National Insurance Company Limited v. Lord Krishna Bank Limited

Case / Petition Number:
ARBA.No.14/2004

Case Synopsis & Summary

This arbitration appeal arises from a dispute under the Bankers Indemnity Policy issued to Lord Krishna Bank Limited for the year 1983–1988, later involved in amalgamations and reconstituted entities. On 25.4.1989 the bank discovered fraud and misappropriation by its employees at the Padanilam branch, and the policy provided indemnity for fraud detected within six months from 31.12.1988 if the incident occurred within two years prior to discovery. The bank claimed Rs. 9,83,720, while the insurer admitted liability but contested the quantum. The arbitrators proceeded, directing the National Insurance Company to pay Rs. 4,06,488 with 18% interest from 27.3.1990. The insurer contended that its liability was capped by the policy at Rs. 2 lakhs, and objected to interest, arguing Section 34 of the CPC should govern any interest entitlement. Although the award was not filed in court initially, Arbitration O.P. 38/1994 was later filed to obtain filing of the award. The insurer challenged Arbitration O.P. 67/1994 before the Sub Court on grounds of mis-conduct and exceeding contractual terms, claiming the award was non-speaking and the policy terms were not annexed. The Kerala High Court, in a division bench consisting of Balakrishnan Nair, J. and M. L. Joseph Francis, applied extrinsic-evidence principles from Associated Engineering Co. and State v. Jolly to determine jurisdiction. It held that while non-annexed terms restrict scrutiny, extrinsic evidence may be admitted to assess jurisdiction. The appeal was dismissed, upholding the award and disallowing recovery from employees, while preserving interest within arbitral discretion.

Precedent Explorer

Find Cases Like This

Explore other judgments dealing with similar legal situations, facts, or statutory provisions.

Case Details & Bench

Court
High Court of Kerala
Hon'ble Judges
  • K. Balakrishnan Nair
  • M. L. Joseph Francis
Judgment Date
2009-02-24
Court Decision / Holding
Appeal dismissed; the award upheld; the bank cannot recover amounts from employees; interest in arbitration permitted within the arbitral discretion; the court did not interfere with the award beyond upholding jurisdictional boundaries.
Final Disposition
Appeal dismissed

Parties to the Case

Appellants / Petitioners

  • National Insurance Company Limited

Respondents

  • Lord Krishna Bank Limited

Legal Representation & Advocates

Counsels for Petitioners

  • • George Cherian
  • • Alexy Augustine

Counsels for Respondents

  • • V. V. Asokan
  • • Smt. S. Amina

Provisions of Law Cited

Arbitration Act, 1940, Section 30(1)Code of Civil Procedure, 1908, Section 34

Legal Doctrines & Maxims

  • Extrinsic evidence is admissible to determine jurisdiction in arbitration (Associated Engineering Co. v. Govt. of Andhra Pradesh, AIR 1992 SC 232).
  • An error in the construction of the contract by an arbitrator is an error within his jurisdiction; wandering outside the contract constitutes a jurisdictional error (Associated Engineering Co., AIR 1992 SC 232).
  • Interest is within the arbitrators’ discretion (Board of Trustees for the Port of Calcutta v. Engineers-De-Space-Age, AIR 1996 SC 2853).
  • Non-speaking awards and the extent of contractual terms may require jurisdictional analysis using extrinsic materials (Associated Engineering; State v. Jolly).

Submissions & Arguments

Contentions of Appellants / Petitioners

The applicants argued that the liability under the policy was capped at Rs. 2 lakhs per year (total Rs. 8 lakhs for four renewals), and since the award exceeded this limit and included interest, it warranted setting aside. They contended the award was a non-speaking order not annexed to the policy, and the Sub Court should not refer to the policy’s terms. They urged that Section 30(1) of the Arbitration Act, 1940 and CPC Section 34 govern interest only when appropriate, and that extrinsic materials are required to determine the arbitrators’ jurisdiction when the main contract terms are not annexed to the award. They also asserted the bank’s claim to amounts recovered from employees was unsupported by the award and outside the scope of indemnity.

Contentions of Respondents

The respondents argued that the policy was taken for several years and coverage extended to Rs. 8 lakhs, so the arbitrators could have awarded the entire loss up to that limit. They maintained that even in the absence of a contract clause, interest could be awarded under the broad principles recognized by the Supreme Court. They urged the court to defer to the arbitrators’ assessment, since the non-annexed policy cannot automatically invalidate the award, and that extrinsic evidence is permissible when determining whether the award remained within the contract’s terms.

Legal Doctrine & Issue Explorer

Explore This Legal Issue

Find relevant judgments and authoritative positions on the legal questions discussed here.

Cited Precedents (3)

Case NameCitationTreatmentExplanation
Associated Engineering Co. v. Government of Andhra PradeshAIR 1992 SC 232PositiveCited to justify that extrinsic evidence is admissible to determine if an arbitrator acted within the contract and to resolve jurisdictional questions when the award is non-speaking.
State v. Jolly1992 (1) KLT 240PositiveCited for principles that allow considering terms of the contract (extrinsic materials) in determining whether arbitrators travelled beyond the contract terms.
Board of Trustees for the Port of Calcutta v. Engineers-De-Space-AgeAIR 1996 SC 2853PositiveCited to support that interest is within the arbitrators’ discretion and not strictly controlled by contractual terms.
Case Applicability Diagnostic

Apply This to My Facts

Share your situation and test whether this judgment governs, supports, or challenges your case.

Official Judgment Record
•2,027 words•~10 min read

In The Court Record

National Insurance Company Limited v. Lord Krishna Bank Limited

## **IN THE HIGH COURT OF KERALA AT ERNAKULAM** **PRESENT :** **THE HONOURABLE MR. JUSTICE K.BALAKRISHNAN NAIR & THE HONOURABLE MR. JUSTICE M.L.JOSEPH FRANCIS TUESDAY, THE 24TH FEBRUARY 2009 / 5TH PHALGUNA 1930** **Arb.A.No. 14 of 2004(E) ----------------------OP.67/1994 of III ADDL.SUB COURT, ERNAKULAM** **....................** ## **APPELLANT/PETITIONER** **-------------------** **NATIONAL INSURANCE COMPANY LIMITED, ERNAKULAM, REPRESENTED BY ITS MANAGER, REGIONAL OFFICE, M.G.ROAD, ERNAKULAM.** **BY ADV. SRI.GEORGE CHERIAN (THIRUVALLA) SRI.ALEXY AUGUSTINE** ## **RESPONDENT/ RESPONDENT** **-------------------------** **LORD KRISHNA BANK LIMITED, HEAD OFFICE, KODUNGALLUR, REPRESENTED BY ITS GENERAL MANAGER.** **ADV. SRI.V.V.ASOKAN SMT.S.AMINA** **THIS ARBITRATION APPEALS HAVING BEEN FINALLY HEARD ON 24/02/2009, THE COURT ON THE SAME DAY PASSED THE FOLLOWING:** **K. BALAKRISHNAN NAIR & M.L. JOSEPH FRANCIS, JJ. ------------------------------ARBA.No. 14 of 2004 ------------------------------Dated this the 24[th] day of February, 2009 J U D G M E N T ~~~~~~~~~~~~** ## **Balakrishnan Nair, J.** The appellant, Insurance Company, was the petitioner in O.P.No.67 of 1994 before the Sub Court, Ernakulam and the respondent in the Arbitration Proceedings before the Arbitrators. The respondent herein, Lord Krishna Bank Ltd., was the respondent in the arbitration O.P. and claimant before the Arbitrators. The said Bank, during the pendency of the proceedings, was amalgamated with Centurion Bank Ltd, which in turn, was amalgamated with H.D.F.C. Bank Ltd. with effect from 23.5.2008. The dispute between the parties relates to a claim under the Bankers Indemnity Policy issued to the respondent Bank for the period covering from 1.1.1988 to 31.12.1988. The respondent had taken Banker's Indemnity Policy from 1983 onwards and the validity of the last policy expired on 31.12.1988. Thereafter, it appears that the respondent took insurance policy from some other company. ARBA.NO.14/2004 2 2. The respondent Bank on 25.4.1989 discovered fraud and misappropriation committed by its employees attached to its Padanilam branch and thereby the resultant monetary loss sustained by the Bank also came to light. As per the terms of the policy, any fraud detected within six months from 31.12.1988 is liable to be indemnified, provided the incident happened within two years prior to the date of such discovery that is, 25.4.1989. The Bank raised a claim for Rs.9,83,720/Though the appellant admitted the liability, it disputed the amount claimed by the Bank. The dispute was finally referred for arbitration. So, as per the terms of the policy, both sides nominated one Arbitrator each. The said Arbitrators entered upon arbitration and after hearing both sides, passed an award directing the appellant to pay an amount of Rs.4,06,488/- with 18% interest from 27.3.1990 to the respondent. Before the Arbitrators, the appellant Insurance Company contended that their liability is limited to Rs.2 lakhs. But, ignoring the said contention of the appellant, the award was passed. The appellant is, mainly, aggrieved by the amount awarded in excess of Rs.2 lakhs. It is also aggrieved by the grant of interest for the ARBA.NO.14/2004 3 amount awarded. According to the appellant, no interest could be awarded and even assuming that it could be awarded, the quantum should be as provided in Section 34 of the Code of Civil Procedure. 3. Though the Arbitrators passed the award, it was not filed in court, even after producing necessary stamp papers by the claimant. So, Arbitration O.P. 38 of 1994 was filed by the Bank praying, inter alia, for filing the award in court. Thereafter, the award was filed in court. 4. Aggrieved by the award dated 29.4.1994 the appellant filed Arbitration O.P. 67 of 1994 under Section 30 of the Arbitration Act, 1940, to set aside the same. It was contended before the court below that the Arbitrators passed the award against the express terms of the policy concerning the limit of liability. Thus, the award was passed without jurisdiction. So, it is a mis-conduct in terms of Section 30(1) of the Act and therefore the award is liable to be set aside, it was contended. The claimant Bank filed its objections, resisting the prayers in ARBA.NO.14/2004 4 the Arbitration O.P. After hearing both sides, the Sub Court found that the award is a non-speaking award. It was also held that since it is a non-speaking award and the policy is not annexed to the award, it is not permissible to the court to refer to the terms of the policy, to find out whether the award is in conformity with the contract or not. Based on the said finding, the grievance voiced by the appellant regarding the limit of its liability was rejected. The contention regarding the award of interest was also repelled. 5. Yet another point canvassed before the court below was that the appellant was entitled to get the amounts received by the Bank from the employees, who were involved in the misappropriation. That claim was specifically rejected by the Arbitrators and it was affirmed by the court below also. So, the petition filed by the appellant to set aside the award was rejected and a decree was passed in favour of the respondent, in terms of the award. ARBA.NO.14/2004 5 6. The aggrieved appellant attacks the order of the court below, declining to set aside the award, on various grounds. The learned counsel for the appellant Mr. George Cherian took us through the materials on record. The learned counsel pointed out that the loss was assessed, by appointing a Chartered Accountant as Commissioner. While assessing the total damage, a supplementary claim made by the respondent Bank in 1992, during the pendency of the arbitration proceedings, was also taken into account. The said claim was barred by limitation. Any loss discovered within six months from the expiry of the policy alone is covered by the policy, it is submitted. 7. It is also submitted that the Arbitrators have travelled beyond the terms of the contract under the policy and awarded amounts exceeding the limit of the liability provided therein. There was no provision for award of interest in the contract. Even then interest at unconscionable rate has been awarded. It is also submitted that even if the policy is not annexed to the award, since the terms of the policy have been referred to by ARBA.NO.14/2004 6 the Arbitrators, it must be taken that the policy is annexed to the award or deemed to be annexed to the award. At any rate, the clauses with reference to which the claims were decided, should be treated as part of the award and they can be adverted to by the court. But the court below misread the decision of the Full Bench of this Court in **State v. Jolly** (1992 (1) KLT 240). Going by the principles laid down in the said decision, the relevant terms of the policy could have been adverted to by the court below for the purpose of examining whether the Arbitrators have travelled beyond the terms of the policy in making the award. If it is found that the Arbitrators travelled beyond the terms of the policy, it is an action without jurisdiction, as held by the Apex Court in **Associated Engineering Company v. Government of Andhra Pradesh** (AIR 1992 SC 232). So, the court below should have interfered with the same, it is submitted. 8. We heard the learned counsel appearing for the respondent. He fully supported the award of the Arbitrators and also the decision of the court below. According to him, since the ARBA.NO.14/2004 7 policy is not annexed to the award, the court below has rightly refused to look into the same. Since the policy was taken for the first time in 1983 and it was renewed from time to time upto 1988, the coverage will come to Rs. 8 lakhs, that is, the coverage per year should be taken as Rs. 2 lakhs and since the policy was renewed for four years, the total amount covered will come to Rs. 8 lakhs. So, the Arbitrators should have awarded the entire amount of loss assessed by the Commissioner appointed by the Arbitrators. It is also submitted that since the entire loss is not indemnified by the Insurance Company, they have no right to receive any amount the Bank may get from the employees. The learned counsel also submitted that even in the absence of any clause for award of interest in the contract, still the Arbitrators can issue direction to pay interest, in view of the decision of the Apex Court in **The Board of Trustees for the post of Calcutta v. Engineers-De-Space-Age** (AIR 1996 SC 2853). It is also pointed out that the loss discovered in 1992 is not awarded by the Arbitrators. ARBA.NO.14/2004 8 9. We considered the rival submissions made at the Bar. We perused the materials on record. The award is a nonspeaking award. The terms of the main contract between the parties are not annexed to the award. Therefore, normally, this Court cannot go into the terms of the contract, while considering the attack against the award, on the ground that the Arbitrators mis-conducted the proceedings. But, in certain circumstances, this Court may look into the award, even if, the terms of the contract are not annexed to it. Those circumstances have been dealt with by the Apex Court in **Associated Engineering Company. v. Govt. of Andhra Pradesh** [AIR 1992 SC 232]. The said point has been considered in detail by this Court in **State v. Jolly** [1992(1)KLT 240], In this case, the main grievance of the appellant is that the Arbitrators mis-construed the terms of the contract, concerning liability. The appellant has already admitted the liability. So, the dispute is only regarding the extent of liability. The appellant claimed that the liability should have been restricted to two lakhs alone. Per contra, the other side contended that the Insurance Company was liable to compensate the entire loss suffered by the Bank. ARBA.NO.14/2004 9 10. In fact, the contention of the appellant is that the Arbitrators have committed an error in the construction of the terms of the contract. Going by the decision of the Apex Court in **Associated Engineering Co.,** it is an error within jurisdiction. The relevant portion of the judgment reads as follows: “29. If the arbitrator commits an error in the construction of the contract, that is an error within his jurisdiction. But, if he wanders outside the contract and deals with matters not allotted to him, he commits a jurisdictional error. Such error going to his jurisdiction can be established by looking into material outside the award. Extrinsic evidence is admissible in such cases because the dispute is not something which arises under or in relation to the contract or dependent on the construction of the contract or to be determined within the award. The dispute as to jurisdiction is a matter which is outside the award or outside whatever may be said about it in the award. The ambiguity of the award can, in such cases, be resolved by admitting extrinsic evidence. The rationale of this rule is that the nature of the dispute is something which has to be determined outside and independent of what appears in the award. Such jurisdictional error need to be proved by evidence extrinsic to the award.” (emphasis supplied) ARBA.NO.14/2004 10 11. If the error is one, within jurisdiction and the award is a non-speaking award, this Court has no power to look into the terms of the contract not annexed to the award, to interfere with it. So, this Court cannot look into the contract to find out whether the liability has been fixed rightly or not. There is nothing apparent on the record to show that the time barred claim made in 1992 also formed part of the amount awarded. In view of the decision of the Apex Court in **Board of Trustees for the post of Calcutta** (supra), the Arbitrators have jurisdiction to award interest. The rate of interest is a matter within the discretion of the Arbitrators, with which this Court cannot interfere. Since the entire loss of the Bank is not covered by the award, the claim of the appellant for the amount, which the Bank may recover from its employees is also unsustainable. In the result, the appeal fails and it is dismissed. ## **(K.BALAKRISHNAN NAIR, JUDGE)** ## **(M.L.JOSEPH FRANCIS, JUDGE)** **ps**
End of Judgment Record
Browse All High Court of Kerala (2009) Decisions
2009-06-26

Nishana Mol.N v Alappuzha Municipality & Secretary, Alappuzha Municipality

This writ petition concerns the registration of a marriage under the Kerala Registration of Marriages (Common) Rules, 2008 (Common Rules). The petitioner Nishana Mol.N, whose marriage was solemnized on 8 March 2009, sought registration of her marriage by the Local Registrar. Her husband was abroad, and she submitted Form No. 1 along with documents; however, the Local Registrar demanded the presence of both spouses for registration, a point contested by the petitioner. The court recalls the apex court’s directions in Seema v. Ashwani Kumar (2006) to frame rules ensuring compulsory registration to protect women and provide evidence of marriage, while noting that registration under the Rules does not itself create a marriage but evidences one solemnized otherwise. The Rules specify that registration is mandatory for marriages solemnized within the state, with various procedural requirements (Rules 5, 6, 9, 10, 11, 13, 16, 17) and mechanisms for correction, appeal, and re-registration. The court clarifies that the presence of both parties is not ordinarily required; the registrar may require appearance only in cases where there is reasonable doubt about identity, and even then as an exception rather than a rule. Ultimately, the court directs that registration and certificate issuance be completed within one month from copy of the judgment, without insisting on joint appearance, provided the memorandum is in order.

2009-07-27

Abdul Majeed Kalathil v. District Collector, Malappuram & Others

This batch of writ petitions concerns the constitutional validity of Section 17 of the Kerala Anti-Social Activities (Prevention) Act, 2007, and the power of District Magistrates to confiscate vehicles used in anti-social activities. The petitions challenge the absence of a substantive prohibition against using vehicles for anti-social activities and the lack of a defined procedure for confiscation or an appellate remedy. In W.P.C. No. 9925 of 2009 (the lead case), Abdul Majeed Kalathil contends that his goods carriage KL 11-B/6651 was seized by the Sub Inspector of Pandikkad Police and reported to the District Collector, Exts.P1–P2. The court scrutinizes Section 17's scope, defining anti-social activity (Section 2(a)) and whether the District Collector’s power to confiscate is constitutionally tenable. It finds Section 17 to be vague and violative of Articles 14, 19(1)(g) and 21, as it rests on subjective police satisfaction with no clear standards or process. It also notes environmental objectives but concludes that fundamental rights must prevail. The court does not sustain confiscation under Section 17; instead, it directs that such vehicles be dealt with under the Kerala Protection of River Banks and Regulation of Removal of Sand Act, 2001 and Rules, with interim release under specified conditions. It further directs initiation of Sand Act proceedings within a month and finalization within another month. The writ petitions are disposed of accordingly, preserving the rule of law and environmental protection.

2009-06-11

WA No. 671 of 2006 (Fertilizers and Chemicals Travancore Ltd v Union of India)

This writ appeal concerns the pay revision and pensionary benefits of employees of the Fertilizers and Chemicals Travancore Ltd (FACT). The long-term settlement covering terms of employment expired on 31 December 1996. A fresh settlement was concluded (notified 28 August 2001) and made retroactive to 1 January 1997, with revisions in wages and benefits. Clause 29 of Ext. P1 provides that arrears relating to wage revision and dearness allowance for the period 1 January 1997 to 30 June 2001 will be reviewed and decided by management/government only when the company earns profits for at least three consecutive years; Clause 33.1 provides that employees who retired on or after 1 January 1997 will be eligible for arrears calculated from 1 January 1997 to the date of retirement, subject to adjustments for interim relief already paid, with any unclaimed amount transferred to a Welfare Fund. The appellants—the retirees who fall in the 1 January 1997 to 1 July 2001 window—argue that they were denied arrears and were paid pensionary benefits at pre-revised rates, creating discrimination. Respondents contend Ext. P1 binds the parties and arrears depend on profits, and that pay revision administered to others does not compel retroactive change. The court held that Ext. P1 terms survive as terms of employment and directed the management to consider terminal benefits at revised rates within two months and to release arrears when paid to current workers, with connected matters following."

2009-05-29

M/S. Palm Fibers & Yars Trading Co. v. State of Kerala & Others

The petitioner, a Small Scale Industrial unit, ran two LT power connections (No.13070 and No.13427) with commercial production starting in July 1994 and July 1995. On 06/02/1992, the Government issued Ext.P1 guaranteeing concessional tariffs (pre-1992 tariff) for five years from the date of commencement or substantial capacity expansion, certified by the District Industries Centre. Ext.P2 certified eligibility for this concession. Subsequently, the petitioner increased power demand to 300 KVA and was reclassified/advised to HT status from 15/05/1998, converting LT supply to HT. The petitioner argued that Ext.P1 benefits should extend for the full five-year period, covering the LT quantities certified in Ext.P2, and that the HT conversion was a mere reclassification directed by the Board, not a cessation of eligibility. The Board argued Ext.P1 targets only those who commenced production during 1992–1996 and that HT conversion from 15/05/1998 falls outside the Ext.P1 window, rendering the petitioner eligible only up to 15/05/1998. Earlier orders (Ext.P3) had set aside a cut-off date for merits, and Ext.P6/Ext.P4 handled appeals. Ultimately, the Court held that the HT conversion was outside Ext.P1’s period, but directed that the LT benefits for the two LT connections be extended only until 23/05/1998 (LT dismantling date) and without reimbursement from the Industries Department, as held in OP No.7622/1998. The petition was disposed of as above.