High Court of KeralaKerala High Court · 2009Division BenchWrit petition disposed with interim directions ...

Paristithi Samrakshana Sangham v. State of Kerala and others

Case / Petition Number:
WP(C) No. 3128 of 2009 (S)

Case Synopsis & Summary

This public interest litigation (W.P.(C) No.3128 of 2009) was filed by the Paristhithi Samrakshana Sangham challenging the sand mining regime in Kerala’s rivers. The petition sought mandamus to conduct a sand audit under Section 29 of the Kerala Protection of River Banks and Regulation of Removal of Sand Act, 2001, before allowing further sand mining in the Periyar River, and to prohibit Kadavu allotments within 500 meters of irrigation works under the Kerala Irrigation and Water Conservation Act, 2003. The court noted that no sand audit had been conducted for five years despite Rule 30 of the 2002 Rules requiring triannual audits by expert bodies (CESS and CWRDM). It highlighted the Act’s aim to protect river banks and biophysical environments, citing concerns over indiscriminate sand mining per CESS’s 2004 report, which recorded thousands of truckloads of sand removed daily across several rivers, threatening environmental integrity. Relying on the precautionary principles from M.C. Mehta v. Union of India and emphasizing sustainable development, the court found sand audits overdue and directed that no new permits be issued until audit reports are obtained and considered. For the current season (to June 2009), mining was to proceed only by permissible methods and within safe limits, as determined after audit, to safeguard the river basin.

Precedent Explorer

Find Cases Like This

Explore other judgments dealing with similar legal situations, facts, or statutory provisions.

Case Details & Bench

Court
High Court of Kerala
Hon'ble Judges
  • S. R. Bannurmath
  • Kurian Joseph
Judgment Date
2009-03-30
Court Decision / Holding
Public interest petition allowed in part. The court directed that unless a sand audit is conducted for the Periyar river by the expert bodies (CESS or CWRDM), the District Expert Committee shall not issue new sand mining permits. Only after receipt and consideration of the audit report may the committee fix the quantity of sand that can be removed. For the current season (ending June 2009), no sand mining may occur within prohibited zones; ongoing mining should proceed only by permissible methods and within safe limits, ensuring river basin protection.
Final Disposition
Writ petition disposed with interim directions to ensure environmental protection through mandatory sand audits and regulatory caution on mining activities; prohibiting new permits pending audit and detailing season-specific restrictions.

Parties to the Case

Appellants / Petitioners

  • Parisithithi Samrakshana Sangham

Respondents

  • State of Kerala
  • District Expert Committee, Ernakulam
  • Keezhmad Grama Panchayat
  • Vaazhakkulam Grama Panchayat

Legal Representation & Advocates

Counsels for Petitioners

  • • Sri.P.B.Sahasranaman
  • • Sri.K.Jagadeesh
  • • Sri.T.S.Harikumar

Counsels for Respondents

  • • Sri.K.Meera, Sr. Government Pleader
  • • Sri.Praveen.H. (Adv.)
  • • Sri.Anwin Gopakumar (for Addl.R3)
  • • Sri.A.Jayasankar (for Addl.R4)
  • • Sri.Manu Govind (for Addl.R4)

Provisions of Law Cited

Section 29 of the Kerala Protection of River Banks and Regulation of Removal of Sand Act, 2001Rule 30 of the Kerala Protection of River Banks and Regulation of Removal of Sand Rules, 2002Section 9 of the Kerala Protection of River Banks and Regulation of Removal of Sand Act, 2001Kerala Irrigation and Water Conservation Act, 2003

Legal Doctrines & Maxims

  • Precautionary principle
  • Sustainable development
  • Balance between environment and economic interests
  • Rio Declaration Principle 15

Submissions & Arguments

Contentions of Appellants / Petitioners

The petitioners pressed for mandamus to mandatorily conduct sand auditing under Section 29 before permitting sand mining and urged protection of the river environment, citing environmental reports and the long overdue audit. They also sought to restrain Kadavu allocations within 500 meters of irrigation works.

Contentions of Respondents

Respondents argued that Section 9 vests power in the District Expert Committee, and that the court should not sit in appeal over expert bodies; audit under Section 29 and Rule 30 should be read with due regard to expert opinions (CESS/CWRDM). They emphasized sand mining as a revenue source for Panchayats and argued the need to balance regulatory powers with rural livelihood.

Legal Doctrine & Issue Explorer

Explore This Legal Issue

Find relevant judgments and authoritative positions on the legal questions discussed here.

Cited Precedents (2)

Case NameCitationTreatmentExplanation
M.C. Mehta v. Union of India and othersAIR 2004 SC 4016PositiveCited to endorse the precautionary principle and the primacy of environmental protection when conflicts arise between development and environmental harm.
T. N. Godavarman Thirumulpad v. Union of IndiaNot specified in documentMentioned OnlyReferenced in the context of forest conservation jurisprudence but not directly applied or distinguished in the present decision.
Case Applicability Diagnostic

Apply This to My Facts

Share your situation and test whether this judgment governs, supports, or challenges your case.

Official Judgment Record
•2,204 words•~11 min read

In The Court Record

Paristithi Samrakshana Sangham v. State of Kerala and others

IN THE HIGH COURT OF KERALA AT ERNAKULAM PRESENT : THE HON'BLE THE CHIEF JUSTICE MR.S.R.BANNURMATH & THE HONOURABLE MR. JUSTICE KURIAN JOSEPH & THE HONOURABLE MR. JUSTICE KURIAN JOSEPH MONDAY, THE 30TH MARCH 2009 / 9TH CHAITHRA 1931 WP(C).No. 3128 of 2009(S) ------------------------------------ PETITIONER: ------------------- PARISTHITHI SAMRAKSHANA SANGHAM, REG.NO.E-249/89,HIGH ROAD,ALUVA-683101, REPRESENTED BY ITS JOINT SECRETARY,N.RAMACHANDRAN. BY ADV. SRI.P.B.SAHASRANAMAN SRI.K.JAGADEESH SRI.T.S.HARIKUMAR RESPONDENTS: ----------------------- 1. STATE OF KERALA REPRESENTED BY ITS REVENUE DEPARTMENT SECRETARIAT,THIRUVANANTHAPURAM. 2. THE DISTRICT EXPERT COMMITTEE, ERNAKULAM REPRESENTED BY ITS CHAIRMAN, DISTRICT COLLECTOR, COLLECTORATE, KAKKANAD, ERNAKULAM. 3. KEEZHMAD GRAMA PANCHAYAT, KEEZHMAD, ALUVA, RESPRESENTRED BY ITS SECRETARY. (ADDL.R3 IS IMPLEADED AS PER ORDER DATED 27.3.2009 IN I.A.NO. 4445 OF 2009) 4. THE SECRETARY, VAZHAKKULAM GRAMA PANCHAYAT, VAZHAKKULAM, ERNAKULAM DISTRICT. (ADDL.R4 IS IMPLEADED AS PER ORDER DATED 27.3.2009 IN I.A.NO.4487 OF 2009) - R1 & R2 BY SR.GOVERNMENT PLEADER SMT.K.MEERA ADV. SRI.PRAVEEN.H. FOR ADDL.R3 - SRI.ANWIN GOPAKUMAR FOR ADDL.R3 SRI.A.JAYASANKAR FOR ADDL.R4 SRI.MANU GOVIND FOR ADDL.R4 THIS WRIT PETITION (CIVIL) HAVING COME UP FOR ADMISSION ON 30/03/2009, THE COURT ON THE SAME DAY DELIVERED THE FOLLOWING: ## **S.R.Bannurmath, C.J. & Kurian Joseph, J.** ------------------------------------------ ## **W.P.(C) No.3128 of 2009 & I.A.No.4653 of 2009** -----------------------------------------Dated, this the 30[th] day of March, 2009 ## **JUDGMENT** ## **Kurian Joseph, J.** This is a public interest litigation filed by the Paristhithi Samrakshana Sangham, mainly with the following two prayers: “i. To issue a writ, direction or order in the nature of mandamus commanding the respondents to conduct sand audit as contemplated under Sec.29 of the Kerala Protection of River Banks and Regulation of Removal of Sand Act, 2001 in respect of Periyar River forthwith, before allowing sand mining in the said river; ii. To issue a writ, direction or order in the nature of mandamus commanding the respondents not to allot any Kadavus within 500 meters from any irrigation works as contemplated under Kerala Irrigation and Water Conservation Act, 2003.” W.P.(C) No. 3128 of 2009 **==> picture [28 x 12] intentionally omitted <==** 2. When the writ petition came up for admission it was brought to our notice that sand audit as required under Section 29 of the Kerala Protection of River Banks and Regulation of Removal of Sand Act, 2001 has not been conducted since the last five years. The Kerala Protection of River Banks and Regulation of Removal of Sand Act, 2001, hereinafter referred to as 'the Act', is intended to protect river banks and river beds from large scale dredging of river sand and to protect their biophysical environment system and regulate the removal of river sand and for matters connected therewith or incidental thereto. It is stated in the preamble of the Act that Government had taken note of the indiscriminate and uncontrolled removal of sand from the rivers causing large scale river bank sliding and loss of property. The Government had also taken note of large scale dredging of river sand disturbing the biophysical environment system of the river and hence it was felt expedient in public interest to provide for regulatory measures for the protection of river banks and for W.P.(C) No. 3128 of 2009 **==> picture [28 x 12] intentionally omitted <==** removal of sand from rivers. Despite the stringent provisions prescribed under the Act introduced in the year 2001, there have been complaints that indiscriminate sand minding has been going on in various rivers. In the report of the CESS prepared in February, 2004, it is stated that 40 local bodies located on either side of the Muvattupuzha, Periyar and Chalakudy rivers are engaged in the mining of 4802 truck loads of sand per day. It is also stated in the report that “the quantity of sand mining is several folds higher than the natural replenishments and hence imposes severe environmental problems in the river basin environments”. In that background the CESS reported that sand auditing should be made mandatory atleast once in every three years and necessary changes applied in the resource allocation scheme for reviving the overall environmental quality of the river basins. 3. Viewed from the background of the legislation and the report of the expert body, we are afraid the contentions taken W.P.(C) No. 3128 of 2009 - **4 -** by the learned counsel appearing for the Panchayat that it is not mandatory that there should be a sand audit for every three years, cannot be appreciated. Section 29 of the Act provides for sand audit which reads as follows: “ **29. Sand auditing.-** The Government may, with a view to ensure protection of every river, provide for periodical measurement of the quantity of sand available for, removal by such method and in such manner as may be prescribed.” Rule 30 of the Kerala Protection of River Banks and Regulation of Removal of Sand Rules, 2002 reads thus: “ **30. Sand audit.** - The Government shall conduct, every three years Sand Audit through Expert committees such as Centre for Earth Science Studies, Centre for Water Resources Development and Management, so as to ensure protection of rivers in each district and to assess the quantity of available sand. (2) The expense required for Sand Audit shall be met from the River Management Fund. W.P.(C) No. 3128 of 2009 - **5 -** (3) The Government shall, as soon as may be after the receipt of the report of sand audit under sub-rule (1) lay the same on the table of Legislative Assembly with an action taken statement thereof.” 4. Section 9 of the Act provides for fixing the total quantity of sand that can be removed from a kadavu or river bank having due regard to the guidelines of the expert agencies like CESS and CWRDM. The said provision reads as follows: **“9. Power and Functions of the District Expert Committee.-** Subject to the other provisions of this Act and the rules made thereunder, the District Expert Committee shall have the following - powers and functions, namely: (a) to identify the Kadavu or river bank in a district in which, sand removal may be permitted; (b) to fix the total quantity of sand that can be removed from a Kadavu or river bank giving due regard to the guidelines of expert agencies like the Centre for Earth Science Studies and Centre for Water Resources Development and Management; W.P.(C) No. 3128 of 2009 - **6 -** (c) to control the transportation of sand from a Kadavu or river bank to another area; (d) to close a Kadavu or river bank opened for sand removal; (e) to ensure the protection of river banks and keep them free from encroachment; (f) to consider the opinion of the Kadavu Committee and take suitable measures to achieve the objectives of this Act; (g) to ensure that the Kadavu Committees of the District are performing their powers and functions conferred on them by this Act; (h) to advise the Government on the measures to protect the biophysical environmental system of the river banks; (i) to recommend to the Government the necessity to ban sand removal from any river or Kadavu during any season of the year; (j) to carry out the Directions given by the Government, from time to time; (k) to exercise such other powers and perform such other duties as are conferred on it by this Act W.P.(C) No. 3128 of 2009 **==> picture [28 x 11] intentionally omitted <==** and rules made thereunder; (l) to advise on any other matter to carry out the provisions of this Act.” 5. Learned counsel appearing for the additional third respondent, Keezhmad Grama Panchayat, submits that Section 9 of the Act has already conferred jurisdiction on the expert committee and this Court may not sit in appeal over the decision taken by the expert committee. It is also submitted that sand mining is one of the income generating sources of the Panchayat. Still further it is submitted that sand mining to some extent takes care of the rural unemployment. The intention of the Legislature is to be understood by reading both Sections 9 and 29 of the Act and Rule 30 of the Rules conjointly. It is clear that without due regard to the opinion of the expert bodies, namely, the CESS and CWRDM, the expert committee under Section 9 of the Act cannot fix the quantity of sand that can be removed from the kadavus or the river bank. For the expert committee to exercise its power under Section W.P.(C) No. 3128 of 2009 **==> picture [28 x 12] intentionally omitted <==** 9 of the Act, the report of the expert body, namely the CESS or CWRDM is absolutely necessary and without which the sand mining cannot be permitted. Rule 30 of the Rules having prescribed the mode of sand audit, it is mandatory that the audit contemplated under Section 29 of the Act is conducted before taking any action for sand mining after the expiry of the report period. 6. We find that the Supreme Court in the case of **M.C.Mehta** v. **Union of India and others** reported in AIR 2004 SC 4016, had occasion to go into the issue of sustainable development and its impact on environmental problems. In paragraph 48 of the judgment the Supreme Court has held as follows: “48. The development and the protection of environments are not enemies. If without degrading the environment or minimising adverse effects thereupon by applying stringent safeguards, it is possible to carry on development activity applying W.P.(C) No. 3128 of 2009 - **9 -** the principles of sustainable development, in that eventuality, the development has to go on because one cannot lose sight of the need for development of industries, irrigation resources and power projects etc. including the need to improve employment opportunities and the generation of revenue. A balance has to be struck. We may note that to stall fast the depletion of forest, series of orders have been passed by this Court in T.N.Godavarman's case regulating the felling of trees in all the forests in the country. Principle 15 of Rio Conference of 1992 relating to the applicability of precautionary principle which stipulates that where there are threats of serious or irreversible damage, lack of full scientific certainty shall not be used as a reason for proposing effective measures to prevent environmental degradation is also required to be kept in view. In such matters, many a times, the option to be adopted is not very easy or in a straitjacket. If an activity is allowed to go ahead, there may be irreparable damage to the environment and if it is stopped, there may be W.P.(C) No. 3128 of 2009 - **10 -** irreparable damage to economic interest. In case of doubt, however, protection of environment would have precedence over the economic interest. Precautionary principle requires anticipatory action to be taken to prevent harm. The harm can be prevented even on a reasonable suspicion. It is not always necessary that there should be direct evidence of harm to the environment.” This is a complete answer to the issue. In a conflicting situation of irreparable injury to the environment and severe damage to the economic interest, protection of environment would have precedence over the economic interest. And, towards such protection, anticipatory action on precautionary principles is also necessary and it is the duty of the State to take such action. Only when there is failure, lapse or refusal as in the instant case, the Court steps in issuing appropriate directions. 7. Admittedly sand audit is long overdue since 2004. The report period expired in 2007. It is shocking that without W.P.(C) No. 3128 of 2009 **==> picture [36 x 12] intentionally omitted <==** conducting the mandatory sand audit, sand mining permits have been issued from the year 2007-08. It is a violence not only to the legislation but also to the environment as such. In such circumstances, this Court has a duty to protect public interest. Therefore, in public interest, we deem it necessary to issue a direction that unless sand audit is conducted in respect of the Periyar river flowing through Ernakulam district, the expert committee shall not issue any new sand mining permits. In other words, only after the audit report from the expert body, namely CESS or CWRDM, and giving regard to the said report only, the expert committee under Section 9 of the Act shall fix the quantity of sand that can be removed from the kadavus or river bank. As far as the ongoing collection of sand is concerned, for the present season ending by June, 2009, we direct the expert committee headed by the District Collector to ensure that there is no sand mining within the prohibited distance of bridges, river banks, bathing ghats, irrigation projects, etc. Steps should also be W.P.(C) No. 3128 of 2009 **==> picture [36 x 12] intentionally omitted <==** taken to see that the river basin is protected. The mining shall only be by permissible methods without affecting the river basin. We deem it our duty to issue such a direction also in view of the tragic deaths due to drowning which have been taking place owing to the pitfalls formed by the indiscriminate mining of sand during the past several years using unauthorised methods. **S.R.Bannurmath, Chief Justice** **Kurian Joseph, Judge** vns
End of Judgment Record
Browse All High Court of Kerala (2009) Decisions
2009-06-26

Nishana Mol.N v Alappuzha Municipality & Secretary, Alappuzha Municipality

This writ petition concerns the registration of a marriage under the Kerala Registration of Marriages (Common) Rules, 2008 (Common Rules). The petitioner Nishana Mol.N, whose marriage was solemnized on 8 March 2009, sought registration of her marriage by the Local Registrar. Her husband was abroad, and she submitted Form No. 1 along with documents; however, the Local Registrar demanded the presence of both spouses for registration, a point contested by the petitioner. The court recalls the apex court’s directions in Seema v. Ashwani Kumar (2006) to frame rules ensuring compulsory registration to protect women and provide evidence of marriage, while noting that registration under the Rules does not itself create a marriage but evidences one solemnized otherwise. The Rules specify that registration is mandatory for marriages solemnized within the state, with various procedural requirements (Rules 5, 6, 9, 10, 11, 13, 16, 17) and mechanisms for correction, appeal, and re-registration. The court clarifies that the presence of both parties is not ordinarily required; the registrar may require appearance only in cases where there is reasonable doubt about identity, and even then as an exception rather than a rule. Ultimately, the court directs that registration and certificate issuance be completed within one month from copy of the judgment, without insisting on joint appearance, provided the memorandum is in order.

2009-07-27

Abdul Majeed Kalathil v. District Collector, Malappuram & Others

This batch of writ petitions concerns the constitutional validity of Section 17 of the Kerala Anti-Social Activities (Prevention) Act, 2007, and the power of District Magistrates to confiscate vehicles used in anti-social activities. The petitions challenge the absence of a substantive prohibition against using vehicles for anti-social activities and the lack of a defined procedure for confiscation or an appellate remedy. In W.P.C. No. 9925 of 2009 (the lead case), Abdul Majeed Kalathil contends that his goods carriage KL 11-B/6651 was seized by the Sub Inspector of Pandikkad Police and reported to the District Collector, Exts.P1–P2. The court scrutinizes Section 17's scope, defining anti-social activity (Section 2(a)) and whether the District Collector’s power to confiscate is constitutionally tenable. It finds Section 17 to be vague and violative of Articles 14, 19(1)(g) and 21, as it rests on subjective police satisfaction with no clear standards or process. It also notes environmental objectives but concludes that fundamental rights must prevail. The court does not sustain confiscation under Section 17; instead, it directs that such vehicles be dealt with under the Kerala Protection of River Banks and Regulation of Removal of Sand Act, 2001 and Rules, with interim release under specified conditions. It further directs initiation of Sand Act proceedings within a month and finalization within another month. The writ petitions are disposed of accordingly, preserving the rule of law and environmental protection.

2009-06-11

WA No. 671 of 2006 (Fertilizers and Chemicals Travancore Ltd v Union of India)

This writ appeal concerns the pay revision and pensionary benefits of employees of the Fertilizers and Chemicals Travancore Ltd (FACT). The long-term settlement covering terms of employment expired on 31 December 1996. A fresh settlement was concluded (notified 28 August 2001) and made retroactive to 1 January 1997, with revisions in wages and benefits. Clause 29 of Ext. P1 provides that arrears relating to wage revision and dearness allowance for the period 1 January 1997 to 30 June 2001 will be reviewed and decided by management/government only when the company earns profits for at least three consecutive years; Clause 33.1 provides that employees who retired on or after 1 January 1997 will be eligible for arrears calculated from 1 January 1997 to the date of retirement, subject to adjustments for interim relief already paid, with any unclaimed amount transferred to a Welfare Fund. The appellants—the retirees who fall in the 1 January 1997 to 1 July 2001 window—argue that they were denied arrears and were paid pensionary benefits at pre-revised rates, creating discrimination. Respondents contend Ext. P1 binds the parties and arrears depend on profits, and that pay revision administered to others does not compel retroactive change. The court held that Ext. P1 terms survive as terms of employment and directed the management to consider terminal benefits at revised rates within two months and to release arrears when paid to current workers, with connected matters following."

2009-05-29

M/S. Palm Fibers & Yars Trading Co. v. State of Kerala & Others

The petitioner, a Small Scale Industrial unit, ran two LT power connections (No.13070 and No.13427) with commercial production starting in July 1994 and July 1995. On 06/02/1992, the Government issued Ext.P1 guaranteeing concessional tariffs (pre-1992 tariff) for five years from the date of commencement or substantial capacity expansion, certified by the District Industries Centre. Ext.P2 certified eligibility for this concession. Subsequently, the petitioner increased power demand to 300 KVA and was reclassified/advised to HT status from 15/05/1998, converting LT supply to HT. The petitioner argued that Ext.P1 benefits should extend for the full five-year period, covering the LT quantities certified in Ext.P2, and that the HT conversion was a mere reclassification directed by the Board, not a cessation of eligibility. The Board argued Ext.P1 targets only those who commenced production during 1992–1996 and that HT conversion from 15/05/1998 falls outside the Ext.P1 window, rendering the petitioner eligible only up to 15/05/1998. Earlier orders (Ext.P3) had set aside a cut-off date for merits, and Ext.P6/Ext.P4 handled appeals. Ultimately, the Court held that the HT conversion was outside Ext.P1’s period, but directed that the LT benefits for the two LT connections be extended only until 23/05/1998 (LT dismantling date) and without reimbursement from the Industries Department, as held in OP No.7622/1998. The petition was disposed of as above.