NEW OKHLA INDUSTRIAL DEVELOPMENT AUTHORITY v. OMVIR SINGH & ORS.

Case / Petition Number:
Civil Appeal No. 9085 of 2022
Neutral Citation:[2022] 17 SCR 729

Case Synopsis & Summary

The land in Village Gheja Tilapatabad, Ghaziabad (now Gautam Buddha Nagar) was acquired for NOIDA’s planned development under a Section 4 notification dated 22.11.1982, with possession taken in 1983 and an award of Rs. 30,000 per bigha. The original owners (father of respondents) moved a Reference under Section 18 challenging the award; the Reference Court dismissed the objections, and review applications were likewise rejected by 1998. After a long delay, the respondents filed an appeal in the Allahabad High Court, which condoned the delay (even though it extended to 16–26 years) and enhanced compensation to Rs. 297 per sq yard but denied interest during the delay. The NOIDA challenged this order in the Supreme Court. The Court held that compensation based on a later Section 4 notification cannot serve as a yardstick for lands acquired five years earlier, particularly where development activity occurred in the interim. Relying on Uttar Pradesh Awas Avam Vikas Parishad’s approach and distinguishing Narendra’s case (which dealt with acquisitions in 1986–1988), it determined that for the 1982 acquisition the appropriate rate is Rs. 120 per sq yard, with statutory benefits and interest under the LA Act, but excluding interest on the enhanced amount for the delayed period. The appeal was partly allowed, with no costs.

Precedent Explorer

Find Cases Like This

Explore other judgments dealing with similar legal situations, facts, or statutory provisions.

Case Details & Bench

Court
Supreme Court of India
Hon'ble Judges
  • M. R. Shah
  • Hima Kohli
Judgment Date
2022-12-15
Court Decision / Holding
The appeal is partly allowed. The impugned High Court judgment is modified: the original claimants are entitled to compensation at Rs. 120 per sq yard along with all statutory benefits and interest under the Land Acquisition Act, 1894. However, the claimants are not entitled to statutory benefits including interest on the enhanced amount of compensation for the delayed period from the date of rejection of the review until the first appeal was filed in the High Court. No costs.
Final Disposition
Appeal partly allowed.

Parties to the Case

Appellants / Petitioners

  • New Okhla Industrial Development Authority (NOIDA)

Respondents

  • Omvir Singh
  • others

Legal Representation & Advocates

Counsels for Petitioners

  • • Nidhi Jain (assisted by Tamana, LCRA)

Counsels for Respondents

  • • Ms. Manvi Dikshit Sharma
  • • Ms. Taruna Ardhendumauli Prasad
  • • Haraprasad Sahu
  • • Pranaya Kumar Mohapatra
  • • Ajit Singh Pundir
  • • D. V. Singh
  • • Arijeet Singh
  • • Ms. Shanti Swaroop Singh
  • • Sourav Roy
  • • Kaushal Sharma
  • • Prabudh Singh
  • • Vishal Malik
  • • Rajnish Kumar Jha
  • • Chandan Kumar
  • • Vimal Johnson Kerketta
  • • Ms. Sushma
  • • Ms. Monika
  • • Ms. Babila K. K.
  • • Ms. Saloni Saran
  • • Mahesh Kr. Tiwari
  • • Bishnu Prasad Tiwari
  • • Kumar Rajeev
  • • Ashutosh Sharma
  • • Ms. Gunjan Sharma
  • • Mahendra Kumar
  • • Ram Sajjan Mishra
  • • Ms. Swati Jain
  • • R. K. Bali
  • • Ms. Meghna Bali
  • • Deepkaran Dalal
  • • Anil Kaushik
  • • Rajat Rana
  • • Ms. Anju Kaushik
  • • Ms. Arunima Dwivedi
  • • Ms. Alka Sinha
  • • Anuvrat Sharma
  • • M. R. Shamshad
  • • Mohd Waquas
  • • Arijit Sarkar
  • • Ms. Nabeela Jamil
  • • Saleem Khan
  • • Surendra
  • • Kr. Gupta
  • • Nischal Kumar Neeraj
  • • K. S. Rana
  • • Sunil Kumar Jain
  • • Ms. Reeta Chaudhary
  • • Aneesh Mittal
  • • Ms. Kamini Jaiswal
  • • Akhilesh Kalra
  • • Rohit Kumar Singh
  • • Harsh Jain
  • • Simranjeet Singh Rekhi
  • • Shubham Kumar
  • • Ms. Rani Mishra
  • • Chiranjeev Johri
  • • Pradeep Kumar Mathur
  • • Ganga Sagar Singh
  • • Ashish Kumar Chaurosiya
  • • Rajesh Kumar Chaurasia
  • • Anurag Nagar

Provisions of Law Cited

Land Acquisition Act, 1894 – sections 4, 6, 18

Legal Doctrines & Maxims

  • Compensation determined on the basis of a later Section 4 notification cannot be a yardstick for lands acquired earlier
  • Delay in filing/appealing can be condoned in peculiar facts, but interest on the delayed period may be denied at the court’s discretion
  • Development activities between 1982 and 1987/1988 can affect appropriate compensation levels

Submissions & Arguments

Contentions of Appellants / Petitioners

NOIDA contends that the High Court erred in condoning a 16-year delay and in allowing an enhanced compensation of Rs. 297 per sq yard. It submits that compensation for the 1982 acquisition cannot be determined by the Rs. 297 per sq yard awarded for later acquisitions (1986/1988), as clarified by this Court in Asha Ram v. UP Awas Avam Vikas Parishad, and emphasized by the decision in Narendra. NOIDA urges that, applying the UP Awas Avam Vikas Parishad framework to the 1982 land, the correct rate is Rs. 120 per sq yard with statutory benefits and interest under the LA Act, but not interest on the enhanced amount for the delayed period. It relies on precedents to show that development between 1982 and 1986/88 should inform compensation, and that the 5-year-later yardstick cannot be used.

Contentions of Respondents

The respondents argue that condonation of delay was justified given the long pendency and that compensation at Rs. 297 per sq yard reflects parity with nearby acquisitions. They rely on the High Court’s approach and on prior decisions where Rs. 297 per sq yard was applied, contending consistency with case law and appropriate attribution of benefits during the delay. They maintain that the enhanced amount and its timing were properly considered, and the delay should not dilute the claim for just compensation.

Legal Doctrine & Issue Explorer

Explore This Legal Issue

Find relevant judgments and authoritative positions on the legal questions discussed here.

Cited Precedents (2)

Case NameCitationTreatmentExplanation
Asha Ram (Dead) through LRs and Others v. UP Awas Avam Vikas Parishad and Another(2022) 2 SCC 567PositiveRelied on by the Court to support applying the later-developed compensation framework and to justify not applying Rs. 297 for the 1982 acquisition.
Narendra and Others v. State of Uttar Pradesh and Others(2017) 9 SCC 426DistinguishedPreviously used to justify Rs. 297 per sq yard in nearby acquisitions (1986/1988), but distinguished for the 1982 acquisition due to different timelines and development between 1982 and 1987/1988.
Case Applicability Diagnostic

Apply This to My Facts

Share your situation and test whether this judgment governs, supports, or challenges your case.

Official Judgment Record
•3,074 words•~14 min read

In The Court Record

NEW OKHLA INDUSTRIAL DEVELOPMENT AUTHORITY v. OMVIR SINGH & ORS.

729 [2022] 17 S.C.R. 729 NEW OKHLA INDUSTRIAL DEVELOPMENT AUTHORITY A v. OMVIR SINGH & ORS. (Civil Appeal No. 9085 of 2022) DECEMBER 15, 2022 ## **[M. R. SHAH AND HIMA KOHLI, JJ.]** _Land Acquisition Act, 1894: ss. 4, 6, 18 – Land acquisition – Enhancement of compensation – Land in question acquired for the planned development by the NOIDA, vide Notification dated 22.11.1982 – Award of compensation at Rs.30,000/- per bigha – Reference u/s. 18 by original owner-father of the respondent, raising objections against the award and claiming enhanced compensation – Reference dismissed – Review application also dismissed – After a period of 16 years, from the date of rejection of review applications, the respondent filed an appeal – High Court while condoning delay, enhanced the compensation to Rs.297/- per sq. yard, however, denied the interest during the period of delay – On appeal, held: Compensation determined on the basis of the Notification 5 years later, cannot be a yardstick for determining the compensation for the land which is acquired five years before – Applying the law laid down by this Court in_ U.P. Awas Avam Vikas Parishad’s case, _to the instant case, the claimants would not be entitled to the same compensation as awarded with respect to the lands acquired after 5 years from the date of acquisition in the instant case – On facts, notification u/s. 4 was issued on 22.11.1982 and the relied upon decisions with respect to Village Makanpur and other villages are of the year 1986/88, which cannot be the basis – As regards, the delay of 16/26 years, the High Court while enhancing compensation, denied the interest for the period of delay thus, no reason to interfere with the order passed by the High Court condoning the delay – Thus, the impugned judgment and order passed by the High Court awarding compensation @ Rs.297/- per sq. yard is unsustainable and the original claimants would be entitled to compensation at the rate of Rs.120/- per sq.yard._ B C D E F G ## **Partly allowing the appeal, the Court** **HELD: 1.1 The submissions made on behalf of the appellant that the High Court has erred in condoning the delay of 16/26** H 729 730 SUPREME COURT REPORTS [2022] 17 S.C.R. - A **years in preferring the appeal is concerned, in the peculiar facts and circumstances of the case and considering the fact that even while enhancing the amount of compensation and entertaining the appeal, the High Court has denied the interest for the period of delay and has exercised its discretion in favour of the claimants, there is no reason to interfere with the order passed by the High** - B **Court condoning the delay in preferring the appeal. [Para 5.1][736H; 737-A-B]** - **1.2 The acquisition is of the year 1982 and in all other relied** - **upon cases the acquisition(s) is/are of the year 1986/88. In all those cases, where the amount of compensation has been** - C **determined @ Rs.297/- per sq.yard, the acquisition(s) is/are of the years 1986/1988 with respect to the Village Makanpur and other nearby villages acquired for the development of NOIDA/ Ghaziabad. In the case of** _**Narendra’s**_ **case, this Court had enhanced the amount of compensation to Rs.297/- per sq.yard** - D **with respect to the land acquired in Village Makanpur and other surrounding villages acquired for the very same project, but with respect to the acquisition of the years 1986/1988. However, subsequently in the case of** _**U.P. Awas Avam Vikas Parishad’s**_ **case and after considering the decision of this Court in the case of** _**Narendra’s**_ **case with respect to the village Makanpur and other** - E **surrounding villages with respect to the acquisition of the year 1982, this Court has determined the compensation at Rs.120/per sq.yard. In the said decision, while refusing to accept the claim of Rs.297/- per sq.yard as awarded in the case of** _**Narendra’s case**_ **which was with respect to the acquisition of 1988, this Court** - F **has observed that the compensation determined on the basis of the Notification 5 years later, cannot be a yardstick for determining the compensation for the land which is acquired five years before. This Court has also taken note of the fact that between the year 1982 and 1987/1988, development activities had been undertaken. Applying the law laid down by this Court in the case** - G **of** _**U.P. Awas Avam Vikas Parishad**_ **to the instant case, the claimants would not be entitled to the same compensation as awarded with respect to the lands acquired after 5 years from the date of acquisition in the instant case. In the instant case, Section 4 Notification had been issued on 22.11.1982 and the relied upon** H NEW OKHLA INDUSTRIAL DEVELOPMENT AUTHORITY v. 731 OMVIR SINGH & ORS. **decisions with respect to Village Makanpur and other villages are of the year 1986/88, which as observed by this Court in the said decision in the case of** _**U.P. Awas Avam Vikas Parishad’s**_ **case, cannot be the basis. Under the above circumstances, the impugned judgment and order passed by the High Court awarding compensation @ Rs.297/- per sq.yard is unsustainable and it is held that the original claimants would be entitled to compensation at the rate of Rs.120/- per sq.yard. [Para 5.2][737-B-H; 738-AB]** **1.3 The impugned judgment and order passed by the High Court is modified. It is ordered and directed that the original claimants would be entitled to compensation at the rate of Rs.120/ - per sq.yard along with all other statutory benefits and interest allowable under the provisions of Land Acquisition Act, 1894. However, the claimants would not be entitled to the statutory benefits including the interest under the Act, 1894 on the enhanced amount of compensation for the delayed period in preferring the appeal before the High Court i.e. from the date of rejection of the review application till the first appeal was filed before the High Court. [Para 6][738-C-D]** _Asha Ram (Dead) through LRs and Others vs. U.P. Awas Avam Vikas Parishad and Another_ **(2022) 2 SCC 567 – relied on.** A B C D E _Narendra and Others vs. State of Uttar Pradesh and Others_ **(2017) 9 SCC 426 : [2017] 11 SCR 540 – referred to.** ## **Case Law Reference** F |**[2017]**|**11 SCR 540**|**referred to**|**Para 3.2**| |---|---|---|---| |**(2022)**|**2 SCC 567**|**relied on**|**Para 5.2**| CIVIL APPELLATE JURISDICTION : Civil Appeal No.9085 of 2022. G From the Judgment and Order dated 28.01.2020 of the High Court of Judicature at Allahabad in First Appeal Defective No.308 of 2015. Ardhendumauli Kumar Prasad, AAG, Ravindra Kumar, Ranji Thomas, Yatindra Singh, Pradeep Kant, Sr. Advs., Binay Kumar Das, Ms. Priyanka Das, Ms. Neha Das, Ajai Kumar, Abhay Kumar Tayal, H 732 SUPREME COURT REPORTS [2022] 17 S.C.R. - A Ms. Manvi Dikshit Sharma, Ms. Taruna Ardhendumauli Prasad, Haraprasad Sahu, Pranaya Kumar Mohapatra, Ajit Singh Pundir, D. V. Singh, Arijeet Singh, Ms. Shanti Swaroop Singh, Sourav Roy, Kaushal Sharma, Prabudh Singh, Vishal Malik, Rajnish Kumar Jha, Chandan Kumar, Vimal Johnson Kerketta, Ms. Sushma, Ms. Monika, Ms. Babila K. K., Ms. Saloni Saran, Mahesh Kr. Tiwari, Bishnu Prasad Tiwari, - B Kumar Rajeev, Ashutosh Sharma, Ms. Gunjan Sharma, Mahendra Kumar, Ram Sajjan Mishra, Ms. Swati Jain, R. K. Bali, Ms. Meghna Bali, Deepkaran Dalal, Anil Kaushik, Rajat Rana, Ms. Anju Kaushik, Ms. Arunima Dwivedi, Ms. Alka Sinha, Anuvrat Sharma, M. R. Shamshad, Mohd Waquas, Arijit Sarkar, Ms. Nabeela Jamil, Saleem Khan, Surendra - C Kr. Gupta, Nischal Kumar Neeraj, K. S. Rana, Sunil Kumar Jain, Ms. Reeta Chaudhary, Aneesh Mittal, Ms. Kamini Jaiswal, Akhilesh Kalra, Rohit Kumar Singh, Harsh Jain, Simranjeet Singh Rekhi, Shubham Kumar, Ms. Rani Mishra, Chiranjeev Johri, Pradeep Kumar Mathur, Ganga Sagar Singh, Ashish Kumar Chaurosiya, Rajesh Kumar Chaurasia, Anurag Nagar, Advs. for the appearing parties. - D The Judgment of the Court was delivered by ## **M. R. SHAH, J.** 1. Feeling aggrieved and dissatisfied with the impugned judgment and order dated 28.01.2020, passed by the High Court of Judicature at E Allahabad in First Appeal Defective No.308 of 2015, by which the High Court has rejected the said appeal after a period of approximately 16 years (as per the appellant, there was a delay of 26 years) by which the High Court has enhanced the compensation payable to the land owners to Rs.297/- per sq.yard, NOIDA has preferred the present appeal. F 2. The facts leading to the present appeal in a nutshell, are as under: 2.1 That the land in question situated in Village Gheja Tilapatabad, Tehsil and Pargana Dadri, District Ghaziabad (now District Gautam Budh Nagar) was acquired for the planned development by the NOIDA, vide G Notification issued under Section 4, dated 22.11.1982. A declaration under the provisions of Section 6 of the Land Acquisition Act, 1894 was issued on 23.11.1982. The possession of the acquired land was taken over by the State on 22.02.1983. The Land Acquisition Officer/Collector declared the Award dated 05.09.1983 and awarded/determined the compensation at Rs.30,000/- per bigha, relying upon the sale deed dated 02.11.1982 of - H NEW OKHLA INDUSTRIAL DEVELOPMENT AUTHORITY v. 733 OMVIR SINGH & ORS. [M. R. SHAH, J.] certain parcels of land in the village itself. The father of the contesting respondents accepted the compensation. At the instance of the original owners – father of the contesting respondents, a Reference under Section 18 of the Land Acquisition Act, 1894 raising objections against the Award was made. The original claimants claimed compensation @ Rs.60,000/per bigha. On contest, by a detailed judgment and order dated 04.05.1989, the Reference Court dismissed the said Reference along with other references. Review applications were filed which came to be dismissed in the year 1998. That after a period of 16 years from the date of rejection of the review applications in the year 2014/2015,the respondents filed the present first appeal before the High Court and relied upon the judgment in some other first appeals by which the compensation was enhanced to Rs.297/- per sq.yard. By the impugned judgment and order, the High Court has condoned the delay of 16 years, however it has denied the interest during the period of delay, and has enhanced the amount of compensation to Rs.297/- per yard. Hence, the present appeal at the instance of the NOIDA. 3. Learned Counsel appearing on behalf of the NOIDA has vehemently submitted that the High Court has materially erred in entertaining the appeal after a period of 16 years from the date of dismissal of the review application and after a period of 26 years from the date of the decision by the Reference Court. 3.1 It is submitted that even otherwise, on merits also in view of the subsequent decision of this Court in the case of **Asha Ram (Dead) through LRs and Others vs. U.P. Awas Avam Vikas Parishad and Another, (2022) 2 SCC 567** with respect to the land acquisition of 1982,this Hon’ble Court has reduced the amount of compensation to Rs.120/- per sq.yard, the claimants shall not be entitled to compensation at the rate of Rs.297/- per sq.yard, as awarded by the High Court. 3.2 It is submitted that as such, in the subsequent decision in the case of **U.P. Awas Avam Vikas Parishad (supra),** this Court did consider its earlier decision in the case of **Narendra and Others vs. State of Uttar Pradesh and Others, (2017) 9 SCC 426,** by which this Court for the acquisition with respect to the nearby villages of the year 1988, has allowed compensation @ Rs.297/- per sq.yard. However, it is submitted that considering the development which took place between the year 1982-1986/1988 this Court in the case of **U.P. Awas Avam Vikas Parishad (supra),** did not accept the case on behalf of the A B C D E F G H 734 SUPREME COURT REPORTS [2022] 17 S.C.R. - A claimants for awarding Rs.297/-per sq.yard and determined the compensation for the lands acquired in the year 1982, at Rs.120/- per sq.yard. 4. While opposing the present appeal, learned counsel appearing on behalf of the original claimants has vehemently submitted that in the B facts and circumstances of the case, the High Court has not committed any error in condoning the delay of 16/26 years by observing that the claimants are entitled tojust compensation. - 4.1 It is submitted that considering the case of the other land - owners decided vide judgment and order passed in the year 2014 with - C respect to similar acquisition with respect to the nearby villages, the amount of compensation had been enhanced to Rs.297/- per sq.yard. Following the same, in the present case the amount of compensation has been awarded @ Rs.297/- per sq.yard,which cannot be said to be unreasonable and the High Court has not committed any error. - D 4.2 Learned counsel appearing on behalf of the original claimants has heavily relied upon the following decisions of the High Court, confirmed by this Court by which the compensation has been determined at Rs.297/- per sq.yard. **INDEX** E F G H **==> picture [137 x 198] intentionally omitted <==** NEW OKHLA INDUSTRIAL DEVELOPMENT AUTHORITY v. 735 OMVIR SINGH & ORS. [M. R. SHAH, J.] **==> picture [116 x 47] intentionally omitted <==** **==> picture [141 x 117] intentionally omitted <==** **==> picture [303 x 378] intentionally omitted <==** A B C D E F G H 736 SUPREME COURT REPORTS [2022] 17 S.C.R. **==> picture [9 x 372] intentionally omitted <==** **----- Start of picture text -----**<br> A<br>B<br>C<br>D<br>E<br>F<br>**----- End of picture text -----**<br> **==> picture [303 x 418] intentionally omitted <==** - Making the above submissions and relying upon the above - G decisions/orders passed by the High Court as well as this Court, it is prayed that the present appeal be dismissed. 5. We have heard learned counsel appearing on behalf of the respective parties at length. 5.1 So far as the submissions made on behalf of the appellant that H the High Court has erred in condoning the delay of 16/26 years in NEW OKHLA INDUSTRIAL DEVELOPMENT AUTHORITY v. 737 OMVIR SINGH & ORS. [M. R. SHAH, J.] preferring the appeal is concerned, in the peculiar facts and circumstances of the case and considering the fact that even while enhancing the amount of compensation and entertaining the appeal, the High Court has denied the interest for the period of delay and has exercised its discretion in favour of the claimants, we see no reason to interfere with the order passed by the High Court condoning the delay in preferring the appeal. 5.2 Now so far as merits of the appeal and the impugned judgment and order passed by the High Court enhancing the amount of compensation at Rs.297/- per sq.yard is concerned and the reliance placed upon the decisions of the High Court and this Court referred to hereinabove and relied upon on behalf of the claimants is concerned, at the outset it is required to be noted that in the present case, the acquisition is of the year 1982 and in all other relied upon cases the acquisition(s) is/are of the year 1986/88. In all those cases, where the amount of compensation has been determined @ Rs.297/- per sq.yard, the acquisition(s)is/are of the years 1986/1988 with respect to the Village Makanpur and other nearby villages acquired for the development of NOIDA/Ghaziabad. In the case of **Narendra & Ors. (supra),** this Court had enhanced the amount of compensation to Rs.297/- per sq.yard with respect to the land acquired in Village Makanpur and other surrounding villages acquired for the very same project, but with respect to the acquisition ofthe years 1986/1988. However, subsequently in the case of **U.P. Awas Avam Vikas Parishad (supra)** and after considering the decision of this Court in the case of **Narendra & Ors. (supra)** with respect to the village Makanpur and other surrounding villages situated at Village Prahladgarh, Village Jhandapur, Village Sahibabad, Village Arthala with respect to the acquisition of the year 1982,this Court has determined the compensation at Rs.120/- per sq.yard. In the said decision, while refusing to accept theclaim of Rs.297/- per sq.yard as awarded in the case of **Narendra & Ors. (supra)** which was with respect to the acquisition of 1988, this Court has observed that the compensation determined on the basis of the Notification 5 years later, cannot be a yardstick for determiningthe compensation for the land which is acquired five years before. This Court has also taken note of the fact that between the year 1982 and 1987/1988, development activities had been undertaken. Applying the law laid down by this Court in the case of **U.P. Awas Avam Vikas Parishad (supra)** to the present case, the claimants shall not be entitled to the same compensation as awarded with respect to the lands acquired after 5 years from the date of acquisition in the present case. As observed A B C D E F G H 738 SUPREME COURT REPORTS [2022] 17 S.C.R. - A hereinabove, in the present case, Section 4 Notification had been issued on 22.11.1982 and the relied upon decisions with respect to Village Makanpur and other villages are of the year 1986/88, which as observed by this Court in the aforesaid decision in the case of **U.P. Awas Avam Vikas Parishad (supra),** cannot be the basis. Under the above circumstances, the impugned judgment and order passed by the High - B Court awarding compensation @ Rs.297/- per sq.yard is unsustainable and it is heldthat the original claimants shall be entitled to compensation at the rate of Rs.120/- per sq.yard. 6. In view of the above and for the reason stated above, the present appeal succeeds in part. The impugned judgment and order passed by C the High Court is hereby modified. It is ordered and directed that the original claimants shall be entitled to compensation at the rate of Rs.120/ - per sq.yard along with all other statutory benefits and interest allowable under the provisions of Land Acquisition Act, 1894. However, the claimants shall not be entitled to the statutory benefits including the interest D under the Act, 1894 on the enhanced amount of compensation for the delayed period in preferring the appeal before the High Court i.e. from the date of rejection of the review application till the first appeal was filed before the High Court. - Present appeal is accordingly allowed to the aforesaid extent. No - E costs. Nidhi Jain (Assisted by : Tamana, LCRA) Appeal partly allowed. F G H
End of Judgment Record
Browse All Supreme Court of India (2022) Decisions
2022-12-09

MOHD. SABEER @ SHABIR HUSSAIN v. RM, U. P. STATE ROAD TRANSPORT CORP.

The appellant, Mohd. Sabeer (also known as Shabir Hussain), a scrap dealer, was a passenger in a UP State Road Transport Corporation bus when the driver rashly and negligently drove the vehicle, causing a collision near Ghaziabad in 2009. He sustained grave injuries including an amputation of the right lower limb and other bodily injuries. The Motor Accident Claims Tribunal (MACT) awarded Rs. 15,76,465 with interest; the High Court of Delhi enhanced the amount to Rs. 16,70,932. The Disability Certificate recorded 70% permanent disability. The High Court had treated the claimant’s functional disability as 35%, relying on post‑accident income reflected in IT returns, and erred in not adequately recognizing the impact on earning capacity of a self‑employed person who cannot drive. The Supreme Court held that the appellant’s functional disability should be treated as 60% for loss of future earning capacity and that permanent disablement warrants consideration of future prospects in addition to future income. It invoked National Insurance Co. v. Pranay Sethi to apply a 40% addition for future prospects, and directed compensation for prosthetic limb purchase and maintenance, as well as enhanced non‑pecuniary damages. The final award was increased to Rs. 38,70,120 with 9% interest from the date of application, and the appeals were allowed, emphasizing liberal, holistic justice to restore the claimant to his pre‑accident position in light of socio‑economic factors.

2022-01-25

Intercontinental Hotels Group (India) Pvt. Ltd. & ANR. v. Waterline Hotels Pvt. Ltd.

Intercontinental Hotels Group (India) Pvt. Ltd. & Anr. v Waterline Hotels Pvt. Ltd. is a Supreme Court decision addressing appointment of a sole arbitrator under Section 11(6) read with Section 11(12)(a) of the Arbitration and Conciliation Act, 1996, in a dispute arising from a Hotel Management Agreement (HMA) for renovating the Holiday Inn & Suites Bengaluru, Whitefield. The petitioners allege breach by Waterline Hotels, including non-payment of incentive management fee and related charges, culminating in Waterline’s email termination of the HMA on 12 October 2018 after rebranding the hotel as Miraya. The petitioners invoked arbitration; Waterline challenged the enforceability of the arbitration clause on the ground that the HMA is an unstamped instrument under the Karnataka Stamp Act. A Karnataka High Court ad‑interim relief was granted in 2018, but the Supreme Court’s judgment focuses on the scope of judicial interference at the pre‑appointment stage. The Court reiterates a pro‑arbitration stance, noting that arbitrability/validity are generally matters for the arbitrators, with a narrow exception to cut deadwood or to refer for authoritative settlement where necessary, invoking Vidya Drolia. It also analyzes stamp duty, observing that stamp duty has been paid (albeit disputed) and that the question of the correct stamp duty may be resolved later, not as a precondition to appointing an arbitrator. Consequently, the Court appoints Justice A. V. Chandrashekara as a sole arbitrator, directs SIAC to proceed under its rules, and allows the petition in terms stated, while leaving stamp duty issues for arbitration to determine later.

2022-02-01

The State of Sikkim v. Jasbir Singh & ANR

This appeal by the State of Sikkim challenges a High Court judgment upholding a Sessions Judge’s order directing a written notice to the Army’s commanding officer to transfer the case to a court-martial. The case concerns concurrent jurisdiction between a court-martial and an ordinary criminal court under the Army Act for an offence allegedly committed by Lance Naik Jasbir Singh during active service in Sikkim, with the FIR under IPC 302 and related charges. The High Court held that the procedure under Sections 125/126 Army Act, the 1978 Rules (Rules 3-5) and CrPC Rule 475 had not been observed and that the Army authorities had exercised their discretion to prefer a court-martial; thus, the court-martial alone would have jurisdiction. The Supreme Court, however, held that the offence falls into a category with concurrent jurisdiction under Sections 69 and 70 of the Army Act, and that where there is concurrent jurisdiction, the first instance discretion to choose the forum lies with the designated officer under Section 125. In the present case there was no decision by the designated officer to institute proceedings before a court-martial, and the sequence of events showed significant cooperation with the CrPC process. Consequently, the Sessions Judge’s competence to proceed in the criminal court was not in error, the High Court’s order is set aside, and the respondent-accused is to be transferred to civil custody to face trial in the criminal court. The appeal is allowed.

2022-07-22

Hemant Kumar Verma & Ors. v. Employees State Insurance Corporation & Ors.

This writ petition concerns whether junior resident doctors in ESIC-run medical colleges should be eligible for the 50% in-service reservation for postgraduate medical courses, a benefit presently available to Insurance Medical Officers Grade-II (IMO-II) recruited through competitive selection. ESIC recruits IMO-II and provides a 50% in-service quota for PG seats; however junior residents, who complete MBBS under bond and serve as part of ESIC's residency scheme, are not deemed in-service doctors. The petitioners argued parity with IMO-II because their qualifications, duties, and work environment are similar, and urged the Court to treat them as in-service to extend the 50% reservation to their batch. ESIC contends that junior residents are contractual, bond-based appointees governed by the ESIC Residency Scheme; IMO-II is a permanent post governed by the ESIC Staff and Condition of Service Regulations 1959; the bond reduction in 2020 and the 2018/2020 memoranda cannot convert junior residents into in-service doctors. The Court relies on precedents establishing institutional preference in PG admissions—Saurabh Chaudri v. Union of India, Yatin Kuma Jasubahi v. State of Gujarat, and Pradeep Jain v. Union of India — to acknowledge the legitimacy of institutional preference, but ultimately holds that junior residents and regular ESIC doctors are distinct categories and the in-service quota cannot be equitably extended to junior residents. The petition is dismissed.