Naresh Kumar & Ors. v. Govt. of NCT of Delhi

Case / Petition Number:
Civil Appeal Nos. 6638 of 2010 and 6637 of 2010
Neutral Citation:/

Case Synopsis & Summary

These Civil Appeals challenge whether, after an Award under Section 11 of the Land Acquisition Act, 1894, the Award can be reviewed under any provision of the Act. The land of the appellants was sought to be acquired by a notification dated 23 May 2002 under Section 4, followed by a declaration under Section 6 on 17 December 2002. An Award dated 01 October 2003 (No.16/03-04) was passed by the Land Acquisition Collector, awarding compensation of Rs 1,97,08,397; part of it was paid, while Rs 9,98,203 remained unpaid along with interest. On 14 July 2004, a Review Award reduced compensation by Rs 49,39,195 on the ground that compensation for alleged illegal structures had been wrongly included in the Award; a Supplementary Award dated 27 October 2004 granted Rs 45,36,781.64 for trees on the land. The appellants challenged the Review Award, learning of it only via RTI and filing writ petitions. The Delhi High Court dismissed those petitions. The core issue is whether the Review Award could be made under Section 13A (correction of clerical/arithmetical mistakes) or any other provision. The Supreme Court held there is no power to review an Award once final under Section 12, except for clerical corrections within six months under Section 13A. The reliance on Kalabharati and earlier cases confirms that review is a creature of statute. The appeals are allowed; the Review Award and related High Court orders are quashed; the appellants are entitled to the original and Supplementary Awards.

Precedent Explorer

Find Cases Like This

Explore other judgments dealing with similar legal situations, facts, or statutory provisions.

Case Details & Bench

Court
Landmark Cases
Hon'ble Judges
  • Arun Mishra
  • Vineet Saran
  • S. Ravindra Bhat
Judgment Date
2019-10-17
Court Decision / Holding
Appeals allowed; Review Award No. 16/03-04 quashed; High Court orders quashed; appellants entitled to compensation as per the original Award dated 01.10.2003 and Supplementary Award dated 27.10.2004.
Final Disposition
Appeals allowed; Review order quashed; original Award and Supplementary Award restored; no costs.

Parties to the Case

Appellants / Petitioners

  • Naresh Kumar & Ors.

Respondents

  • Govt. of NCT of Delhi

Provisions of Law Cited

Section 4 of Land Acquisition Act, 1894Section 6 of Land Acquisition Act, 1894Section 11 of Land Acquisition Act, 1894Section 12 of Land Acquisition Act, 1894Section 13A of Land Acquisition Act, 1894Section 18 of Land Acquisition Act, 1894Section 24(8) of Land Acquisition Act, 1894

Legal Doctrines & Maxims

  • Review is not an inherent power; it must be conferred by law, either expressly or by necessary implication.
  • In the absence of express statutory provision granting the power of review, an order of review is ultra vires, illegal and without jurisdiction.
  • Section 13A is for correction of clerical or arithmetical mistakes only, and such corrections must be made within six months from the date of the award.
  • Power of review requires statutory authorization; no statutory provision means review is impermissible.

Submissions & Arguments

Contentions of Appellants / Petitioners

The appellants submitted that once the Award under Section 11 dated 01.10.2003 became final under Section 12, it could not be reviewed under any provision of the Act. They argued that Section 13A only allows correction of clerical or arithmetical mistakes within six months from the date of the Award, not a review. They contended that the Review Award dated 14.07.2004 was beyond this period and thus invalid, and that the Supplementary Award for trees should have been paid as part of the original compensation.

Contentions of Respondents

The respondent contended that a mistake in the Award could be corrected at any time and that the Review Award corrected the inclusion of compensation for an illegal structure, based on instructions and approvals from higher authorities. They argued that notice of the Review proceedings was provided and that corrections could be made under law.

Legal Doctrine & Issue Explorer

Explore This Legal Issue

Find relevant judgments and authoritative positions on the legal questions discussed here.

Cited Precedents (8)

Case NameCitationTreatmentExplanation
Kalabharati Advertising v. Hemant Vimalnath Narichania(2010) 9 SCC 437PositiveCited to state that review is not maintainable unless explicitly provided by statute.
Patel Chunibhai Dajibha v. Narayanrao Khanderao JambekarAIR 1965 SC 1457PositiveCited for the proposition that review must be conferred by law, not inherent.
Patel Narshi Thakershi v. Pradyuman Singhji ArjunsinghjiAIR 1970 SC 1273; (1971) 3 SCC 844PositiveCited for limitations on review and necessity of statutory grant.
Major Chandra Bhan Singh v. Latafat Ullah Khan(1979) 1 SCC 321PositiveCited for the principle that review power is not inherent.
Kuntesh Gupta (Dr.) v. Hindu Kanya MahavidyalayaAIR 1987 SC 2186; (1987) 4 SCC 525PositiveCited to support that review is not an inherent power and requires statutory grant.
State of Orissa v. Commissioner of Land Records and Settlement(1998) 7 SCC 162; AIR 1998 SC 7PositiveCited for the principle regarding the non-inherent nature of review.
Sunita Jain v. Pawan Kumar Jain(2008) 2 SCC 705; (2008) 1 SCC (Cri) 537PositiveCited for the proposition on the necessity of statutory authority for review.
Harbhajan Singh v. Karam SinghAIR 1966 SC 641PositiveCited as part of the line of authority that review is not an inherent power.
Case Applicability Diagnostic

Apply This to My Facts

Share your situation and test whether this judgment governs, supports, or challenges your case.

Official Judgment Record
•1,940 words•~9 min read

In The Court Record

Naresh Kumar & Ors. v. Govt. of NCT of Delhi

1 ## **REPORTABLE** **IN THE SUPREME COURT OF INDIA CIVIL APPELLATE JURISDICTION** ## **CIVIL APPEAL NO. 6638 OF 2010** **NARESH KUMAR & ORS. …..APPELLANTS** **VERSUS** **GOVT. OF NCT OF DELHI …RESPONDENT** **WITH CIVIL APPEAL NO. 6637 OF 2010** **NARESH KUMAR & ORS. …..APPELLANTS** **VERSUS** **GOVT. OF NCT OF DELHI …RESPONDENT** **J U D G M E N T** ## **Vineet Saran, J.** **1.** The short question involved in these appeals are, as to whether under the Land Acquisition Act, 1894 (for short ‘the Act’), after the passing of the Award under Section 11 of the Act, the Signature Not Verified Digitally signed byJAYANT KUMAR ARORA Award could be reviewed under any of the provisions of the Act, Date: 2019.10.17 17:17:11 IST Reason: specially under Section 13A of the Act. 2 **2.** Brief facts of this case, relevant for the purpose of the present appeals are, that land of the appellants was sought to be acquired by a notification dated 23.05.2002 issued under Section 4 of the Act, followed by a declaration under Section 6 of the Act issued on 17.12.2002. An Award bearing no.16/03­04 dated 01.10.2003 was passed by the Land Acquisition Collector awarding compensation of Rs.1,97,08,397/­ in favour of the appellants, out of which, an amount of Rs.1,87,10,194/­ was paid to the appellants and the balance amount of Rs.9,98,203/­, along with interest, still remains to be paid. **3.** Then on 14.07.2004, a Review Award was passed by the Land Acquisition Collector, reducing the amount of compensation by Rs.49,39,195/­ on the ground that the compensation ought not to have been awarded in respect of alleged illegal structures on the land, which had wrongly been awarded by the Award dated 01.10.2003. Such amount was thus deducted by the Review Award. The appellants were unaware of the said Review Award having been passed and, in the meantime, a Supplementary Award dated 27.10.2004 was passed in favour of the appellants for an 3 amount of Rs.45,36,781.64 paise towards compensation for the trees on the land which was acquired. **4.** The appellants then filed Writ Petition (C) No.2185 of 2008 praying for release of the compensation in respect of the Supplementary Award dated 27.10.2004. On having been informed of the passing of the Review Award No.16/03­04 on 14.07.2004, which information was furnished to the appellants in response to an RTI application dated 18.12.2007, the appellants then filed Writ Petition (C) No.381 of 2009 challenging the Review Award dated 14.07.2004. Both the Writ Petitions were heard together and dismissed by a common judgment dated 04.03.2010 passed by the Division Bench of the Delhi High Court, which is under challenge in the present appeals. **5.** The contention of the learned Counsel for the appellants is that after the Award had been passed on 01.10.2003 under Section 11 of the Act, the same had become final as per Section 12 of the Act, and the same could not have been reviewed under any provision of the Act. It has been contended that the only provision is for correction of clerical errors etc. under Section 13A of the Act, which only permits the Collector to correct any clerical or arithmetical mistake in the Award, and that too within a period of 4 six months and not beyond. It is thus contended that Award dated 01.10.2003 had attained finality, and could not have been reviewed under any of the provisions of the Act. It is lastly contended that the Supplementary Award dated 27.10.2004 was passed for compensation of the trees on the land of appellants, which amount ought to have been paid and the High Court has wrongly denied the same. **6.** Per contra, learned Counsel for the respondent submitted that a mistake committed by the Land Acquisition Collector, while passing the Award dated 01.10.2003, could be corrected at any time, and in the present case, the Award included the compensation for the illegal structure, which ought not to have been paid to the petitioner as the same would not be payable under the 8[th] Clause of Section 24 of the Act. It has been contended that a mistake which had occurred in the Award could be corrected by the Land Acquisition Collector at any time, and in the present case, the same was done on the instruction of the Secretary, Land and Building, which was duly approved by the Lieutenant Governor. Though it is submitted that notice of the proceedings in the Review Award was sent to the appellants, but the same is denied by the 5 appellants, who have thus contended that they had no knowledge of the proceedings of the Review Award. **7.** We have heard learned Counsel for the parties at length and have perused the material on record. **8.** There is no provision under the Land Acquisition Act, 1894 for review of the Award once passed under Section 11 of the Act and had attained finality. The only provision is for correction of clerical errors in the Award which is provided for under Section 13A of the Act, which was inserted with effect from 24.09.1984. The relevant Section 13A of the Act reads as under: _**13A. Correction of clerical errors, etc. –** (1) The Collector may, at any time but not later than six months from the date of the_ _award, or where he has been required under section 18 to make a reference to the Court, before the making of such reference, by order, correct any clerical or arithmetical mistakes in the award or errors arising therein either on his own motion or on the application of any person interested or a local authority:_ _Provided that no correction which is likely to affect prejudicially any person shall be made unless such person has been given a reasonable opportunity of making a representation in the matter._ 6 _(2) The Collector shall give immediate notice of any correction made in the award to all the persons interested._ _(3) Where any excess amount is proved to have been paid to any person as a result of the correction made under sub­section (1), the excess amount so paid shall be liable to be refunded and in the case of any default or refusal to pay, the same may be recovered as an arrear of land revenue._ _(emphasis supplied)_ A bare reading of the said Section 13A would make it clear that the same is not a provision for Review of the Award but only for correction of clerical or arithmetical mistakes in the Award. It is further provided in the sub­Section (1) of Section 13A that the said correction can be made at any time, but not later than six months from the date of award. In the present case, the Land Acquisition Collector has actually not made any correction of clerical or arithmetical mistake, but has in fact reviewed the Award dated 01.10.2003 by its Review Award no.16/03­04 dated 14.07.2004, which was also clearly passed beyond such period of six months. **9.** In our considered view, the Review Award could not have been passed under Section 13A of the Act, which is meant only for correction of any clerical or arithmetical mistake. There is no other 7 provision in the Act under which the said order dated 14.07.2004 could have been passed. **10.** In the present case, the compensation for the structure on the land has been deducted from the Award dated 01.10.2003 by the Review Award dated 14.07.2004 on the ground of the same being illegal structure, which actually amounts to Review of the Award and cannot be said to be a correction of any clerical or arithmetical mistake. The question whether the structure on the land of the appellants was legal or illegal could only be decided after the parties were given opportunity to adduce evidence, which correction cannot be termed as correction of any clerical or arithmetical mistake. There being no provision under the Land Acquisition Act, 1894 for review of the Award, the passing of the order dated 14.07.2004 in Review Award no.16/03­04 cannot be justified in law. **11.** Section 12 of the Act clearly provides that the Award of the Collector shall become final on the same being filed in the Collector’s office, of which the Collector shall give immediate notice to the persons interested. From the facts of this case, it is clear that the Award dated 01.10.2003, of which due notice had been given to the appellants and part compensation had also been paid 8 to the appellants in pursuance thereto, had become final and the same could not have been reviewed, and that too beyond a period of six months, within which period only clerical or arithmetical mistakes could have been corrected. **12.** It is settled law that the power of Review can be exercised only when the statute provides for the same. In the absence of any such provision in the concerned statute, such power of Review cannot be exercised by the authority concerned. This Court in the case of _Kalabharati Advertising vs. Hemant Vimalnath Narichania_ _(2010) 9 SCC 437,_ has held as under: _“……………_ _**12.** It is settled legal proposition that unless the statute/rules so permit, the review application is not maintainable in case of judicial/quasi­judicial orders. In the absence of any provision in the Act granting an express power of review, it is manifest that a review could not be made and the order in review, if passed, is ultra vires, illegal and without jurisdiction. (Vide Patel Chunibhai Dajibha v. Narayanrao Khanderao Jambekar [AIR 1965 SC 1457] and Harbhajan Singh v. Karam Singh [AIR 1966 SC 641] .)_ _**13.** In Patel Narshi Thakershi v. Pradyuman Singhji Arjunsinghji [(1971) 3 SCC 844 :_ 9 _AIR 1970 SC 1273] , Major Chandra Bhan Singh v. Latafat Ullah Khan [(1979) 1 SCC 321] , Kuntesh Gupta (Dr.) v. Hindu Kanya Mahavidyalaya [(1987) 4 SCC 525 : 1987 SCC (L&S) 491 : AIR 1987 SC 2186] , State of Orissa v. Commr. of Land Records and Settlement [(1998) 7 SCC 162] and Sunita Jain v. Pawan Kumar Jain [(2008) 2 SCC 705 : (2008) 1 SCC (Cri) 537] this Court held that the power to review is not an inherent power. It must be conferred by law either expressly/specifically or by necessary implication and in the absence of any provision in the Act/Rules, review of an_ earlier order is impermissible as review is a creation of statute. Jurisdiction of review can be derived only from the statute and thus, any order of review in the absence of any statutory provision for the same is a nullity, being without jurisdiction. _**14.** Therefore, in view of the above, the law on the point can be summarised to the effect that in the absence of any statutory provision providing for review, entertaining an application for review or under the garb of clarification /modification/ correction is not permissible.”_ **==> picture [369 x 38] intentionally omitted <==** 10 **13.** In view of the aforesaid, we hold that the Award dated 01.10.2003 could not have been reviewed by the Collector, and thus we allow these appeals and quash the order dated 04.07.2004 passed by the Collector in Review Award No.16/03­04 as well as the order dated 04.03.2010 passed by the Delhi High Court in Writ Petition (C) No.2185 of 2008 and Writ Petition (C) No.381 of 2009. The appellants shall thus be entitled to the compensation as awarded in terms of the Award of the Land Acquisition Collector dated 01.10.2003, and the Supplementary Award dated 27.10.2004. No orders as to costs. **==> picture [270 x 36] intentionally omitted <==** **………………………………..J. [Arun Mishra]** **………………………………..J. [Vineet Saran] ………………………………..J. [S. Ravindra Bhat]** **New Delhi Dated: October 17, 2019**
End of Judgment Record
Browse All Landmark Cases Judgments
2019-01-22

State of Himachal Pradesh & Anr. v. Pinju Ram & Others; State of Himachal Pradesh & Ors. v. Ganesh Dutt & Anr.

This batch of appeals concerns regularisation and monetary benefits of part‑time employees in Himachal Pradesh who were converted to daily‑wage status. The State had issued a policy on 27 February 2004: part‑time Class‑IV employees who had completed ten years of continuous service as on 31 December 2003 would be made daily wagers with prospective effect, and posts vacated by such employees would stand abolished; Education and Ayurveda were excluded from the policy. Revenue Chowkidars, engaged by Panchayats, were not covered by that policy and received separate treatment. Following writ petitions and an order of the Himachal Pradesh High Court and in light of later developments, the State drew‑up directions in 2011 (22 September) to give seniority to Revenue Chowkidars on the basis of ten years of service, but with wages from the date of actual appointment and without back‑dated monetary benefits; 7 July 2012 further instructions reiterated this stance for remaining part‑time employees, with monetary benefits not guaranteed in the interregnum. The respondents pressed for back wages dating from 1 January 2007 and broader coverage. The Supreme Court held that the 2007 back‑pay direction was unsustainable, clarified that seniority would count from ten years without past benefits, and that the 2011 policy and Moti Singh principle should guide the approach. The appeals are allowed; no costs. The related writ petitions are to be disposed of consistent with these directions.

2018-08-14

Union Bank of India and Others v. C.G. Ajay Babu and Anr.

This is a Supreme Court of India appeal concerning the forfeiture of gratuity under the Payment of Gratuity Act, 1972. The respondent was a branch manager of the appellant bank and was dismissed on 3 June 2004 after disciplinary proceedings. A show-cause notice sought to forfeit gratuity due to misconduct involving moral turpitude, which was ordered on 20 April 2004. The High Court upheld the dismissal but held that gratuity could be paid since there was no financial loss to the bank, and that a bipartite settlement between the bank and employees permitted forfeiture only where misconduct caused financial loss. The Division Bench, however, held that forfeiture under Section 4(6) must be read together with Section 4(5) and that no loss was proven, thus entitling the employee to gratuity in accordance with the bipartite settlement. The Supreme Court agreed with the High Court that forfeiture is not automatic; it is controlled by Sections 4(5) and 4(6) of the Act and by the bipartite settlement, which requires loss to justify forfeiture. The Court emphasized that an act must constitute an offence involving moral turpitude and that conviction is generally required for forfeiture under 4(6)(b)(ii). The appeal is dismissed with no costs.

2018-09-25

Reema Salkan v. Sumer Singh Salkan

This is a Supreme Court of India criminal appeal under the Criminal Appellate Jurisdiction arising from a maintenance dispute under Section 125 Cr.P.C. The parties, married in 2002, had a protracted litigation history. The Family Court granted maintenance to the wife from 17 July 2003 to 8 December 2010, and held no maintenance thereafter. The High Court, in revision, partly allowed the application, directing Rs.9,000 per month from 9 December 2010 onward, while upholding the earlier period’s Rs.10,000 per month. This Court had earlier granted interim maintenance of Rs.20,000 per month in 2014 (Criminal Appeal Nos. 2347-2349 of 2014). The appellant contends there has been no change in circumstances since the interim order and that the respondent’s substantial assets, education, and overseas earnings establish the capacity to pay higher maintenance. The respondent defends the High Court’s reasoning, arguing that the Family Court’s assessment, demeanor observations, and the principle that maintenance should not be perpetual require careful scrutiny, and that the notional minimum wage approach used by the High Court is flawed. The overarching issue is the quantum of monthly maintenance payable to the appellant and whether the interim amount should be augmented beyond the period up to 2010.”

2019-12-03

M/s Embassy Property Developments Pvt. Ltd. v State of Karnataka & Ors.

This judgment concerns three Civil Appeals filed by a Resolution Applicant, the Corporate Debtor (through its Resolution Professional) and the Committee of Creditors, challenging an Interim Order of the Karnataka High Court staying an NCLT order in proceedings under the Insolvency and Bankruptcy Code, 2016. The NCLT Chennai had admitted an application under Section 7 of the IBC against M/s Tiffins Barytes Asbestos & Paints Ltd. and directed a moratorium under Section 14. The Interim Resolution Professional then sought a deemed extension of a mining lease under MMDR Act, 1957 and the Government of Karnataka rejected it. The NCLT, by an order dated 11.12.2018, set aside the Government’s order and directed execution of Supplement Lease Deeds for the period up to 31.03.2020. The Government of Karnataka challenged this in a High Court writ petition, which stayed the impugned NCLT order. The core issues were: (i) whether the High Court may interfere under Article 226/227 with an NCLT order in IBC when an appeal lies to the NCLAT, and (ii) whether fraud can be inquired into by NCLT/NCLAT in CIRP. The Court reiterates that IBC is a complete, umbrella code with a three‑tier mechanism (NCLT, NCLAT, Supreme Court) and that public‑law disputes arising from MMDR Act obligations lie outside IBC. It ultimately holds that while NCLT/NCLAT may inquire into fraud, they cannot adjudicate MMDR‑related public legal disputes; and the High Court’s writ jurisdiction in public‑law contexts remains permissible. The appeals are dismissed.