Tenetowl LogoTenetowl
Landmark CasesDivision BenchDismissed

Om Sai Punya Educational and Social Welfare Society & Another v. All India Council for Technical Education and Another

Case / Petition Number:
WRIT PETITION (CIVIL) NO.571 OF 2017

Case Synopsis & Summary

This is a Supreme Court judgment in a writ petition under Article 32 challenging AICTE’s rejection of approval to start Anant Institute of Business Studies (AIBS) in Madhya Pradesh for the academic year 2017-18 and reviewing the sequence of inspections and approvals conducted by AICTE. The petitioners had applied in February 2017 for LOA; the AICTE scrutiny committee recommended approval, but subsequent proceedings involved multiple AICTE committees (EVC, SAC-SC) and a fresh inspection directed by the Court after earlier objections. The Court’s 22 June 2017 order allowed a fresh EVC inspection to be conducted expeditiously for both AIBS and AIM, with conditions including payment of inspection charges and a shared inspection team. In July 2017, deficiencies were found for AIBS and AIM; the petitioners withdrew AIM’s proposal and AICTE proceeded to consider AIBS, ultimately issuing LOA for 2018-19. The Court, analyzing statutory timelines in AICTE Regulations and the admission schedule, held that AICTE’s timelines are mandatory, not directory, and could not be relaxed to grant 2017-18 approval. It concluded the petition lacked merit and dismissed it with costs. The decision underscores that regulatory timelines govern approvals and public interest, including the integrity of the admission process, outweigh delays caused by petitioners.

Precedent Explorer

Find Cases Like This

Explore other judgments dealing with similar legal situations, facts, or statutory provisions.

Case Details & Bench

Court
Landmark Cases
Hon'ble Judges
  • Dipak Misra
  • A.M. Khanwilkar
Judgment Date
2017-08-16
Court Decision / Holding
The petition is dismissed. The Court held that AICTE’s timelines are mandatory and cannot be breached; it noted that the fresh inspection directed by the Court led to deficiencies, the petitioners withdrew the AIM proposal, and AICTE issued LOA for AIBS for 2018-19. Costs of Rs. 50,000 were awarded to the respondents.
Final Disposition
Dismissed

Parties to the Case

Appellants / Petitioners

  • Om Sai Punya Educational and Social Welfare Society & Another

Respondents

  • All India Council for Technical Education and Another

Provisions of Law Cited

Article 32 of the Constitution of IndiaAICTE Act and Regulations framed thereunderApproval Process Handbook 2017-18

Legal Doctrines & Maxims

  • Statutory timelines in AICTE Regulations are mandatory (not directory)
  • No direction to grant approval in breach of statutory timelines
  • Article 142 of the Constitution of India may be invoked for extraordinary orders but cannot override statutory timelines

Submissions & Arguments

Contentions of Appellants / Petitioners

The petitioners contended that AICTE breached timelines and delayed processing of their proposal and that the Court’s June 2017 order directing a fresh inspection should prompt immediate LOA for 2017-18. They argued that the deficiencies identified by the fresh EVC report were either resolved or were harmless, and that substantial investments had already been made in setting up the institutions. They asserted that the schedule in AICTE Regulations has statutory backing and is mandatory, and urged the Court to ensure timely approval so that students could be admitted for the 2017-18 year; they also argued that the delay was not their fault and should not prejudice their legitimate expectations.

Contentions of Respondents

The respondents argued that AICTE must adhere to statutory timelines, and the original proposals were processed in earnest but faced deficiencies, including the two institutes sharing land and facilities, which necessitated re-inspection. They highlighted that the 22 June 2017 order contemplated a fresh decision in accordance with law and not an automatic grant for 2017-18. They pointed out that the admission schedule for 2017-18 had already started and the last date for admissions was approaching, making any relaxation untenable. They maintained that TEC (EVC/SAC) findings and the subsequent approval for 2018-19, after withdrawing AIM, were proper and in the larger public interest, and that the petitioners cannot override statutory timelines by invoking Article 142.

Legal Doctrine & Issue Explorer

Explore This Legal Issue

Find relevant judgments and authoritative positions on the legal questions discussed here.

Cited Precedents (1)

Case NameCitationTreatmentExplanation
Parshvanath Charitable Trust v. All India Council for Technical Education(2013) 3 SCC 385PositiveCited to establish that statutory timelines in AICTE approvals are mandatory and must be adhered to; approving authorities should not operate outside the admitted schedule.
Case Applicability Diagnostic

Apply This to My Facts

Share your situation and test whether this judgment governs, supports, or challenges your case.

Official Judgment Record
•3,218 words•~15 min read

In The Court Record

Om Sai Punya Educational and Social Welfare Society & Another v. All India Council for Technical Education and Another

1 # **REPORTABLE** IN THE SUPREME COURT OF INDIA CIVIL ORIGINAL JURISDICTION ## **WRIT PETITION (CIVIL) NO.571 OF 2017** Om Sai Punya Educational and Social Welfare Society & Another ….Petitioners Versus All India Council for Technical Education and Another …. Respondents ## **J U D G M E N T** ## **A.M. KHANWILKAR, J.** 1. The petitioners have filed this writ petition under Article 32 of the Constitution of India for issuing a writ of mandamus or any other appropriate writ directing respondent No.1 to immediately issue a Letter of Approval permitting petitioner No.1-society to start its college, namely Anant Institute of Business Studies from the academic year 2017-2018. The Signature Not Verified petitioner No.1-society applied in February, 2017 to Digitally signed by CHETAN KUMAR Date: 2017.08.16 15:31:19 IST Reason: respondent No.1-All India Council for Technical Education (for short “ **AICTE** ”) for its approval to establish Anant Institute of 2 Business Studies (for short “ **AIBS** ”). The Scrutiny Committee of AICTE (for short “ **SC** ”) tendered a report dated 01.03.2017. The petitioners assert that the report did not point out any deficiency and recommended grant of Letter of Approval to the petitioner No.1-society. 2. The said proposal was processed by different committees between March 2017 and April 2017, such as Expert Visit Committee (for short “ **EVC** ”) and the Standing Appellate Committee – Scrutiny Committee (for short “ **SAC - SC** ”). As the petitioners entertained some apprehension that there would be delay in processing the application, petitioner No.1- society rushed to the High Court of Madhya Pradesh Bench at Gwalior by way of Writ Petition No. 2793 of 2017. They prayed for a direction against the respondents to process the application as per the procedure given in Approval Process Handbook 2017-18 and consider the report of SC which has clearly mentioned that the two different institutes of the petitioners were on different patches of land and therefore to issue a Letter of Approval without any further delay and, in any case, 3 to complete the process of approval before 30[th] April, 2017. The respondent No.1-AICTE, however, issued a letter of rejection on 30[th] April, 2017. As a result, the writ petition filed by the petitioners before the High Court came to be dismissed on 16[th] May, 2017, as having become infructuous. The petitioners challenged the said decision before this Court by way of SLP (C) No.15799 of 2017 which was disposed of on 22[nd] June, 2017, in the following terms: ## _“O R D E R_ _By two letters dated 30.04.2017, the first respondent rejected the applications submitted by the petitioners for setting up an Institute of Management and an Institute of Business Studies. The ground on which the rejection took place was primarily that when the EVC team proceeded to inspect the institutions, it was not allowed to do so._ _When this petition came up before the court on 19.06.2017, a submission was made on behalf of the petitioners that having regard to the ground which weighed with the first respondent, the petitioners are ready and willing to submit themselves to a fresh inspection by an EVC team to be constituted by the first respondent. The hearing was adjourned to enable counsel for the first respondent to take instructions._ _During the course of the hearing learned counsel appearing on behalf of the first respondent states, on instructions, that an EVC Team shall be constituted expeditiously and a fresh inspection shall be carried out within a period of two weeks from today. This, it has been submitted, is subject to two conditions; firstly, that the petitioners shall pay the usual charges and expenses for_ 4 _the inspection; and secondly, that one EVC team shall inspect both the Institutions. Both these conditions are acceptable to the petitioners._ _We accordingly take on record the statement which has been made on behalf of the first respondent and direct that in consequence the earlier rejection of the proposal submitted by the petitioners shall not come in the way of the EVC team while carrying out a fresh inspection, as agreed. Thereupon, the first respondent 3 shall take a fresh decision in accordance with law expeditiously uninfluenced by the earlier order of rejection. If the petitioners are aggrieved by the fresh decision, they will be at liberty to pursue the remedies available in law._ _The special leave petition is accordingly disposed_ _of._ _Pending applications, if any, shall stand disposed of.”_ 3. The petitioner No.1-society thereafter decided to withdraw the application for grant of approval for its other institute Anant Institute of Management (for short “ **AIM** ”) vide Application ID No.1-3395565031, as it was not possible for them to get affiliation from the Jiwaji University, Gwalior for the academic year 2017-18. This decision was communicated to AICTE vide letter dated 5[th] July, 2017. 4. In the meantime, in deference to the observation made by this Court in its order dated 22[nd] June, 2017, EVC conducted 5 a fresh inspection in respect of AIBS and submitted its report on 1[st] July, 2017 pointing out the deficiencies. The petitioners then rushed to this Court by way of present writ petition filed on 22[nd] July, 2017, but before that the proposal for grant of Letter of Approval to the petitioners’ institution was referred to SAC-SC, which finally submitted its recommendations and observations to AICTE. The respondent No.1-AICTE, vide letter dated 21[st] July, 2017 informed its decision to the Principal/Chairman of the petitioner No.1-society. The said communication reads thus: _“ALL INDIA COUNCIL FOR TECHNICAL Education (A Statutory Body of the Govt. of India) Ministry of Human Resource Development, Govt. of India Nelson Mandela Marg, New Delhi – 110067 Phone: 011-26131576, 77, 78, 80 - Website: www.aicte india.org_ _F.No. AICTE/AB/CR/PID 1-3404613481 Date: 21.07.2017 To,_ _The Principal/Chairman,_ _Om Sai Punya Educational and Social Welfare Society, 404, Suparsvnath Apartment, A-8, Silicon City, Madhya Pradesh – 452012_ _Sir,_ _This has reference to Hon’ble Supreme Court order dated 22.06.2017 regarding conduct of a fresh Inspection in respect of Anant Institute of Business Studies, M.P. (AID 1-3404613481) and 2. Anant Institute of Management, M.P._ 6 _(AID 1-3395565031). The EVC was conducted on 01.07.2017 to both institutes. The EVC has reported deficiencies in respect of both Institutes. The matter was placed before the SAC on 13.07.2017 for recommendation. The representative of the Institute presented the case before the SAC._ _The recommendation and observation of SAC in respect of Anant Institute of Business Studies, (AID 1-3404613481) are as under:_ **==> picture [392 x 368] intentionally omitted <==** **----- Start of picture text -----**<br> S. Deficiencies Observation of SAC<br>No. noted by dated 13.07.2017<br>EVC<br>Other Institution Documents for closure are<br>(AICTE submitted & accepted.<br>approved/ not<br>under AICTE<br>ambit) are being<br>run/proposed to<br>be run in the<br>same patch of<br>land of land<br>shown for the<br>present<br>–<br>Institution.<br>Proposed to run<br>in the new<br>Anant Institute<br>of Management.<br>1. Amenities Area: Architects certificate &<br>Boys Common Affidavit are submitted &<br>Room Accepted.<br>Girls Common<br>Room<br>**----- End of picture text -----**<br> ## _Recommendation:_ _“The SAC recommends LOA for starting Anant Institute of Business Studies from the Academic year 2018-19._ _The above recommendation of SAC has been approved by the Competent Authority in the Council. You are hereby intimated to comply with the recommendation of SAC for_ 7 _starting Anant Institute of Business Studies from the Academic year 2018-19._ **==> picture [118 x 44] intentionally omitted <==** 5. Notably, the petitioners have not claimed any relief with reference to the aforementioned communication. The relief in the writ petition, however, is to issue a writ in the nature of mandamus to respondent No.1-AICTE, to immediately issue a Letter of Approval and permit the petitioner No.1-society to start its college AIBS from the academic year 2017-18. Absence of challenge to the communication dated 21[st] July, 2017 even if overlooked, the moot question is whether in the fact situation of the present case the petitioners can succeed in getting the relief as claimed in the writ petition. Indubitably, it is not open to AICTE to breach the timelines specified in the AICTE Act and the Regulations framed thereunder for processing the proposal for grant of a Letter of Approval. It is well settled that the schedule specified in the Regulations has statutory backing. Its adherence is mandatory and not directory. As per the said schedule, AICTE does not have any 8 jurisdiction or authority to issue approval for commencement of a new course or for additional intake of students beyond 30[th] April of the year immediately preceding the commencement of an academic year. In the case of _**Parshvanath Charitable Trust Vs. All India Council for Technical Education,**_ **[1]** it has been made amply clear that even the order granting recognition by the Appellate Committee of AICTE should not fall foul of the admission schedule. The admission schedule for academic year 2017-18 has already commenced and been substantially completed. The academic year has also commenced and the last date for completing the admission process is August 15[th] , 2017. The dates and timelines are provided in the Regulations and reiterated by this Court in the aforementioned decision. The same are inviolable. 6. The grievance of the petitioners is that the petitioners had submitted their application for grant of approval within the specified timeline and also completed all the necessary formalities. As a matter of fact, it was the inaction of the 1 . (2013) 3 SCC 385 9 AICTE which resulted in delay and the petitioners cannot be held responsible for that and moreso, after having made huge investment upto rupees four crores for establishing the college. This plea has been countered by respondent No.1 by filing the affidavit of Assistant Director to oppose this writ petition, dated 9[th] August, 2017. It is asserted by the respondents that in terms of the statutory obligation cast on the respondent No.1, the proposal submitted by the petitioner No.1-society for starting two new institutes namely AIBS and AIM for the academic year 2017-18 was processed in right earnest. Further, it is only on 5[th] July, 2017 the petitioners withdrew their proposal in respect of AIM, whereafter the deficiency of sharing the same land and other infrastructure between the two institutes stood removed. Only then it became possible to issue a Letter of Approval to AIBS and was so issued on 21[st] July, 2017, for the academic year 2018-19. It is asserted by the respondents that the SAC-SC on 15[th] April, 2017 had found something amiss and noted that AIBS has a common building plan and land, for which a fresh scrutiny of the proposal was essential by a single committee. As a result, 10 fresh scrutiny was undertaken by a common EVC for both institutes. As directed, on 25[th] April, 2017 EVC went for inspection of the institutes. The team of EVC, however, was not allowed to enter the approach road of the institutes for reasons best known to the petitioners. This fact was intimated to petitioner No.1-society by the AICTE vide letter dated 30[th] April, 2017. Finally, after the direction given by this Court on 22[nd] June, 2017, EVC proceeded to take inspection in the presence of the representative of petitioner No.1-society and inspection was conducted on 1[st] July, 2017. As apprehended earlier by the authorities, it was noticed that both the institutes were situated on the same patch of land and shared various other common facilities. This deficiency could not be condoned under the Rules. Presumably, realising this position, the petitioners were advised to withdraw the proposal relating to AIM and gave in writing in that behalf to AICTE only on 5[th] July, 2017. It is only thereafter the respondent No.1 could process the proposal of the petitioners to start AIBS, which was so accorded on 21[st] July, 2017 for the academic year 2018-19. The respondents have relied on the exposition in 11 Para 46.6 of the decision in _**Parshvanath Charitable Trust**_ (supra), which reads thus:- _“46.6. If the appellate authority decides the matter prior to 30[th] April of the year concerned and grants approval to a college, then alone such institution will be permitted to be included in the list of colleges to which admissions are to be made and not otherwise. In other words, even if the appellate authority grants approval after 30[th] April, it will not be operative for the current academic year. All colleges which have been granted approval/affiliation by 10[th] or 30[th] April, as the case may be, shall alone be included in the brochure/advertisement/website for the purpose of admission and none thereafter.”_ 7. In the backdrop of the aforementioned facts, it is unfathomable as to how respondent No.1-AICTE can be held responsible for the delay in issuing the Letter of Approval in respect of AIBS for the academic year 2017-18. It is obvious that the petitioners having realised that because of inspection by one EVC, their claim of no deficiency at all will be exposed were advised to withdraw the proposal in respect of another institute (AIM) which shared the same plot of land and common facilities. This deficiency was then removed by the petitioners only in July, 2017, by sending communication 12 dated 5[th] July, 2017 for that purpose. The fact that the petitioners have already made huge investments _per se_ cannot be the basis to overlook the statutory timelines specified for grant of approval, which this Court has authoritatively held to be mandatory and not directory. Any indulgence shown to the petitioners would inevitably affect the larger public interests, as the academic course has already commenced for the current academic year from 1[st] August, 2017 and the last date up to which the students can be admitted against the seats available in any recognised college, is specified as 15[th] August, 2017. 8. The petitioners would contend that the deficiencies noted in the EVC report dated 1[st] July, 2017 were contrary to the finding noted in its previous report dated 10[th] March, 2017 as also of SAC-SC report dated 19[th] April, 2017. The argument though attractive at the first blush deserves to be stated to be rejected. Inasmuch as, the earlier report of EVC and SAC-SC were based on the proposal and documents submitted by the petitioners. Notably, the EVC team which wanted to visit the 13 site for inspection on 25[th] April, 2017 was obstructed from entering the college complex. On 15[th] April, 2017 the SAC-SC had already expressed apprehension about the factual position and had advised one EVC team to visit both the institutes so that the correct position could be ascertained. That became possible only after the direction given by this Court on 22[nd] June, 2017. The common EVC then inspected the site in the presence of the representative of the petitioner No.1- society and submitted its report dated 1[st] July, 2017 mentioning about the two deficiencies noticed during the said inspection namely, another institute of the petitioner No.1- society in the name of AIM was proposed to be run on the same land on which AIBS was situated and a fresh deficiency about the area of the Boys’ Common Room and Girls’ Common Room being less than the required area i.e. 75 sqm. This report must be taken as the final observation of the EVC which is based on inspection of the site. In other words, some noting made in the previous report submitted by EVC and SAC-SC would be of no avail to the petitioners. 14 9. It is next contended that as the deficiencies have since been removed, the AICTE was obliged to grant approval for the academic year 2017-18 as was the intent behind the order passed by this Court on 22[nd] June, 2017. Even this submission does not commend to us. For, on a fair reading of the order dated 22[nd] June, 2017, we find that no direction has been issued to AICTE to grant approval for the academic year 2017-18. Rather, it has been left open to the AICTE to take a fresh decision in accordance with law uninfluenced by the earlier order of rejection. As noted earlier, the deficiencies noticed in the EVC report dated 1[st] July, 2017 stood removed only after the petitioners withdrew their proposal relating to AIM vide letter dated 5[th] July, 2017. Since approval to be accorded by the AICTE was after the cut off date of 30[th] April, 2017 for the academic year 2017-18, it chose to issue approval for starting AIBS institute for the academic year 2018-19. No fault can be found with the AICTE in that regard, as even the order dated 22[nd] June, 2017 expected the AICTE to take a fresh decision in accordance with law. Suffice it to observe that the decision of this Court dated 22[nd] June, 2017 cannot 15 be construed as a direction to AICTE to grant approval in breach of the statutory timelines specified in that behalf. 10. It is next contended by the petitioners that there is no other institute in the entire district of Ashok Nagar, Madhya Pradesh which imparts courses pertaining to Business Studies and therefore grant of approval for starting AIBS for the academic year 2017-18 will be in public interest. This is an argument of desperation. For, the petitioners are responsible for the present situation. In the fact situation of the present case, we are not inclined to show any indulgence to the petitioners especially when the entire admission process has been substantially completed and the academic year has commenced from 1[st] August, 2017. Any indulgence shown to the petitioners would fall foul of the admission schedule for the academic year 2017-18. 11. A priori, in law, the petitioners are not entitled for the relief as claimed in the writ petition. Furthermore, from the facts which have now emerged it is noticed that the petitioners were fully aware of sharing of the same piece of land and some 16 of the common facilities between the two institutes but did not disclose that fact in the original application (proposal). Whereas, the team of officers of EVC who had visited the site for inspection on the earlier occasion were obstructed from entering the building complex, obviously with ulterior design. Realising that the deficiency of two institutes sharing the same plot and some of the common facilities would come in the way of the petitioners, the petitioners have since been advised to withdraw the proposal in respect of AIM. That decision was taken by the petitioners on 1[st] July, 2017, which was communicated to AICTE only on 5[th] July, 2017. It is only after receipt of that communication, the AICTE proceeded on the assumption that the stated deficiency stood removed in respect of AIBS and accorded approval to the said institute on 21[st] July, 2017, but for the academic year 2018-19. Keeping in mind, the aforementioned factual position and in particular the conduct of the petitioners, the question of granting any relief to the petitioners much less by invoking plenary powers of this Court, in exercise of Article 142 of the Constitution of India, to condone or relax the timeline regarding grant of 17 approval and to direct the respondent authorities to treat the approval for the academic year 2017-18 as prayed by the petitioners does not arise. 12. Accordingly, this petition being devoid of merits is dismissed with costs quantified at Rupees Fifty Thousand to be paid to the respondents within four weeks from today. …………………………………….J. **(Dipak Misra)** ....……………………………….J. **(A.M. Khanwilkar)** New Delhi, Dated: August 16, 2017.
End of Judgment Record
Browse All Landmark Cases Judgments
2019-01-22

State of Himachal Pradesh & Anr. v. Pinju Ram & Others; State of Himachal Pradesh & Ors. v. Ganesh Dutt & Anr.

This batch of appeals concerns regularisation and monetary benefits of part‑time employees in Himachal Pradesh who were converted to daily‑wage status. The State had issued a policy on 27 February 2004: part‑time Class‑IV employees who had completed ten years of continuous service as on 31 December 2003 would be made daily wagers with prospective effect, and posts vacated by such employees would stand abolished; Education and Ayurveda were excluded from the policy. Revenue Chowkidars, engaged by Panchayats, were not covered by that policy and received separate treatment. Following writ petitions and an order of the Himachal Pradesh High Court and in light of later developments, the State drew‑up directions in 2011 (22 September) to give seniority to Revenue Chowkidars on the basis of ten years of service, but with wages from the date of actual appointment and without back‑dated monetary benefits; 7 July 2012 further instructions reiterated this stance for remaining part‑time employees, with monetary benefits not guaranteed in the interregnum. The respondents pressed for back wages dating from 1 January 2007 and broader coverage. The Supreme Court held that the 2007 back‑pay direction was unsustainable, clarified that seniority would count from ten years without past benefits, and that the 2011 policy and Moti Singh principle should guide the approach. The appeals are allowed; no costs. The related writ petitions are to be disposed of consistent with these directions.

2018-08-14

Union Bank of India and Others v. C.G. Ajay Babu and Anr.

This is a Supreme Court of India appeal concerning the forfeiture of gratuity under the Payment of Gratuity Act, 1972. The respondent was a branch manager of the appellant bank and was dismissed on 3 June 2004 after disciplinary proceedings. A show-cause notice sought to forfeit gratuity due to misconduct involving moral turpitude, which was ordered on 20 April 2004. The High Court upheld the dismissal but held that gratuity could be paid since there was no financial loss to the bank, and that a bipartite settlement between the bank and employees permitted forfeiture only where misconduct caused financial loss. The Division Bench, however, held that forfeiture under Section 4(6) must be read together with Section 4(5) and that no loss was proven, thus entitling the employee to gratuity in accordance with the bipartite settlement. The Supreme Court agreed with the High Court that forfeiture is not automatic; it is controlled by Sections 4(5) and 4(6) of the Act and by the bipartite settlement, which requires loss to justify forfeiture. The Court emphasized that an act must constitute an offence involving moral turpitude and that conviction is generally required for forfeiture under 4(6)(b)(ii). The appeal is dismissed with no costs.

2018-09-25

Reema Salkan v. Sumer Singh Salkan

This is a Supreme Court of India criminal appeal under the Criminal Appellate Jurisdiction arising from a maintenance dispute under Section 125 Cr.P.C. The parties, married in 2002, had a protracted litigation history. The Family Court granted maintenance to the wife from 17 July 2003 to 8 December 2010, and held no maintenance thereafter. The High Court, in revision, partly allowed the application, directing Rs.9,000 per month from 9 December 2010 onward, while upholding the earlier period’s Rs.10,000 per month. This Court had earlier granted interim maintenance of Rs.20,000 per month in 2014 (Criminal Appeal Nos. 2347-2349 of 2014). The appellant contends there has been no change in circumstances since the interim order and that the respondent’s substantial assets, education, and overseas earnings establish the capacity to pay higher maintenance. The respondent defends the High Court’s reasoning, arguing that the Family Court’s assessment, demeanor observations, and the principle that maintenance should not be perpetual require careful scrutiny, and that the notional minimum wage approach used by the High Court is flawed. The overarching issue is the quantum of monthly maintenance payable to the appellant and whether the interim amount should be augmented beyond the period up to 2010.”

2019-12-03

M/s Embassy Property Developments Pvt. Ltd. v State of Karnataka & Ors.

This judgment concerns three Civil Appeals filed by a Resolution Applicant, the Corporate Debtor (through its Resolution Professional) and the Committee of Creditors, challenging an Interim Order of the Karnataka High Court staying an NCLT order in proceedings under the Insolvency and Bankruptcy Code, 2016. The NCLT Chennai had admitted an application under Section 7 of the IBC against M/s Tiffins Barytes Asbestos & Paints Ltd. and directed a moratorium under Section 14. The Interim Resolution Professional then sought a deemed extension of a mining lease under MMDR Act, 1957 and the Government of Karnataka rejected it. The NCLT, by an order dated 11.12.2018, set aside the Government’s order and directed execution of Supplement Lease Deeds for the period up to 31.03.2020. The Government of Karnataka challenged this in a High Court writ petition, which stayed the impugned NCLT order. The core issues were: (i) whether the High Court may interfere under Article 226/227 with an NCLT order in IBC when an appeal lies to the NCLAT, and (ii) whether fraud can be inquired into by NCLT/NCLAT in CIRP. The Court reiterates that IBC is a complete, umbrella code with a three‑tier mechanism (NCLT, NCLAT, Supreme Court) and that public‑law disputes arising from MMDR Act obligations lie outside IBC. It ultimately holds that while NCLT/NCLAT may inquire into fraud, they cannot adjudicate MMDR‑related public legal disputes; and the High Court’s writ jurisdiction in public‑law contexts remains permissible. The appeals are dismissed.