Case Synopsis & Summary

This is a Constitution of India Article 32 writ petition filed in the Supreme Court by the Okhla Enclave Joint Action Committee and others challenging the allotment process by the coloniser, M/s. Durga Builders (P) Ltd. The petition alleges lack of sincerity in allotment to bookers and seeks a remedial ordering to ensure fair distribution of plots. The matter evolved into a complex housing project involving density norms, plot sizes, and revised land pricing under Haryana government rules. The Court directed the Haryana Town & Country Planning Authority to examine whether existing plots could be subdivided by increasing density, thereby converting larger plots into smaller units in conformity with current sanctioning rules. If increasing density is not feasible, petitioners should be accommodated in the pending scheme awaiting government sanction. Meanwhile, license renewals and their compliance became a central concern, given that licences had lapsed due to conditions not being met. The respondents proposed that those in default due to revised charges could be treated as compliant upon payment of an additional amount, while those who had paid should be recognized as fulfilled. The Court underscored a practical, protectionist approach, directing the Department to pursue density adjustment and the pending scheme, with the coloniser depositing funds and licenses renewed. The petitions were disposed of with no costs, providing a structured blueprint for resolution of the scheme and development issues.

Precedent Explorer

Find Cases Like This

Explore other judgments dealing with similar legal situations, facts, or statutory provisions.

Case Details & Bench

Court
Supreme Court of India
Hon'ble Judges
  • K. Ramaswamy
  • D. P. Wadhwa
Judgment Date
1997-04-07
Court Decision / Holding
The writ petitions were disposed of with no costs. The Court directed the Haryana Town & Country Planning Department to investigate whether density can be increased to reduce plots to smaller sizes within the existing scheme; if not feasible, petitioners would be accommodated in the pending scheme. It was directed that the coloniser’s licences or renewals be granted according to rules, and that the involved parties cooperate to finalize the arrangement within six weeks from the order. Further, the record was opened for scrutiny if needed, and the Department was empowered to take necessary steps to protect the petitioners’ interests.
Final Disposition
Petitions disposed of

Parties to the Case

Appellants / Petitioners

  • Okhla Enclave Joint Action Committee and others

Respondents

  • Union of India
  • M/s Durga Builders (P) Ltd.
  • Haryana Government
  • Haryana Town & Country Planning Authority

Legal Representation & Advocates

Counsels for Petitioners

  • • A. Bali
  • • M. T. George
  • • Attar Singh
  • • Devendra Singh
  • • Balraj Dewan

Counsels for Respondents

  • • A. Bali
  • • M. T. George
  • • Attar Singh
  • • Devendra Singh
  • • Balraj Dewan

Provisions of Law Cited

Article 32, Constitution of India, 1950

Legal Doctrines & Maxims

  • prima facie

Submissions & Arguments

Contentions of Appellants / Petitioners

The applicants argued that the coloniser failed to allot plots to petitioners who booked and paid for them, while some petitioners faced revised charges and density restrictions. They urged the Court to direct allotment either within the existing scheme or within the pending scheme, advocating density enhancement to convert larger plots into smaller, compliant units. They pressed for swift resolution, protection of legitimate expectations, and adherence to government pricing and development charges, with licenses kept in force to facilitate timely allotment and registration.

Contentions of Respondents

The respondents contended that several petitioners have fully paid and some have already been allotted or in possession; issues centered on defaulters due to revised pricing and density adjustments. They proposed treating certain defaults via payment of an additional amount and insisted on adherence to Haryana government rates for development charges and land cost. If density could be increased, allotments would proceed within the existing scheme; otherwise, petitioners could be adjusted in the pending scheme after sanction. Licences and renewals would be granted as per rules, with safeguards to ensure compliance and recoveries.

Legal Doctrine & Issue Explorer

Explore This Legal Issue

Find relevant judgments and authoritative positions on the legal questions discussed here.

Case Applicability Diagnostic

Apply This to My Facts

Share your situation and test whether this judgment governs, supports, or challenges your case.

Official Judgment Record
•2,232 words•~11 min read

In The Court Record

OKHLA ENCLAVE JOINT ACTION COMMITTEE v. UNION OF INDIA AND ORS.

A B # OKHLA ENCLAVE JOINT ACTION COMMITIEE ETC. _v._ UNION OF INDIA AND ORS. APRIL 7, 1997 (K. RAMASWAMY AND D.P. WADHWA, JJ.) _Constitution of India, 1950 Article 32._ _W!it filed by petitioners-Allegation that builder, respondent No. 6, was not sincere in the allotment of plots to petitioners-Counsel for coloniser_ C _directed by Court to look into the matter and assist the Court in solving the problem-Counsel made meticulous analysis of the problem and submitted its repon--lssues to be solved:-Allotmellt of the plots either in the existing scheme or the scheme pending approval with the Haryana Town and Country P/a11ni11g Depanme11t-The Depanment is directed to find out first whether_ D _the increase in density of plots be possible so that petitioners could be adjusted, thereby reduce the plots illto smaller sizes in con/ om1ity with the existing Rules governing the sanction of the scl1eme--l11 case there is any difficulty, the Depanment is free to approach this Coun for necessary orders-In case the density is not increased and thereby the plots cannot be convened i11to smaller plots, it is obvious that the coloniser should allot_ E _11ecessary plots to all of the petitioners in the pending sc11eme--ln the meantime licences held by the Coloniser had lapsed 011 accou11t of non-compliance of the co11ditions-Pe11di11g writ petitions the Coloniser deposited Rs. 3 crores and agreed that the balance amount would be deposited shonly after the disposal of the writ petitio11s-U11der these circumstances, Court directed that_ F _necessa1y licences or renewal thereof should be granted by the appropriate authority according to mies._ CIVIL ORIGINAL JURISDICTION : Writ Petition (C) No. 113 of 1996 Etc. G (Under Article 32 of the Constitution of India.) Jitendra Sharma, Rajeev Dhawan, Arun Jaitley, H.N. Salve, Manu Mridul, Surya Kant, A.K. Sikri, V.K. Rao, Ms. Madhu Sikri, R.S. Diwan, Rajesh Srivastava, H.K. Puri, Ujjwal Banerjee, Prem Malhotra, Puneet H 669 - _-6_ 670 (1997] 3 S.C.R. SUPREME COURT REPORTS A Bali, M.T. George, Attar Singh, Devcndra Singh and Balraj Dewan for the appearing parties. The following Order of the Court was delivered : Applications for impleadment arc allowed. All the applicantsbe B treated as the petitioners. This writ petition came to be filed from time to time under Article 32 of the Constitution of India on the premise that the Coloniser, M/s. Durga Builders (P) Ltd., respondent No. 6 has not been sincer!" iff'allotC ment of the plots to the petitioners who, admittedly, had book<(d their plots with the Coloniser. After the notice was issued and the counters were filed in this Court, we requested Mr. Harish N. Salve, learned senior counsel for the Coloniser, to personally look into the matter and assist this Court in resolving the problem. We deeply appreciate and place on record our D appreciation for the efforts made by Mr. Salve for the commendable job he has done in this behalf. After consulting learned counsel appearing for the parties and also looking into the matter personally, he has stated as under: E "l. Various meetings have been held between the Counsels for the petitioners and the Counsels for the respondents. The situation which emerges appears to be as under : F (i) There are Petitioners who have paid in full and have not committed any default. It is the Respondent's case that due allotments have been made to these people, some of whom have been put in possession also; registrations, etc., are complete. Some of such names are included in the list of Petitioner-however, the respondent insists that these petitioners have been given possession. G (ii) The real bone of contention has been the concept of 'defaulter'. The short payments by the subscribers have arisen on three counts, namely; H (a) Increase in the price of plot with fixation of 'no profit no loss' by government, Haryana Town & Country Planning 671 OKHLA ENCLAVE JOINT ACTION COMMITfEE _v._ U .0.1. A Authority. (b) Increase in the amount payable per plot due to readjustment in the size of the plot (originally proposed size of plots was revised 100 sq. yd. to 121 sq. yd. and 200 sq. yd. to 239 sq. yds.) as sanctioned by the Government of Haryana. B (c) General non payment. 2. There does not appear to be any major dispute as to the identity of Petitioners who have made full payment. As regards the petitioners who have refused to pay the revised rates fixed C by the Government of Haryana, the respondent had given an offer that payment of a sum of Rs. 550 (over and above the originally agreed cost of land) would be treated as proper payment if paid on or before 15.9.1995. It is the _Respondent's_ case that all petitioners who have paid the due amount have been treated as having made full payment and not in default and, D therefore, given due allotments. 3. It is the case of some of the Petitioners that they were not given proper advice notice about either the revised demand charges, the basis of the demand, or the revised cost of land (due to increase E in land area) and it is for that reason that they did not make payment. The Respondent claims that notices have been sent to each and every petitioner. 4. It is conceivable that there being large number of Petitioner some of them, transferees, who names may or may not be on the record at the appropriate time, the notices were sent but not received. It is extremely difficult to believe or disbelieve either of the parties on this score. The respondent have mailed copies of letters/some of these Petitioners deny receiving the same. F G 5. It was, therefore, suggested to the respondent that one way of resolving this problem is all those who are defaulters on account on non payment of developmental charges or payment for difference in area of land could be treated more or less on H 672 [1997) 3 S.C.R. SUPREME COURT REPORTS A B c D par with their making some additional payment. The respondents are, by and large, agreeable to this proposal provided the following can be safeguarded; (a) The actual amount payable should now be paid at the rates fixed by the H aryana Government. The respondent has suffered a loss because they have had to pay the entire amount to the Government, without petitioners making the due payment. It is not the case that the respondent have pocketed the money and not paid. The situation is converse. The allotment of the plots would be made upon grant of section of the pending scheme (The Respondent has applied for sanction of the scheme to the Haryana Town & Country Planning Authority for an area which is more enough the land is in possession of the Respondent and is the property of the Respondent). The only problem in the allotment is the clearance of the scheme by the Haryana Government on account of an order imposing a bar on construction within _5_ km from Surajkund area. Now the bar has been reduced to one Km. Therefore, this land is clear as far as this Hon'ble Court is concerned. However, some additional safeguards have been provided. E F G H > (b) In the existing sanctioned scheme, there are a large number of plots available but they are of considerably larger size. The Respondent has already allotted smaller plots - larger plots are unsold and in possession of the Respondent. The small plots have been allotted to the booking holders and partly given under the commitment to the EWS Scheme. 6 Since the Petitioners are insisting for allotment in the present sanctioned scheme, suggestion had been made that a joint application be made by the Respondent and the present petitioners to the Haryana Town and Country Planning Authority to consider our request for reduction in the area of the plot by suitable increasing the density norms. 7. In other words, the petition is that the land is available - the )- ) 673 OKHLA ENCLAVE JOINT ACTION COMMITIBE _v._ U.O.I. _I_ Respondent is willing to make over the land at the originally A promised price (although the prices have gone up considerably) on payment of the additional actual amount demanded by the Government. However, the exact possession of the plot would only be given on clearance of the scheme by the Haryana Town & Country Planning Authority. B 6. To sum up, the position is as under : (i) It is the _Respondent's_ case that there is adequate land in its possession. The Respondent is also willing to abide by the Original price of land together '.1-ith such developmental char- C ges as are allowed to it by the Government of Haryana. (ii) the actual possession of the land can be given only on the grant of approval for the revision of density norms by the Haryana Town and Country Planning Authority. D (iii) The respondent, in any way, is committed· to its original offer to return the money together with interest as this Court may consider just and proper." • E .. A reading of the above would clearly indicate how meticulous analysis of the problem. Two broad issues remain to be solved. Firstly, allotment of the plots either in the existing scheme or the scheme pending approval with the Haryana Town and Country Planning Department, respondent No. 5 (for short the 'Department'). A suggestion came F that if the Department agre·es to increase the density o( the area and thereby existing plots are converted into smaller plots, all the petitioners in these writ petitions could be accommodated in the existing scheme. In case the said authority finds it difficult to reduce the plot area, in the scheme pending approval, the petitioners could be adjusted therein. In that behalf, we find that there is no intractable difficulty in sorting out G the problem. The Department is directed to find out first, whether the increase in density of plots be possible, thereby reduce the plots into smaller sizes in conformity with the existing Rules governing the sanction of the scheme. In case there is any difficult, the Department is free to approach this Court for necessary orders. H F H 674 SUPREME COURT REPORTS (1997] 3 S.C.R. A In case there is any intractable difficulty in adjustment of the same, on necessary sanction being granted to the pending scheme, all the petitioners should be adjusted in the pending scheme. The next area of controversy pertains to the cost of the land. It is B seen that the Government of Haryana has decided the pay charges for internal development and external development. As far as cost of the land is concerned, the Coloniser has agreed to abide by the rate which it had contracted for, namely, Rs. 100 to Rs. 200 per square yard depending upon the size of the plots. As far as the development charges are conerned they are now governed by the orders of the Department. As regards internal C development, the Government has fixed Rs. 878 for the plots of the size, between 135 sq. yards to 170 sq. yards and Rs. 975 for the plots of 171 to 220 sq. yards. Practically, there may not be any difficulty in this behalf for the reason that the matter could be easily verified from the record of the appropriate Department of the Haryana Government. A letter has been D placed before us in this behalf. _Prima f acie,_ we proceed on the terms of the said letter. If there is any difference, it can be sorted out with reference to undisputed record of the Government. As regards external developments, it is worked out at Rs. 4.7 lakhs per acre that would be borne obviously by the allottees. E Mr. Dhawan, learned senior counsel, has pointed out that licences hdd by the Coloniser had lapsed on account of non-compliance of the conditions. Mr. Salve, learned senior counsel, has brought to our notice that pending writ petitions the Colloniser has already deposited Rs. 3 F crores and the balance amount would be deposited shortly after the disposal of the writ petitions. Under these circumstances, the necessary licences or renewal thereof would be granted by the appropriate authority according to rules. Thereafter, the above exercise would be done. This would be done within a period of six weeks from the date of receipt of this order. G It is then brought to our notice that in case the density is not increased and thereby the plots cannot be converted into smaller plots, it is obvious that the coloniser should allot necessary plots to all of the petitioners in the pending scheme. Mr. Salve, learned senior counsel, has H suggested that the record of the coloniser is open to scrutiny and in case 675 OKHLAENCLAVE.TOINT ACTIONCOMMITTEEv. U.O.L the petitioners have feeling that the coloniser is avoiding allotment of the A plots, the 4th respondent is at liberty to look into the matter and it can directly allot the plots to the allottees whose list will be supplied by the Coloniser to it With this fair stand taken by the Coloniser, we _plima facie_ accept it to be justified. Parties are at liberty to approach this Court in case of any difficulty for further directions. B- In that view of the matter, the writ petitions are disposed of. No costs. T.N.A. Petitions disposed of.
End of Judgment Record
Browse All Supreme Court of India (1997) Decisions
1997-12-17

Sharad Vasant Kotak and Ors. v. Ramniklal Mohanlal Chawda and Anr.

This Supreme Court judgment concerns the maintainability of a suit for dissolution of partnership and accounts under the Indian Partnership Act, 1932, as amended by the Maharashtra Amendment of 1984 (Section 69(2A)). The Paramount Builders partnership, registered in 1980 with seven partners (Kotak family and Chawda family), underwent changes after the death of partner Mohanlal Chawda in 1986, when his widow was inducted as a partner. A series of deeds (1986, 1992) reconstituted the firm without informing the Registrar of Firms, raising questions about registration and the applicability of Section 69(2A), which restricts suits to registered firms where the suing partner is shown in the Register of Firms. The Bombay High Court Division Bench held that reconstitution does not cancel registration and that amendments to pleadings were permissible; it concluded that Section 69(2A) does not bar the suit. The appellants argued that induction of a new partner dissolves the old firm and requires a fresh registration, while the respondents contended that dissolution and reconstitution are distinct concepts and that registration continues despite changes. The Supreme Court ultimately held that the firm was merely reconstituted, not dissolved; non‑compliance with registration provisions may attract penalties, but does not erase registration. The Special Leave Appeal was dismissed, with no costs.

1997-11-18

National Insurance Co. Ltd. v. Santro Devi and Ors.

National Insurance Co. Ltd. v. Santro Devi deals with a motor-accident compensation claim under the Motor Vehicles Act. A Tribunal found that the offending vehicle was driven by a person who held a valid driving licence, which had been renewed on the date of the accident, and the claimants were accordingly awarded compensation. The Punjab and Haryana High Court affirmed this finding on appeal but then referred the matter to a full Bench to decide a legal question: whether a forged or fake licence, if renewed, would be treated as a valid licence for purposes of liability. The full Bench answered that a forged licence would not become valid under the Motor Vehicles Act and that an insured, bonafide believing in the licence’s validity, would still incur liability toward third parties under the policy; several related conclusions regarding insurer liability were laid down. The Insurance Company challenged these High Court observations. The Supreme Court allowed the appeal in part, holding that the claimants were rightly granted compensation on the facts, and that the High Court’s observations on forged licences were obiter and not binding precedents since there was concurrent factual finding that the driver held a valid licence renewed on the date of the accident. The Court affirmed the substantive order and dismissed the related Special Leave Petition.

1997-02-03

JAIPUR DEVELOPMENT AUTHORITY v. SITA RAM AND ORS.

This appeal concerns the validity of notifications under Section 52 of the Rajasthan Urban Improvement Act, 1959, by which the Jaipur Development Authority sought to continue land acquisition even after the repeal of the 1959 Act, and after a fresh notification was issued in 1984 under the Jaipur Development Authority Act. The Rajasthan High Court had held that unless the master plan scheme under the JDA Act had been properly framed, the notification issued under Section 52 was not valid in law. The appellants challenge this proposition, contending that framing of a scheme is not a mandatory pre-condition for acquisition and that the 1984 notification cannot be quashed solely for lack of a sanctioned scheme. The matter traces several precedents: Pratap v. State of Rajasthan; State of Tamil Nadu v. Mohd. Yousef; Narain v. State of Rajasthan; and Urban Improvement Trust v. State of Rajasthan. The decision ultimately clarifies that framing of a scheme is not a required pre-condition for land acquisition; overruled or distinguished interpretations in earlier decisions, especially Tamil Nadu Yousef, Krishnan’s later formulation and Narain’s approach. The Court endorses the view that the notification for acquisition cannot be invalidated on account of non-framing of a scheme, and thus allows the appeals, setting aside the High Court’s judgment and dismissing the writ petitions, with no costs to either side.

1997-07-07

Delhi Administration (Now Govt. of N.C.T. Delhi) through the Chief Secretary, Delhi and Ors. v. Nand Lal Pant and Anr.

Delhi Administration v. Nand Lal Pant concerns the scope of promotion from the cadre of Trained Graduate Teachers (TGT) to Post-Graduate Teachers (Sanskrit) in the Delhi education cadre, and the remedy when a sanctioned channel does not exist. Pant, appointed as a TGT in 1974 and confirmed, was asked to officiate in the PGT (Sanskrit) post when it became vacant after the retirement of S.N. Sastri, a Sanskrit-qualified officer. He repeatedly sought promotion to the PGT position, which the Delhi High Court granted in 1996, directing promotion with effect from 1986 and ordering payment of consequential benefits. The Delhi Administration appealed on the ground that there was no direct promotional channel from TGT (General) to PGT (Sanskrit), and that the SC caste reservation for the post should be respected. The Supreme Court accepted that there is no direct channel, but noted Pant’s extended officiation in the PGT post since 1986. It held that justice required a workable remedy: creation of a supernumerary PGT (Sanskrit) post in any school or directorate, allowing Pant to continue there until retirement, with pay from the date of creation. The decision clarifies it as a discretionary remedy and not a general precedent, and it disposed of the appeal with no costs.