HRD Corporation[12]_ and _Ssangyong Engineering and Construction Company Limited[13] ._ 14. Mr. Tushar Mehta, learned Solicitor General and Mr. Huzeffa Ahmadi, learned Senior counsel have submitted that at the time when the earlier SLP(C) Nos.13629-13631 of 2019 were heard, they were heard at length and all the arguments including the effect of the amendment to Section 34 was also raised and only thereafter, the earlier SLPs came to be dismissed. It was submitted that though the dismissal of order dated 19.07.2019 is a non-speaking order, the petitioner had raised all contentious points, now urged, and faced an order of dismissal, and the petitioner cannot be allowed to reagitate the matter by filing a review petition. B C D E F 15. In _Board of Control for Cricket in India[14]_ , the Supreme Court held that the Amendment Act, 2015 would apply to Section 34 10 _Oil & Natural Gas Corporation Ltd. v. Saw Pipes Ltd._ **(2003) 5 SCC 705** 11 _Oil & Natural Gas Corporation Ltd. v. Western Geco International Limited_ **(2014) 9 SCC 263** G > 12 _HRD Corporation (Marcus Oil and Chemical Division) v. GAIL (India) Limted_ **(2018) 12 SCC 471** 13 _Ssangyong Engineering and Construction Company Limited v. National Highways Authority of India (NHAI)_ **(2019) 15 SCC 131, Para No.19** 14 _Board of Control for Cricket in India v. Kochi Cricket Private Limited and Others_ **(2018) 6 SCC 287** H 164 SUPREME COURT REPORTS [2020] 4 S.C.R. A petitions that are made after 23.10.2015 (the day on which the Amendment Act came into force). In the present case, admittedly, after the arbitral awards are dated 29.03.2016, the applications under Section 34 of the Act were filed before the Judicial Commissioner, Shillong as per the decision in _Board of Control for Cricket in India[15]_ , the provisions of the Amendment Act would apply. - B 16. Patent illegality as a ground for setting aside a domestic award was first expounded in the judgment of _Saw Pipes Ltd.[16 ]_ where this Court was dealing with a domestic award. This Court gave a wider interpretation to the ‘public policy of India’ in Section 34(2)(b)(ii) in Part I of the 1996 Act. The Court held that an award would be “patently C illegal”, if it is contrary to the substantive provisions of law; or, provisions of the 1996 Act; or, terms of the contract. 17. In the subsequent judgment of _Associate Builders[17]_ , this Court discussed the ground of patent illegality as a ground under public policy for setting aside a domestic award. The relevant extract of the judgment D in _Associate Builders_ case (supra) reads as follows:- ## “40. **Patent Illegality** We now come to the fourth head of public policy namely, patent illegality. It must be remembered that under the explanation to E Section 34(2)(b), an award is said to be in conflict with the public policy of India if the making of the award was induced or affected by fraud or corruption. This ground is perhaps the earliest ground on which courts in England set aside awards under English law. Added to this ground (in 1802) is the ground that an arbitral award would be set aside if there were an error of law by the F arbitrator….” “42. In the 1996 Act, this principle is substituted by the ‘patent illegality’ principle which, in turn, contains three sub heads- G 42.1 (a) a contravention of the substantive law of India would result in the death knell of an arbitral award. This must be understood in the sense that such illegality must go to the root of - 15 _Board of Control for Cricket in India v. Kochi Cricket Private Limited and Others_ **(2018) 6 SCC 287** 16 _Oil & Natural Gas Corporation Ltd. v. Saw Pipes Ltd._ **(2003) 5 SCC 705** H > 17 _Associate Builders v. Delhi Development Authority_ **(2015) 3 SCC 49** , paras 40 to 45. ## PATEL ENGINEERING LTD. v. NORTH EASTERN ELECTRIC 165 POWER CORPORATION LTD. (NEEPCO) the matter and cannot be of a trivial nature. This again is a really A a contravention of Section 28(1)(a) of the Act, which reads as under: 28. Rules applicable to substance of dispute.—(1) Where the place of arbitration is situated in India,- (a) in an arbitration other than an international commercial arbitration, the arbitral tribunal shall decide the dispute submitted to arbitration in accordance with the substantive law for the time being in force in India; 42.2 (b) a contravention of the Arbitration Act itself would be regarded as a patent illegality-for example if an arbitrator gives no reasons for an award in contravention of Section 31(3) of the Act, such award will be liable to be set aside. 42.3 (c) Equally, the third sub-head of patent illegality is really a contravention of Section 28(3) of the Arbitration Act, which reads as under: B C D 28. Rules applicable to substance of dispute.- (3) In all cases, the arbitral tribunal shall decide in accordance with the terms of the contract and shall take into account the usages of the trade applicable to the transaction. This last contravention must be understood with a caveat. An arbitral tribunal must decide in accordance with the terms of the contract, but if an arbitrator construes a term of the contract in a reasonable manner, it will not mean that the award can be set aside on this ground. Construction of the terms of a contract is primarily for an arbitrator to decide unless the arbitrator construes the contract in such a way that it could be said to be something that no fair minded or reasonable person could do.” (emphasis supplied) 18. The Law Commission in its 246[th] Report[18] recommended the insertion of the ground of ‘patent illegality’ for setting aside a domestic award by the insertion of clause (2A) in Section 34 of the Act. The relevant extract from the Report of the Law Commission is extracted herein below:- E F G 18 Available at : http://lawcommissionofindia.nic.in/reports/Report246.pdf H 166 SUPREME COURT REPORTS [2020] 4 S.C.R. A “It is for this reason that the Commission has recommended the addition of section 34 (2A) to deal with purely domestic awards, which may also be set aside by the Court if the Court finds that such award is vitiated by “patent illegality appearing on the face of the award.” In order to provide a balance and to avoid excessive intervention, it is clarified in the proposed proviso to the proposed B section 34 (2A) that such “an award shall not be set aside merely on the ground of an erroneous application of the law or by reappreciating evidence.” The Commission believes that this will go a long way to assuage the fears of the judiciary as well as the other users of arbitration law who expect, and given the C circumstances prevalent in our country, legitimately so, greater redress against purely domestic awards. This would also do away with the unintended consequences of the decision of the Supreme Court in ONGC v. Saw Pipes Ltd, (2003) 5 SCC 705, which, although in the context of a purely domestic award, had the unfortunate effect of being extended to apply equally to both D awards arising out of international commercial arbitrations as well as foreign awards, given the statutory language of the Act. …” (emphasis supplied) A D To give effect to the said recommendation, it was suggested that: E “(iii) After the Explanation in sub-section (2), insert sub-section ‘(2A) An arbitral award arising out of arbitrations other than international commercial arbitrations, may also be set aside by the Court if the Court finds that the award is vitiated by patent illegality appearing on the face of the award. Provided that an award shall not be set aside merely on the ground of an erroneous F application of the law or by re-appreciating evidence.’ G [NOTE: The proposed S.34(2A) provides an additional, albeit carefully limited, ground for setting aside an award arising out of a domestic arbitration (and not an international commercial arbitration). The scope of review is based on the patent illegality standard set out by the Supreme Court in ONGC Ltd. v. Saw Pipes Ltd., (2003) 5 SCC 705. The proviso creates exceptions for erroneous application of the law and re-appreciation of evidence, which cannot be the basis for setting aside awards.]” (emphasis supplied) H PATEL ENGINEERING LTD. v. NORTH EASTERN ELECTRIC 167 POWER CORPORATION LTD. (NEEPCO) 19. Pursuant to the recommendations of the Law Commission, A the 1996 Act was amended by Act 3 of 2016, which came into force w.e.f. 23.10.2015. The ground of “patent illegality” for setting aside a domestic award has been given statutory force in Section 34(2A) of the 1996 Act. The ground of “patent illegality” cannot be invoked in international commercial arbitrations seated in India. Even in the case of B a foreign award under the New York Convention, the ground of “patent illegality” cannot be raised as a ground to resist enforcement, since this ground is absent in Section 48 of the 1996 Act. The newly inserted subsection (2A) in Section 34, reads as follows:- “(2A) An arbitral award arising out of arbitrations other than international commercial arbitrations, may also be set aside by the Court, if the Court finds that the award is vitiated by patent illegality appearing on the face of the award : Provided that an award shall not be set aside merely on the ground of an erroneous application of the law or by reappreciation of evidence.” 20. In _Ssangyong Engineering and Construction Company Limited[19] ,_ this Court was considering a challenge to an award passed in an international commercial arbitration, between the Appellant – company a foreign entity registered under the laws of Korea, and the Respondent, a Government of India undertaking. In paragraph (19) of the judgment, this Court noted that the expansive interpretation given to “public policy of India” in the _Saw Pipes_ (supra) and _Western Geco International Limited[20 ]_ cases, which had been done away with, and a new ground of “patent illegality” was introduced which would apply to applications under Section 34 made on or after 23.10.2015. In paragraphs (36) and (37) of the judgment, this Court held that insofar as domestic awards are concerned, the additional ground of patent illegality was now available under sub-section (2A) to Section 34. However, re-appreciation of evidence was not permitted under the ground of “patent illegality” appearing on the face of the award. C D E F G 21. In paragraphs (39) and (40) of _Ssangyong Engineering_ (supra) _,_ the Court reiterated paragraphs (42.2) and (42.3) of _Associate_ 19 _Ssangyong Engineering and Construction Company Limited v. National Highways Authority of India (NHAI)_ **(2019) 15 SCC 131** 20 _Oil & Natural Gas Corporation Ltd. v. Western Geco International Limited_ **(2014) 9 SCC 263** H 168 SUPREME COURT REPORTS [2020] 4 S.C.R. - A _Builders_ (supra) wherein, it was held that the construction of the terms of a contract is primarily for an arbitrator to decide, unless the arbitrator construes a contract in a manner which no fair minded or reasonable person would take i.e. if the view taken by the arbitrator is not even a possible view to take. In paragraphs (39) and (40), the Supreme Court held as under:- - B “ **39** . To elucidate, para 42.1 of _Associate Builders v. Delhi Development Authority_ (2015) 3 SCC 49, namely, a mere contravention of the substantive law of India, by itself, is no longer a ground available to set aside an arbitral award. Para 42.2 of _Associate Buildersv. Delhi Development Authority_ (2015) 3 SCC C 49, however, would remain, for if an arbitrator gives no reasons for an award and contravenes Section 31(3) of the 1996 Act, that would certainly amount to a patent illegality on the face of the award. - **40** . The change made in Section 28(3) by the Amendment Act - D really follows what is stated in paras 42.3 to 45 in _Associate Builders v. Delhi Development Authority_ (2015) 3 SCC 49 **,** namely, that the construction of the terms of a contract is primarily for an arbitrator to decide, unless the arbitrator construes the contract in a manner that no fair-minded or reasonable person - E would; in short, that the arbitrator’s view is not even a possible view to take. Also, if the arbitrator wanders outside the contract and deals with matters not allotted to him, he commits an error of jurisdiction. This ground of challenge will now fall within the new ground added under Section 34(2-A).” (emphasis supplied) - F 22. The present case arises out of a domestic award between two Indian entities. The ground of patent illegality is a ground available under the statute for setting aside a domestic award, if the decision of the arbitrator is found to be perverse, or, so irrational that no reasonable person would have arrived at the same; or, the construction of the contract is such that no fair or reasonable person would take; or, that the view of - G the arbitrator is not even a possible view. 23. In the present case, the High Court has referred to the judgment in _Associated Builders_ (supra) at length in paragraph (42) of its judgment dated 26.02.2019 and arrived at the correct conclusion that an arbitral award can be set aside under Section 34 if it is patently illegal or perverse. H PATEL ENGINEERING LTD. v. NORTH EASTERN ELECTRIC 169 POWER CORPORATION LTD. (NEEPCO) This finding of the High Court is in conformity with paragraph (40) of A the judgment of this Court in _Ssangyong Engineering_ (supra) _._ 24. In the present case, the High Court in paragraph (51) has held that no reasonable person could have arrived at a different conclusion while interpreting Clauses 2.7 and 3.4 of the BoQ and Clauses 32(ii)(a) and 33(iii) of the Conditions of Contract. Any other interpretation of the above clauses would definitely be irrational and in defiance of all logic. The relevant extract reads:- “ **51** . …Clause 33(iii) specifically provides that “if the rates for such items of work cannot be determined in the manner as specified in Clause 33(ii), the rates for such items to be executed shall be determined by the Engineer-in-Charge on the basis of actual and analysed cost taking the following into consideration the rates for such items of works as are required to be executed due to deviations as stated in sub-clause shall be payable in the manner as stated hereunder…..”. We are of the firm view that this is the only possible interpretation of Clauses 2.7 and 3.4 of the BoQ and Clauses 32(ii)(a) and 33(iii) of the Conditions of Contract. No reasonable person would arrive at a different conclusion while interpreting Clauses 2.7 and 3.4 of the BoQ and Clauses 32(ii)(a) and 33(iii) of the Conditions of Contract. Any other interpretation of the above clauses would definitely be irrational and defiance of all logic.” (emphasis supplied) B C D E 25. The High Court in paragraph (52) came to the finding that the findings in the award suffer from the vice of irrationality and perversity, and held as follows:- “ **52** . The Arbitral Awards and the findings of the learned Arbitrator suffer from the vice of perversity. The learned Arbitrator has taken into account various factors irrelevant in coming to the decision and has ignored vital clauses of the tender documents like Clause 2 and various Sub-clauses i.e. Sub-clauses 2.1 to 2.8.7 under Clause 2 and Clause 3 and various Sub-Clauses i.e. Subclauses 3.1 to 3.7 under Clause 3 of the BoQ, Clause 2 and various Sub-clauses i.e. Sub-clause 2.1 to 2.17.7 under Clause 2 and Clause 3 and various Sub-clauses i.e. Sub-clause 3.1 to 3.10.5 under Clause 3 of “Particular Technical Specifications”, Vol. 2, Part II. The learned Arbitrator has taken into consideration an F G H 170 SUPREME COURT REPORTS [2020] 4 S.C.R. A irrelevant fact that while making provisional payment, the initial lead of 3.0 km has been deducted and that this shows that Clause 2.7 and 3.4 of the BoQ are applicable. The provisional payment was an interim arrangement and was preceded by meetings dated 07.12.2012 and 08.12.2012 wherein it was specifically agreed between the parties that HoP, NEEPCO would take steps for B referring the dispute to arbitration and that till the arbitral award, the payment would be made as per the prevailing provisional rate without any escalation and that final rate payable for transportation of sand and boulder shall be done on implementation of the arbitral award. As such the fact that provisional payment was made by C deducting initial lead of 3.0 km was an irrelevant fact for deciding the issue. The findings of the learned Arbitrator having been arrived at by taking into account irrelevant factors and by ignoring vital clauses, the same suffers from vice of irrationality and perversity. It must be borne in mind that the Arbitral Awards in question are Declaratory Arbitral Awards and involved interpretation of Clauses D 2.7 and 3.4 of the BoQ and Clauses 32(ii)(a) and 33(iii) of the Conditions of Contract and the learned arbitrator was required to interpret the same in accordance with the established rules of interpretation. The findings of the learned Additional Deputy Commissioner (Judicial), Shillong while upholding the arbitral E awards of the learned Arbitrator also suffer from the similar vice. We are, therefore, of the considered view that that the common order dated 27.04.2018 passed by the learned Additional Deputy Commissioner (Judicial), Shillong in Arbitration Case No. 5 (T) 2016, Arbitration Case No. 6 (T) 2016 and Arbitration Case No. 7 (T) 2016 as well as the 3 (three) Arbitral Awards dated 29.03.2016 F passed by the learned Arbitrator warrant interference in these appeals under Sec. 37 of the Arbitration and Conciliation Act, 1996. 53. There are additional reasons for interfering with order dated 27.04.2018 passed by the learned Additional Deputy Commissioner G (Judicial), Shillong and the Arbitral Awards dated 29.03.2016 passed by the learned Arbitrator. As the learned counsel for the appellant has submitted, the potential effect of the Arbitral Award on public exchequer is that the appellant, which is a public sector undertaking, will have to pay a sum of about Rs. 3.56 Lakh for H every truckload of 10 cubic metre of sand or boulder (travelling H PATEL ENGINEERING LTD. v. NORTH EASTERN ELECTRIC 171 POWER CORPORATION LTD. (NEEPCO) for 100 km) and the total potential effect would be about Rs. 1,000 Crore. We are of the considered view that payment of Rs. 3.56 Lakh per truck (10 Cubic Metre) of sand or boulder (100 km distance) is definitely a case of unjust enrichment which is contrary to the Fundamental Policy of Indian Law. Unjust enrichment being contrary to the Fundamental Policy of Indian Law is a ground for interference with an Arbitral Award under Sec. 34(2) of the Act. The Bombay High Court in Angerlehner Structural and Civil Engineering co. v. Municipal Corporation of Greater Mumbai has recognized unjust enrichment of a party at the cost of public exchequer as being against the fundamental policy of Indian law. The Bombay High Court has held: “If the argument of the Contractors is accepted, it lead to them blatantly enriching themselves over and above what they are entitled. Such completely unjust enrichment, that too at the cost of public funds, is abhorrent under the fundamental policy of Indian Law. The award in AJECT, which permits such blatant enrichment is therefore is also vitiated on the ground that it is against the fundamental policy of Indian Law.” We are also of the considered view that the Arbitral Award which would potentially result in unjust enrichment of the respondent to the extent of about Rs. 1,000 Crores is against the fundamental policy of Indian law and, therefore, warrant interference on this count as well. Though this court is not sitting in appeal over the award of the arbitral tribunal, the presence of grounds under Section 34[2] of the Act and the satisfaction arrived at by this Court in this regard, warrants interference more so, as the Arbitral Awards in question are Declaratory Arbitral Awards and involved interpretation of Clauses 2.7 and 3.4 of the BoQ and Clauses 32(ii)(a) and 33(iii) of the Conditions of Contract and the learned arbitrator was required to interpret the same in accordance with the established rules of interpretation and in line with the fundamental policy of Indian law.” A B C D E F G (emphasis supplied) 26. Even though the High Court in paragraph (44) of the judgment referred to various judgments, including _Western Geco_ (supra) [which H 172 SUPREME COURT REPORTS [2020] 4 S.C.R. - A is now no longer good law], the case has been decided on the ground that the arbitral award is a perverse award and on a holistic reading of all the terms and conditions of the contract, the view taken by the arbitrator is not even a possible view. The High Court has rightly followed the test set out in paragraph (42.3) of _Associate Builders_ (supra), which was reiterated in paragraph (40) of the _Ssangyong Engineering_ judgment - B (supra). 27. In our view, while dealing with the appeal under Section 37 of the Act, the High Court has considered the matter at length, and held that while interpreting the terms of the contract, no reasonable person could have arrived at a different conclusion and that the awards passed C by the arbitrator suffer from the vice of irrationality and perversity. 28. The learned Solicitor General Mr. Tushar Mehta and Mr. H. Ahmadi, Senior Advocate for the respondent, submitted that all these contentions were raised in the earlier round when challenge to the substantive Judgment dated 26.02.2019 was made. The said challenge D was repelled by this Court _vide_ Order dated 19.07.2019 by dismissal of the earlier SLPs. It is now not open to re-open the matter by filing a review petition on the same grounds, which have been rightly dismissed by the High Court. The Petitioner has failed to make out any error on the face of the judgment dated 26.02.2019. The High Court by the E impugned order dated 10.10.2019 rightly dismissed the review petitions and we do not find any ground warranting interference with the impugned order. 29. In the result, all the special leave petitions are dismissed with no order as to costs. F Ankit Gyan Special Leave Petitions dismissed. G H
End of Judgment Record
Browse All Supreme Court of India (2020) Decisions
2020-01-17

SATPAL AND ANR. v. BANK OF INDIA AND ORS.

This appeal arises from the Debt Relief Scheme for agriculturists notified in the Union Budget 2008-09, under which farmers were categorized as marginal, small, or other farmers with varying waivers or debt-relief. The appellants, Satpal and Anr., approached the District Consumer Disputes Redressal Forum in Faridabad after borrowing Rs. 3,00,000 in 2008 for a tractor loan. They claimed they fell within the ‘small farmer’ category and sought full waiver under clause 5. The District Forum accepted that each held 38 kanals 11 marlas (roughly 4 acres 6 kanals 11 marlas) and thus fell within the small-farmer bracket based on the largest landholding in the pool; the State Commission affirmed. The National Commission, however, reversed, holding the district of Faridabad not listed in Annexure-I and denying full waiver, pursuing clause 6 and Annexure-I thresholds, and also applying that an investment credit for allied activities could fall under explanation 3. The Supreme Court reversed the National Commission, holding that the largest landholding in a pooled loan governs classification for the pool (explanation 2 to the definitions), that the appellants fall under the small farmer category, and that clause 5 governs their entitlement to the entire eligible amount. It held that clause 6’s Annexure-I restrictions were inapplicable to their clause-5 claim and that explanation 3 does not apply to a tractor loan in allied activities. The Court restored the District Forum order, with costs awarded to the appellants.

2020-09-09

Stalin v. State Represented by the Inspector of Police

This is a criminal appeal by Stalin challenging a Madurai Bench of the Madras High Court judgment that convicted him under Section 302 IPC for the murder of Kalidas and affirmed the trial court’s decision. The Supreme Court granted leave limited to whether the conviction ought to be under Section 304 Part II IPC or Section 302 IPC. The Court surveys a long line of authorities on single-injury cases, stressing there is no universal rule; the outcome depends on facts such as the nature of the injury, the part of the body struck, the weapon, and surrounding circumstances. The eye-witness PW3 testified that the deceased served extra beer to outsiders, provoking anger in the accused, who accused the deceased of discriminating against locals, and in a scuffle fired a knife from behind, injuring the victim. The Court acknowledges the lack of a fixed rule but notes the totality of circumstances, including weapon and injury to a vital area, points toward culpable homicide not amounting to murder but under Section 304 Part I, given a likelihood of death from the injury. Consequently, the Court allows the appeal in part, converting the conviction from 302 IPC to 304 Part I IPC, sentencing the accused to eight years’ RI with Rs 10,000 fine, in default one more year RI. The judgment clarifies that motive is not essential where eyewitnesses establish the facts.

2020-10-29

The State of Rajasthan & Ors. v. Heem Singh

This Supreme Court judgment concerns a civil appeal by the State of Rajasthan challenging a Division Bench order of reinstating Heem Singh, a police constable, after disciplinary proceedings that found him guilty of misconduct and the charge of murder while on leave. Heem Singh had been acquitted in a criminal trial, but the State argued that a criminal acquittal does not bar departmental action where misconduct affects public trust in the police. The High Court Division Bench had reinstated the respondent in service with consequential benefits but without back wages, prompting the State’s appeal. The Court clarifies that the standard of proof in disciplinary matters is a preponderance of probabilities, not beyond reasonable doubt, and that courts should not re-appreciate evidence as an appellate tribunal would. It emphasizes that the authority of the disciplinary process is to balance administrative autonomy with protection against perverse findings, while ensuring some evidentiary basis. The Court examines the disciplinary record, including witnesses’ testimony and cross-examination, and notes enmity between the parties, the presence of the respondent at or near the scene, and the impact on public confidence. It relies on precedents such as M. Siddiq v. Suresh Das and others to formulate the standard and to uphold limits on judicial review. The decision ultimately sets aside the reinstatement and directs cessation from service from minimum qualifying service, with retiral dues payable within three months, and no back wages.

2020-10-28

MRS RITIKA SHARAN v. MR SUJOY GHOSH

This Supreme Court judgment concerns a custody dispute involving a minor, Sattik, born in 2013, whose parents have lived apart since 2016. The appellant, Ritika Sharan, a working mother, relocated to Singapore in September 2017 for employment, while the child remained in Bengaluru with the maternal grandparents. The Family Court had, on 1 March 2018, restrained the appellant from taking the child out of Bengaluru, and the High Court dismissed writ petitions challenging this order. The matter reached the Supreme Court on appeal. The Court emphasized that the welfare of the child is the paramount consideration and invoked Article 142 of the Constitution as a tool to fashion an order that best serves the child’s interests. It held that the presence and care of the mother since birth, with the maternal grandparents merely assisting, does not legally transfer custody. The child expressed a desire to live with his mother in Singapore, and the Court found no compelling material to force him to stay with the grandparents in Bengaluru. Consequently, the impugned judgments were set aside. The Court permitted the child to accompany the mother to Singapore, ordered passport handover, and laid out an access/visitation framework to be observed, superseding prior Family Court and High Court orders, while guardianship proceedings proceed.