National Highways Authority of India v. M/s. Ganga Enterprises and Anr.

Case / Petition Number:
Civil Appeal No. 4123 of 1999
Neutral Citation:SUPREME COURT REPORTS (2003) SUPP. 3 S.C.R.

Case Synopsis & Summary

This case concerns a tender for toll collection on a highway segment in Rajasthan, with two forms of security: a bid security of Rs 50 lakhs and a performance security by bank guarantee of Rs 2 crores. The bid security was framed as an earnest money to deter withdrawal during the bid validity period (120 days) and, if accepted, to secure furnishment of performance security and signing of the agreement. The respondent submitted a bid and bank guarantee, was the highest bidder but withdrew within bid validity. The appellant encashed the Rs 50 lakh bank guarantee. The Delhi High Court allowed a writ petition for refund, holding that no complete contract had formed and that the bank guarantee could not be invoked. The Supreme Court reversed, holding that the bank guarantee is an independent contract enforceable under its terms: if the bid is withdrawn within the validity period or performance obligations are not fulfilled, the bank guarantee may be invoked. It was explained that disputes over tender terms are contractual and not ordinarily enforceable by a writ under Article 226 of the Constitution, and that the Indian Contract Act permits withdrawal of an offer before acceptance, but not the forfeiture of earnest money under misaligned terms. The Court affirmed that the bank guarantee’s invocation did not violate statutory rights and that government bids are driven by ensuring genuine bids. The appeal was allowed and the writ petition dismissed.

Precedent Explorer

Find Cases Like This

Explore other judgments dealing with similar legal situations, facts, or statutory provisions.

Case Details & Bench

Court
Supreme Court of India
Hon'ble Judges
  • S. N. Variava
  • H. K. Sema
Judgment Date
2003-08-28
Court Decision / Holding
Appeal allowed. The High Court’s judgment is set aside. The writ petition is dismissed. The bank guarantee was rightly invoked in terms of the guarantee; there is no breach of a statutory right by the enforcement of the bid security.
Final Disposition
Appeal allowed; writ petition dismissed; no order as to costs.

Parties to the Case

Appellants / Petitioners

  • National Highways Authority of India

Respondents

  • M/s Ganga Enterprises
  • Anr.

Legal Representation & Advocates

Counsels for Petitioners

  • • Mukul Rohatgi
  • • Raju Ramachandran
  • • Dushyant Dave
  • • Sanjeev Sachdeva
  • • Ms. Priya Puri

Counsels for Respondents

  • • Niranjan Singh
  • • Mrs. Anil Katiyar
  • • Lakshmi Raman Singh
  • • Kamal Mohan Gupta
  • • Mrs. Rita Choudhary
  • • Manish Kumar
  • • Sunil Kumar Jain

Provisions of Law Cited

Constitution of India, Articles 226 and 299Indian Contract Act, Section 5 (withdrawal of offer before acceptance)

Legal Doctrines & Maxims

  • Disputes relating to contracts cannot be entertained under Article 226 of the Constitution (maintainability of contractual disputes)
  • A contract of guarantee is a complete and separate contract by itself
  • On-demand bank guarantees must be enforced strictly on their terms; courts should not interfere when invoked under the guarantee (unless fraud or breach)
  • Forfeiture of earnest/security money ensures that only genuine bids are received in government tenders
  • Withdrawal of an offer before acceptance creates no binding contract; however, if made on a condition that earnest money will be forfeited, the money can be forfeited

Submissions & Arguments

Contentions of Appellants / Petitioners

The appellant contended that the bid security was a separate earnest to ensure non-withdrawal during bid validity and that the on-demand bank guarantee could be enforced; there was no statutory right to recover the bid security when withdrawal occurred within the validity period; the contract dispute is not suitable for Article 226 writs; the bank guarantee was enforceable under its terms and the courts should refrain from interfering with enforceable guarantees.

Contentions of Respondents

The respondents argued that no completed contract existed since acceptance and performance security were not furnished; withdrawal before acceptance could entitle refund of the bid security; the writ petition should be entertained for refund; the High Court erred in treating the matter as beyond writ jurisdiction and in not recognizing remedies available under contract law.

Legal Doctrine & Issue Explorer

Explore This Legal Issue

Find relevant judgments and authoritative positions on the legal questions discussed here.

Cited Precedents (5)

Case NameCitationTreatmentExplanation
Kerala State Electricity Board v. Kurien E. Kalathil(2000) 6 SCC 293PositiveCited and relied upon as authority for the proposition that contractual disputes are not amenable to writ jurisdiction under Article 226.
State of U.P. v. Bridge & Roof Co. (India) Ltd.(1996) 6 SCC 22PositiveCited to support the principle that contract disputes are not maintainable via writ petitions.
B.D.A. v. Ajai Pal Singh(1989) 2 SCC 116PositiveCited as authority on contractual disputes and maintainability issues.
Verigamto Naveen v. Government of A.P.(2001) 8 SCC 344Mentioned OnlyCited but held inapplicable to the present contractual dispute.
Harminder Singh Arora v. Union of India(1986) 3 SCC 247Mentioned OnlyCited but held inapplicable to the contractual dispute at issue.
Case Applicability Diagnostic

Apply This to My Facts

Share your situation and test whether this judgment governs, supports, or challenges your case.

Official Judgment Record
•3,118 words•~15 min read

In The Court Record

National Highways Authority of India v. M/s. Ganga Enterprises and Anr.

A # NATIONAL HIGHWAY AUTHORITY OF INDIA _v._ _MIS._ GANGA ENTERPRISES AND ANR. AUGUST 28, 2003 ## B [S.N. VARIAVA AND H.K. SEMA, JJ.] ## _Contract:_ > _Tender-Forfeiture of bid security-Bidders required to furnish bid_ C _security and performance security-Bid SPcurity to be forfeited if bidder withdrew his bid during period of bid validity-Respondent gave his bid/ offer and furnished bank guarantee for bid security-Later, when he came to be highest bidder, withdrew his bid before expiry of period of bid validity-Appellant encashed the bank guarantee-Writ petition by respondent for refund of amount allowed by High Court-Held, by_ D _invoking the bank guarantee and/or enforcing the bid security, there is no statutory right, exercise of which was being fettered-There is no term in the contract which is contrary to the provisions of the Contract Act-The Contract Act merely provides that a person can withdraw his offer before its acceptance-But withdrawal of an offer, before it is accepted, is a_ E _completely different aspect from forfeiture of earnest/security money which has been given for a particular purpose-A person may have a right to withdraw his offer but if he has made his offer on a condition that some earnest money will be forfeited for not entering into contract or if some act is not performed, then even though he may have a right to withdraw_ F _his offer, he has no right to claim that the earnest/security be returned to him-Forfeiture of such earnest/security, in no way, affects any statutory right unde1 .. 1e Contract Act-Such earnest/security is given and taken to ensure that a contract comes into existence-In government contracts, such a term is always included in order to ensure that only a genuine party_ G _makes a bid_ _Contract-Contract of guarantee-Tender-Bid security by way of bank guarantee-Forfeiture of on withdrawal of bid during period of bid validity-A contract of guarantee is a complete and separate contract by itself-The law regarding enforcement of an "on demand bank guarantee"_ H _is very clear-If the enforcement is in terms of the guarantee, then Courts_ 114 NATIONAL HJGHW A Y AUTHORITY OF INDIA _v._ GANGA ENTERPRISES 115 ' _must not interfere with the enforcement of bank guarantee-The existence_ A _or non-existence of an underlying contract become irrelevant when the invocation is in terms of the bank guarantee-The bank guarantee stipulated that if the bid was withdrawn within 120 days or if the performance security was not given or if an agreement was not signed, the guarantee could be enforced-The bank guarantee was enforced because_ B _the bid was withdrawn within 120 days-Therefore, it could not be said that the invocation of the bank guarantee was against the terms of the bank guarantee-If the guarantee was rightly invoked, there was no question of directing refund-Bank guarantee-Courts' power to interferewith._ ## _Constitution of India, 1950:_ c _Articles 226 and 299-Contractual disputes-Writ petitionMaintainability of-Tender-Forfeiture of bid security-Writ petition for refand of amount allowed by High Court-Held, disputes relating to contracts cannot be agitated under Article 226-The dispute in this case_ D _was regarding the terms of offer-It was thus a contractual dispute in respect of which a writ court was not the proper forum._ _Kera/a State Electricity Board_ v. _Kurien E. Kalathil,_ (2000) 6 SCC 293; _State of V.P._ v. _Bridge & Roof Co. (India) Ltd,_ (1996) 6 sec 22 E and _B.D.A._ v. _Ajai Pal Singh,_ (1989) 2 SCC 116, relied on. _Verigamto Naveen_ v. _Government of A.P.,_ (2001) 8 SCC 344 and _Harminder Singh Arora_ v. _Union of India,_ (1986) 3 SCC 247, held inapplicable. F CIVIL APPELLATE JURlSDICTION : Civil Appeal No. 4123 of 1999. From the Judgment and Order dated 30.10.98 of the Delhi High Court in C.W.P. No. 739 of 1998. G Mukul Rohatgi, Raju Ramachandran, Additional Solicitor Generals, Dushyant Dave, Sanjeev Sachdeva and Ms. Priya Puri, Mrs. Niranjan Singh, Mrs. Anil Katiyar, Lakshmi Raman Singh, Kamal Mohan Gupta, Mrs. Rita Choudhary, Manish Kumar and Sunil Kumar Jain for the apearing parties. H 116 SUPREME COURT REPORTS (2003] SUPP. 3 S.C.R. A F The following Order of the Court was delivered : This appeal is against the Judgement of the High Court of Delhi dated 30th October, 1998. ## B Briefly stated, the facts are as follows : The Appellant issued a tender notice calling for tenders for collection of toll on a portion of the highway running through Rajasthan. The last date of submission of bid was 31st July, 1997. It was also provided that toll plazas would be got completed by the authority and handed over to C the selected enterprise. There was two types of securities to be furnished, one being a bid security in an amount of Rs. 50 lakhs (Rupees fifty lakhs only). The other was a performance security by way of a bank guarantee of Rs. 2 Crores (Rupees Two crores only). Clauses 7.1 to 8 deal with bid security. They read as under :- ## D "7. _Bid Security._ E 7. I. The bidder shall furnish, as a part of his bid, a Bid Security in an amount of Rs. 50 Lakhs (Rupees Fifty Lakhs only), or an equivalent amount in a freely convertible currency. The Bid Security shall, at the bidder's opinion, be in the form of a Bank Draf, or Guarantee from a Bank located in India. The Bank Guarantee shall be in the Form of Bank Guarantee for Bid Security included herein, valid of 150 days after the last date for submission of the bid. 7.2. A bid not accomoanied by an acceptable bid security shall be rejected by National Highways Authority of India as nonresponsive. G 7.3. The Bid Security of unsuccessful bidders will be returned by National Highways Authority of India as promptly as possible but not later than 30 days after the expiratio;i of the period of bid validity. ## H ## 7.4. The Bid Security of the successful bidder will be returned NA TI ON AL HIGHWAY AUTHORITY OF INDIA r. GANGA ENTERPRISES 117 by National Highways Authority oflndia soon after the bidder has A furnished the required Performance Security. - 7.5. The Bid Security may be forfeited : - (a) if the bidder withdraws his bid during the period of bid validity; or B - (b) in case the successful bidder fails within the specified period to - (i) furnish the required Performance Security; and c - (ii) sign the Agreement. 8. _Bid Validity._ Bid shall remain valid for a period of 120 days after the last date of bid submission." Thus, it is to be seen that the bid security of Rs. 50 lakhs was not for performance of the contract. It was in essence an earnest to be given to ensure that the bidder did not withdraw his bid during the period of bid validity and/or that after acceptance the performance security is furnished and the Agreement signed. The other terms pertained to the anticipated E contract for collection of toll. It must be mentioned that the bid validity period was 120 days. In terms of this tender document the Respondent gave his bid or offer. The offer/bid was in terms of the tender and thus it was also in two parts. F The first part being an offer that the bid would not be withdrawn during the bid validity period and/or that on acceptance the performance security would be furnished and the Agreement signed. The second part of the offer dealt with the terms and conditions pertaining to the performance of the contract of collection of tolls, ifthe offer was accepted. As earnest/security for performance (of the first part of the offer) the Respondent along with G his bid furnished a bank guarantee in a sum ofRs .. 50 Lakhs as bid security. The bank guarantee furnished was a "on demand guarantee" which specifically provided that the bank guarantee could be enforced "on demand" if the bidder withdraws his bid during the period of bid validity or if the bidder, having beeen notified of the acceptance of his bids, fails H SUPREME COURT REPORTS [2003] SUPP. 3 S.C.R. 118 A to furnish the performance security or fails to sign the Agreement. The amount of the Bank? Guarantee was to be paid by the bank without demur on the written demand merely stating that one of these conditions had been fulfilled. The moment the bank guarantee was given and accepted by the Appellants the first portion of the offer, regarding bid security, stood B accepted. Of course, this did not mean that a competed contract in respect of the work of toll collection had come into existence. It is an admitted position that 120 days would have come to an end of 28th November, 1997. In August the technical bids were opened. In September the financial bids were opened, wherein it was found that the C Respondent was the highest bidder. On 20th November, 1997 the Respondent withdrew his bid _i.e._ he ·withdrew his bid before the expiry of 120 days. On 21st November, 1997, the Appellants accepted the offer of the Respondent. However, as the D Respondent had withdrawn his bid the performance guarantee was not furnished and the Agreement was not entered into. The Appellants thus encashed the bank guarantee for Rs. 50 lakhs. The Respondent then filed a Writ Petition in the High Court, for E refund of the amount. On the pleadings before it, the High Court raised two questions _viz._ {a) whether the forfeiture of security deposit is without authority of law and without any binding contract between the parties and also contrary to Section 5 of the Contract Act and (b) whether the writ petition is maintainable in a claim arising out of a breach of contract. Question (b) should have been first answered as it would go to the root F of the matter. The High Court instead considered question (a) and then chose not to answer question (b ). In our view, the answer to question (b) is clear. It is settled law that disputes relating to contracts cannot be agitated under Article 226 of the Constitution of India. It has been so held in the cases of _Kera/a State Electricity Board_ v. _Kurien E. Ka/athil_ reported in G [2000] 6 sec 293, _State ofU.P._ v. _Bridge_ & _Roof Co. (India) Ltd._ reported in (1996) 6 SCC 22 and _B.D.A._ v. _Ajai Pal Singh_ reported in (1989) 2 SCC 116. This is settled law. The dispute in this case was regarding the terms of offer. They were thus contractual disputes in respect of which a Writ Court was not the proper forum. Mr. Dave however relied upon the cases H of _Verigamto Naveen_ v. _Government of A.P._ reported in [200 l] 8 sec 344 NATIONAL HIGHWAY AUTHORITY OF INDIA _v._ GANGA ENTERPRISES 119 and _Harminder Singh Arora_ v. _Union of India_ reported in [1986] 3 SCC A 247. These however are cases where the Writ Court was enforcing a statutory right or duty. These cases do not lay down that a Writ Court can interfere in a matter of contract only. Thus on the ground of maintainability the Petition should have been dismissed. > By the impugned Judgment the Writ Petition has been allowed. The B High Court holds that the offer was withdrawn before it was accepted and thus no completed contract had come into existence. The High Court holds that in law it is always open to a party to withdraw its offer before its acceptance. To this proposition there can be no quarrel. We therefore did not permit Mr. Dave to cite authorities for the proposition that an offer can C be withdrawn before it is accepted. The Court, however, then goes on to hold as under : "The statutory right having been so exercised, the fetter imposed by the clause to the contrary in the tender documents and D the bank guamatee could not override the provisions of the Indian Contract Act. Any clause in so far as it is contrary of comes in conflict with the provisions of the Indian Contract Act is inoperative and void and connot be enforced. To have an enforceable contract there must be an offer and unconditional acceptance. A person E who makes an offer has the right of withdrawing it before acceptance. Until the offer is accepted unconditionally it creates no legal right and the bid can be withdrawn at any time. Once it is held that there is no completed contract between the parties no further question can arise. There can be no breach of contract. F There is no statutory rule or an act whenunder the security deposit in the form of a bank guarantee could be claimed by the respondent No. 2. The position may, however, be different ifthere is a statutory rule having force of law precluding withdrawal of a bid before its acceptance. The petitioner was entitled to withdraw G the bid because the prohibition against withdrawal does not have the force of law and there was no consideration to bind him down to the condition. In the present case there was no acceptance by respondent No. 2 on the date of withdrawal of the bid by the petitioner. In the circumstances the invocation and encashment of the bank guarantee is illegal and void and is liable to be set aside." H SUPREME COURT REPORTS (2003) SUPP. 3 S.C.R. 120 A In our view, the High Court fell in error in so holding. By invoking the bank guarantee and/or enforcing the bid security, there is no statutory right, exercise of which was being fettered. There is no term in the contract which is contrary to the provisions of the Indian Contract Act. The Indian Contract Act merely provides that a person can withdraw his offer before B its acceptance. But withdrawal of an offer, before it is accepted, is a completely different aspect from forfeiture of earnest/security money which has been given for a particular purpose. A person may have a right to withdraw his offer but if he has made his offer on a condition that some earnest money will be forfeited for not entering into contract or if some act is not performed, then even though he may have a right to withdraw C his offer, he has no right to claim that the earnest/security be returned to him. Forfeiture of such earnest/security, in no way, affects any statutory right under the Indian Contract Act. Such earnest/security is given and taken to ensure that a contract comes into existence. It would be an anomalous situation that a person who, by his own conduct, precludes the D coming into existence of the contract is then given advantage or benefit of his own wrong by not allowing forfeiture. It must be remembered that, particularly in government contracts, such a term is always included in order to ensure that only a genuine party makes a bid. If such a term was not there even a person who does not have the capacity or a person who E has no intention of entering into the contract will make a bid. The whole purpose of such a clause _i.e._ to see that only genuine bids are received would be lost if forfeiture was not permitted. There is another reason why the impugned Judgment cannot be F sustained. It is settled Jaw that a contract of guarantee is a complete and separate contract by itself. The Jaw regarding enforcement of an "on demand bank guarantee" is very clear. If the enforcement is in terms of the guarantee, then Courts must not interfere with the enforcement of bank guarantee. The Court can only interfere if the invocation is against terms of the guarantee or if there is any fraud. Courts cannot restrain invocation G of an "on demand guarantee" in accordance with its terms by looking at terms of the underlying contract. The existence or non-existence of an underlying contract become irrelevant when the invocation is in terms of the bank guarantee. The bank guarantee stipulated that if the bid was withdrawn within 120 days or if the performance security was not given H or if an Agreement was not signed, the guarantee could be enforced. The NATIONAL HIGHWAY AUTHORITY OF INDIA _v._ GANGA ENTERPRISES 121 bank guarantee was enforced because the bid was withdrawn within 120 days. Therefore, it could not be said that the invocation of the bank guarantee was against the tenns of the bank guarantee. If it was in tenns of the bank guarantee, one fails to understand as to how the High Court could say that the guarantee could not have been invoked. If the guarantee was rightly invoked, there was no question of directing refund as has been done by the High Court. Mr. Dave submitted that the Respondent had no option· but to withdraw his offer as the Appellants had not completed the toll plazas. He pointed out that the period of the contract was to be from !st October, 1997 to 30th September, 1999. He submitted that even though the contract, if C accepted, was to commence from I st October 1997, the Appellants had not accepted the offer till 20th November, 1997 and thus Respondent had to withdraw his offer. He submitted that it has come on record that the toll plazas were not completed till March, 1998. He submitted that the Respondent was forced to withdraw his offer because of the inaction/ D negligence on the part of the Appellant. He submitted that under these circumstances Respondent shold not be penalized by forfeiture of his deposit. We are unable to accept this submission. The Bid security was given to meet a specific contingency _viz._ non-withdrawal of the offer within 120 days. The contingency having arisen, Appellants were entitled to E forfeit. It may only be mentioned that in the proposed Agreement there is a clasue which provides that if therre is a delay on the part of the Appellants, which results in delay in the work of collection of toll, the amount payable by the Respondent would be reduced _pro-rata._ Thus by reason of the delay Respondent would not have suffered. Also Respondent was well aware that 120 days would end on 28th November, 1997. Thus F the Respondent was aware when he gave his offer, that acceptance could be delayed till 28th November, 1997. Thus non-acceptance till 20th November, 1997 was not a ground would justify action of Respondent in withdrawing his offer. G In this view of the matter, the impugned Judgment is set aside. The Appeal is accordingly allowed. The Writ Petition of the Respondents shall stand dismissed. There will be no order as to costs. R.P. Appeal allowed. _)_
End of Judgment Record
Browse All Supreme Court of India (2003) Decisions
2003-09-22

State of Punjab v. Pohla Singh and Anr.

This is a Supreme Court of India decision (September 22, 2003) arising from Criminal Appeal No. 901 of 1996, where the State of Punjab challenges acquittal by the Punjab and Haryana High Court of two respondents for offences under Section 302 read with Section 34 IPC. The trial court had convicted Pohla Singh and Balkaur Singh for homicidal death of Mandip Singh around 5.30 a.m. on 11 June 1991; the other two accused were given the benefit of doubt. The High Court acquitted the two respondents on the ground of delay in lodging the FIR and questioned the time of occurrence, treating these as improbable factors that undermined the prosecution case. The State contends that there is no embargo on appellate review of acquittals and that the High Court’s reasoning rests on surmises and conjectures, ignoring the eye-witnesses’ detailed testimony and the trial court’s careful evaluation. The Supreme Court agrees to re-appreciate admissible evidence to prevent miscarriage of justice, noting that unexplained delay, standing alone, is the relevant factor, and that the prosecution need not answer every hypothetical question. It faulted the High Court’s approach, upheld the credibility of witnesses, reversed the acquittal, and restored the trial court’s verdict, directing the respondents to serve their sentences.

2003-05-01

Parwati Bai v. Radhika

This Supreme Court decision concerns eviction of a sub-tenant from municipal non-residential premises in Khargaon, Madhya Pradesh. The appellant (Parwati Bai) had leased the premises from the Municipal Council and sub-let to the respondent (Radhika). The ownership of the premises vested in the municipality, and the landlord sought eviction on the ground of non-payment of rent and need for self-occupation under the Transfer of Property Act, while contending that the Madhya Pradesh Accommodation Control Act, 1961 should not apply since the property is owned by a local authority used for non-residential purposes. The Trial Court and the First Appellate Court, and the High Court, held that the accommodation-control Act applied and dismissed the eviction suit for lack of proven grounds under Section 12. The Supreme Court held that the premises, being owned by a local authority, are immune from the Act itself, and between the landlord (appellant) and sub-tenant (respondent), the landlord-tenant relationship arises with the municipality as the landlord. The key issue is whether tenancy was terminated validly under Section 106 of the Transfer of Property Act; there is no infirmity in the notice. Consequently, the appeal is allowed: the suit for eviction is decreed, the respondent to vacate within six months (with undertaking), rent arrears to be determined by the Executing Court, and no order as to costs. The decision aligns with existing rulings on premiss-based immunity and the applicability of transfer-only remedies.

2003-03-31

T. Lakshmipathi v. P. Nithyananda Reddy

This Supreme Court judgment deals with an eviction challenge under the Andhra Pradesh Buildings (Lease, Rent and Eviction) Control Act, 1960, over a property in Chittoor whose ownership status arose from a partition among co-owners. Respondent No. 1, P. Nithyananda Reddy, remained a co-owner and landlord after partition, while several co-owners sold their interests. Tenants of the property temporarily yielded possession to transferees (appellants Nos. 3–5) and later to appellants Nos. 1–2 through sale deeds; eviction petitions were filed on grounds of bona fide need and rent arrears. The Rent Controller decreed eviction, confirmed by the Appellate Authority and High Court. The central issue was whether eviction could proceed when tenancy rights persisted despite transfers, and whether the doctrine of merger could terminate the tenancy. The Court held that merger requires complete coalescence of the lessee’s and lessor’s interests in the whole property at the same time in one person; because the appellants acquired only a portion of the co-owners’ interests, there was no merger, and tenancy rights remained. Demolition of the superstructure by tenants did not destroy the tenancy since the land continued. The judgment relies on several precedents concerning co-ownership, merger, and estoppel, reinforcing that partial acquisitions do not extinguish tenancy. Consequently, the appeal was dismissed and the eviction decree upheld with costs.

2003-11-17

Nair Service Society v. District Officer, Kerala Public Service Commission and Ors.

Nair Service Society (NSS) challenged a Kerala High Court order directing the Kerala Public Service Commission (KPSC) to advise candidates from the Muslim supplementary list against not-joining-duty vacancies (NJD) in the recruitment for Sub-Engineers for the Kerala State Electricity Board (KSEB). The case turns on the Kerala State and Subordinate Service Rules, 1958, particularly Rules 14–17, which provide a rotating chain of appointments between open competition (merit) and reserved categories (SC/ST/OBC) with a 50% aggregate ceiling for reservation in any recruitment year. KPSC had prepared a main rank list of 177 and a supplementary list of 62 to satisfy reservation requirements. After the main list exhausted, KPSC advised Muslims from the supplementary list for NJD vacancies, prompting NSS to file petitions. The High Court and Division Bench had held that the supplementary list could continue to operate, even after the main list expired, to fill NJD vacancies, thereby potentially breaching the 50% ceiling. The Supreme Court held that the supplementary list has no survival once the main list is exhausted and that advising from it would violate the 50:50 rule, as envisaged by Article 16(4) and related provisions. Nevertheless, appointments already made pursuant to the impugned judgment were not to be disturbed. The appeals were disposed of with no costs.