P. Vasu and others v. Kerala State Electricity Board and others

Case / Petition Number:
WP(C).No. 8396 of 2004

Case Synopsis & Summary

The petitioners are retired Scheduled Caste employees of the Kerala State Electricity Board (KSEB). The Kerala State and Subordinate Service Rules (KSR) have been adopted by KSEB, and Government orders under the KSR exempted SC/ST employees from passing qualification tests for promotion. However, initial exemptions were not extended to KSEB employees; Ext.P4 (4.12.1975) retrospectively exempted SC/ST employees already in service as of 13.1.1972 from promotion-test qualifications, effective from that date. Some employees challenged this, resulting in Ext.P5, a judgment that quoted a Division Bench decision (W.A.No.18/1976) and held that beneficiaries were entitled to promotion with effect from the date the exemption notification was issued. Pursuant to that, Ext.P6 granted retrospective promotion with test exemption to three employees, with monetary benefits in some cases, while Ext.P7 denied monetary benefits to others. Subsequently, Exts.P10 to P22 provided retrospective promotions exempting the petitioners from test qualification, with monetary benefits restricted to later dates. The petitioners seek (A) mandamus to permit reoptions and secure the full monetary benefits, (B) a declaration of right to reoption for monetary gains, and (C) quashing Exts.P7 and P10–P22 to the extent they grant only notional pay fixation, so that monetary benefits are provided as if the petitioners held the promoted posts from Ext.P1 dates, considering Exts.P23–P25. The respondents counter, and the learned Judge ultimately dismisses the petition on delay and laches, citing Rabindranath Bose and Others v. Union of India (AIR 1970 SC 470). The decision reflects a careful balance between equity and the time-bound nature of relief, upholding the bar of delay.

Precedent Explorer

Find Cases Like This

Explore other judgments dealing with similar legal situations, facts, or statutory provisions.

Case Details & Bench

Court
High Court of Kerala
Hon'ble Judges
  • S. Siri Jagan
Judgment Date
2009-01-15
Court Decision / Holding
The writ petition is dismissed on account of delay and laches.
Final Disposition
Dismissed

Parties to the Case

Appellants / Petitioners

  • P.Vasu, S/o Padmanabhan
  • K.P.Pavithran, S/o Poovan
  • V.Sivaraman, S/o Velumpan
  • J.C.Babu, S/o C.M. Jacob
  • R.Leela, W/o D.Ravikumara
  • K.K.Janamama, D/o K.Kunjachan
  • N.Kesavan, S/o Narayanan
  • C.Ramakrishnan, S/o K.Chellappan
  • K.K.Gopalan, S/o Kesavan
  • P.Kochuraman, S/o Pachanan
  • A.Krishna Kutty, S/o R. Ayyappan
  • B.M.Shobhi, W/o Chanrasen
  • G.Divakaran, Special Officer, Revenue (RTD)
  • A.S.Thankaswamy, S/o V.K. Appicherukkan

Respondents

  • The Kerala State Electricity Board, rep. by its Secretary
  • The Chief Engineer (HRM) Kerala State Electricity Board, Trivandrum
  • The Chief Internal Auditor, Kerala State Electricity Board, Trivandrum

Legal Representation & Advocates

Counsels for Petitioners

  • • Sri G.S. Reghunath

Counsels for Respondents

  • • Sri P. Santhalingam, SC for R1–R3
  • • Sri C.K. Karunakaran, SC for KSEB

Provisions of Law Cited

Kerala State and Subordinate Service Rules (KSR)Rule 23(a) of Part I of KSR

Legal Doctrines & Maxims

  • Laches (doctrine)
  • Delay and laches in writ petitions

Submissions & Arguments

Contentions of Appellants / Petitioners

The petitioners contend that since Ext.P4/F.1975 notification exempted SC/ST employees from passing tests for promotion and Ext.P5 (the extant judgment) recognized retrospective promotions with exemption, they are entitled to retrospective promotions and monetary benefits. They seek mandamus to allow reoptions to secure full monetary benefits, declare their right to reoption, and quash Exts.P7 and P10–P22 to the extent they provide only notional fixation, so that monetary benefits are granted from the dates in Ext.P1 while considering Exts.P23–P25.

Contentions of Respondents

The respondents rely on Ext.P7 (denying monetary benefits) and argue that those promoted under Ext.P6, who had actually passed tests, stand on a different footing. They invoke Rule 23(a) of Part I of the KSR and contend that past lapses or mistakes do not automatically trigger monetary gains. They assert delayed representations, and rely on the Board’s justification that some beneficiaries did not pursue relief timely, and that monetary benefits were not uniformly available, justifying the delay-based dismissal.

Legal Doctrine & Issue Explorer

Explore This Legal Issue

Find relevant judgments and authoritative positions on the legal questions discussed here.

Cited Precedents (3)

Case NameCitationTreatmentExplanation
Rabindranath Bose and Others v. Union of India and OthersAIR 1970 SC 470PositiveCited to illustrate that there is a limit to the time for making representations; delay in approaching the court can bar relief.
W.A.No.18/1976W.A.No.18/1976Mentioned OnlyReferenced as a background Division Bench decision regarding retroactive promotion, not adopted as controlling in the present judgment.
OP. NO.6464/82OP No.6464/82Mentioned OnlyExt.P5 is a judgment in this court (OP 6464/82) cited to reflect prior reasoning cited by Ext.P5, but not adopted in full in the current decision.
Case Applicability Diagnostic

Apply This to My Facts

Share your situation and test whether this judgment governs, supports, or challenges your case.

Official Judgment Record
•1,572 words•~8 min read

In The Court Record

P. Vasu and others v. Kerala State Electricity Board and others

## **IN THE HIGH COURT OF KERALA AT ERNAKULAM** **PRESENT :** **THE HONOURABLE MR. JUSTICE S.SIRI JAGAN** **THURSDAY, THE 15TH JANUARY 2009 / 25TH POUSHA 1930** **WP(C).No. 8396 of 2004(Y)** **------------------------------------** ## **PETITIONER(S):** - **------------------------** **1. P.VASU, S/O.PADMANABHAN, AGED 60, INDIRA BHAVAN, K.K.GARDENS, INDIRA NAGAR, PEROORKKADA.** **2. K.P.PAVITHRAN, S/O.POOVAN, AGED 57, PADMA DHAYA, MANGULAM LANE, T.K.D.ROAD, PATTOM TRIVANDRUM.** **3. V.SIVARAMAN, S/O.VELUMPAN, AGED 65, PANAMOOTTIL, KRISHNA PURAM, P.O. OACHIRA.** **4. J.C.BABU S/O.C.M. JACOB,AGED 68, BABU NIVAS, SREECHITRA NAGAR P.O. THYCAUD, TRIVANDRUM.** **5. R.LEELA, WIFE OF D.RAVIKUMAR, AGED 57, RAVIKIRAN, PEROORKADA, NEMOM P.O. TRIVANDRUM. - 20.** **6. K.K.JANAMMA, D/O.K.KUNJACHAN, AGED 55, MELOTTUVILAKAM, EDAKODE, NEMOM P.O. TRIVANDRUM-20.** **7. N.KESAVAN, S/O.NARAYANAN, AGED 60 TC 55/739, ATTISSERY, NEW HOUSE, NEERAMONKARA, KAIMANAM P.O. TRIVANDRUM - 40.** **8. C.RAMAKRISHNA, S/O.K.CHELLAPPAN, AGED 57 T.C. 76/1375,. SUSMITHA BHAVAN, ANANTHAPURAM LANE, KOONAMOOLA, PILLA P.O.** **9. K.K.GOPALAN, S/O.KESAVAN, AGED 60 VATTUVILA VEEDU, KOOVALASSERI P.O. TRIVANDRUM.** **10. P.KOCHURAMAN, S/O.PACHAN, AGED 58 T.C.NO.25/3420, UPPALAM ROAD, TRIVANDRUM - 1.** ## **W.P.9C0 NO.8396/2004** **11. A.KRISHNA KUTTY, S/O.R. AYYAPPAN, AGED 60 SANU MANDIRAM, KARAYALATTUKNAM, VENCODE P.O. TRIVANDRUM.** **12. B.M.SHOBHI, W/I.CHANRASEN, AGED 58 YEARS SOJA BHAVAN, NEETHI NAGAR, 147, PEROORKKADA, TRIVANDRUM.** **13. G.DIVAKARAN, SPECIAL OFFICER, REVENUE (RTD), S/O.LATE K.GOPALAN, AGED 57, KERALA STATE ELECTRICITY BOARD, RESIDING AT MUKKOOTTUSSERY, T.C. XI/1495, PAROTTUKONAM, NALANCHIRA P.O. TRIVANDRUM- 15** **14. A.S.THANKASWAMY, S/O.V.K.APPICHERUKKAN, AGED 59 YEARS, UPASANA, T.C.3/2595(1) MARAPPALAM ROAD, PATTOM P.O. TRIVANDRUM - 4.** **BY ADV. SRI.G.S.REGHUNATH** ## **RESPONDENT(S):** **------------------------** **1. THE KERALA STATE ELECTRICITY BOARD, REP. BY ITS SECRETARY.** **2. THE CHIEF ENGINEER (HRM) KERALA STATE ELECTRICITY BOARD, TRIVANDRUM.** **3. THE CHIEF INTERNAL AUDITOR, KERALA STATE ELECTRICITY BOARD, TRIVANDRUM.** **ADV. SRI.P.SANTHALINGAM, SC, KSEB FOR R1TO3 SRI.C.K.KARUNAKARAN, SC FOR KSEB FOR R** **THIS WRIT PETITION (CIVIL) HAVING BEEN FINALLY HEARD ON 15/01/2009, THE COURT ON THE SAME DAY DELIVERED THE FOLLOWING:** ## **W.P.(C) NO.8396/2004** ## **APPENDIX** ## **PETITIONERS EXHIBITS** ## **P1:- COPY OF THE TABLE SHOWING THE PETITIONERS' DT. OF ENTRY IN THE SERVICE OF THE IST RESPONDENT, RESPECTIVE DATES OF PROMOTIONS, THE POSTS HELD BY THEM AND THE DATES OF THEIR RETIREMENT FROM SERVICE.** **P2:- COPY OF THE G.O.9,S0 NO.22/PD DT. 13.1.1972.** **P3:- COPY OF THE ORDER DT. 27.7.64 OF THE IST RESPONDENT.** **P4:- COPY OF THE B.O. NO. RL.I 27519/74 DT. 4.12.75.** **P5:- COPY OF THE JUDGMENT DT. 14.11.86 IN OP. NO.6464/82 OF THIS HONOURABLE COURT.** **P6:- COPY OF THE ORDER DT. 21.4.88 OF THE CHIEF ENGINEER (ELECTRICITY), TRIVANDRUM.** **P7:- COPY OF THE B.O. NO. 786/01 (LAS IV) 12175/92 DT. 31.3.2001.** **P8:- COPY OF THE B.O. NO.1276/93 DT. 2.7.93.** **P9:- COPY OF THE G.O.(P) NO.101/80/167/FIN. DT. 30.1.80 ISSUED BY THE GOVERNMENT.** **P10:- COPY OF THE ORDER NO.EB/GR.I/22/2001 DT. 13.9.01.** **P11:- COPY OF THE ORDER BO. NO.2278/2001(LA)S) IV/12175/92 DT. 16.11.01.** **P12:- COPY OF THE ORDER NO.EB/GR.I/87/2001 DT. 5.12.01.** **P13:- COPY OF THE ORDER NO.EB/GR.I/26/2001 DT. 28.9.01.** **P14:- COPY OF THE ORDER B.O.NO.1852/001/LAS. IV/12175/92 DT. 6.9.01.** **P15:- COPY OF THE ORDER NO.EB/GR.I/38/2001 DT. 3.10.01.** **P16:- COPY OF THE ORDER NO.EB/GR.I/55/2001 DT. 22.10.01. P17:- COPY OF THE ORDER NO.EB/GR.I /41/2001 DT. 6.10.01.** **P18:- COPY OF THE ORDER NO.EB/GR.I/21/2001 DT.12.9.01.** **P19:- COPY OF THE ORDER NO.EB/GR.I 78/2001 DT. 24.11.01.** **P20:- COPY OF THE ORDER NO.EB/GR.I/18/01 DT. 13.9.01.** **P21:- COPY OF THE ORDER NO.EB/GR.I/25/01 DT. 12.9.01. P22:- COPY OF THE ORDER NO.EB/GR.I/20/2001 DT. 12.9.01.** ## **W.P.(C) NO.8396/2004** **P23:- COPY OF THE ORDER B.O. NO.732/93 (PS I/2003/92 ) TRVM. DT. 21.4.93.** **P24:- COPY OF THE ORDER B.O. NO.PSI. 1533/89-7(71) DT. 12.11.90.** **P25:- COPY OF THE ORDER BO. NO.2138/95 (ESTT. I/3857/95) DT. 5.10.95.** **P26:- COPY OF THE REPRESENTATION DT. 19.10.01 SUBMITTED BY THE 10TH PETITIONER BEFORE THE IST RESPONDENT.** **P26(a):- COPY OF THE REPRESENTATION DT. 10.10.01 SUBMITTED BY THE 13TH PETITIONER BEFORE THE IST RESPONDENT.** **P27:- COPY OF THE G.O.(P) NO.545/01 DT. 19.3.01.** _**/**_ **TRUE COPY/** **P.A. TO JUDGE** **tss** S.SIRI JAGAN, J. ================== ## W.P(C).No.8396 of 2004 ================== Dated this the 15[th] day of January, 2009 **==> picture [103 x 14] intentionally omitted <==** The petitioners are retired employees of the Kerala State Electricity Board. The petitioners belong to Scheduled Caste. The Kerala State and Subordinate Service Rules have been adopted by the KSEB. The Government had issued orders under the K.S.&.S.S.R. exempting SC/ST employees from obtaining test qualification for the purpose of promotion. The said benefit was not extended to the employees of the KSEB originally. Later, by Ext.P4 order dated 4.12.1975, the KSEB exempted the SC/ST employees already in service on or before 13.1.1972 from passing all tests for promotion in the Board with retrospective effect. But such exemption was given only with effect from the dated of Ext.P4, viz. 4.12.1975. Some of the employees challenged the same by fling O.P.No. 6264/1982, in which Ext.P5 judgment was passed by a learned Single Judge of this Court, in which quoting from a Division Bench decision of this Court in W.A.No.18/1976, it was found that the petitioners in that original petition were entitled to promotion with effect from the date when the Government issued notification granting exemption. Pursuant thereto, Ext.P6 order was passed wherein three employees were given retrospective promotion exempting them from acquisition of test 2 qualification. They were also given monetary benefits for the retrospective promotion. However, some other employees who were also given similar retrospective promotion by Ext.P7 were denied monetary benefits and only notional fixation of pay was granted. The petitioners, who are Scheduled Caste employees of the Board, sought similar benefits as in Exts.P5 and P6. After several representations, ultimately, Exts.P10 to P22 orders were passed wherein the petitioners were given retrospective promotion exempting them from test qualification with effect from an anterior date in accordance with their seniority in the seniority list in their respective posts. However, monetary benefits were restricted from a subsequent date. Although the petitioners are stated to have filed representations, nothing tangible has come out and therefore, the petitioners have filed this writ petition seeking the following reliefs: - “A) That all records relating to Exts.P7 and P10 to P22 be called to this Hon'ble Court and a writ of mandamus or other order passed directing the respondents to allow the petitioners to exercise reoptions in respective pay revisions as mentioned under para 17 of this Writ Petition to enable the petitioners to get the entire monitory (sic) benefits arising out of Exts.P10 to P22 orders granting retrospective promotion to the petitioners. - B) That the petitioners' right to exercise re-option to obtain the monetary benefits flowing from Exts.P10 to P22 orders granting retrospective promotions to the petitioners as shown in Exts.P10 to P22 be declared. - C) That all records relating to Exts.P7 and P10 to P22 be called to this Hon'ble Court and a writ of certiorari or other order passed quashing Exts.P7 and P10 to P22 to the extent it gives only notional fixation in the posts to which promotions are ordered and direct the respondents 1 to 3 to give all monetary benefits due to 3 the petitioners on the basis of the retrospective promotions given to them as if they were holding the respective posts detailed in Ext.P1 from the dates mentioned therein taking Exts.P23 to P25 into account, where ever they apply.” 2. A counter affidavit has been filed disputing the claim of the petitioners. According to the Board, the employees involved in Ext.P6 stand on a different footing in so far as they had actually passed the test although subsequently. The Board heavily relies on Ext.P7 order whereby monetary benefits on account of similar retrospective promotion had been denied to other employees. 3. I have considered the rival contentions in detail. 4. I am not satisfied with the explanation given by the Board for treating the employees involved in Ext.P6 and the petitioners or others involved in Ext.P7 differently. All these employees are Scheduled Caste employees who were given retrospective promotion excepting them from acquiring test qualification retrospectively. The fact that some of them subsequently obtained test qualification does not in any way alter the position. Both sets of employees were given promotion with retrospective effect granting exemption from test qualification retrospectively. Although the counsel for the Board relies on Rule 23(a) of Part I of KSR, I do not think that after having not done what they should have done earlier they can take advantage of their mistake by relying on Rule 23(a). 5. All the same, I am not inclined to exercise my discretionary 4 jurisdiction in favour of the petitioners on account of unexplained delay and laches. Exts.P10 to P22 orders were passed in 2001. The petitioners were perfectly aware of their rights even at the time of issuing Exts.P10 to P22. Nothing prevented the petitioners from seeking relief within a reasonable period. Although the petitioners claimed that they had filed representations in that regard, they did not do anything to get their grievances redressed until 9.4.2004, when they filed this writ petition. In the decision of the Supreme Court in ## _**Rabindranath Bose and Others v. Union of India and Others**_ (AIR 1970 SC 470) it was held that in respect of the subject matter of a writ petition representations were being received by the Government all the time was not sufficient for explaining the delay in approaching the Court and that there is a limit to the time which can be considered reasonable for making representations. The petitioners slept over their rights for a long period of 3 years. In the above circumstances, this writ petition is dismissed on account of explained delay and laches. sdk+ Sd/S.SIRI JAGAN, JUDGE ///True copy/// P.A. to Judge 5
End of Judgment Record
Browse All High Court of Kerala (2009) Decisions
2009-06-26

Nishana Mol.N v Alappuzha Municipality & Secretary, Alappuzha Municipality

This writ petition concerns the registration of a marriage under the Kerala Registration of Marriages (Common) Rules, 2008 (Common Rules). The petitioner Nishana Mol.N, whose marriage was solemnized on 8 March 2009, sought registration of her marriage by the Local Registrar. Her husband was abroad, and she submitted Form No. 1 along with documents; however, the Local Registrar demanded the presence of both spouses for registration, a point contested by the petitioner. The court recalls the apex court’s directions in Seema v. Ashwani Kumar (2006) to frame rules ensuring compulsory registration to protect women and provide evidence of marriage, while noting that registration under the Rules does not itself create a marriage but evidences one solemnized otherwise. The Rules specify that registration is mandatory for marriages solemnized within the state, with various procedural requirements (Rules 5, 6, 9, 10, 11, 13, 16, 17) and mechanisms for correction, appeal, and re-registration. The court clarifies that the presence of both parties is not ordinarily required; the registrar may require appearance only in cases where there is reasonable doubt about identity, and even then as an exception rather than a rule. Ultimately, the court directs that registration and certificate issuance be completed within one month from copy of the judgment, without insisting on joint appearance, provided the memorandum is in order.

2009-07-27

Abdul Majeed Kalathil v. District Collector, Malappuram & Others

This batch of writ petitions concerns the constitutional validity of Section 17 of the Kerala Anti-Social Activities (Prevention) Act, 2007, and the power of District Magistrates to confiscate vehicles used in anti-social activities. The petitions challenge the absence of a substantive prohibition against using vehicles for anti-social activities and the lack of a defined procedure for confiscation or an appellate remedy. In W.P.C. No. 9925 of 2009 (the lead case), Abdul Majeed Kalathil contends that his goods carriage KL 11-B/6651 was seized by the Sub Inspector of Pandikkad Police and reported to the District Collector, Exts.P1–P2. The court scrutinizes Section 17's scope, defining anti-social activity (Section 2(a)) and whether the District Collector’s power to confiscate is constitutionally tenable. It finds Section 17 to be vague and violative of Articles 14, 19(1)(g) and 21, as it rests on subjective police satisfaction with no clear standards or process. It also notes environmental objectives but concludes that fundamental rights must prevail. The court does not sustain confiscation under Section 17; instead, it directs that such vehicles be dealt with under the Kerala Protection of River Banks and Regulation of Removal of Sand Act, 2001 and Rules, with interim release under specified conditions. It further directs initiation of Sand Act proceedings within a month and finalization within another month. The writ petitions are disposed of accordingly, preserving the rule of law and environmental protection.

2009-06-11

WA No. 671 of 2006 (Fertilizers and Chemicals Travancore Ltd v Union of India)

This writ appeal concerns the pay revision and pensionary benefits of employees of the Fertilizers and Chemicals Travancore Ltd (FACT). The long-term settlement covering terms of employment expired on 31 December 1996. A fresh settlement was concluded (notified 28 August 2001) and made retroactive to 1 January 1997, with revisions in wages and benefits. Clause 29 of Ext. P1 provides that arrears relating to wage revision and dearness allowance for the period 1 January 1997 to 30 June 2001 will be reviewed and decided by management/government only when the company earns profits for at least three consecutive years; Clause 33.1 provides that employees who retired on or after 1 January 1997 will be eligible for arrears calculated from 1 January 1997 to the date of retirement, subject to adjustments for interim relief already paid, with any unclaimed amount transferred to a Welfare Fund. The appellants—the retirees who fall in the 1 January 1997 to 1 July 2001 window—argue that they were denied arrears and were paid pensionary benefits at pre-revised rates, creating discrimination. Respondents contend Ext. P1 binds the parties and arrears depend on profits, and that pay revision administered to others does not compel retroactive change. The court held that Ext. P1 terms survive as terms of employment and directed the management to consider terminal benefits at revised rates within two months and to release arrears when paid to current workers, with connected matters following."

2009-05-29

M/S. Palm Fibers & Yars Trading Co. v. State of Kerala & Others

The petitioner, a Small Scale Industrial unit, ran two LT power connections (No.13070 and No.13427) with commercial production starting in July 1994 and July 1995. On 06/02/1992, the Government issued Ext.P1 guaranteeing concessional tariffs (pre-1992 tariff) for five years from the date of commencement or substantial capacity expansion, certified by the District Industries Centre. Ext.P2 certified eligibility for this concession. Subsequently, the petitioner increased power demand to 300 KVA and was reclassified/advised to HT status from 15/05/1998, converting LT supply to HT. The petitioner argued that Ext.P1 benefits should extend for the full five-year period, covering the LT quantities certified in Ext.P2, and that the HT conversion was a mere reclassification directed by the Board, not a cessation of eligibility. The Board argued Ext.P1 targets only those who commenced production during 1992–1996 and that HT conversion from 15/05/1998 falls outside the Ext.P1 window, rendering the petitioner eligible only up to 15/05/1998. Earlier orders (Ext.P3) had set aside a cut-off date for merits, and Ext.P6/Ext.P4 handled appeals. Ultimately, the Court held that the HT conversion was outside Ext.P1’s period, but directed that the LT benefits for the two LT connections be extended only until 23/05/1998 (LT dismantling date) and without reimbursement from the Industries Department, as held in OP No.7622/1998. The petition was disposed of as above.