New Okhla Industrial Development Authority v Omvir Singh & Ors

Case / Petition Number:
Civil Appeal No. 9085 of 2022 (Special Leave Petition (C) No. 9558 of 2020, Diary No. 16450 of 2020)

Case Synopsis & Summary

This is a Civil Appeal arising from a land-acquisition dispute where NOIDA challenged a High Court order that enhanced compensation payable to landowners for land acquired in 1982 for NOIDA/Ghaziabad development. The reference court had fixed compensation at Rs. 30,000 per bigha; the High Court, after condoning a substantial delay (about 16 years) in filing the First Appeal, increased compensation to Rs. 297 per sq yard but denied interest on the period of delay. NOIDA contends that entertaining the appeal after decades was improper and that the 297 per sq yard award is unsupported by later jurisprudence. The landowners support the High Court’s enhancement as just, citing similar awards in nearby villages. The Supreme Court, while acknowledging the delay and the need for just compensation, relies on subsequent decisions on compensation for acquisitions in the same era to hold that the Rs. 297 per sq yard rate cannot be sustained for the 1982 acquisition. Following Asha Ram (2022) 2 SCC 567 and UP Awas Avam Vikas Parishad guidelines, the Court determines that Rs. 120 per sq yard is the appropriate rate for this case, with statutory benefits but not interest on the enhanced amount during the delay. The appeal is allowed to this extent.

Precedent Explorer

Find Cases Like This

Explore other judgments dealing with similar legal situations, facts, or statutory provisions.

Case Details & Bench

Court
Landmark Cases
Hon'ble Judges
  • M. R. Shah
  • Hima Kohli
Judgment Date
2022-12-15
Court Decision / Holding
Appeal allowed in part. The High Court’s enhancement to Rs.297 per sq yard is set aside; the compensation is fixed at Rs.120 per sq yard with all statutory benefits and interest allowable under the Act, except interest on the enhanced amount for the delayed period from the date of rejection of the review petition till filing of the first appeal. No costs.
Final Disposition
Appeal partly allowed; compensation reduced to Rs.120 per sq yard with statutory benefits; no interest on the enhanced amount for the delay; No costs.

Parties to the Case

Appellants / Petitioners

  • New Okhla Industrial Development Authority

Respondents

  • Omvir Singh & Ors.

Provisions of Law Cited

Land Acquisition Act, 1894Section 4Section 6Section 18

Submissions & Arguments

Contentions of Appellants / Petitioners

The NOIDA petition contends that the High Court erred in entertaining the appeal after an inordinate delay (approximately 16 years) and in enhancing compensation to Rs.297 per sq yard. It argues that, even if delay is condoned, the compensation award is unsustainable in light of later Supreme Court judgments (notably Asha Ram) and decisions distinguishing earlier awards. NOIDA asserts that the 1982 acquisition cannot be governed by later awards (1986/1988) and seeks to limit compensation to what is appropriate under the 1982 notification, i.e., Rs.120 per sq yard, with statutory benefits but excluding interest on delayed enhancements.

Contentions of Respondents

The landowners submit that the High Court correctly condoned the long delay and that Rs.297 per sq yard reflects just compensation in line with similar acquisitions in the vicinity. They rely on several earlier decisions confirming Rs.297 per sq yard in comparable 1986/1988 acquisitions (e.g., Narendra & Ors., Jaiprakash, Mangu Singh, Pradeep Kumar) and seek continued enhancement with applicable statutory benefits and interest on the enhanced amount.

Legal Doctrine & Issue Explorer

Explore This Legal Issue

Find relevant judgments and authoritative positions on the legal questions discussed here.

Cited Precedents (7)

Case NameCitationTreatmentExplanation
Asha Ram (Dead) through LRs and Others v. U.P. Awas Avam Vikas Parishad and Another(2022) 2 SCC 567PositiveAsha Ram reduced compensation to Rs.120 per sq yard for similar 1982 acquisitions, guiding the Court to limit the award in the present case.
Narendra & Ors. v. State of Uttar Pradesh and Others(2017) 9 SCC 426DistinguishedAward of Rs.297 per sq yard in 1988 acquisitions; UPAVP later distinguished applying to 1982 acquisitions, leading to the Rs.120 rate.
U.P. Awas Avam Vikas Parishad (supra)—PositiveSupreme Court decision that, for lands acquired in 1982, Rs.120 per sq yard is appropriate; used as governing precedent for the present calculation.
Jaiprakash (D) v State of UP(2020) 11 SCC 770PositiveCase that increased compensation to Rs.297 per sq yard in related circumstances, cited in the discussion of precedent.
Mangu Singh v State of UP(2018)PositiveCited for imposing Rs.297 per sq yard in related acquisitions; later overridden by 120 per sq yard in 1982 context.
Pradeep Kumar v State of UP(2016) 6 SCC 308PositiveEarlier decision increasing compensation in a similar context, quoted as part of the evolving jurisprudence on Rs.297 per sq yard.
GDA v. Kashi RamSLP(C) No. 5815 of 2015; FA No. 910/2000PositivePart of the line of authorities that recognized Rs.297 per sq yard in related judgments.
Case Applicability Diagnostic

Apply This to My Facts

Share your situation and test whether this judgment governs, supports, or challenges your case.

Official Judgment Record
•2,235 words•~11 min read

In The Court Record

New Okhla Industrial Development Authority v Omvir Singh & Ors

## **REPORTABLE** # **IN THE SUPREME COURT OF INDIA CIVIL APPELLATE JURISDICTION** ## **CIVIL APPEAL NO.9085 of 2022** **(@ Special Leave Petition (C) No.9558 of 2020) (@ Diary No.16450 of 2020)** New Okhla Industrial Development Authority …Appellant Versus Omvir Singh & Ors. …Respondents ## **J U D G M E N T** ## **M.R. SHAH, J.** 1. Feeling aggrieved and dissatisfied with the impugned Signature Not Verified judgment and order dated 28.01.2020, passed by the High Court Digitally signed by R Natarajan Date: 2022.12.15 18:15:16 IST Reason: of Judicature at Allahabad in First Appeal Defective No.308 of 2015, by which the High Court has rejected the said appeal after 1 a period of approximately 16 years (as per the appellant, there was a delay of 26 years) by which the High Court has enhanced the compensation payable to the land owners to Rs.297/­ per sq.yard, NOIDA has preferred the present appeal. 2. The facts leading to the present appeal in a nutshell, are as under: 2.1 That the land in question situated in Village Gheja Tilapatabad, Tehsil and Pargana Dadri, District Ghaziabad (now District Gautam Budh Nagar) was acquired for the planned development by the NOIDA, vide Notification issued under Section 4, dated 22.11.1982. A declaration under the provisions of Section 6 of the Land Acquisition Act, 1894 was issued on 23.11.1982. The possession of the acquired land was taken over by the State on 22.02.1983. The Land Acquisition Officer/Collector declared the Award dated 05.09.1983 and awarded/determined the compensation at Rs.30,000/­ per bigha, relying upon the sale deed dated 02.11.1982 of certain parcels of land in the village itself. The father of the contesting respondents 2 accepted the compensation. At the instance of the original owners – father of the contesting respondents, a Reference under Section 18 of the Land Acquisition Act, 1894 raising objections against the Award was made. The original claimants claimed compensation @ Rs.60,000/­ per bigha. On contest, by a detailed judgment and order dated 04.05.1989, the Reference Court dismissed the said Reference along with other references. Review applications were filed which came to be dismissed in the year 1998. That after a period of 16 years from the date of rejection of the review applications in the year 2014/2015, the respondents filed the present first appeal before the High Court and relied upon the judgment in some other first appeals by which the compensation was enhanced to Rs.297/­ per sq.yard. By the impugned judgment and order, the High Court has condoned the delay of 16 years, however it has denied the interest during the period of delay, and has enhanced the amount of compensation to Rs.297/­ per yard. Hence, the present appeal at the instance of the NOIDA. 3 3. Learned Counsel appearing on behalf of the NOIDA has vehemently submitted that the High Court has materially erred in entertaining the appeal after a period of 16 years from the date of dismissal of the review application and after a period of 26 years from the date of the decision by the Reference Court. 3.1 It is submitted that even otherwise, on merits also in view of the subsequent decision of this Court in the case of **Asha Ram (Dead) through LRs and Others vs. U.P. Awas Avam Vikas Parishad and Another, (2022) 2 SCC 567** with respect to the land acquisition of 1982, this Hon’ble Court has reduced the amount of compensation to Rs.120/­ per sq.yard, the claimants shall not be entitled to compensation at the rate of Rs.297/­ per sq.yard, as awarded by the High Court. 3.2 It is submitted that as such, in the subsequent decision in the case of **U.P. Awas Avam Vikas Parishad (supra),** this Court did consider its earlier decision in the case of **Narendra and** **Others vs. State of Uttar Pradesh and Others, (2017) 9 SCC** 4 **426,** by which this Court for the acquisition with respect to the nearby villages of the year 1988, has allowed compensation @ Rs.297/­ per sq.yard. However, it is submitted that considering the development which took place between the year 1982­ 1986/1988 this Court in the case of **U.P. Awas Avam Vikas Parishad (supra),** did not accept the case on behalf of the claimants for awarding Rs.297/­ per sq.yard and determined the compensation for the lands acquired in the year 1982, at Rs.120/­ per sq.yard. 4. While opposing the present appeal, learned counsel appearing on behalf of the original claimants has vehemently submitted that in the facts and circumstances of the case, the High Court has not committed any error in condoning the delay of 16/26 years by observing that the claimants are entitled to just compensation. 4.1 It is submitted that considering the case of the other land owners decided vide judgment and order passed in the year 2014 with respect to similar acquisition with respect to the nearby 5 villages, the amount of compensation had been enhanced to Rs.297/­ per sq.yard. Following the same, in the present case the amount of compensation has been awarded @ Rs.297/­ per sq.yard, which cannot be said to be unreasonable and the High Court has not committed any error. 4.2 Learned counsel appearing on behalf of the original claimants has heavily relied upon the following decisions of the High Court, confirmed by this Court by which the compensation has been determined at Rs.297/­ per sq.yard. ## **INDEX** **==> picture [455 x 256] intentionally omitted <==** **----- Start of picture text -----**<br> PARTICULARS<br>LIST OF JUDGMENTS OF LAND ACQUISITION IN MAKANPUR VILLAGE<br>Sl. Village Date of Judgment of the Page<br>No. Notifications Court Nos.<br>&<br>Compensatio<br>n (per sq. yd.)<br>1. Makanpur, 12.09.1986/ F.A. No. 910/2000 6­26<br>(Vaishali) 28.02.1987 in re: GDA v. Kashi<br>Distt.<br>Ram. [DoJ:<br>Ghaziabad, [Rs. 297/­]<br>13.11.2014].<br>Tehsil Dadri<br>27­32<br>SLP (C) No. 5815 of<br>2015, GDA v. Kashi<br>Ram & Ors.<br>**----- End of picture text -----**<br> 6 **==> picture [455 x 643] intentionally omitted <==** **----- Start of picture text -----**<br> dismissed on<br>05.05.2015 33­34<br>Review Petition (C)<br>No. 2632 of 2015<br>dismissed on<br>35­37<br>06.10.2015<br>Curative Petition (C)<br>No. 94 of 2016 was<br>dismissed on<br>15.03.2016<br>2. Makanpur, 15.03.1988 Judgment dt. 38­95<br>(Sector 62, 15.04.2015 of the<br>Noida) Distt. [Rs. 297/­] High Court in F.A.<br>Gautam No. 737 in re:<br>Budh Nagar, NOIDA v. Surendra<br>Tehsil Dadri<br>Singh, awarding<br>compensation @ Rs.<br>135/­ for Makanpur,<br>was set­aside by this<br>Court vide judgment<br>dt. 16.02.2016,<br>rendered in Civil<br>Appeal No. 1506­<br>96­98<br>1517 of 2016 in re:<br>Pradeep Kumar v.<br>State of U.P.,<br>reported as (2016) 6<br>SCC 308 and the<br>case was remanded<br>for consideration 99­124<br>afresh.<br>Pursuant to remand,<br>the High Court<br>dismissed F.A. No.<br>737 in re: NOIDA v.<br>Surendra Singh<br>**----- End of picture text -----**<br> 7 **==> picture [455 x 648] intentionally omitted <==** **----- Start of picture text -----**<br> along with other First<br>Appeals of Noida and<br>allowed the First<br>Appeals filed by the<br>farmers (F.A. No.<br>522 of 2009<br>Pradeep Kumar vs.<br>State of UP, being<br>the lead case) and<br>awarded<br>compensation of Rs.<br>297 per sq. yd. vide<br>final judgment dt.<br>21.04.2016 . This<br>has attained finality.<br>[Note: In the<br>present bunch of<br>cases, listed before<br>this Court, the<br>compensation has<br>been awarded @ Rs.<br>­<br>297/ sq. yard based<br>on this judgment<br>dated 21.04.2016<br>only as they pertain<br>to the same<br>notification and the<br>same village<br>(Makanpur) and<br>have arisen out of<br>the same Reference<br>Court order.]<br>3. Makanpur, 12.09.1986/ This Court in Civil 125­<br>(Vaishali) 24.02.1988 Appeal No. 10429­ 135<br>Distt. 10430 of 2017,<br>Ghaziabad, [Rs. 297/­] Narendra vs. State<br>Tehsil Dadri of UP, reported as<br>**----- End of picture text -----**<br> 8 **==> picture [455 x 646] intentionally omitted <==** **----- Start of picture text -----**<br> (2017) 9 SCC 426<br>has awarded<br>compensation @ Rs.<br>297/­<br>4. Makanpur, 16.08.1988 This Court in Civil 136­<br>(Indirapuram Appeal No. 16960 of 137<br>) Distt. [Rs. 297/­] 2017, Jaiprakash<br>Ghaziabad,<br>(D) V State of U.P.<br>Tehsil Dadri<br>vide judgment dated<br>24.11.2017, reported<br>as (2020) 11 SCC<br>770, increased<br>compensation to Rs.<br>297/­ (Followed In<br>re: Narendra)<br>5. Makanpur, 16.08.1988 This Hon’ble Court in<br>(Indirapuram Civil Appeal No.<br>) Distt. [Rs. 297/­] 16961 of 2017, Om<br>Ghaziabad, Prakash vs. State of<br>Tehsil Dadri<br>UP vide the same<br>judgment dated<br>24.10.2017 in Jai<br>Prakash (supra)<br>increased the<br>compensation to Rs.<br>297/­<br>6. Makanpur, 12.09.1986/ This case had also<br>(Vaishali) 28.02.1987 arisen out of the<br>Distt. above­mentioned<br>Ghaziabad, [Rs. 297/­] Kashi Ram<br>Tehsil Dadri judgment (supra) .<br>After the judgment in<br>Kashi Ram, an<br>application bearing<br>CMAN no. 194412 of<br>**----- End of picture text -----**<br> 9 |2016 was filed in one|| |---|---| |of the First Appeals|| |bearing **FA No. 484**|| |**of 2019, Ghaziabad**|| |**Development**|| |**Authority vs. Trilok**|| |**Chand & Ors.**, which|| |was also decided|| |along with the bunch|| |of<br> **Kashi**<br>**Ram**|| |**(supra)**<br>for 33%|| |deduction<br>as|| |development charges|| |from<br>the|| |compensation<br>determined at the|**138­**| |rate of Rs. 297/­ sq.|**139**| |yard, but the same|| |was rejected.|| |SLP bearing**SLP (C)**|| |**No.**<br>**12547/2017,**|| |**Ghaziabad**|| |**Development**|| |**Authority vs. Trilok**|| |**Chand & Ors **was|| |filed against the said|| |dismissal, wherein|| |while issuing notice,|| |vide order dated|| |28.04.2017, it was|| |especially recorded<br>that the GDA was|**140­**| |aggrieved by the non­|**141**| |deduction of 33% as|| |development charges.|| |However, the said|| |SLP was dismissed|| |vide order dated|| 10 **==> picture [455 x 197] intentionally omitted <==** **----- Start of picture text -----**<br> 03.08.2017.<br>7. Makanpur, 16.08.1988 This Court in Civil 142­<br>(Indirapuram Appeal No. 9208­ 144<br>) Distt. [Rs. 297/­] 9211 of 2018,<br>Ghaziabad,<br>Mangu Singh Vs.<br>Tehsil Dadri<br>State of UP, vide<br>judgment dated<br>10.09.2018,<br>increased<br>compensation to Rs.<br>297/­.<br>**----- End of picture text -----**<br> Making the above submissions and relying upon the above decisions/orders passed by the High Court as well as this Court, it is prayed that the present appeal be dismissed. 5. We have heard learned counsel appearing on behalf of the respective parties at length. 5.1 So far as the submissions made on behalf of the appellant that the High Court has erred in condoning the delay of 16/26 years in preferring the appeal is concerned, in the peculiar facts and circumstances of the case and considering the fact that even while enhancing the amount of compensation and entertaining the appeal, the High Court has denied the interest for the period of delay and has exercised its discretion in favour of the 11 claimants, we see no reason to interfere with the order passed by the High Court condoning the delay in preferring the appeal. 5.2 Now so far as merits of the appeal and the impugned judgment and order passed by the High Court enhancing the amount of compensation at Rs.297/­ per sq.yard is concerned and the reliance placed upon the decisions of the High Court and this Court referred to hereinabove and relied upon on behalf of the claimants is concerned, at the outset it is required to be noted that in the present case, the acquisition is of the year 1982 and in all other relied upon cases the acquisition(s) is/are of the year 1986/88. In all those cases, where the amount of compensation has been determined @ Rs.297/­ per sq.yard, the acquisition(s) is/are of the years 1986/1988 with respect to the Village Makanpur and other nearby villages acquired for the development of NOIDA/Ghaziabad. In the case of **Narendra & Ors. (supra),** this Court had enhanced the amount of compensation to Rs.297/­ per sq.yard with respect to the land acquired in Village Makanpur and other surrounding villages acquired for the very same project, but with respect to the acquisition of the years 12 1986/1988. However, subsequently in the case of **U.P. Awas Avam Vikas Parishad (supra)** and after considering the decision of this Court in the case of **Narendra & Ors. (supra)** with respect to the village Makanpur and other surrounding villages situated at Village Prahladgarh, Village Jhandapur, Village Sahibabad, Village Arthala with respect to the acquisition of the year 1982, this Court has determined the compensation at Rs.120/­ per sq.yard. In the said decision, while refusing to accept the claim of Rs.297/­ per sq.yard as awarded in the case of **Narendra & Ors. (supra)** which was with respect to the acquisition of 1988, this Court has observed that the compensation determined on the basis of the Notification 5 years later, cannot be a yardstick for determining the compensation for the land which is acquired five years before. This Court has also taken note of the fact that between the year 1982 and 1987/1988, development activities had been undertaken. Applying the law laid down by this Court in the case of **U.P. Awas Avam Vikas Parishad (supra)** to the present case, the claimants shall not be entitled to the same compensation as awarded with respect to the lands acquired after 13 5 years from the date of acquisition in the present case. As observed hereinabove, in the present case, Section 4 Notification had been issued on 22.11.1982 and the relied upon decisions with respect to Village Makanpur and other villages are of the year 1986/88, which as observed by this Court in the aforesaid decision in the case of **U.P. Awas Avam Vikas Parishad (supra),** cannot be the basis. Under the above circumstances, the impugned judgment and order passed by the High Court awarding compensation @ Rs.297/­ per sq.yard is unsustainable and it is held that the original claimants shall be entitled to compensation at the rate of Rs.120/­ per sq.yard. 6. In view of the above and for the reason stated above, the present appeal succeeds in part. The impugned judgment and order passed by the High Court is hereby modified. It is ordered and directed that the original claimants shall be entitled to compensation at the rate of Rs.120/­ per sq.yard along with all other statutory benefits and interest allowable under the provisions of Land Acquisition Act, 1894. However, the claimants shall not be entitled to the statutory benefits including the 14 interest under the Act, 1894 on the enhanced amount of compensation for the delayed period in preferring the appeal before the High Court i.e. from the date of rejection of the review application till the first appeal was filed before the High Court. Present appeal is accordingly allowed to the aforesaid extent. No costs. **…………………………..J. (M. R. SHAH)** **…………………………...J. (HIMA KOHLI)** **NEW DELHI; DECEMBER 15, 2022.** 15
End of Judgment Record
Browse All Landmark Cases Judgments
2019-01-22

State of Himachal Pradesh & Anr. v. Pinju Ram & Others; State of Himachal Pradesh & Ors. v. Ganesh Dutt & Anr.

This batch of appeals concerns regularisation and monetary benefits of part‑time employees in Himachal Pradesh who were converted to daily‑wage status. The State had issued a policy on 27 February 2004: part‑time Class‑IV employees who had completed ten years of continuous service as on 31 December 2003 would be made daily wagers with prospective effect, and posts vacated by such employees would stand abolished; Education and Ayurveda were excluded from the policy. Revenue Chowkidars, engaged by Panchayats, were not covered by that policy and received separate treatment. Following writ petitions and an order of the Himachal Pradesh High Court and in light of later developments, the State drew‑up directions in 2011 (22 September) to give seniority to Revenue Chowkidars on the basis of ten years of service, but with wages from the date of actual appointment and without back‑dated monetary benefits; 7 July 2012 further instructions reiterated this stance for remaining part‑time employees, with monetary benefits not guaranteed in the interregnum. The respondents pressed for back wages dating from 1 January 2007 and broader coverage. The Supreme Court held that the 2007 back‑pay direction was unsustainable, clarified that seniority would count from ten years without past benefits, and that the 2011 policy and Moti Singh principle should guide the approach. The appeals are allowed; no costs. The related writ petitions are to be disposed of consistent with these directions.

2018-08-14

Union Bank of India and Others v. C.G. Ajay Babu and Anr.

This is a Supreme Court of India appeal concerning the forfeiture of gratuity under the Payment of Gratuity Act, 1972. The respondent was a branch manager of the appellant bank and was dismissed on 3 June 2004 after disciplinary proceedings. A show-cause notice sought to forfeit gratuity due to misconduct involving moral turpitude, which was ordered on 20 April 2004. The High Court upheld the dismissal but held that gratuity could be paid since there was no financial loss to the bank, and that a bipartite settlement between the bank and employees permitted forfeiture only where misconduct caused financial loss. The Division Bench, however, held that forfeiture under Section 4(6) must be read together with Section 4(5) and that no loss was proven, thus entitling the employee to gratuity in accordance with the bipartite settlement. The Supreme Court agreed with the High Court that forfeiture is not automatic; it is controlled by Sections 4(5) and 4(6) of the Act and by the bipartite settlement, which requires loss to justify forfeiture. The Court emphasized that an act must constitute an offence involving moral turpitude and that conviction is generally required for forfeiture under 4(6)(b)(ii). The appeal is dismissed with no costs.

2018-09-25

Reema Salkan v. Sumer Singh Salkan

This is a Supreme Court of India criminal appeal under the Criminal Appellate Jurisdiction arising from a maintenance dispute under Section 125 Cr.P.C. The parties, married in 2002, had a protracted litigation history. The Family Court granted maintenance to the wife from 17 July 2003 to 8 December 2010, and held no maintenance thereafter. The High Court, in revision, partly allowed the application, directing Rs.9,000 per month from 9 December 2010 onward, while upholding the earlier period’s Rs.10,000 per month. This Court had earlier granted interim maintenance of Rs.20,000 per month in 2014 (Criminal Appeal Nos. 2347-2349 of 2014). The appellant contends there has been no change in circumstances since the interim order and that the respondent’s substantial assets, education, and overseas earnings establish the capacity to pay higher maintenance. The respondent defends the High Court’s reasoning, arguing that the Family Court’s assessment, demeanor observations, and the principle that maintenance should not be perpetual require careful scrutiny, and that the notional minimum wage approach used by the High Court is flawed. The overarching issue is the quantum of monthly maintenance payable to the appellant and whether the interim amount should be augmented beyond the period up to 2010.”

2019-12-03

M/s Embassy Property Developments Pvt. Ltd. v State of Karnataka & Ors.

This judgment concerns three Civil Appeals filed by a Resolution Applicant, the Corporate Debtor (through its Resolution Professional) and the Committee of Creditors, challenging an Interim Order of the Karnataka High Court staying an NCLT order in proceedings under the Insolvency and Bankruptcy Code, 2016. The NCLT Chennai had admitted an application under Section 7 of the IBC against M/s Tiffins Barytes Asbestos & Paints Ltd. and directed a moratorium under Section 14. The Interim Resolution Professional then sought a deemed extension of a mining lease under MMDR Act, 1957 and the Government of Karnataka rejected it. The NCLT, by an order dated 11.12.2018, set aside the Government’s order and directed execution of Supplement Lease Deeds for the period up to 31.03.2020. The Government of Karnataka challenged this in a High Court writ petition, which stayed the impugned NCLT order. The core issues were: (i) whether the High Court may interfere under Article 226/227 with an NCLT order in IBC when an appeal lies to the NCLAT, and (ii) whether fraud can be inquired into by NCLT/NCLAT in CIRP. The Court reiterates that IBC is a complete, umbrella code with a three‑tier mechanism (NCLT, NCLAT, Supreme Court) and that public‑law disputes arising from MMDR Act obligations lie outside IBC. It ultimately holds that while NCLT/NCLAT may inquire into fraud, they cannot adjudicate MMDR‑related public legal disputes; and the High Court’s writ jurisdiction in public‑law contexts remains permissible. The appeals are dismissed.