Supreme Court of IndiaSupreme Court · 2019Division BenchAppeal partly allowed.

Ningappa Thotappa Angadi (Dead) through LRs. v. Special Land Acquisition Officer and Anr.

Case / Petition Number:
Civil Appeal No. 9415 of 2019
Neutral Citation:[2019] 15 S.C.R. 37

Case Synopsis & Summary

This Supreme Court judgment concerns the enhancement of compensation under the Land Acquisition Act, 1894 for land acquired in Yellapur Village, Hubli Taluka, for the Hubli–Ankola Broad Gauge Railway Line. The Land Acquisition Officer fixed the market value at Rs. 7,500 per gunta; the Reference Court then enhanced to Rs. 25,000 per gunta (Rs. 10,00,000 per acre). The Karnataka High Court subsequently reduced the award to Rs. 5,10,000 per acre, applying depreciation and drawing on earlier example awards. Several landowners filed Special Leave Petitions; in 2016, this Court in Ningappa Thotappa Angadi v. Special Land Acquisition Officer & Anr. restored the Reference Court’s Rs. 10,00,000 per acre award for those similarly situated. The present appellant, who delayed filing by 2928 days, sought parity with those landowners but faced the issue of interest on enhanced amounts for the delayed period. The Court condoned the delay, held that similarly placed claimants are entitled to parity, and set aside the High Court’s order, restoring the Reference Court award. However, relief is limited to parity, with no interest on enhanced compensation or statutory amounts for the delay period. The decision relies on several precedents emphasizing liberal handling of delays and parity among identically situated claimants.

Precedent Explorer

Find Cases Like This

Explore other judgments dealing with similar legal situations, facts, or statutory provisions.

Case Details & Bench

Court
Supreme Court of India
Hon'ble Judges
  • S. A. Bobde
  • B. R. Gavai
  • Surya Kant
Judgment Date
2019-12-13
Court Decision / Holding
Appeal partly allowed. The impugned High Court order dated 24.11.2008 in MFA No. 3274/2007 is set aside; the Reference Court’s award restoring Rs 10,00,000 per acre is reinstated for the appellant-claimants. However, the appellant-claimants shall not be entitled to any interest on the enhanced compensation and statutory amount for the period of delay of 2928 days in filing the appeal.
Final Disposition
Appeal partly allowed.

Parties to the Case

Appellants / Petitioners

  • Ningappa Thotappa Angadi (Dead) through LRs.

Respondents

  • Special Land Acquisition Officer, Hubli-Ankola
  • Anr.

Legal Representation & Advocates

Counsels for Petitioners

  • • S. N. Bhat
  • • V. N. Raghupathy
  • • Mahindarpal Gupta
  • • Prakash Jadhav

Counsels for Respondents

  • • S. N. Bhat
  • • V. N. Raghupathy
  • • Mahindarpal Gupta
  • • Prakash Jadhav

Provisions of Law Cited

Land Acquisition Act, 1894 - s.4(1)Land Acquisition Act, 1894 - s.6(1)Land Acquisition Act, 1894 - s.17(1)Land Acquisition Act, 1894 - s.17(4)Land Acquisition Act, 1894 - s.18

Legal Doctrines & Maxims

  • Equities can be balanced by denying the appellants’ interest for the period for which they did not approach the Court.
  • A liberal approach should be adopted in condoning delays in Special Leave Petitions.
  • Identically situated claimants should be treated alike; parity in compensation should be extended where appropriate.
  • Delay should not defeat substantive rights to just and fair compensation.

Submissions & Arguments

Contentions of Appellants / Petitioners

The appellants contend they are identically situated with other landowners who received Rs 10,00,000 per acre following the 11 November 2016 Supreme Court judgment in CA No. 2927/2010, and seek parity by restoring the Reference Court’s award. They urge that the delay in filing be condoned and that they should not be penalized with denial of parity or interest for the period of delay. They rely on prior precedents, especially the liberal approach to delays in SLPs and the principle that parity should be afforded to similarly situated claimants.

Contentions of Respondents

The respondents defend the High Court’s reduction of compensation as justified by depreciation and the dry-land characterization; they argue that not all claimants are identically situated and that parity should not override established distinctions. They stress that relief should not entail interest for the period of delay and that the High Court properly balanced equities in light of comparable awards and earlier practice.

Legal Doctrine & Issue Explorer

Explore This Legal Issue

Find relevant judgments and authoritative positions on the legal questions discussed here.

Cited Precedents (4)

Case NameCitationTreatmentExplanation
Dhiraj Singh (Dead) through LRs. and Others v. State of Haryana and Others(2014) 14 SCC 127PositiveCited to support parity for identically situated claimants and the liberal handling of delays in filing SLPs.
Imrat Lal & Ors. v. Land Acquisition Collector & Ors.(2014) 14 SCC 133PositiveCited to endorse liberal approach toward delays in SLPs and to prevent denial of just compensation because of procedural delays.
Huchanagouda v. Assistant Commissioner and Land Acquisition Officer(2019) SCC Online SC 990PositiveCited for condoning delay and extending parity, with guidance on not denying relief due to delay.
Ningappa Thotappa Angadi v. Special Land Acquisition Officer & Anr.Civil Appeal No. 2927/2010PositivePrecedent where this Court restored the Reference Court’s enhanced compensation, guiding the present case on parity with similarly placed claimants.
Case Applicability Diagnostic

Apply This to My Facts

Share your situation and test whether this judgment governs, supports, or challenges your case.

Official Judgment Record
•2,101 words•~10 min read

In The Court Record

Ningappa Thotappa Angadi (Dead) through LRs. v. Special Land Acquisition Officer and Anr.

[2019] 15 S.C.R. 37 37 NINGAPPA THOTAPPA ANGADI (DEAD) THROUGH LRS. A v. THE SPECIAL LAND ACQUISITION OFFICER AND ANOTHER (Civil Appeal No. 9415 of 2019) B ## DECEMBER 13, 2019 ## **[S. A. BOBDE, CJI, B. R. GAVAI AND SURYA KANT, JJ.]** _Land Acquisition Act, 1894 – ss.4(1), 6(1), 17(1), (4) & 18 – Long delay in filing SLP – Grant of enhanced compensation as granted in the case of other land owners, under the same acquisition, who appealed against the impugned judgment expeditiously – If permissible – Land situated in Yellapur Village, Hubli Taluka acquired for construction of Hubli Ankola Broad Gauge Railway Line – Land Acquisition Officer fixed the market value at the rate of Rs.7,500/- per gunta – Aggrieved, the appellant(s) and other similarly placed persons sought reference –Reference Court by common order enhanced the compensation to Rs 25,000/- per gunta (Rs.10,00,000/- per acre) – High Court in appeals by the Land Acquisition Officer, modified the award passed by Reference Court and reduced the compensation to Rs.5,10,000/- per acre – Some of the affected land owners filed Special Leave Petition(s) and Supreme Court vide judgment dtd. 11.11.16 passed in Civil Appeal No.2927/ 2010 allowed their appeals restoring the compensation of Rs.10,00,000/- per acre in their case, as awarded by the Reference Court – Present appellant(s) who was/were also aggrieved by the impugned judgment of the High Court did not file the appeal along with other similarly situated land owners – Present appeal filed with delay of 2928 days – Held: Delay condoned – It is undeniable that Supreme Court vide judgment dtd. 11.11.16 passed in C.A. No.2927/2010_ (Ningappa Thotappa Angadi v. Special Land Acquisition Officer & Anr.) _set aside the order of the High Court and restored the compensation awarded by the Reference Court – Appellant(s) are also similarly placed claimants and thus, entitled to seek parity and claim the same amount of fair and just compensation as awarded to other land owners – However, the appellant(s) are not entitled to any interest on the enhanced compensation and statutory amount_ C D E F G H 37 38 SUPREME COURT REPORTS [2019] 15 S.C.R. - A _for the period of delay of 2928 days in filing the appeal – Impugned order passed by the High Court, set aside – Award passed by the Reference Court, restored – Equity._ ## **Partly allowing the appeal, the Court** - **HELD: It is undeniable that Supreme Court vide judgment** - B **dtd. 11.11.16 passed in C.A. No.2927/2010 (Ningappa Thotappa Angadi v. Special Land Acquisition Officer & Anr.) has set aside the order of the High Court and restored the compensation awarded by the Reference Court. The appellant(s) are also similarly placed claimants. They are, thus, entitled to seek parity** - C **and claim the same amount of fair and just compensation as has been awarded to other land owners. The appellant(s) are, however, not entitled to seek interest for the period for which they did not approach this Court. The impugned order passed by the High Court dated 24.11.2008 in M.F.A. No. 3274/2007 is set aside and the award passed in favour of the appellant-claimant(s) by the** - D **Reference Court is restored. However, the appellant-claimant(s) shall not be entitled to any interest on the enhanced compensation and statutory amount for the period of delay of 2928 days in filing the appeal. [Paras 10-12][41-F; 42-B-D]** _Dhiraj Singh (Dead) through LRs. and Others v. State_ E _of Haryana and Others_ **(2014) 14 SCC 127;** _Imrat Lal & Ors. v. Land Acquisition Collector & Ors._ **(2014) 14 SCC 133;** _Huchanagouda v. Assistant Commissioner and Land Acquisition Officer_ **2019 SCC Online SC 990** _**–**_ **relied on.** - F **Case Law Reference** |**(2014)**|**14**|**SCC**|**127**|**relied on**|**Para**|**8**| |---|---|---|---|---|---|---| |**(2014)**|**14**|**SCC**|**133**|**relied on**|**Para**|**9**| CIVIL APPELLATE JURISDICTION: Civil Appeal No. 9415 G of 2019. From the Judgment and Order dated 24.11.2008 of the High Court of Karnataka, Circuit Bench at Dharwad in M.F.A. No. 3274 of 2007. S. N. Bhat, V. N. Raghupathy, Mahindarpal Gupta, Prakash Jadhav, Advs. for the appearing parties. H NINGAPPA THOTAPPA ANGADI (DEAD) THR. LRS. v. SPECIAL LAND ACQUISITION OFFICER AND ANR. 39 The following Judgment of the Court was delivered : A ## **JUDGMENT** 1. Delay condoned. Leave granted. 2. The instant appeal is directed against the order dated 24.11.2008 passed by High Court of Karnataka, Circuit Bench at Dharwad in M.F.A No. 3274 of 2007 whereby the appeal filed by Special Land Acquisition Officer, Hubli-Ankola against the award of the Reference Court was allowed and the compensation for acquiring appellant’s land was reduced from Rs.10,00,000 per acre to Rs 5,10,000/- per acre. 3. The facts giving rise to the present controversy may be breifly noted. The Special Land Acquisition Officer, Hubli, Ankola issued Notification No. HB-LAW CR: 1/2002-2003 dated 18.4.2002 under Section 17(4) and 4(1) of Land Acquisition Act, 1894 for acquiring land situated in Yellapur Village, Hubli Taluka for the purpose of construction of Hubli Ankola Broad Gauge Railway Line with a further direction restraining the affected land owners from alienating or creating charge over the said land. A final notification under Section 17(1) and 6(1) of the Act was issued on 19.10.2002 for acquiring the said land. Subsequently, Land Acquisition Officer passed an award on 17.3.2003 with respect to the acquired land and fixed the market value at the rate of Rs.7,500/- per gunta. Aggrieved by the Land Acquisition Officer’s award, the appellant(s) and other similarly placed persons sought refence under Section 18 of the 1894 Act seeking enhancement of compensation. The Reference Court-cum-Principal Civil Judge, Hubli passed a common order on 12.10.2006 and relying upon an earlier award of its own in LAC No.44/2004 in which compensation of Rs 25,000/- per gunta had been awarded, coupled with the fact that the acquired land in the present case and the land in LAC No. 44/2004 are located in adjoining villages and in close proximity of Hubli City, the Reference Court enhanced the compensation to Rs 25,000/- per gunta (Rs 10,00,000/- per acre). 4. Aggrieved by the afore-stated enhancement, the Land Acquisition Officer preferred appeals before the High Court of Karnataka contending that the acquired land was actually ‘dry land’ and that some other modes for determining its current market value should also have been applied. On the other hand, the claimants—affected land owners filed cross-objections seeking enhancement of compensation to Rs 26,000/- per gunta. The High Court of Karnataka vide impugned judgment dated 24.11.2008 allowed appeals filed by the Land Acquisition B C D E F G H 40 SUPREME COURT REPORTS [2019] 15 S.C.R. - A Officer. The High Court observed that the same Land Acquisition Officer had acquired some other land vide preliminary notification dated 13.05.2005 for the same public purpose and claimants/land owners in those proceedings entered into an agreement and a consent award was passed granting Rs 6,00,000/- per acre. Having noted the exampler, the High Court held that lands of the present claimants which were acquired - B 3 years prior to 13.05.2005, could not be granted compensation of Rs 26,000 per guntas. Consequently, the High Court applied the principle of annual depreciation @ 15% and modified the award passed by Reference Court and reduced the compensation to Rs. 5,10,000/- per acre. 5. Some of the affected land owners filed Special Leave Petition(s) C and this Court vide judgement dated 11.11.2016 passed in Civil Appeal No. 2927/2010 allowed their appeal and set aside the judgment of the High Court insofar as the appellant(s) in the said case were concerned and restored the compensation of Rs 10,00,000/- per acre as awarded by the Reference Court. - D 6. The present appellant(s) who was/were also aggrieved by the impugned judgment of Karnataka High Court did not file the appeal along with other similarly situated land owners. He has come to this Court after a considerable long period seeking parity with the other exappropriated land owners and craves for restoration of the E compensation as was awarded by the Reference Court. The short question which, thus, falls for consideration is whether the appellant(s) whose predecessor-in-interest did not assail the High Court order in respect of the land which is subject matter of this appeal as expeditiously as the other land owners under the same acquisition, be allowed to get the same compensation despite a delay of 2928 days and if so, whether F they are entitled to seek interest as well? 7. We have heard the learned counsel for the parties and perused the record. 8. We find that the issue raised in this appeal is no longer res- G integra. This Court in _**Dhiraj Singh (Dead) through LRs. and Others v. State of Haryana and Others[1]**_ held that: “14. The appellants are identically situated and there is no reason to meet out a different treatment to them. We also note that, while in these cases, the High Court had refused to condone the delay - H 1 (2014) 14 SCC 127 NINGAPPA THOTAPPA ANGADI (DEAD) THR. LRS. v. SPECIAL LAND ACQUISITION OFFICER AND ANR. 41 and dismissed the LPAs of the appellants, other LPAs were A allowed by the High Court itself by condoning the delay of the same magnitude in the same circumstances. 15. Equities can be balanced by denying the appellants’ interest for the period for which they did not approach the Court. The substantive rights of the appellants should not be allowed to be defeated on technical grounds by taking hypertechnical view of self-imposed limitations. In the matter of compensation for land acquisition, we are of the view that approach of the Court has to be pragmatic and not pedantic. B [Emphasis applied] C 9. The afore-cited view has been consistently followed by this Court in a series of cases before and after the decision in _**Dhiraj Singh’s (dead)**_ case (supra). In _**Imrat Lal & Ors. v. Land Acquisition Collector & Ors.[2] ,**_ it was observed that the delay in filing the Special Leave Petition cannot be the reason to deny just and fair compensation to the claimants. This Court observed that a liberal approach should be adopted in such like matters. In _**Huchanagouda v. Assistant Commissioner and Land Acquisition Officer[3]**_ also this Court condoned the delay and restored parity in the matter of grant of compensation though with a condition “that for the period of delay in filing and in refiling the Special Leave Petitions, the appellant-claimant(s) shall not be entitled to any interest on the enhanced compenation and statutory amount.” 10. It is undeniable that this Court vide judgment dated November 11, 2016 passed in C.A. No. 2927/2010 ( _Ningappa Thotappa Angadi v. Special Land Acquisition Officer & Anr._ ) has set aside the order of the High Court and restored the compensation as was awarded by the Reference Court. In the cited case, this Court held as follows: “We have heard the learned counsel for the parties to some length and carefully perused the material on record. We are of the considered opinion that the impugned judgment and order of the High Court deserves to be set aside and judgment and order passed by the Reference Court restored. We say so because, this Court has in a similar appeal directed against the very same order set aside the impugned judgment and restored the enhancement D E F G > 2 (2014) 14 SCC 133 > 3 (2019) SCC Online SC 990 H 42 SUPREME COURT REPORTS [2019] 15 S.C.R. A granted by the Reference Court. We see no reason to take a different view in the present case. We, accordingly, allow this appeal and while setting aside the impugned judgment insofar as the same relates to the appellant, restore the judgment and order passed by the Reference Court. The parties shall, however, bear their own costs.” B 11. The appellant(s) are also similarly placed claimants. They are, thus, entitled to seek parity and claim the same amount of fair and just compensation as has been awarded to other land owners. The appellant(s) are, however, not entitled to seek interest for the period for which they did not approach this Court. C 12. For the reasons aforestated, the appeal is allowed in part, the impugned order passed by the High Court dated 24.11.2008 in M.F.A. No. 3274/2007 is set aside and the award passed in favour of the appellant-claimant(s) by the Reference Court is restored. However, the appellant-claimant(s) shall not be entitled to any interest on the enhanced D compensation and statutory amount for the period of delay of 2928 days in filing the appeal. Ordered accordingly. Divya Pandey Appeal partly allowed. E F G H
End of Judgment Record
Browse All Supreme Court of India (2019) Decisions
2019-09-03

Uber India Systems Pvt. Ltd. v. Competition Commission of India & Ors.

Uber India Systems Pvt. Ltd. v. Competition Commission of India & Ors. concerns allegations that Uber, in its ride‑hailing network, abused a dominant position under the Competition Act, 2002. The case arose on appeals challenging the Competition Appellate Tribunal’s order in Appeal No. 31 of 2016, which upheld the Director General’s inquiry into whether Uber’s pricing and incentive practices violated Section 4. The Supreme Court analysed whether the information before it sufficed to constitute a prima facie case under Section 26(1) and whether there was abuse of a dominant position in the National Capital Region. It focused on the two ingredients for abuse: the existence of a dominant position and its misuse. The court considered, based on a statement summarizing driver incentives and a period when Uber reportedly paid high incentives to fleet owners, that Uber may have pursued a pricing strategy that would affect its competitors. Under Section 4(2)(a), abuse includes an unfair price, including predatory pricing. The Court accepted that there is a prima facie case for infringement, yet did not itself interfere with the Appellate Tribunal’s order and dismissed the appeals. It directed the Director General to complete the investigation within six months from today.

2019-07-19

STATE OF BIHAR & ORS. v. DR. CHAITRAYA KUMAR SINGH & ORS.

This civil appeal concerns the reorganization of the erstwhile Bihar into Bihar and Jharkhand in 2000 and the post-allocation transfer of an employee. The first respondent, Dr. Chaitraya Kumar Singh, was initially allocated to Jharkhand in 2007 as an Ayurvedic Medical Officer and, following Union guidelines permitting transfer after final allocations, was re-allocated to Bihar on 6 September 2010 with mutual consent of both States. Bihar issued formal orders, and the respondent joined Jharkhand in 2007; however, he remained in Jharkhand and continued to work there until his retirement on 30 April 2017. A few days before retirement, he filed a writ petition in Jharkhand seeking relief to join Bihar and to be relieved by Jharkhand so that Bihar could accept joining. The Jharkhand High Court confirmed a Single Judge’s order directing Bihar to absorb him. The appellants contend that after the 2010 allocation there was no vacancy, the respondent did not pursue available remedies promptly, and seven years of service in Jharkhand after allocation render absorption in Bihar inappropriate. The Court agrees, noting the allocation to Bihar continued to hold and the petitioner failed to pursue remedies in time; his superannuation in Jharkhand eliminates the basis for absorption. The relieving order issued post-retirement is irrelevant. The appeal is allowed, the High Court’s order set aside, and there shall be no costs; pending applications are disposed.

2019-01-07

PUNJAB FINANCIAL CORPORATION v. M/S PAULBRO LEATHERS PVT. LTD.

Punjab Financial Corporation (lender) filed against Paulbro Leathers Pvt. Ltd. after Paulbro defaulted on a loan. The dispute was settled under the Corporation’s One Time Settlement (OTS) policy on 01.04.2003, and a court-ordered reference to a Chartered Accountant (CA) was made to determine the remaining outstanding balance. After the CA submitted his report, a new dispute arose about the precise liability and how much had been paid, prompting the Corporation to issue a demand for Rs. 49,86,713 which Paulbro disputed in a writ petition before the Punjab and Haryana High Court. The High Court allowed the petition on the ground that the entire exercise had been carried out with consent and no objection had been raised, effectively barring re-opening of the settlement. The appellant challenged these rulings in this Court. The Supreme Court held that the settlement created a fresh dispute arising out of its terms and that the matter must be decided on its merits under the law. It emphasized that the High Court should record how and on what basis Paulbro satisfied the settlement and discharged liability, and if needed, refer the report to another CA. The Court remanded the case to the High Court to decide the writ petition afresh on merits, with a directions to decide expeditiously (preferably within six months).

2019-12-06

RAJESH KUMAR DWIVEDI v. STATE OF U.P. & ANR.

Rajesh Kumar Dwivedi challenges the rejection of his candidature for the post of Instructor in Fitter at Government Industrial Training Institutes in Uttar Pradesh. An advertisement of 17 March 2008 required candidates to possess a certificate in the respective trade from the NCVT, in addition to experience. Dwivedi possessed three National Trade Certificates from Model Industrial Training Institute, Haldwani (one-year basic training in Mechanical, six-month Fitter General module, six-month Metrology and Engineering Inspection), but did not hold a two-year NCVT certificate. The High Court had dismissed his writ petition, holding that three separate courses could not be treated as equivalent to the NCVT qualification. Dwivedi relied on (i) the 16 December 1983 circular clarifying equivalence between the Restructured and Conventional patterns of the Craftsmen Training Scheme, and (ii) 1988 and 1992 UP circulars recognizing MITI, Haldwani training as equivalent to NCVT, including a two-year Fitter trade certificate. The State argued that the amended UP ITI Rules require NCVT certification and that the reliance on circulars cannot override the Rules. The Supreme Court held that the eligibility condition is to have a certificate in the respective trade from NCVT, and that if the State had earlier treated certain qualifications as equivalent through its circulars, such equivalence cannot be disregarded. Consequently, the appellant’s candidature could not be validly rejected, and the State was directed to appoint him within two months. The decision underscores how State-issued equivalence can complement or override rigid Rule-based qualifications when consistently recognized.