National Highways and Infrastructure Development Corporation Ltd. v. BSCPL Infrastructure Ltd.

Case / Petition Number:
Civil Appeal No. 6168 of 2019

Case Synopsis & Summary

This Supreme Court Civil Appeal concerns whether an arbitration clause can spring into operation at the LOA stage in a bidding process for a road project, or whether a final binding contract is necessary through signing of a Concession Agreement. The appeal arises from a Rajnagara/Meghalaya style project where an RFP was issued, the LOA was issued in 31 October 2014, and responses culminated in LOA acceptance in November 2014. The matter dragged on for years and the LOA remained non final because, among other things, No Objection Certificate issues prevented the land transfer. The Delhi High Court had held that arbitration clauses embedded in a standard draft Concession Agreement could govern disputes and an arbitrator could be appointed via the standard form, citing a decision in PSA Mumbai Investments. The Supreme Court, however, revisited the sequence of events, the disclaimers in the RFP, and the bidding schedule. It reaffirmed that until a Concession Agreement is signed, there is no concluded contract, and disputes arising during bidding must be resolved in courts, specifically Delhi courts, per clause 6.1. It distinguished the Inox Wind decision, which dealt with an exception to standard form arbitration, as not applicable here due to the absence of an agreement. The Appeal is allowed and the impugned judgment set aside, with the PSA Mumbai Investments case treated as guiding precedent.

Precedent Explorer

Find Cases Like This

Explore other judgments dealing with similar legal situations, facts, or statutory provisions.

Case Details & Bench

Court
Landmark Cases
Hon'ble Judges
  • R. F. Nariman
  • Surya Kant
Judgment Date
2019-08-07
Court Decision / Holding
Appeal allowed. The impugned judgment dated 26.10.2018 is set aside and the appeal is allowed; the arbitration clause in the standard form cannot apply at LOA without a concluded Concession Agreement. Disputes arising during bidding will be resolved in the Delhi Courts under clause 6.1.
Final Disposition
Appeal allowed; judgment set aside; LOA stage does not create a binding contract enforceable by arbitration; disputes related to bidding will be resolved by Delhi Courts under clause 6.1; PSA Mumbai Investments (2018) 10 SCC 525 guides the decision; Inox Wind distinguished.

Parties to the Case

Appellants / Petitioners

  • M/s. National Highways and Infrastructure Development Corporation Ltd.

Respondents

  • M/s. BSCPL Infrastructure Ltd.

Legal Representation & Advocates

Counsels for Petitioners

  • • Shri Debal Banerjee (Senior Counsel)

Counsels for Respondents

  • • Ms. Kiran Suri (Senior Counsel)

Provisions of Law Cited

Indian Contract Act, 1872, Section 7

Legal Doctrines & Maxims

  • sine qua non

Submissions & Arguments

Contentions of Appellants / Petitioners

The appellant argues that the LOA is not a concluded contract. A binding obligation only arises when a final Concession Agreement is signed, not merely upon accepting an LOA. The RFP disclaimer and the bidding schedule make clear that the bid process may be cancelled and that exclusivity of dispute resolution lies with Delhi courts under clause 6.1. An arbitration clause in a prospective Concession Agreement cannot operate at the LOA stage since no enforceable contract exists. Relying on PSA Mumbai Investments PTE. Ltd., the appellant contends that disputes during bidding are to be resolved in court, and the standard form arbitration clause cannot override the bidding framework. The court is urged to distinguish cases like Inox Wind, noting no concluded agreement exists here to trigger arbitration.

Contentions of Respondents

The respondent contends that acceptance of the LOA culminates in a binding step toward execution of the Concession Agreement, thereby activating the arbitration clause in the draft agreement. It points to clause 2.1.14 which indicates that LOA may lead to termination and to clauses 2.6.3 and 2.20.7 detailing forfeiture of BID Security and related consequences, arguing that disputes at this stage should be arbitrated. Citing PSA Mumbai Investments PTE. Ltd., it argues for a binding forum through arbitration and contends that the disclaimer and schedule should not override the LOA-created obligations. It asserts that the bidding process is governed by a standard form that contemplates arbitration and that the Court should apply the exception recognized in Inox Wind, given an agreement-like stage at LOA.

Legal Doctrine & Issue Explorer

Explore This Legal Issue

Find relevant judgments and authoritative positions on the legal questions discussed here.

Cited Precedents (3)

Case NameCitationTreatmentExplanation
PSA Mumbai Investments PTE. Ltd. v. Board of Trustees of Jawaharlal Nehru Port Trust and Another2018 (10) SCC 525PositiveCited as the guiding precedent; the Court relies on PSA Mumbai Investments to hold that disputes during the bidding process are not subject to arbitration and must be resolved in the designated courts.
Inox Wind Ltd. v. Thermocables Ltd.2018 (2) SCC 519DistinguishedReferenced as a precedent establishing an exception to the general rule, but the Court distinguishes its facts here because there is no concluded agreement to trigger arbitration.
M.R. Engineers and Contractors Private Limited2009 (7) SCC 696Mentioned OnlyCited to set out the general rule regarding standard forms containing arbitration clauses; not directly applied to the present facts.
Case Applicability Diagnostic

Apply This to My Facts

Share your situation and test whether this judgment governs, supports, or challenges your case.

Official Judgment Record
•3,124 words•~15 min read

In The Court Record

National Highways and Infrastructure Development Corporation Ltd. v. BSCPL Infrastructure Ltd.

**‘** _**REPORTABLE’**_ ## **IN THE SUPREME COURT OF INDIA CIVIL APPELLATE JURISDICTION** ## **CIVIL APPEAL NO. 6168 OF 2019 (Arising out of SLP (C) No. 32010 of 2018)** **M/s. NATIONAL HIGHWAYS AND INFRASTRUCTURE DEVELOPMENT CORPORATION LTD.** **Appellant(s)** ## **VERSUS** **M/s. BSCPL INFRASTRUCTURE LTD. Respondent(s)** **==> picture [109 x 10] intentionally omitted <==** **R. F. NARIMAN, J.** **Leave granted.** **The present case involves the question as to whether an arbitration clause would spring into being at the stage of Letter of Award (referred to as ‘LOA’ for brevity) acceptance, or whether it would be necessary to sign the ultimate agreement which would then bring in the arbitration clause contained therein.** **The skeletal facts necessary to appreciate the controversy in the present case is that a Request for Proposal (referred to as ‘RFP’ for brevity) was sent out by** Signature Not Verified **the appellant for road construction in the State of** Digitally signed by R NATARAJAN Date: 2019.08.19 11:20:12 ISTReason: **Meghalaya. The LOA so far as the RFP is concerned, is by a letter dated 31.10.2014, in which the Government of India** 1 **CIVIL APPEAL NO. 6168 OF 2019 (Arising out of SLP (C) No. 32010 of 2018)** **referred to the bid document and requested for return of a signed copy of duplicate LOA as its acknowledgment within seven days of the receipt of the LOA. It was clearly stated therein that “Thereafter, you are required to execute the Contract Agreement within 15 days from the date of issue of LOA as per clause 1.3 of the RFP……….”** **In answer to this letter, on 05.11.2014, the respondent accepted the bid proposal and enclosed a copy of the LOA received by fax duly signed with an acknowledgment. By a further communication dated 08.11.2014, the respondent then wished to sign the contract agreement for the above work on 13.11.2014. Nothing happened until August, 2016, except that the guarantees that were required under the RFP were kept alive by the respondent. Finally, on 04.08.2016, the appellant decided to withdraw the LOA due to nonavailability of No Objection Certificate from the Khasi Hill Autonomous District Council, which was a** _**sine qua non**_ **for the land for the project. It is in this factual scenario that the controversy has arisen in this case, which is, as to whether the LOA is a binding contract, and further that, if it is found to be a binding contract, whether the arbitration clause of the draft agreement between the parties would kick in.** **The Delhi High Court, by its judgment dated 26.10.2018, went through various clauses of the draft** 2 **CIVIL APPEAL NO. 6168 OF 2019 (Arising out of SLP (C) No. 32010 of 2018)** **agreement which is part of the RFP, and after referring to this Court’s judgment in** _**Inox Wind Ltd.**_ **v.** _**Thermocables Ltd.**_ **(2018) 2 SCC 519 found that, contained in the standard form of the draft agreement, is an arbitration clause, and that a general reference to it is good enough, so that an arbitrator could be appointed. The Court then went on to appoint Justice Shiavax Jal Vazifdar, former Chief Justice, Punjab and Haryana High Court, after which two other arbitrators would then be appointed by the International Centre for Alternate Dispute Resolution.** **According to Shri Debal Banerjee, learned senior counsel, events have overtaken the respondent. This Court’s judgment in** _**PSA Mumbai Investments PTE. Limited**_ **v.** _**Board of Trustees of the Jawaharlal Nehru Port Trust and Another**_ **(2018) 10 SCC 525 would squarely cover this case. He prepared for our perusal a chart in which he pointed out the similarity of this case with the facts in** _**PSA Mumbai Investments PTE. Limited’**_ **s case - the disclaimer clause referred to by us in the said judgment; the schedule of bidding process; the signing of the LOA; and most importantly the fact that the entire bidding process shall be governed by and construed in accordance with the laws of India and that the Courts at Mumbai shall have exclusive jurisdiction over all disputes arising under, pursuant to or in connection with the bidding process; and the fact that** 3 **CIVIL APPEAL NO. 6168 OF 2019 (Arising out of SLP (C) No. 32010 of 2018)** **the authority may, in its own discretion, cancel the bidding process at any stage prior to entering into the ultimate contract agreement.** **According to him, the minor difference between the** _**PSA Mumbai Investments PTE. Limited’**_ **judgment containing a reference to the formation of a Special Purpose Vehicle, which is absent in the facts of this case, would be entirely immaterial for the purpose of discovery as to whether an agreement exists in this case and whether an arbitration clause contained in a standard form would, therefore, govern the parties.** **Ms. Kiran Suri, learned senior counsel appearing on behalf of the respondent, has taken us through the impugned judgment as well as our judgment, and has pointed out various differences which according to her should conclude the matter in her favour. Most importantly, according to her, what is important is contained in clause 2.1.14, which makes it clear that in the facts of the present case, the moment the stage of LOA of the agreement is reached, the agreement between the parties “shall be liable to be terminated...” thereby indicating that at the stage of the LOA, an agreement has, in fact, been reached between the parties.** **She also relied upon clause 2.6.3 and clause 2.20.7 to indicate that, on the facts of the present case, since an** 4 **CIVIL APPEAL NO. 6168 OF 2019 (Arising out of SLP (C) No. 32010 of 2018)** **agreement had been entered into at the stage of acceptance of the LOA, the arbitration clause contained in the standard form would definitely kick in.** **Having heard learned counsel for the both the parties, it is important to set out some of the important clauses contained in the RFP in the present case. These clauses are as follows:** ## **‘Disclaimer** **This RFP is not an Agreement and is neither an offer nor invitation by the Authority to the prospective Bidders or any other person. The purpose of this RFP is to provide interested parties with information that may be useful to them in making their financial offers (BIDs) pursuant to this RFP. This RFP includes statements which reflect various assumptions and assessments arrived at by the Authority in relation to the project.** **...The issue of this RFP does not imply that the Authority is bound to select a Bidder or to appoint the Selected Bidder JV or Contractor, as the case may be, for the Project and the Authority reserves the right to reject all or any of the Bidders or Bids without assigning any reason whatsoever.** ## **Clause 1.3:** ## **Schedule of Bidding Process** **The Authority shall endeavour to adhere to the following schedule:** ## **Event Description:** **1. Last date of receiving queries: 09.06.2014** **2. Pre-bid meeting: 16.06.2014** **3. Authority response to queries latest by: 04.07.2014** **4. Last date of sale of BID document: 25.07.2014** 5 **CIVIL APPEAL NO. 6168 OF 2019 (Arising out of SLP (C) No. 32010 of 2018)** **5. Bid Due Date: 28.07.2014 up to 1100 Hrs.** **6. Opening of Bids: 28.07.2014 upto 1100 Hrs** **7. Letter of Award (LOA) : Within 30 days of Bid Due Date** **8. Validity of Bids: 120 Days of Bid Due Date** **9. Signing of Concession Agreement: Within 15 days of award of LOA.** ## **Clause 3.3.5** **After selection, a Letter of Award (the ‘LOA’) shall be issued, in duplicate, by the Authority to the Selected Bidder and the Selected Bidder shall, within 7 (seven) days of the receipt of the LOA, sign and return the duplicate copy of the LOA in acknowledgement thereof. In the event the duplicate copy of the LOA duly signed by the Selected Bidder is not received by the stipulated date, the Authority may, unless it consents to extension of time for submission thereof, appropriate the BID Security of such Bidder as Damages on account of failure of the Selected Bidder to acknowledge the LOA, and the NOI inconformity with 3.3.3.** ## **Clause 3.3.6** **After acknowledgement of the LOA as aforesaid by the Selected Bidder, it shall cause the bidder to execute the Agreement within the period prescribed in Clause 1.3. The Selected Bidder shall not be entitled to seek any deviation, modification or amendment in the Agreement.** ## **Clause 2.20.5** **The Selected Bidder’s BID Security will be returned, without any interest upon the bidder signing the Contract Agreement and furnishing the Performance Security in accordance with the provisions thereof. The Authority may, at the Selected Bidder’s option,** 6 **CIVIL APPEAL NO. 6168 OF 2019 (Arising out of SLP (C) No. 32010 of 2018)** **adjust the amount of BID Security in the amount of Performance Security to be provided by him in accordance with the provisions of Agreement.** ## **Clause 6.1** **The Bidding Process shall be governed by, and construed in accordance with, the laws of India and the Courts at Delhi shall have exclusive jurisdiction over all disputes arising under, purusant to and/or in connection with the Bidding Process.** ## **Clause 6.2(a)** **The Authority, in its sole discretion and without incurring any obligation or liability, reserves the right, at any time, to;** **(a) suspend and/or cancel the Bidding Process and/or amend and/or supplement the bidding Process or modify the dates or other terms and conditions relating thereto;...”** **Even a cursory look at the aforesaid clauses will show that barring one or two small differences, these clauses are virtually identical with the clauses contained in the** _**PSA Mumbai Investments PTE. Limited case**_ **.** **After setting out some of these clauses, this Court in its judgment in** _**PSA Mumbai Investments PTE. Ltd.’**_ **s case, held:** **12) On a conjoint reading of the aforesaid clauses, a few things become clear -** **(i) first and foremost a Disclaimer at the forefront of the RFP makes it clear that there is only a bid process that is going on between the parties and that there is no concluded contract between the same,** 7 **CIVIL APPEAL NO. 6168 OF 2019 (Arising out of SLP (C) No. 32010 of 2018)** **(ii) it is equally clear that such bid process would subsume a Letter of Award to be issued by the Respondent No.1 with two further steps under the schedule to be gone into before the draft Concession Agreement finally becomes an agreement between Respondent No.1 and the Special Purpose Vehicle that is constituted by the Consortium for this purpose,** **(iii) that through out the stage of the bid process, the forum for dispute resolution is exclusively with the Courts at Mumbai, and** **(iv) that right uptil the stage of the entering into the Concession Agreement, the bid process may be annulled without giving any reason whatsoever by the Respondent No.1.** **14) Under Section 7 of the Indian Contract Act, 1872 in order to convert a proposal into a promise, the acceptance must be absolute and unqualified. It is clear on the facts of this case that there is no absolute and unqualified acceptance by the Letter of Award – two or three very important steps have to be undergone before there could be said to be an agreement which would be enforceable in law as a contract between the parties.** **19) Mr. Dave also strongly relied upon the judgment in** _**INOX Wind Limited**_ **v.** _**Thermocables Limited**_ **, (2018) 2 SCC 519. This judgment in paras 17-19 thereafter made it clear that an exception to the general rule laid down in** _**M.R. Engineers and Contractors Private Limited**_ **(2009) 7 SCC 696 as to standard forms of practice containing arbitration clauses would be extended also to standard forms between individual persons and not merely standard forms of professional assessments.** **20) We may hasten to add that this judgment in** _**INOX Wind Ltd. case**_ **would have no manner of application on the facts of this case for the reason that it has been found by us that there is no agreement between the parties at all in the facts of the present case, making it clear, therefore, that the arbitration clause contained in the draft Concession Agreement would not apply.** **However, learned senior counsel for the respondent** 8 **CIVIL APPEAL NO. 6168 OF 2019 (Arising out of SLP (C) No. 32010 of 2018)** **relied heavily upon clause 2.1.14, which reads as follows:** **“2.1.14 A Bidder shall be liable for disqualification and forfeiture of BID Security, if any legal, financial or technical adviser of the Authority in relation to the Project is engaged by the Bidder, its Member or any Associate thereof, as the case may be, in any manner for matters related to or incidental to such Project during the Bidding Process or subsequent to the (I) issue of the LOA or (ii) execution of the Agreement. In the event any such adviser is engaged by the selected Bidder or Contractor, as the case may be, after issue of the LOA or execution of the Agreement for matters related or incidental to the project, then notwithstanding anything to the contrary contained therein or in the LOA or the Agreement and without Prejudice to any other right or remedy or the Authority, including the forfeiture and appropriation of the BID Security or Performance Security, as the case may be, which the Authority may have there under or otherwise, the LOA or the Agreement, as the case may be, shall be liable to be terminated without the Authority being liable in any manner whatsoever to the Selected Bidder or Contractor for the same. For the avoidance or doubt, this disqualification shall not apply where such adviser was engaged by the Bidder, its member or Associate in the past but its assignment expired or was terminated 6 (six) months prior to the date of issue of this RFQ. Nor will this disqualification apply where such adviser is engaged after a period of 3 (three) years from the date of commercial operation of the Project.”** **She also relied upon clauses 2.6.3 and 2.20.7:** **“2.6.3 In case it is found during the evaluation or at any time before signing of the Agreement or after its execution and during the period of defect liability, subsistence thereof, that one or more of the pre-qualification conditions have not been met by the Bidder, or the Bidder has made material misrepresentation or has given any materially incorrect or false information, the Bidder shall be disqualified forthwith if not yet appointed as the contractor either by issue of the LOA or entering into of the Agreement, and if the Selected Bidder has already been issued the LOA or has entered into the Agreement, as the case may be, the same shall,** 9 **CIVIL APPEAL NO. 6168 OF 2019 (Arising out of SLP (C) No. 32010 of 2018)** **notwithstanding anything to the contrary contained therein or in this RFP, be liable to be terminated, by a communication in writing by the Authority to the selected Bidder or the Contractor, as the case may be, without the Authority being liable in any manner whatsoever to the Selected Bidder or the Contractor. In such an event, the Authority shall be entitled to forfeit and appropriate the BID Security or Performance Security, as the case may be, as Damages, without prejudice to any other right or remedy that may be available to the Authority under the Bidding Documents and/or the Agreement, or otherwise.”** **2.20.7 The BID Security shall be forfeited and appropriated by the Authority as damages payable to the Authority for, inter-alia, time cost and effort of the Authority without prejudice to any other right or remedy that may be available to the Authority under the bidding documents and / or under the Agreement, or otherwise, under the following conditions:** - **(a) If a Bidder submits a non-responsive BID as defined in 3.2.** - **(b) If a Bidder engages in a corrupt practice, fraudulent practice, coercive practice, undesirable practice or restrictive practice as specified in Section 4 of this RFP;** - **(c) If a Bidder withdraws its BID during the period of Bid validity as specified in this RFP and as extended by mutual consent of the respective Bidder(s) and the Authority;** - **(d) In the case of Selected Bidder, if it fails within the specified time limit - (i) to sign and return the duplicate copy of LOA;** - **(ii) to sign the Agreement; or** - **(iii) to furnish the Performance Security within the period prescribed therefor in the Agreement; or** - **(e) In case the Selected Bidder, having signed the Agreement, commits any breach thereof prior to furnishing the Performance Security.** - **A perusal of the aforesaid clauses would only show** 10 **CIVIL APPEAL NO. 6168 OF 2019 (Arising out of SLP (C) No. 32010 of 2018)** **that a bidder is liable for disqualification and forfeiture of bidding security at all stages of the agreement, notwithstanding that there may not be execution of the agreement between the parties.** **The expression “shall be liable to be terminated...” in clause 2.1.14 is only in this context, thereby making it clear that even after the LOA may have been accepted, such disqualification and forfeiture of bid security, if the other conditions exist, can be done by the appellant. The same interpretation goes for clauses 2.6.3 and clause 2.20.7.** **What really puts paid to this agreement is the schedule of bidding process which is identical to the schedule of bidding process in the** _**PSA Mumbai Investments PTE. Ltd.’**_ **s case.** **This schedule of bidding process begins with the last date for receiving queries and ends with the signing of concession agreement, LOA being Item No. 7 and part and parcel of this bidding process. The moment this is so, then what is clear is that under clause 6.1, dispute resolution can only take place by the Courts of Delhi.** **It is not possible to say that a standard form arbitration clause contained in a draft agreement would then oust clause 6.1 and disturb the entire scheme of the schedule of bidding process. This being the case, it is** 11 **CIVIL APPEAL NO. 6168 OF 2019** **(Arising out of SLP (C) No. 32010 of 2018)** **clear that even at the stage of acceptance of LOA, if disputes arise between the parties, they can only be resolved by the Courts of Delhi and not by arbitration. This being the case, it is clear that the** _**PSA Mumbai Investments PTE. Ltd.’**_ **s judgment is, in fact, on all fours and would govern the facts of the present case.** **In this view of the matter, we set aside the impugned judgment dated 26.10.2018 and allow the appeal.** **…………………………………………………………………., J. [ R. F. NARIMAN ]** **…………………………………………………………………., J. [ SURYA KANT ]** **New Delhi; August 7, 2019.** 12
End of Judgment Record
Browse All Landmark Cases Judgments
2019-01-22

State of Himachal Pradesh & Anr. v. Pinju Ram & Others; State of Himachal Pradesh & Ors. v. Ganesh Dutt & Anr.

This batch of appeals concerns regularisation and monetary benefits of part‑time employees in Himachal Pradesh who were converted to daily‑wage status. The State had issued a policy on 27 February 2004: part‑time Class‑IV employees who had completed ten years of continuous service as on 31 December 2003 would be made daily wagers with prospective effect, and posts vacated by such employees would stand abolished; Education and Ayurveda were excluded from the policy. Revenue Chowkidars, engaged by Panchayats, were not covered by that policy and received separate treatment. Following writ petitions and an order of the Himachal Pradesh High Court and in light of later developments, the State drew‑up directions in 2011 (22 September) to give seniority to Revenue Chowkidars on the basis of ten years of service, but with wages from the date of actual appointment and without back‑dated monetary benefits; 7 July 2012 further instructions reiterated this stance for remaining part‑time employees, with monetary benefits not guaranteed in the interregnum. The respondents pressed for back wages dating from 1 January 2007 and broader coverage. The Supreme Court held that the 2007 back‑pay direction was unsustainable, clarified that seniority would count from ten years without past benefits, and that the 2011 policy and Moti Singh principle should guide the approach. The appeals are allowed; no costs. The related writ petitions are to be disposed of consistent with these directions.

2018-08-14

Union Bank of India and Others v. C.G. Ajay Babu and Anr.

This is a Supreme Court of India appeal concerning the forfeiture of gratuity under the Payment of Gratuity Act, 1972. The respondent was a branch manager of the appellant bank and was dismissed on 3 June 2004 after disciplinary proceedings. A show-cause notice sought to forfeit gratuity due to misconduct involving moral turpitude, which was ordered on 20 April 2004. The High Court upheld the dismissal but held that gratuity could be paid since there was no financial loss to the bank, and that a bipartite settlement between the bank and employees permitted forfeiture only where misconduct caused financial loss. The Division Bench, however, held that forfeiture under Section 4(6) must be read together with Section 4(5) and that no loss was proven, thus entitling the employee to gratuity in accordance with the bipartite settlement. The Supreme Court agreed with the High Court that forfeiture is not automatic; it is controlled by Sections 4(5) and 4(6) of the Act and by the bipartite settlement, which requires loss to justify forfeiture. The Court emphasized that an act must constitute an offence involving moral turpitude and that conviction is generally required for forfeiture under 4(6)(b)(ii). The appeal is dismissed with no costs.

2018-09-25

Reema Salkan v. Sumer Singh Salkan

This is a Supreme Court of India criminal appeal under the Criminal Appellate Jurisdiction arising from a maintenance dispute under Section 125 Cr.P.C. The parties, married in 2002, had a protracted litigation history. The Family Court granted maintenance to the wife from 17 July 2003 to 8 December 2010, and held no maintenance thereafter. The High Court, in revision, partly allowed the application, directing Rs.9,000 per month from 9 December 2010 onward, while upholding the earlier period’s Rs.10,000 per month. This Court had earlier granted interim maintenance of Rs.20,000 per month in 2014 (Criminal Appeal Nos. 2347-2349 of 2014). The appellant contends there has been no change in circumstances since the interim order and that the respondent’s substantial assets, education, and overseas earnings establish the capacity to pay higher maintenance. The respondent defends the High Court’s reasoning, arguing that the Family Court’s assessment, demeanor observations, and the principle that maintenance should not be perpetual require careful scrutiny, and that the notional minimum wage approach used by the High Court is flawed. The overarching issue is the quantum of monthly maintenance payable to the appellant and whether the interim amount should be augmented beyond the period up to 2010.”

2019-12-03

M/s Embassy Property Developments Pvt. Ltd. v State of Karnataka & Ors.

This judgment concerns three Civil Appeals filed by a Resolution Applicant, the Corporate Debtor (through its Resolution Professional) and the Committee of Creditors, challenging an Interim Order of the Karnataka High Court staying an NCLT order in proceedings under the Insolvency and Bankruptcy Code, 2016. The NCLT Chennai had admitted an application under Section 7 of the IBC against M/s Tiffins Barytes Asbestos & Paints Ltd. and directed a moratorium under Section 14. The Interim Resolution Professional then sought a deemed extension of a mining lease under MMDR Act, 1957 and the Government of Karnataka rejected it. The NCLT, by an order dated 11.12.2018, set aside the Government’s order and directed execution of Supplement Lease Deeds for the period up to 31.03.2020. The Government of Karnataka challenged this in a High Court writ petition, which stayed the impugned NCLT order. The core issues were: (i) whether the High Court may interfere under Article 226/227 with an NCLT order in IBC when an appeal lies to the NCLAT, and (ii) whether fraud can be inquired into by NCLT/NCLAT in CIRP. The Court reiterates that IBC is a complete, umbrella code with a three‑tier mechanism (NCLT, NCLAT, Supreme Court) and that public‑law disputes arising from MMDR Act obligations lie outside IBC. It ultimately holds that while NCLT/NCLAT may inquire into fraud, they cannot adjudicate MMDR‑related public legal disputes; and the High Court’s writ jurisdiction in public‑law contexts remains permissible. The appeals are dismissed.