P. V. John v. Thresiamma and others

Case / Petition Number:
AS.No.390 of 1998 (B); RFA.No.266 of 2006-C

Case Synopsis & Summary

P. V. John v. Thresiamma and others is a Division Bench judgment of the Kerala High Court delivered on 9 December 2009. The appellant/plaintiff filed OS 44/1996 in the Sub Court, Pala, seeking specific performance of a contract for sale of plaint schedule property described as 1 acre 24 cents, or in the alternative a return of Rs. 10,000 paid as advance with 12% interest. The defendants included Thresiamma and multiple heirs of the Ist defendant, along with further respondents impleaded later. The plaintiff asserted an earlier agreement dated 2 November 1987 at Rs. 2,000 per cent and an extended series of correspondingly extended agreements (30.4.1988; 2.4.1988; 6.8.1988; 7.11.1988) through which he claimed entitlement to specific performance of 1 acre 24 cents. The trial court found Ext.A1 (30.4.1988) unreliable and held Ext.B2 (7.11.1988) to be a novation that ended the original contract. The appellant relied on several documents and the doctrine of novation to argue that a subsisting contract existed. The respondents contended Ext.A1 is not genuine, that Ext.B1–B3 reflect a chain of extensions, cancellations, and a later sale deed (Ext.B3) that extinguished the contract; and that the appellant lacked readiness and willingness and funds to buy the entire property. The High Court ultimately held that the plaintiff failed to prove readiness and willingness, no valid novation was established, and the relief of specific performance could not be granted. The injunction appeal was also dismissed. The appeals were disposed of by common judgment.

Precedent Explorer

Find Cases Like This

Explore other judgments dealing with similar legal situations, facts, or statutory provisions.

Case Details & Bench

Court
High Court of Kerala
Hon'ble Judges
  • K.M. Joseph
  • M.L. Joseph Francis
Judgment Date
2009-12-09
Court Decision / Holding
The High Court dismissed AS 390/1998 and confirmed the trial court’s view. It held that the appellant failed to prove readiness and willingness to perform, that no valid novation was established, and that Ext.B3 did not extinguish the earlier contract. Consequently, no specific relief could be granted, and the injunction appeal (RFA 266/2006) was also dismissed. There will be no order as to costs.
Final Disposition
Disposed of by common judgment; Appeals dismissed; no costs awarded.

Parties to the Case

Appellants / Petitioners

  • P. V. John

Respondents

  • Thresiamma
  • Joseph (s/o KuriaKose)
  • Joseph (s/o John)
  • Joseph (s/o Ulahannan)
  • Joseph (s/o Kurian) (5th respondent)
  • Jeevan Raj
  • Maniyan Nair

Legal Representation & Advocates

Counsels for Petitioners

  • • P.G. Parameswara Panicker (Senior Advocate)
  • • N. Manoj Kumar

Counsels for Respondents

  • • K. J. Josemon
  • • Aginov Mathappan
  • • K. George
  • • K. Sherin Mohan
  • • Mathew Skaria

Provisions of Law Cited

Indian Contract Act, 1872, Section 62 (Novation)Indian Sale of Goods Act, 1930, Section 6(1) and 6(3)Hyderabad Sale of Goods Act, Act VII of 1351 F (as cited)

Legal Doctrines & Maxims

  • Time is not the essence of contract
  • He who comes into equity must come with clean hands
  • Novation is substitution of a contract (essential feature: new contract replaces old)

Submissions & Arguments

Contentions of Appellants / Petitioners

The appellant contends Ext.A1 (30.4.1988) and the series of extensions (2.11.1987, 2.4.1988, 6.8.1988, 7.11.1988) created a subsisting contract for 1 acre 24 cents at Rs. 2,000 per cent. He argues the earlier agreement was not extinguished by novation; the mortgage was discharged only on 7.10.1988 and Ext.B3 (16.11.1988) did not terminate the contract but reflected a continuation or extension of performance. The court should not treat mere variations as novation; all contracts should be read together, and Ext.B3 cannot alone extinguish Ext.A1. He asserts readiness and financial ability to complete the sale; he claims suppression of Ext.B2 is not fatal given other admissible evidence; time is not the essence of a sale of immovable property, and the relief of specific performance should be granted in equity.

Contentions of Respondents

Defendants contend Ext.A1 is not genuine and that Ext.B1, B2 explicitly cancel all prior agreements, with Ext.B3 creating a sale deed for part of the property. They argue there was no valid novation; Ext.B3 did not substitute the original contract but only varied the terms. They emphasize that the plaintiff failed to prove readiness and willingness and lacked funds to purchase the entire property; they point out the plaintiff’s suppression of Ext.B3 and reliance on Ext.A1 despite Ext.B1’s cancellation. The respondents rely on case law to insist that adhesion to the original contract was not established, and equity should not compel specific performance where conduct signals inconsistency with the contract’s terms (including misrepresentation or supplying partial performance). They cite authorities clarifying that time is not necessarily non-essential only where evidence shows correspondingly; in this case the conduct indicates the contract’s end after Ext.B3.

Legal Doctrine & Issue Explorer

Explore This Legal Issue

Find relevant judgments and authoritative positions on the legal questions discussed here.

Cited Precedents (8)

Case NameCitationTreatmentExplanation
Arjun v. Irukulla Shankariah and anotherAIR 1957 AP 784PositiveUsed to illustrate that novation requires substitution of a contract, not mere variation.
Gilbert v. Hall1831 I LJ Ch 15 (H)PositiveCited for principle that a later contract may resile or substitute a former contract when terms are inconsistent.
Kshetranath v. Harsukdas BalakissendasAIR 1927 Cal 538PositiveCited on evaluating the intention of the parties and interpretation of contracts in novation analysis.
State of Bihar v. Ram Ballabh Das Jalan and anotherAIR 1960 Patna 400PositiveCited to discuss substance and effect of subsequent documents in payment and performance.
Bharat Coking Coal Ltd. v Annapurna Construction(2003) 8 SCC 154PositiveUsed to discuss that acceptance of final bill does not preclude further claims where not expressly stated.
Aliyas v Aboobacker2006(4) KLT 282PositiveCited regarding unilateral contracts and signature efficacy ( Ext.A1).
Basheer v. Khadeeja2001 (2) KLT 632PositiveCited on readiness and willingness and capacity to perform as a condition for specific relief.
Singaravelu Kounder v Sulaiman2007 (2) KLT 556PositiveCited for equitable relief and clean hands principle in awarding or not awarding specific performance.
Case Applicability Diagnostic

Apply This to My Facts

Share your situation and test whether this judgment governs, supports, or challenges your case.

Official Judgment Record
•6,114 words•~28 min read

In The Court Record

P. V. John v. Thresiamma and others

IN THE HIGH COURT OF KERALA AT ERNAKULAM PRESENT : THE HONOURABLE MR. JUSTICE K.M.JOSEPH & THE HONOURABLE MR. JUSTICE M.L.JOSEPH FRANCIS WEDNESDAY, THE 9TH DECEMBER 2009 / 18TH AGRAHAYANA 1931 AS.No. 390 of 1998(B) -----------------------------OS.44/1996 of SUB COURT, PALA .................... ## APPELLANT(S): PLAINTIFF: -------------------------------------- P.V.JOHN, KAVARAPPADIL HOUSE, KIZHAKKUMCHERI VADAKKE MURI, NADUVILA VILLAGE, VAIKOM TALUK. BY ADV. SRI.P.G.PARAMESWARA PANICKER, SENIOR ADVOCATE SRI.N.MANOJ KUMAR ## RESPONDENT(S): DEFENDANTS: ----------------------------------------------- ## 1. THRESIAMMA, W/O.KURIAKOSE, PALATHINKALAYA THEKKEVELIYIL, UDAYAMPEROOR KARA, MANAKKUNNAM VILLAGE. ## 2. JOSEPH, S/O.KURIAKOSE, MADATHIL, KIZHAKKUMCHERI, VALLAKAM KARA, NADUVILA VILLAGE. 3. JOSEPH, S/O.JOHN, CHEMMANATHU KARA, VAIKOM VILLAGE, KOTTAYAM. ## 4. JOSEPH, S/O.ULAHANNAN, KURUPPANCHERI THARAYIL, VALLAKAM KARA, NADUVILA VILLAGE. ## ADDL. 5. JOSEPH, S/O.KURIAN, MAZHUVANCHERIL, MUVATTUPUZHA TALUK, ELANJI VILLAGE. (The additional 5[th] respondent is impleaded as per order on CMP No.2737 of 2002 dated 7.11.2003). AS.No. 390 of 1998 -2- ADDL.6. JEEVAN RAJ, S/O.AYYAPPAN, CHULLIPARAMBIL HOUSE, KAKKANAD KARA, KAKKANAD VILLAGE. ADDL.7. MANIYAN NAIR, S/O.V.CHELLAPPAN NAIR, CHILAMBU VEEDU, VAIKOM VILLAGE, PADINJARE MURI, THEKKE NADA P.O.-686142. (Additional arespondents 6 and 7 are impleaded as per order on I.A. No.1222/2004 dated 7.4.2004) R1 & R2 BY ADV.SRI.K.J.JOSEMON. R1 TO R4 BY ADV. SRI.AGINOV MATHAPPAN SRI.K.GEORGE SMT.K.SHERIN MOHAN R5 BY ADV. SRI.MATHEW SKARIA THIS APPEAL SUIT HAVING BEEN FINALLY HEARD 09/12/2009 ALONG WITH RFA NO. 266 OF 2006 THE COURT ON THE SAME DAY DELIVERED THE FOLLOWING: ## **K.M.JOSEPH & M.L.JOSEPH FRANCIS, JJ.** ------------------------------------------------------ ## **A.S.No.390 of 1998 (B) R.F.A.No.266 of 2006-C** ---------------------------------------------- Dated, this the 9[th] day of December, 2009 ## **J U D G M E N T** ## K.M.Joseph, J. These cases being connected, they are disposed of by this common judgment. 2. AS 390/98 arises out of OS 44/96 on the file of the Sub Court, Pala. OS 44/96 is a suit for specific performance of contract or in the alternative to return Rs.10,000/- paid as advance with 12 % interest. RFA 266/2006 is directed against OS 45/1996. That was a suit filed by the plaintiff in the other case seeking injunction. The plaintiff is the appellant in both appeals. ## **A.S.No.390/1998:** 3. We will refer to the facts in OS 44/1996. The case of the appellant/plaintiff in brief is as follows: 4. The plaint schedule property consisting of 1 acre 24 cents belonged to the Ist defendant. The 2[nd] defendant is the father of the Ist defendant and also the power of attorney holder of the Ist defendant. The 2[nd] AS.390/98 & RFA.266/06 -2- defendant executed an agreement of sale in respect of the plaint schedule property on 30.4.1988 in favour of the appellant. The consideration of the property is fixed as Rs.2,000/- per cent. The 2[nd] defendant agreed to measure the property and sell the same to the appellant within a period of 3 months from 30.4.1988. He received advance of Rs.10,000/- from the appellant on 30.4.1988 on behalf of the Ist defendant. Defendants 1 and 2 were not in a position to execute the sale deed within the time and the period of contract was extended upto 15.2.1989. They made an attempt to sell the property to strangers. Then the plaintiff instituted the suit for injunction. It is stated that defendants 1 and 2 have created some documents in favour of defendants 3 and 4. It is said to be in violation of the order of injunction granted by the Munsiff Court, Vaikom in the suit for injunction filed by the appellant and therefore those documents were invalid and sham. 5. The case of defendants 1 and 2, _inter alia,_ was as follows: 1 acre 34 cents belonged to the Ist defendant. AS.390/98 & RFA.266/06 -3- They denied the agreement dated 30.4.1988. They say that they have not received the advance amount as alleged. According to them, there was an agreement on 2.11.1987. It is their case that on the said date 10 cents out of 1 acre 34 cents was sold to the appellant pursuant to his request. On the said day, there was an agreement for sale of the remaining property. The consideration fixed was Rs.2,000/per cent. The 2[nd] defendant received advance of Rs.10,000/on 2.11.1987. The plaintiff is described as a broker. He was unable to raise the funds. He approached the defendants seeking extension of time by three months. Another agreement was executed on 2.4.1988 cancelling the earlier agreement. Very same conditions in the agreement dated 2.11.1987 were retained and the advance paid on 2.11.1987 was treated as advance in the agreement dated 2.4.1988. Again, the appellant could not raise funds and he prayed extension of time. After cancelling the earlier agreement, a new agreement was executed on 6.8.1988 wherein the period fixed was three months. The original advance was carried over. The period expired on 6.10.1988. On 6.11.1988 the AS.390/98 & RFA.266/06 -4- appellant approached the defendants and expressed his inability to raise funds. Further extension of time was sought till 28.11.1988. A new agreement was executed on 7.11.1988. The advance was carried over to this agreement also. Subsequently, the appellant met the 2[nd] defendant and told him that he is not in a position to raise funds and he requested the 2[nd] defendant to execute sale deed in respect of 12.865 cents after adjusting the advance paid. A sale deed was executed on 29.11.1988. Only a meager amount was shown as consideration in order to avoid payment of stamp duty. There is no subsisting contract and they have denied the allegations regarding the readiness and willingness of the appellant to perform the contract. 6. The 3[rd] defendant also filed written statement denying the allegations. 7. Before the trial court, the agreement dated 30.4.1988 was marked as Ext.A1. Ext.A2 is the sale deed executed on 8.3.1989 by the 2[nd] defendant. Ext.A3 is another sale deed executed by the 2[nd] defendant. Ext.B1 is the agreement dated 6.8.1988. Ext.B2 is the agreement dated AS.390/98 & RFA.266/06 -5- 7.11.1988. Ext.B3 is the sale deed executed by the 2[nd] defendant in favour of the appellant. Ext.B4 is the power of attorney executed by the Ist defendant in favour of the 2[nd] defendant. Ext.B5 is the same as Ext.A2. Appellant was examined as Pw1. The 2[nd] defendant was examined as Dw1 and Dw2 is the 3[rd] defendant. The court below found that Ext.A1 does not inspire the confidence of the court. It is further found that even if there is an agreement dated 30.4.1988, in view of Ext.B2 dated 7.11.1988 Ext.A1 is no longer in force. The appellant has suppressed Ext.B2 agreement. It is found that the circumstances brought out in evidence would establish that the 2[nd] defendant has not executed Ext.A1 document. ## **RFA 266/2006:** 8. This is a suit seeking injunction against defendants 1 and 2 against alienation of the property. The suit was filed on the basis of the alleged agreement for sale of the property. 9. We heard Sri.P.G.Parameswara Panicker, learned senior counsel appearing on behalf of the appellant, AS.390/98 & RFA.266/06 -6- Sri.K.J.Josemon, learned counsel for respondents 1 and 2 and Sri.Mathew Scaria, learned counsel for the 5[th] respondent. Sri.P.G.Parameswara Panicker would contend that there was an agreement on 2.11.1987 for the sale of 1 acre 24 cents at the rate of Rs.2,000/- per cent. On the said day Rs.10,000/was paid as advance. A period of 6 months was fixed for the performance of the agreement. It is pointed out that it is agreed by the seller that he would discharge the mortgage outstanding and the property would be measured. He would contend that the 2[nd] respondent did not discharge his obligation under the agreement by discharging the mortgage. (It has come out in evidence that the mortgage was discharged only on 7.10.1988). He would submit that the trial court is not correct in not acting upon Ext.A1. According to him, Ext.A1 was produced and that was the only agreement with the appellant. He would point out certain circumstances to support his contention that Ext.A1 is a genuine document. He would point out that the two witnesses in Ext.A1 are the witnesses in Ext.B1 and B2 agreements and Ext.B3 sale deed and Ext.B4 power of attorney and one of the AS.390/98 & RFA.266/06 -7- witnesses is also a witness in Exts.B5. He further submits that the first witness is none other than the uncle of the 2[nd] defendant. He would point out that, at any rate, Ext.A1 is not very relevant. In this context he pressed into service the doctrine of novation and he would submit that in the facts and circumstances of this case it is clear that there were no novation as the original agreement between the parties is dated 2.11.1987 wherein the relevant terms have been set out and all that has happened when Ext.A1 dated 30.4.1988 was executed, was extension of time. He would submit that variation of a few terms in the agreement would not by itself result in novation of the contract. He would submit that unless a later contract placed side by side with an earlier contract is so inconsistent with the former, there cannot be a question of novation and the original agreement would continue to exist in the eye of law. Novation takes place only when the original agreement is substituted by a new agreement and there cannot be a substitution of the earlier agreement when only one or a few terms are altered. He would submit that the consideration of the agreement AS.390/98 & RFA.266/06 -8- dated 2.11.1987 continues as a golden thread in the agreement dated 2.4.1988, 30.4.1988, 6.8.1988 and 7.11.1988. The property is the same, parties are the same, and the amount paid as advance on 2.11.1987 is treated as advance in subsequent agreements. The only thing purported to be done was extension of period of agreement upon expiry of the earlier agreement. In this regard, he relied on Pollock & Mulla in Indian Contract and Specific Relief Acts, (12[th] Edition) wherein at Page 1214 it is stated as follows: “The word 'novation' is used in the marginal note to the section, and is the accepted catchword for its subject matter. It has been thus defined: 'that, there being a contract in existence, some new contract is substituted for it either between the same parties (for that might be) or between different parties, the consideration mutually being the discharge of the old contract. Novation of a contract comprises two elements: the discharge of one debt or debtor and the substitution of a new debt or debtor. It is well settled that the parties to an original contract can by mutual agreement enter into a new contract in substitution of the old one. Novation is a substitution of the contract and not mere variation of some of its terms. It should rescind or extinguish the previous contract. Novation under s 62 is brought about by: AS.390/98 & RFA.266/06 -9- (a) introduction of new parties; or (b) by alteration between the same parties by introduction of new terms. It is not consistent with the original debtors remaining liable on the old contract. Substitution of a new contract is the core of novation. Its essential feature is that a right under the original contract is relinguished or replaced by a new contract. Where these essentials are missing there is no novation. Under Indian law one of the requisites of such novation is the agreement of all the parties to the new contract. The consent of the parties may be established by circumstances showing such assent as well as by express words.” 10. He also relied on the decision in _Vishram_ ## _Arjun v. Irukulla Shankariah and another {AIR 1957 AP 784}_ _(paragraphs 6 and 10). Paragraph 10 reads as follows:_ _10. The question therefore is, whether Ex.D-7 is in fact a novation. As observed above, a novation is a substitution of the contract and not a mere variation of some of its terms. It should rescind or extinguish the previous contract. As laid down in Gilbert v.Hall, (1831) I LJ Ch 15 (H), a new and independent agreement concerning the same matter as the previous agreement may be construed to discharge the former, only if the terms of the latter are so inconsistent with those of the former that they cannot stand together._ _In other words, a contract will be said to be rescinded by another between the same parties when the latter is inconsistent with or_ AS.390/98 & RFA.266/06 -10- _renders impossible the performance of the former. If their legal effect is the same, though they differ in terms, even then it will be a mere ratification of the first and they must be construed together. Whether an agreement entered into is in substitution of an old contract or not is always a question of fact depending also on the intention of the parties._ _The intention of the parties no doubt may be inferred from the contents of the document, but in order to gather their intention one should look to the substance of the matter and not to the mere form. The same was the view expressed by the Calcutta High Court in Kshetranath v. Harsukdas Balakissendas, AIR 1927 Cal 538 (I). Looking at the terms of the contract from this angle, we feel it difficult to come to the conclusion that Ext.D-7 which relates only to some of the terms and is not a self-contained agreement in relation to the contract of sale entered into between the parties, substitutes or extinguishes the previous contract and can form the sole basis for determination of all rights and liabilities of the party in relation to the contract of sale._ _It is substantially an agreement of remission. The same will be the conclusion even if the matter is judged under the provisions of the Sale of Goods Act. One would do well to bear in mind that Ext.P-6 is a contract to sell goods. The term 'goods' is defined in section 2 (7) of the Indian Sale of Goods Act (III of 1930) as follows:_ _“ Goods' means every kind of moveable property other than actionable claims and money; and includes stock and shares, growing crops, grass and things attached to or forming_ AS.390/98 & RFA.266/06 -11- _part of the land which are agreed to be severed before sale or under the contract of sale.”_ _According to Section 6 (1) of the said Act, the goods which form the subject of a contract of sale maybe either existing goods, owned or possessed by the seller, or future goods. Subsection (3) of the said section reads as follows:_ _“Where by contract of sale, the seller purports to effect a present sale of future goods, the contract operates as an agreement to sell the goods.”_ _The suit contract of sale relates to severed timber lying in the forest area and also future goods therein subject to the Forest Rules as stated in Ext.D-34, the original contract of sale executed between the Forest Department and the plaintiff, is no doubt a contract of sale within the meaning of the Indian Sale of Goods Act and also the Hyderabad Sale of Goods Act (Act VII of 1351, F). By the time Ext.D-7 was entered into, not only the defendants were put in possession of the subject matter of sale but also that they had removed a substantial portion of such goods to their destination and even paid considerable amount._ _It cannot therefore be said that Ext.D-7 is a rescission of the previous contract of sale. At the most it is an agreement varying the quantum of purchase money in view of subsequent circumstances. The time and the manner in which the payment was to be made under Ext.P-6 was made dependent on the demand of P.W.D. from the first party, but now it has been clearly determined. There is no variation as to the term relating to the unservicable wood to be left for the use of the_ AS.390/98 & RFA.266/06 -12- _plaintiff. The term relating to the responsibility of the plaintiff to the P.W.D. for any dispute is not altered._ _Nor is the term relating to power-ofattorney affected. As a matter of fact this document does not bear reference to any of these even though they are some of the important terms of contract of sale. For these, one has even now to look to Ext.P-6 notwithstanding Ext.D-7. In this way, Exts.P-6 and D-7 are, both put together, one complete subsisting contract. The latter supplements rather than supplants or substitutes the former. The plea of novation therefore must fail.”_ ## He also relied on _State of Bihar v. Ram Ballabh_ ## _Das Jalan and another {AIR 1960 Patna 400}_ . 11. He would further contend that it is important to notice the effect of Ext.B3. Ext.B3 is the sale deed executed by the 2[nd] defendant in favour of the appellant in respect of 12.865 cents out of the plaint schedule property on 16.11.1988. He would contend that the agreement dated 2.11.1987 as also other agreements which have been admittedly executed and two of which are produced as Exts.B1 and B2, all create a legal right in the plaintiff to seek specific performance for 1 acre 24 cents. When Ext.B3 sale deed was AS.390/98 & RFA.266/06 -13- executed he would contend that the appellant was ready and willing to take the entire property. He had necessary funds also. But, the 2[nd] defendant refused to sell the entire property. There was a rise in price of the property. This, according to him, was brought about by the operation of the service station which was started by the appellant in the 10 cents of the property which was purchased by him on 2.11.1987. He would submit that unless there is accord and satisfaction, the appellant could not be said to have given up his right for specific performance of the entire property covered by the agreement. There is no such accord and satisfaction. In this regard he would submit that the conduct of the defendants is crucial. He would submit that Ext.B3 was executed on 16.11.1988. However it is registered on 29.11.1988. According to him, the 2[nd] defendant who was examined as Dw1 has stated that the registration took place on 29.11.1988 and he was watching whether the appellant would be forthcoming with the entire funds. This circumstance, in his submission is clinching to show that when Ext.B3 sale deed was executed on 16.11.1988, the parties did AS.390/98 & RFA.266/06 -14- not contemplate that the plaintiff is foreclosed for suing for remainder of the property. He would further point out that if it were that by Ext.B3 the plaintiff was giving up his rights under the agreement, nothing prevented the parties from expressly mentioning so in Ext.B3 itself. He also relied on the decision in _Bharat Coking Coal Ltd.v Annapurna Construction (2003 (8) SCC 154)_ wherein it was held as follows: _“Only because the respondent has accepted the final bill, the same would not mean that it was not entitled to raise any claim. It is not the case of the appellant that while accepting the final bill, the respondent had unequivocally stated that he would not raise any further claim. In absence of such a declaration, the respondent cannot be held to be estopped or precluded from raising any claim. We, therefore, do not find any merit in the said submission of Mr.Sinha.”_ 12. He would further contend that it is settled law that in contracts of sale of immovable property, time is not the essence of the contract. He wold point out that in February, 1989, upon knowing that the defendants are attempting to alienate the property, the appellant instituted the suit for injunction in the Munsiff Court, Vaikom. It is pending decision on the interlocutory application in the said AS.390/98 & RFA.266/06 -15- suit that the 2[nd] defendant sold 7 cents to the 3[rd] defendant vide Ext.A2 and 5.45 cents vide Ext.A3 to the 4[th] defendant. Ext.A2 is on 8.3.1989 while Ext.A3 is dated 21.2.1989. Subsequent to the alienation, interlocutory injunction was granted. Subsequent to the same and pending the suit, the 2[nd] defendant has transferred 10 cents more in favour of the 5[th] respondent. He would submit that the plaintiff was affluent. He would also submit that even if Ext.A1 could not be acted upon as a Court of justice nothing would prevent this Court from granting relief to the appellant/plaintiff on the admitted facts. In other words, he would contend that ignoring Ext.A1 agreements dated 2.11.1987, 2.4.1988, 6.8.1988, 7.11.988 cannot be overlooked. Since these agreements are admitted and as in a sale of immovable property time is not the essence of contract and as the plaintiff is ready and willing and was having the funds which is to be determined on the basis of the capacity to raise the consideration, the court below has clearly erred in not granting the relief. 13. Sri.K.J.Josemon, learned counsel appearing AS.390/98 & RFA.266/06 -16- on behalf of defendants 1 and 2 would on the other hand point out that there is no merit in the Appeal. He would contend that it is relevant to notice the averments in the plaint. There is no reference to Exts.B1, B2 and B3. The crucial aspects have been suppressed. He would reiterate that Ext.A1 is not a genuine document. Further, in regard to the question as to the effect of Ext.B3 sale deed, he would point out one circumstance. Upon executing Ext.B3 sale deed, the plaintiff returned Exts.B1 and B2 agreements to defendants 1 and 2. In Ext.B2 agreement dated 7.11.1988 it is recited that all the earlier agreements were cancelled. Ext.A1 is dated 30.4.1988. Thus, upon execution of Ext.B3 sale deed and the return of all the agreements, there is no subsisting agreement to be specifically enforced and the case set up by the appellant/plaintiff being built around Ext.A1, cannot be decreed by a court, he points out. He would refer in this context the decision in _Singaravelu Kounder v Sulaiman (2007 (2) KLT 556)_ wherein the Division Bench of this Court, inter alia, held as follows: _“The plaintiff in a suit for specific reference must plead and prove that he was ready and willing to_ AS.390/98 & RFA.266/06 -17- _perform his part of the contract and that he continued to be so. It is founded on the principles of equity. “Specific performance will be refused where the contract is tainted with fraud, even if it is not a fraud on the other party to the contract, but on the public, or where the plaintiff has made some positive misrepresentation, or has been guilty of fraudulent suppression, or if the particulars or conditions of sale are misleading; indeed, in such cases the contract will be rescinded, and cannot be enforced even at law. Even if there is no fraud or misrepresentation sufficient to justify the rescission of the contract, the court may still refuse the equitable remedy of specific performance if the conduct of the plaintiff has been tricky or unfair, for “he who comes into equity must come with clean hands,” and the court is not bound to decree specific performance in every case in which it will not set aside the contract.”_ 14. He relies on the same for pointing out that in this case the consideration shown in Ext.B3 is Rs.6,000/-. According to him, the amount was shown, so that the plaintiff could avoid payment of stamp duty. He would further point out that the appellant was not ready and willing to perform the contract. He did not have funds to purchase the entire property and the time which was fixed in Ext.B2 dated 7.11.1988 was to expire on 28.11.1988. He came forward to purchase 12.865 cents. According to him, the consideration AS.390/98 & RFA.266/06 -18- was by partly adjusting Rs.10,000/- given as advance and the balance was given by the appellant. Therefore it is a clear case where the appellant was not ready and willing and furthermore, he must be treated as given up his rights under the agreement by taking the sale of a lesser extent for which he was possessed of funds. He also highlighted the conduct of the plaintiff. The learned counsel for the 5[th] respondent would point out that Ext.A1 agreement is only executed by the 2[nd] defendant as a unilateral agreement and such an agreement cannot be specifically executed. He relied on paragraph 20 of the decision in _Aliyas v Aboobacker (2006(4) KLT 282)_ which reads as follows: _“20. There is another circumstance worth mentioning, that is, the plaintiff is not a signatory to Ext.A1 agreement. Dealing with such agreements where only one of the contracting parties put signature, one of us (Justice R.Bhaskaran) held in Lalithambika v. Varghese (2004 (3) KLT 892 thus;_ _“Ext.A1 is executed by the defendant only. There is no agreement executed by the plaintiff. Therefore, if Ext.A1 is violated, the plaintiff alone can take action against the defendant. If the defendant takes any action it will be open to the plaintiff to pretend ignorance_ AS.390/98 & RFA.266/06 -19- _and contending that he has nothing to do with Ext.A1 and he was not aware of it. An agreement for sale is an agreement by two sides to perform the respective obligations and to have their rights enforced. In a case where one party alone signs the document, it is clear that the party who has not signed is at the dominating position. This circumstance itself is an indication to show that it was obtained at the instance of the plaintiff to safeguard his interest while he did not put his signature in the document.”_ 15. A suit for specific performance is a suit where the plaintiff seeks equitable relief. It is a discretionary remedy. It is certainly relevant to note the conduct of the plaintiff in such a case, the mere existence of a contract cannot arm the plaintiff with unalterable right for enforcement of the contract irrespective of the facts of the case. In this case, the appellant has approached the court making the specific averment that the contract between the appellant and the defendants is concluded by agreement dated 30.4.1988 (Ext.A1) and the specific averment is that the appellant paid a sum of Rs.10,000/- as advance on the said date. It is averred that though the appellant was ready, defendants 1 and 2 were not ready and the time was extended till 15.2.1989. There is AS.390/98 & RFA.266/06 -20- absolutely no reference to the agreement dated 2.4.1988, Ext.B1 agreement dated 6.8.1988 or Ext.B2 agreement dated 7.11.1988. The appellant in his evidence has categorically admitted that apart from Ext.A1 agreement, there were 4 agreements. Therefore, he was fully aware of the agreement dated 2.11.1987 and more importantly, the agreements dated 2.4.1988, 6.8.1988 and 7.11.1988. He suppressed Ext.B3 sale deed. It is now necessary for us to consider the context of the aforesaid pleading of the plaintiff. The case of the appellant is that the court below ought not to have found that the Ext.A1 was not genuine. Ext.A1 was executed only by the 2[nd] defendant. PW1 has given evidence that he has also signed Ext.A1. He would further submit that apart from him and the other executant, nobody has signed. It has come out in evidence that 2 witnesses have signed the agreement. More importantly, it is the admitted case that on 2.11.1987, an agreement was executed wherein the period was fixed as six months. That was to expire on 1.5.1988. An agreement was admittedly executed on 2.4.1988 the period of which was 3 months. If an agreement dated 2.4.1988 is executed, AS.390/98 & RFA.266/06 -21- we fail to see what is the need for the parties to enter into another agreement on 30.4.1988 as is contended by the appellant. Still, more importantly, Ext.B1 dated 6.8.1988 specifically recites that all the agreements have been cancelled. This is well within the knowledge of the appellant as he admits Ext.B1 agreement dated 6.8.1988. He suppressed the agreement from the Court. The contradiction in the evidence of Pw1 is sought to be attributed to memory lapse. If the agreement dated 6.8.1988 is genuine, then necessarily Ext.A1 dated 30.4.1988 would cease to exist. It was well within the appellant's knowledge that Ext.A1 agreement was without any force. It may be true that when Dw1 was examined, he has not specifically denied the signature in Ext.A1. But the other circumstance prevailing would persuade us to take the same view as has been taken by the trial court, namely Ext.A1 does not inspire the confidence of the court for various reasons which are mentioned. This circumstance by itself is of great weight to refuse judicial discretion of specific relief in favour of the appellant. Even proceeding on the basis of the agreement AS.390/98 & RFA.266/06 -22- dated 2.11.1987 and Exts.B1 and B2 we will consider the case of the appellant. Admittedly the sale deed was not executed pursuant to agreement dated 2.11.1987. Extension was sought. No doubt the mortgage came to be discharged by respondents 1 and 2 only on 7.10.1988. The plaintiff in his evidence admits that at the time of Ext.B3 was executed the mortgage had already been discharged. Leaving apart the agreement dated 2.4.1988 and Ext.B1 agreement dated 6.8.1988 when agreement dated 7.11.1988 was executed it would appear to us that nothing remaining to be done by the sellers of the property. There is no case established on behalf of the appellant that the respondents have not measured out the properties. It is to be noticed that the agreement contemplated the sale of the property on the basis of measurement at the rate of Rs.2,000/- per cent for 1 acre 24 cents. There is no case in the plaint even that respondents did not discharge the mortgage or were not ready and willing in that sense or that they have not measured out the property. It is pertinent to notice in this context that the period of extension has been progressively shortened. The AS.390/98 & RFA.266/06 -23- original contract for six months was thereafter extended for three months again on 6.8.1988 there was an extension for three months and lastly extension is limited to 20 days. In this context we must appreciate the contention of the learned senior counsel for the appellant that actually this is a case where the appellant was ready and willing and having funds to take the entire property and what happened was defendants 1 and 2 on account of increase in price were not willing to execute the sale deed in respect of the entire property. In this context we take note of the fact that even on 7.11.1988 when Ext.B2 agreement was executed the agreement is for the sale of the entire property. This is a circumstance which we would think goes to probabilise the case of respondents 1 and 2 that they were willing and the appellant was seeking extension of time. In this context we must also examine the evidence regarding the availability of funds or the capacity of the appellant to raise funds. In his examination the appellant would say that at the Vaikom junction he has a three storied hotel cum lodge. Near KSRTC he has got 77 cents of land. He would say that he is a AS.390/98 & RFA.266/06 -24- contractor and further he is running a service station. When Dw1 was examined he does not admit the suggestion made on these lines. The appellant placed reliance on Dw2 (subsequent alienee from the 2[nd] defendant). But we notice that in cross examination appellant would submit that he has got Rs.2.5 lakhs in bank deposit. There is a loan sanctioned from the KFC. He stated that he has the pass book and he can produce it. He further states that the loan sanctioned from the KFC is there. It is significant to note that though a specific challenge is raised in this regard and he states that he can produce it still he has not chosen to make available any documentary evidence which is admittedly in his possession to prove the requisite funds with which he could purchase the entire property. In this context we rely on the judgment of the Division Bench of this Court in _Basheer v. Khadeeja (2001 (2) KLT 632)_ . Paragraph 6 of the said judgment reads as under: _“In order to get a decree for specific performance, the appellant must prove that he was and is still ready to perform his part of the agreement. Admittedly the property was not measured and the draft of the sale deed was not prepared. It is true that the respondent has a case that the appellant had never approached either the respondent for her father Pokku Haji. If actually, the appellant_ AS.390/98 & RFA.266/06 -25- _was ready and willing to perform his part of the contract, he might have atleast sent a notice stating his readiness and willingness. Apart from the interested testimony of the appellant there is no other evidence to show his readiness and willingness to perform his part of the contract. That mediators allegedly intervened in the transaction was not examined. The relief of specific performance is a discretionary remedy and that discretion must be exercised on sound principles and circumstances. The readiness and willingness of the appellant to perform his part of the contract is a question of fact to be inferred from the facts and circumstances of each case. The conduct of the party and the attending circumstances also is to be looked into. Here, in this case, the appellant has not adduced any evidence to show that the balance of sale consideration was ready with him. There is only the self serving evidence of Pw-1 alone regarding the same. During examination, he has admitted that he was having bank accounts in three different banks. But he has not produced the pass books in respect of the accounts or other documents. in the circumstances it cannot be found that the appellant was ready and willing to perform his part of the contract.”_ 16. Thus, we would think that we can hold that this is a case where the appellant was not in a position to establish that he was having the capacity to raise funds with which he could purchase the entire extent of property. It is more probable as contended by respondents 1 and 2 that the appellant was not with funds to purchase the entire extent. AS.390/98 & RFA.266/06 -26- After adjusting Rs.10,000/- which is given as advance on 2.11.1988 and further amounts which was paid before registration aggregating the agreed consideration as per the agreement the sale deed came to be registered. Now it is true that it is not so mentioned in Ext.B3. But having regard to the circumstances of the case it appears to be more probable that the case of respondents 1 and 2 is correct in this regard. Learned counsel for the appellant also brought to our notice the following deposition of Dw1. But as already noticed we cannot overlook the fact that upon execution of Ext.B3 the appellant has returned Exts.B1 and B2 agreement to defendants 1 and 2. This is a very significant circumstance in our view for deciding the question as to whether with the execution of Ext.B3 sale deed the parties contemplated the death of obligations arising from the agreements. In this context the conduct of the AS.390/98 & RFA.266/06 -27- appellant/plaintiff in not referring to Exts.B1 and B2 agreements is very significant. Thus the appellant parted with Ext.B1 and B2 agreements on the execution of Ext.B3 sale deed, and then he comes to the court by producing Ext.A1 agreement dated 30.4.1988. In this context also we feel the unreliability of Ext.A1 and also the case of the appellant is questionable. 17. In the facts and circumstance of this case it cannot be said that the appellant would be justified in relying on the principle that time is not the essence of contract in a contract of specific performance. Totally all circumstances in this case would show that the appellant was not ready and willing, and, furthermore, on executing Ext.B3 agreement the parties contemplated that the obligations were at an end. It is in such circumstances that we would not be justified in granting specific relief to the appellant. Having regard to these circumstance we find no merit in this appeal and it is dismissed. There will be no order as to costs. AS.390/98 & RFA.266/06 -28- ## RFA 266/2006: 18. This is only an appeal from the judgment declining to grant injunction. Since we have already confirmed the judgment refusing specific relief we find no merit in this appeal and the appeal is dismissed. There will be no order as to costs. (K.M.JOSEPH) JUDGE. (M.L.JOSEPH FRANCIS) JUDGE. MS
End of Judgment Record
Browse All High Court of Kerala (2009) Decisions
2009-06-26

Nishana Mol.N v Alappuzha Municipality & Secretary, Alappuzha Municipality

This writ petition concerns the registration of a marriage under the Kerala Registration of Marriages (Common) Rules, 2008 (Common Rules). The petitioner Nishana Mol.N, whose marriage was solemnized on 8 March 2009, sought registration of her marriage by the Local Registrar. Her husband was abroad, and she submitted Form No. 1 along with documents; however, the Local Registrar demanded the presence of both spouses for registration, a point contested by the petitioner. The court recalls the apex court’s directions in Seema v. Ashwani Kumar (2006) to frame rules ensuring compulsory registration to protect women and provide evidence of marriage, while noting that registration under the Rules does not itself create a marriage but evidences one solemnized otherwise. The Rules specify that registration is mandatory for marriages solemnized within the state, with various procedural requirements (Rules 5, 6, 9, 10, 11, 13, 16, 17) and mechanisms for correction, appeal, and re-registration. The court clarifies that the presence of both parties is not ordinarily required; the registrar may require appearance only in cases where there is reasonable doubt about identity, and even then as an exception rather than a rule. Ultimately, the court directs that registration and certificate issuance be completed within one month from copy of the judgment, without insisting on joint appearance, provided the memorandum is in order.

2009-07-27

Abdul Majeed Kalathil v. District Collector, Malappuram & Others

This batch of writ petitions concerns the constitutional validity of Section 17 of the Kerala Anti-Social Activities (Prevention) Act, 2007, and the power of District Magistrates to confiscate vehicles used in anti-social activities. The petitions challenge the absence of a substantive prohibition against using vehicles for anti-social activities and the lack of a defined procedure for confiscation or an appellate remedy. In W.P.C. No. 9925 of 2009 (the lead case), Abdul Majeed Kalathil contends that his goods carriage KL 11-B/6651 was seized by the Sub Inspector of Pandikkad Police and reported to the District Collector, Exts.P1–P2. The court scrutinizes Section 17's scope, defining anti-social activity (Section 2(a)) and whether the District Collector’s power to confiscate is constitutionally tenable. It finds Section 17 to be vague and violative of Articles 14, 19(1)(g) and 21, as it rests on subjective police satisfaction with no clear standards or process. It also notes environmental objectives but concludes that fundamental rights must prevail. The court does not sustain confiscation under Section 17; instead, it directs that such vehicles be dealt with under the Kerala Protection of River Banks and Regulation of Removal of Sand Act, 2001 and Rules, with interim release under specified conditions. It further directs initiation of Sand Act proceedings within a month and finalization within another month. The writ petitions are disposed of accordingly, preserving the rule of law and environmental protection.

2009-06-11

WA No. 671 of 2006 (Fertilizers and Chemicals Travancore Ltd v Union of India)

This writ appeal concerns the pay revision and pensionary benefits of employees of the Fertilizers and Chemicals Travancore Ltd (FACT). The long-term settlement covering terms of employment expired on 31 December 1996. A fresh settlement was concluded (notified 28 August 2001) and made retroactive to 1 January 1997, with revisions in wages and benefits. Clause 29 of Ext. P1 provides that arrears relating to wage revision and dearness allowance for the period 1 January 1997 to 30 June 2001 will be reviewed and decided by management/government only when the company earns profits for at least three consecutive years; Clause 33.1 provides that employees who retired on or after 1 January 1997 will be eligible for arrears calculated from 1 January 1997 to the date of retirement, subject to adjustments for interim relief already paid, with any unclaimed amount transferred to a Welfare Fund. The appellants—the retirees who fall in the 1 January 1997 to 1 July 2001 window—argue that they were denied arrears and were paid pensionary benefits at pre-revised rates, creating discrimination. Respondents contend Ext. P1 binds the parties and arrears depend on profits, and that pay revision administered to others does not compel retroactive change. The court held that Ext. P1 terms survive as terms of employment and directed the management to consider terminal benefits at revised rates within two months and to release arrears when paid to current workers, with connected matters following."

2009-05-29

M/S. Palm Fibers & Yars Trading Co. v. State of Kerala & Others

The petitioner, a Small Scale Industrial unit, ran two LT power connections (No.13070 and No.13427) with commercial production starting in July 1994 and July 1995. On 06/02/1992, the Government issued Ext.P1 guaranteeing concessional tariffs (pre-1992 tariff) for five years from the date of commencement or substantial capacity expansion, certified by the District Industries Centre. Ext.P2 certified eligibility for this concession. Subsequently, the petitioner increased power demand to 300 KVA and was reclassified/advised to HT status from 15/05/1998, converting LT supply to HT. The petitioner argued that Ext.P1 benefits should extend for the full five-year period, covering the LT quantities certified in Ext.P2, and that the HT conversion was a mere reclassification directed by the Board, not a cessation of eligibility. The Board argued Ext.P1 targets only those who commenced production during 1992–1996 and that HT conversion from 15/05/1998 falls outside the Ext.P1 window, rendering the petitioner eligible only up to 15/05/1998. Earlier orders (Ext.P3) had set aside a cut-off date for merits, and Ext.P6/Ext.P4 handled appeals. Ultimately, the Court held that the HT conversion was outside Ext.P1’s period, but directed that the LT benefits for the two LT connections be extended only until 23/05/1998 (LT dismantling date) and without reimbursement from the Industries Department, as held in OP No.7622/1998. The petition was disposed of as above.