High Court of KeralaSingle JudgeThe original petition is allowed; Exts.P3 and P...

M.V. Poulose v. Kerala State Electricity Board & Others

Case / Petition Number:OP 4247/2001-E

Case Details & Bench

Court
High Court of Kerala
Hon'ble Judges
  • T. R. Ramachandran Nair
Judgment Date
2008-12-09
Court Decision / Holding
Exts.P3 and P9 are quashed. The petitioner’s remitted amounts are to be adjusted, and a revised bill issued accordingly; any excess paid shall be refunded or adjusted against future bills. The petition is allowed; no costs.
Final Disposition
The original petition is allowed; Exts.P3 and P9 quashed; revised bill to be issued after adjusting amounts already paid; any excess refunded or adjusted against future bills; no costs.

Parties to the Case

Appellants / Petitioners

  • M.V. Poulose, Managing Partner, Tomcos Poly Tec, Varapuzha

Respondents

  • The Secretary, Kerala State Electricity Board, Trivandrum 4
  • The Deputy Chief Engineer, APTS, Yadyuthy Bhavan, Trivandrum 4
  • The Executive Engineer, Electrical Division, Aluva
  • The Asst. Executive Engineer, Electrical Major Section, Varapuzha

Legal Representation & Advocates

Counsels for Petitioners

  • • P.M. Kunjimoideenkutty
  • • Arliss Trency Antony
  • • Citations for Advocate(s) not separately listed in document

Counsels for Respondents

  • • C.K. Karunakaran, SC for KSEB (R1 to 4)

Case Synopsis & Summary

This Original Petition challenges extra-billings issued for alleged misuse of energy due to an unauthorised connected load of 10 kW at the petitioner’s premises. A pre-penalty inspection led to Ext.P1 demanding Rs.51,482 with threefold penalties on fixed charges and twofold penalties on energy charges. The petitioner challenged Ext.P1 before the Appellate Authority, whose decision is reflected in Ext.P3, which upheld the demand. The petitioner relied on Ext.P4 (12.01.2000) to argue that liability should be limited to the period from that date, particularly since the 10 kW load could be traced to a newly installed motor; however, the appellate order treated the period of misuse per clause 42(d) as six months prior to detection unless a convincing reason is shown. The petitioner further contends that the penalty cannot be imposed on both energy and fixed charges simultaneously and relies on J.D.T. Islam Orphanage Committee v. Assistant Engineer, KSEB and George Joseph v. KSEB to support a narrow construction of penalties for unauthorised extension. The Board cites strict liability principles and contends that penalties must be imposed under the tariff framework. The court ultimately sides with the petition, holding that Exts.P3 and P9 are quashed, and directs a revised bill after adjusting earlier payments, with any excess refunded or adjusted; the petition is allowed with no costs.

Provisions of Law Cited

Clause 42(d) of the Conditions of Supply of Electrical EnergyClause 43 of the Conditions of Supply of Electrical EnergyRegulation 24Regulation 42(d)Regulation 43Tariff NotificationSection 271(1)(c) of the Income-tax Act, 1961

Legal Doctrines & Maxims

  • Penal provisions must be construed strictly.
  • Strict liability in civil penalties; mens rea not essential in certain penalties (Union of India v. Dharamendra Textile Processors).
  • Tariff includes the rules and regulations relating to it.
  • Regulation 42(d) provides penalty; Regulation 43 cannot be construed as another penal provision for the same irregularity.
  • Liability for unauthorised load is restricted to penal rates (three times fixed charges under LT VI tariff) for six months; energy charges cannot be penalized in the same manner as per J.D.T. Islam Orphanage Committee and George Joseph decisions.

Submissions & Arguments

Contentions of Appellants / Petitioners

The petitioner argues that the reliance on Ext.P4 (12.01.2000) as the trigger for ‘misuse’ is unsupported by probative evidence, and that the six-month pre-detection period should be applied only with clear justification. He contends that the Appellate Authority’s reasoning lacks basis and that clause 42(d) permits misuse penalties only for three times the fixed charges over the relevant six months, not to penalise energy charges anew. Citing J.D.T. Islam Orphanage Committee v. Assistant Engineer, KSEB and George Joseph v. KSEB, he asserts that penal computation cannot treat unauthorised extension as a tariff temporary extension or levy penalties on energy charges, and that there is no theft of energy; the penalties on energy charges are unlawful. He further submits that tariff provisions (including Regulation 24) require proper procedure and limit penalties to fixed charges; Exts.P3 and P9 should be quashed and a revised bill issued accordingly.

Contentions of Respondents

The Board’s counsel defends the penalties as strict liability under the tariff framework, arguing that violation of the contractual load triggers misuse penalties; the six-month pre-detection period is applicable where there is evidence of misuse, and the penalties can be calculated from detection date. He relies on Union of India v. Dharamendra Textile Processors and Hari Shankar to argue that penal provisions must be construed strictly and that tariff includes rules and regulations. He contends that a penalty can be levied on both fixed and energy charges where the unlawful load is verified, and a revised bill is justified. The Board emphasizes that Regulation 42(d) contemplates penal rates and that Regulation 43 cannot create a separate penal provision for the same irregularity.

Cited Precedents (4)

Case NameCitationTreatmentExplanation
J.D.T. Islam Orphanage Committee v. Assistant Engineer, KSEB2007 (3) KLT 388PositiveCited to support the proposition that liability for unauthorised extension is limited to penal rates (three times fixed charges under LT VI tariff) for six months, not penalties on energy charges.
George Joseph v. KSEB and othersILR 2008 (4) Ker. 377PositiveUsed to support strict construction of penal provisions and that Regulation 42(d) already provides a penalty; Regulation 43 cannot be another penal provision for the same irregularity.
Hari Shankar and others v. U.P. State Electricity Board and anotherAIR 1974 Allahabad 70PositiveCited to illustrate that tariff includes the rules and regulations relating to it.
Union of India and others v. Dharamendra Textile Processors and others(2008) 18 VST 180PositiveUsed to justify strict liability for civil penalties (mens rea not essential) in the context of penalties and to compare with tax-like penalties.

Diagnostic Tool

Beta

Does this judgment govern your specific facts?

Don't risk relying on a distinguishable precedent. Enter your facts or proposition below. We will test it against M.V. Poulose v. Kerala State Electricity Board & Others and instantly map out authorities that support, challenge, or govern your position.

Extracted Judgment Text

Exact text extracted from official judgment records.

## **IN THE HIGH COURT OF KERALA AT ERNAKULAM** **PRESENT :** **THE HONOURABLE MR. JUSTICE T.R.RAMACHANDRAN NAIR** **FRIDAY, THE 5TH DECEMBER 2008 / 14TH AGRAHAYANA 1930** ## **OP.No. 4247 of 2001(E)** **--------------------------------** ## **PETITIONER(S):** **-----------------------** ## **M.V.POULOSE, MANAGING PARTNER, TOMCOS POLY TEC, VARAPUZHA.** **BY ADV. SRI.P.M.KUNJIMOIDEENKUTTY SMT.ARLISS TRENCY ANTONY** ## **RESPONDENT(S):** **-------------------------** **1. THE SECRETARY, KERALA STATE ELECTRICITY BOARD, TRIVANDRUM 4.** **2. THE DEPUTY CHIEF ENGINEER, APTS, YDYUTHY BHAVAN, TRIVANDRUM 4.** **3. THE EXECUTIVE ENGINEER, ELECTROCAL DIVISION, ALUVA.** **4. THE ASST. EXECUTIVE ENGINEER, ELECTRICAL MAJOR SECTION, VARAPUZHA.** **ADV. SRI.C.K.KARUNAKARAN, SC FOR KSEB FOR R1 TO 4** **THIS ORIGINAL PETITION HAVING BEEN FINALLY HEARD ON 05/12/2008, THE COURT ON THE SAME DAY DELIVERED THE FOLLOWING:** **ORDER ON CMP. NO.7047/2001 IN OP. 4247/2001** ## **Dismissed** **05.12.2008 SD/- T.R.RAMACHANDRAN NAIR, JUDGE** ## **APPENDIX** ## **PETITIONERS EXHIBITS** ## **P1:- COPY OF THE INVOICE NO.05973 DT. 28.2.2000.** **P2:- COPY OF THE MEMORANDUM APPEAL DT. 2.3.2000.** **P3:- COPY OF THE ORDER DT. 5.1.01.** **P4:- COPY OF THE BILL NO.SS/168 DT. 12.1.2000.** **P5:- COPY OF THE ORDER NO.VIG BV-5507/99 -2000/EKM /654 DT. 24.5.2000.** **P6:- COPY OF THE BOARD ORDER NO.3225/98 DT. 20.10.98.** **P7:- COPY OF THE RECEIPT NO.76/2517 DT. 4.9.2000.** **P8:- COPY OF THE INVOICE DT. 1.8.2000.** **P8(a):- COPY OF THE INVOICE DT. 10.11.2000.** **P8(b):- COPY OF THE INVOICE DT. 11.12.2000.** **P9:- COPY OF THE ORDER DT. 12.2.01.** _**/**_ **TRUE COPY/** **P.S. TO JUDGE** **tss** ## **T.R. Ramachandran Nair, J.** **- - - - - - - - - - - - - - - - - - - - - - - - O.P.No. 4247 of 2001-E** **- - - - -- - - - - - - - - - - - - - - - - - - - - Dated this the 5th day of December, 2008.** ## **JUDGMENT** The original petition is filed challenging the additional bills issued consequent on the allegation of misuse of energy for the unauthorised connected load of 10 KW in the premises of the petitioner. Respective orders are produced as Exts.P3 and P9. 2. The premises were inspected by the Anti Power Theft Squad, on 24.2.2000 along with the officers of Electrical Major Section, Varappuzha. Ext.P1 is the bill issued to the petitioner whereby he had been asked to remit an amount of Rs.51,482/-. Therein, towards fixed charges three times penalty has been imposed and as far as the energy charges are concerned, two times have been charged. This was challenged by the petitioner before the Appellate Authority in appeal which was disposed of by Ext.P3. The petitioner had got a further contention relying upon Ext.P4 bill dated 12.1.2000. According to him, he had purchased a 20 HP motor and that was installed in the system, whereby the additional load was created. According to him, any imposition can be only from the date of Ext.P4, i.e. from 12.1.2000 and the calculation made by taking six months as the period OP 4247/2001 2 during which the additional load was to be assessed for additional amount of energy charges and fixed charges, is not correct. 3. Subsequent bills have also been issued, produced as Ext.P8 series, which were separately challenged by him resulting in Ext.P9 order, upholding the same. 4. Learned counsel for the petitioner raised two contentions. One is that going by Ext.P4, only from 12.1.2000 alone the additional bills could be collected. This aspect was dealt with in Ext.P3 in detail by the Appellate Authority. After considering the matter, it was found that in the absence of any information given to the concerned section, the reliance placed on the invoice to contend for the position that the said date is crucial, cannot be accepted. In the absence of any other supporting evidence of probative value, it was found that the plea does not deserve any merit. The provisions of clause 42(d) of the Conditions of Supply of Electrical Energy, provides that misuse of energy will be billed at three times the rate applicable to the respective tariff for the previous six months from the date of detection of misuse unless there are convincing reasons for adopting different periods and supply disconnected without notice. Therefore, in the absence of convincing reasons, the respondents are right in adopting the billing for misuse of energy for a period of six months prior to the date of detection. In OP 4247/2001 3 that view of the matter, I am of the opinion that the view taken by the Appellate Authority does not call for any interference. 5. The second issue raised is whether the penalty can be imposed both on the consumed energy for which energy charges have already been collected by the respondents and also for the fixed charges. Herein, going by Ext.P1, three times rate on fixed charges and two times energy charges have been imposed on the petitioner. The question is whether the Board will be justified in collecting the penalty for these two items simultaneously. Learned counsel for the petitioner has relied upon the decisions of this court in **J.D.T. Islam Orphanage Committee v. Assistant Engineer, KSEB** (2007 (3) KLT 388) and **George Joseph v. KSEB and others** (ILR 2008 (4) Ker. 377) to contend for the position that the method adopted by the respondents cannot be justified. In **J.D.T. Islam Orphanage Committee's case** (2007 (3) KLT 388) it was held that “in view of the procedure prescribed for extension under Regulation 24, in case any unauthorised extension is taken, and if the same is likely to cause any danger to life or loss of property, the said extension as well as the supply itself is liable to be disconnected. But there is no provision under the Conditions of Supply of Electrical Energy or the Tariff Notification that the unauthorised extension OP 4247/2001 4 shall be treated as temporary extension for the purpose of Tariff. I the absence of any provision enabling the Board to levy energy charges under L.T.VIII for the alleged unauthorised extension, billing at penal rates on the basis of the connected load on daily basis is impermissible. Liability is only for the penal rates at three times the fixed charges alone under LT VI tariff for six months, during the relevant period.” In the recent decision in **George Joseph's case** (ILR 2008 (4) Ker.377) the matter was elaborately considered. It was held that “it is settled law that a penal provision has to be construed strictly. In any event for unauthorised load a penalty is already provided for in Regulation 42(d) and therefore Regulation 43 cannot be construed as another penal provision for the same irregularity”. Finally, it was held in para 13 that “the impugned demand of 2 times rate of current charges for the proportionate consumption to the unauthorised load in addition to 3 times normal rate of fixed charges for unauthorised additional load is clearly without jurisdiction and liable to be set aside.” 6. Herein, 10 KW is the additional load that is detected. As far as the energy charges for the respective months are concerned, already they have collected charges by the normal method of billing. The fixed charges alone were affected since the additional load was not detected. There is no theft of energy or misuse of energy consumed by the petitioner. Clause 43 OP 4247/2001 5 of the Conditions of Supply of Electrical Energy has no application here. In that view of the matter, learned counsel is justified in relying upon the principles stated in the above decisions to contend that liability is only as far as the fixed charges are concerned and the penalty imposed for the energy charges consumed cannot be justified. 7. Opposing the said argument, learned Standing Counsel for the Board submitted that the provision for imposing a penalty has to be construed in strict sense. The question of exercising discretion in those circumstances does not arise and the liability is depending upon the violation of the provision itself and not on the basis of any mens rea and as such when the violation is found out, the consumer is liable to be charged for the misuse of energy and the matter cannot be differentiated by taking fixed charges and energy charges as two components. Reliance is placed on the decision of the Apex Court in **Union of India and others v. Dharamendra Textile Processors and others {** (2008) 18 VST 180} and a decision of a Division Bench of Allahabad High Court in **Hari Shankar and others v. U.P. State Electricity Board and another** (AIR 1974 Allahabad 70). In **Union of India and others' case {** (2008) 18 VST 180}, the Apex Court was considering the question whether in the absence of OP 4247/2001 6 mens rea whether the liability for penalty is automatically attracted. In para 27, after examining the question their Lordships held as follows: “The Explanations appended to Section 271(1)(c) of the Income-tax Act, 1961, indicate the element of strict liability on the assessee for concealment or for giving inaccurate particulars while filing the return. The object behind the enactment of section 271(1)(c) read with the Explanations indicates that the section has been enacted to provide for a remedy for loss of revenue The penalty under that provision is a civil liability. Wilful concealment is not an essential ingredient for attracting civil liability as is the case in the matter of prosecution under Section 276C.” In the decision of the Allahabad High Court in **Hari Shankar's case** (supra), the meaning of the term 'tariff' was considered and it was held that “the tariff includes within its ambit not only the fixation of rates but also the rules and regulations relating to it.” Herein, the issue to be considered is quite different. The question is whether penalty can be imposed on these two components, viz. fixed charges and energy charges. Herein, the allegation is that the contract load exceeded the sanctioned one. Going by the view taken by this court on the interpretation of the relevant clause 42 (d), the liability is only for 3 times normal rate for the fixed charges and not for the energy charges which have already been collected as per the billing system. In that view of the matter, the issue is covered against the OP 4247/2001 7 respondents by the two decisions referred to above. The various bills issued cannot, therefore, be sustained. 8. Therefore, Exts.P3 and P9 are quashed. The petitioner has already remitted various amounts during the currency of the proceedings. In that view of the matter, a revised bill will be issued after adjusting the amounts already paid and if any excess amount has been paid, the same will be refunded to the petitioner or the same will be adjusted against future bills. The original petition is allowed as above. No costs. **(T.R. Ramachandran Nair, Judge.)** ## **kav/** OP 4247/2001 8 T.R. Ramachandran Nair, J. - - - - - - - - - - - - - - - - - - - - - - O.P. No. 4247 of 200-E - - - - - - - - - - - - - - - - - - - - - - ## JUDGMENT 9th December, 2008.