Mumbai Waste Management Ltd. v. Secretary of Environment Government of India & Ors.

Case / Petition Number:
Special Leave Petition (Civil) No. 18394-18395 of 2012
Neutral Citation:[2013] 6 S.C.R. 1153

Case Synopsis & Summary

The case concerns a dispute over territorial allocation for hazardous waste management facilities under the Hazardous Waste (Management & Handling) Rules, 1989, and later the 2008 Rules. Mumbai Waste Management Ltd. (MWM) challenged an order curtailing its area of operation and the subsequent reallocation of territory in favor of SMS Infrastructure Ltd., contending that the 2008 Rules curtailed the Central Government’s power to fix or re-fix territorial jurisdictions and that the Maharashtra Pollution Control Board (MPCB) and the Department of Environment, Government of Maharashtra, could not determine or reallocate areas for waste management. The High Court had held that the matter was limited to the legality of the 2008 reallocation and that the 2008 Rules did not contest the authority to allocate territory, with MPCB’s authorization controlling the activities of collection, treatment, recycling, and disposal. The Supreme Court, while not addressing whether MPCB/State authorities possess power to allocate territories, found the High Court’s decision not patently unjust or illegal on the then-existing facts and refused to decide the competence issue, since it had not been raised before the High Court. Ultimately, the Supreme Court dismissed the special leave petitions, upholding the High Court’s direction that MWM must confine its operations within its allotted districts and not encroach on SMS’s area.

Precedent Explorer

Find Cases Like This

Explore other judgments dealing with similar legal situations, facts, or statutory provisions.

Case Details & Bench

Court
Supreme Court of India
Hon'ble Judges
  • Gyan Sudha Misra
  • J. Chelameswar
Judgment Date
2013-05-02
Court Decision / Holding
SLPs dismissed.
Final Disposition
Dismissed

Parties to the Case

Appellants / Petitioners

  • Mumbai Waste Management Ltd.

Respondents

  • Secretary of Environment Government of India
  • SMS Infrastructure Ltd.
  • Department of Environment, Government of Maharashtra
  • Maharashtra Pollution Control Board

Legal Representation & Advocates

Counsels for Petitioners

  • • Shailesh K. Kapoor
  • • Ajay Kumar
  • • Rajan Singh
  • • Rameshwar Prasad Goyal

Counsels for Respondents

  • • P.S. Patwalia
  • • Jayant Kumar
  • • Dr. Sadhna Mahashabde
  • • Dharitry Phookan
  • • Vivek Vishnoi
  • • Mukesh Verma
  • • Pawan Kumar Shukla
  • • Yash Pal Dhingra

Provisions of Law Cited

Hazardous Waste (Management & Handling) Rules, 1989, Rule 5(2)Hazardous Waste (Management, Handling and Transboundary Movement) Rules, 2008Constitution of India, 1950, Art. 136

Submissions & Arguments

Contentions of Appellants / Petitioners

The petitioner challenged the High Court’s direction limiting the area of operation for waste management to four districts and contested the interpretation of the 2008 Hazardous Waste Rules. It contended that the 2008 Rules curtailed the Central Government’s power to fix/re-fix territorial areas and questioned the competency of the Maharashtra Pollution Control Board/State authorities to allocate territory. It argued that allocation of territory is beyond the powers of the authorities under the new framework and that encroachment into SMS’s area would be unlawful; it pressed for a broader grant of territorial rights under prior rules.

Contentions of Respondents

The respondents argued that Rule 5(2) of the 1989 Rules contemplates authorization for handling hazardous wastes, including the area of operation, and that under the 2008 Rules the State Authority remains competent to fix/alter territory within the framework of authorization. They contended that the High Court correctly held that the petition did not challenge the 2008 regime and that the authority to allocate areas remains vested with the statutory authorities; the relief sought would undermine the established allocation and the regulatory structure for hazardous waste management.

Legal Doctrine & Issue Explorer

Explore This Legal Issue

Find relevant judgments and authoritative positions on the legal questions discussed here.

Case Applicability Diagnostic

Apply This to My Facts

Share your situation and test whether this judgment governs, supports, or challenges your case.

Official Judgment Record
•2,676 words•~13 min read

In The Court Record

Mumbai Waste Management Ltd. v. Secretary of Environment Government of India & Ors.

## [2013] 6 S.C.R. 1153 MUMBAI WASTE MANAGEMENT LTD. _v._ SECRETARY OF ENVIRONMENT GOVERNMENT OF INDIA & ORS. (Special Leave Petition (Civil) No. 18394-9512012) MAY 2, 2013 A B **[GYAN · SUDHA MISRA AND J. CHELAMESWAR,** JJ.] _HAZARDOUS WASTE (MANAGEMENT AND HANDLING) RULES, 1989:_ c _r._ 5 _(2)_ -- _Allotment of area to petitioner to collect, treat,_ - _recycle, reprocess, store and dispose of hazardous waste_ - _Subsequently, allotment to another concern also Writ_ - _petition by petitioner challenging the order of curtailment_ 0 _Held: The order is not patently unjust or illegal on the existing facts of the case_ - _In view of the order of allocation specifically determining the territory which has been allotted to petitioner and fifth respondent, order of High Court_ as _also of appellate authority do not need to be interfered with_ as _High Court is_ E _correct and justified in holding that petitioner would not encroach upon the territory which falls beyond the territory_ -- _which had been allotted to it As Jong_ as _competence and authority of Maharashtra Pollution Control Board and Department of Environment, Government of Maharashtra is not struck down_ as _illegal and invalid by any court of_ F _competent jurisdiction, it is not open for petitioner to assail their authority for the first time before Supreme Court at the stage of special leave to appeal, specially when the question_ -- _had not been raised by petitioner before High Court Hazardous Waste (Management, Handling and_ G - _Transboundary Movement) Rules, 2008 Constitution of_ - _India, 1950 Art. 136._ 1153 H 1154 SUPREME COURT REPORTS [2013] 6 S.C.R. A CIVIL APP ELLA TE JURISDICTION : Petition For Sepcial Leave (Civil) No. 18394-18395 of 2012. From the Judgment & Order dated 16.03.2012 of the High Court of Bombay in CA No. 1310 of 2011, CWP No. 3953 B 2011. Shailesh K. Kapoor, Ajay Kumar, Rajan Singh, Rameshwar Prasad Goyal for the Petitioner. P.S. Patwalia, Jayant Kumar, Dr. Sadhna Mahashabde, c Dharitry Phookan, Vivek Vishnoi, Mukesh Verma, Pawan Kumar Shukla, Yash Pal Dhingra for the Respondents. The following order of the Court was delivered ## **ORDER** ## D 1. Extensive arguments were advanced by the counsel for the petitioner at the admission stage itself who has assailed the order passed by the High Court of Judicature at Bombay in Writ Petition No.3953/2011 whereby the High Court was E pleased to dismiss the writ petition directing the petitioner not to encroach upon the area of operation allotted by respondent No.2, Secretary of Environment, Government of India to any other facility except its own. 2. The petitioner-Mumbai Waste Management Ltd. (shortly F referred to as 'MWM') in writ petition No.3953/2011 out of which present SLP arises was issued the letter of award to collect, treat, recycle, reprocess, store and dispose of hazardous waste from the area allotted to the petitioner. Similarly, the respondent No.5 SMS Infrastructure Ltd. was also issued the G letter of consent on 27 .10.2005 for treatment, storage and disposal facility of hazardous waste from the area allotted to respondent No.5. The areas were determined upon certain geographical criteria. The petitioner - MWM has been allotted the Westernmost Belt of Maharashtra consisting of districts of H Thane, Raigad, Ratnagiri and Sindudurg outside Bombay. ## MUMBAI WASTE MANAGEMENT LTD. _v._ 1155 SECRETARY OF ENVIRONMENT GOVT. OF INDIA to deal with waste management facilities. Since the petitioner A - MWM was issued the letter of award for the years prior to respondent No.5, the petitioner MWM felt aggrieved as it curtailed some part of their area of operation as part of those areas were given to respondent No.5 - SMS since it offered more facilities for treatment of hazardous waste by the B government. 3. The petitioner - MWM, therefore, challenged the fixing of the territorial jurisdiction and the assignment of the areas of operation by the government-respondent No.2 and claim that it is entitled to collect the hazardous waste of establishment C outside the area allotted to it. 4. The principal ground of challenge of the Petitioner-MWM is that under the rules of 2005 in force, the consent to operate was not materially changed under the new rules of 2008 under which the government merely sought to re-fix the territorial area of operation through the orders of respondent No.2. The petitioner-MWM assailed the order of curtailment essentially on the ground that on 24.9.2008, the Central Government through respondent No.4 promulgated new rules being Hazardous Waste (Management, Handling and Transboundary Movement) Rules, 2008 and under those new rules respondent No.2 was denuded of the power to fix/re-fix the territorial area of operation of the waste management facilities. The petitioner contended that under 2008 rules respondent No.2 is only the monitoring authority to the facilities set up but not to allocate/re-allocate the territorial jurisdiction. D E F 5. The High Court was pleased to hold that all that was required to be adjudicated was whether the action of respondent No.2 modifying the allocated area and re-fixing the jurisdiction of the two facilities between petitioner - MWM and respondent No.5 - SMS is validly made under the 2008 rules or whether it is in excess of the jurisdiction of their authority. It has been categorically observed therein that the 2008 rules have not been challenged by the petitioner. G H 1156 SUPREME COURT REPORTS [2013] 6 S.C.R. A 6. The High Court on a perusal and assessment of the relevant Rule 5 of the 1989 Rules as also the 2008 Rules in regard to the Hazardous Waste Management Rules finally concluded that under 2008 Rules the person engaged in collection of hazardous waste has to obtain authorization from B respondent No.2 in the State of Maharashtra. As such respondent No.2 authorized such facilities to collect waste under the old rules by an application made in a specific format in that behalf. The High Court was pleased to hold that not only the collection and treatment but re-cycling and re-processing, c storage and disposal of the waste by such facilities would be only as per the authorization of respondent No.2 in the State of Maharashtra. The High Court found substance in the contention on behalf of respondent No.5 that as the collection and treatment. recycling, re-processing, storage and disposal is under the authorization of respondent Np.2, the area of such 0 operation would fall impliedly within the jurisdiction and authority of respondent No.2 to grant and authorize the applicant for collection of waste management. The learned Judges of the High Court also took judicial notice of the fact that the industries augmenting hazardous chemical waste and its effluents E requiring proper management for its collection, treatment, recycling and disposal had increased manifestly in recent years in keeping with economic advancement and trade in such chemicals. Consequently, more facilities had to be established wherein more players would enter upon such trade. Hence the F monopoly of facility was bound to be denuded. The High Court finally was pleased to hold that the area of allocation granted to MWM which are in the Westernmost 4 districts of Maharashtra does not suffer from the ills of unreasonableness of the criteria for allocation. Such allocation was prima facie G shown to have been made upon a reasonable criteria for the classification of districts which falls within the area of allocation and similar other areas of allocation of other such facilities. The High Court also noted that the area of allocation had not been challenged by the petitioner nor it had sought to quash or set H aside the orders of respondent No.2 dated December 11, 2008 A ## MUMBAI WASTE MANAGEMENT LTD. _v._ 1157 SECRETARY OF ENVIRONMENT GOVT. OF INDIA challenged by the petitioner nor it had sought to quash or set A aside the orders of respondent No.2 dated December 11, 2008 and March 9, 2009 or the respondent No.4 in appeal therefrom dated January 29, 2011. Consequently, the direction to the MWM not to encroach upon the area of other facilities provider like respondent No.5 was required to be passed in favour of B respondent No.5 SMS which also had filed a separate writ petition No.5846/2011. 7. Counsel for the petitioner vehemently and with utmost force _inter-alia_ contended that the High Court was clearly in error in issuing a direction to the petitioner to confine its area C of operation relating to waste management to the four districts, as Maharashtra Pollution Control Board was authorized only to monitor and supervise and could not tinker or interfere with the area of allocation. However, the counsel did not even expressly much less with any clarity said so but adopted a circuitous and D vague argument that the respondent had no authority to reduce and expand or allot any area for the business of waste management as it was only competent to authorize the parties to treat the industrial waste and it had no authority or jurisdiction to do anything other than treat the waste product. What is sought to be emphasized by the petitioner's counsel is that the respondents had no authority to allocate the area for operating the business of waste management. E · 8. In spite of our persistent query, the counsel for the F, petitioner could not establish or explain it to this Court that if the respondent No.2 - Maharashtra Pollution Control Board was not authorized to allocate the area then who exactly would allocate the area and in the process also missed that if that were the position then the petitioner himself would not be left G with any authority to operate this business as he has been allotted the area to operate by the same authority who allotted it to the Respondent No.5. F, 9. However, learned senior counsel for the respondent- H 1158 SUPREME COURT REPORTS [2013] 6 S.C.R. - A SMS, Mr. Patwalia relied upon rule 5 sub rule (2) of Hazardous Waste (Management & Handling) Rules, 1989 and has drawn the attention of this Court to the provision of sub-rule (2) of Rule 5 which lays down as follows:- - "5. Grant of authorization for handling hazardous - B wastes. - (2) Every occupier generating hazardous wastes and having a facility for collection, reception, treatment, transport storage and disposal of such wastes shall make - c an application in Form 1 to the State Pollution Control Board for the grant of authorisation for any of the above activities: Provided that the occupier not having a facility for the D collection, reception, treatment, transport, storage and disposal of hazardous wastes shall make an application to the State Pollution Control Board in Fonn 1 for the grant of authorisation within a period of six months from the date of commencement of these rules." E E 10. Learned counsel submitted that the above quoted subrule (2) of Rule (5) clearly establishes that authorization to operate or treat waste management would have to be interpreted so as to infer that the authorization included allocation of the area and if this were not so then there would F be no difference in the contents of sub rule (1) and sub-rule (2) of Rule 5 and sub-rule (2) will merely be an imitation of subrule (1 ). In that view of the matter, he submitted, that the Maharashtra Pollution Control Board was clearly competent to determine the area of operation also. G 11. However, we have noticed that the High Court has not entered into the question as to whether sub-rule (2) of Rule 5 is the provision from which it could be inferred that the Maharashtra Pollution Control Board is competent to authorize a party to treat and operate waste management and whether MUMBAI WASTE MANAGEMENT LTD. _v._ 1159 SECRETARY OF ENVIRONMENT GOVT. OF INDIA aspect of the matter as in that event, it would be judging the A issue which was neither raised nor dealt with by the High Court. In view of this, one of the options available for this Court could have been to remand the matter to the High Court to determine this issue as the same had not been considered earlier. But we refrain and desist ourselves from doing so as we notice that B the order is not patently unjust or illegal on the existing facts of this case which could persuade this Court to enter into a determination of the question which had neither been raised nor dealt with by the High Court. C 12. There is yet another reason not to enter into this aspect C as the High Court has clearly observed that the petitioner has not challenged the orders of respondent No.2 dated December 11, 2008 and March 9, 2009 or order of respondent No.4. The petitioner had merely challenged the order of the appellate authority dated January 29, 2011 and the appellate authority D had clearly observed and rightly so that it had no jurisdiction to determine the question as to whether respondent No.2 - Maharashtra Pollution Control Board and respondent No.4 - Department of Environment, Government of Maharashtra had jurisdiction to allocate territory for conducting the business of E waste management. In that view of the matter, we do not think it appropriate to adjudicate and record a finding in regard to the competence and authority of respondent No.2 and respondent No.4. Nevertheless, we find no reason to entertain these special leave petitions by which the High Court had . F refused to entertain the writ petition assailing the order of the appellate authority which in view of the order of respondent No. 2 and respondent No.4 was pleased to hold that the petitioner will have to confine its area of operation to the area of those territories for which an order had been passed in its favour and G the area which was allotted to respondent No.5 - SMS will not be encroached by the petitioner. D E G 13. In view of the order of allocation specifically determining the territory which has been allotted to the petitioner and H ## 1160 SUPREME COURT REPORTS [2013] 6 S.C.R. - A respondent No.5, the order of the High Court as also the appellate authority do not need to be interfered with as the High Court appears to be correct and justified while holding that the petitioner would not encroach upon the territory which falls beyond the territory which had been allotted to it. However, - B since the competence and authority of respondent No.2 and respondent No.4 had not been gone into by the High Court, it is left open to be raised later in an appropriate case specifically for the reason that the High Court has not recorded any finding in regard to the competence of the respondent No.2 and - c respondent No.4 in regard to allotment of territory or area . As long as the competence and authority of respondent No. 2 and respondent No. 4 is not struck down as illegal and invalid by any court of competent jurisdiction, it is not open for the petitioner to assail their authority for the first time before this Court at the stage of Special Leave to Appeal, specially when - 0 this question had neither been raised by the petitioner before the High Court nor dealt with by the High Court out of which the instant matter arises nor the High Court has dealt with the same by rightly observing that the petitioner has never challenged the orders dated December 11, 2008, March 9, 2009 nor has - E raised this question before the High Court as to whether respondent No.2 and respondent No.4 had jurisdiction to determine the territory of the area of operation by the operators dealing in waste management. Therefore, as already indicated hereinabove, the petitioner cannot be allowed to assail their - F authority in the instant special leave petitions in absence of any challenge to question before the High Court. 14. In view of the aforesaid analysis, we find no substance in these special leave petitions and consequently they are G dismissed. R.P. SLPs dismissed.
End of Judgment Record
Browse All Supreme Court of India (2013) Decisions
2013-12-06

STATE OF RAJASTHAN v BASANT AGROTECH (INDIA) LTD.

This batch of appeals challenges Chapter VI I of the Rajasthan Finance Act, 2008, which imposes an environment and health cess on mineral rights, and the accompanying 2009 notification amending rates (notably Rock Phosphate to Rs.500 per tonne) with retrospective effect from 1.4.2008. The Rajasthan High Court held the levy within the legislative competence but struck down the 2009 notification’s retrospective operation. The State challenged this, contending that where a statute vests power in a state government, the power may be exercised “from time to time” and, by implication, retrospective action may be permissible under delegated powers under the main Act and General Clauses. The Court clarifies that fiscal statutes must be construed strictly and that subordinate legislation cannot ordinarily possess retrospective effect unless expressly or by necessary implication authorized by the parent statute. The majority emphasizes that the words “from time to time” have a futuristic tenor and do not automatically authorize retroactive rates, and that a notification can have prospective effect only. The judgment surveys a spectrum of precedents on taxation, the distinction between taxes/cess, and the constitutional framework regarding mineral development (MMDR Act) and the legislative scope of state versus central power. Ultimately, the appeals are dismissed with no costs, upholding the High Court’s view on retrospective validity of the notification and the need for precise statutory authorization for retrospective action.

2013-07-16

M/S. HOTEL QUEEN ROAD PVT. LTD. & ORS. v. MR. RAM PARSHOTAM MITTAL & ORS.

This Supreme Court judgment arises from Civil Appeal No. 5499 of 2013 in which M/S Hotel Queen Road Pvt. Ltd. and others challenged an order of the Delhi High Court that permitted withdrawal of FAO(OS) 349 of 2009 and extended interim relief beyond the date of withdrawal. The High Court had heard the matter on merits, allowed withdrawal to pursue an alternative remedy, and extended the interim relief up to 10 May 2010, with stated reasons. The appellants contended that such observations during withdrawal were improper and that upon final disposal the court would become functus officio; hence continuing interim relief beyond withdrawal was impermissible. The respondents argued that, in the interest of justice, the court retains inherent power to extend interim relief where the matter has been heard on merits and withdrawal is permitted to facilitate the remedy, and that the observations were prima facie and non-merits determinations. The Supreme Court, after examining the jurisprudence, held that the High Court’s observations were innocuous and did not decide the merits. It clarified that ordinarily a petition that is withdrawn should not receive continued interim relief, but where the matter has been heard on merits and withdrawal is permitted, interim relief can be extended for a limited period with reasons. The appeal and SLP were dismissed, and the interim relief stood vacated. The decision relies on authorities including State of Orissa v. Madan Gopal Rungta, Padam Sen, Ajay Mohan, and G.E. Power Controls (cited).

2013-02-07

Lakshmi alias Bhagyalakshmi and Anr. v. E. Jayaram (D) by LR.

This Supreme Court appeal arises from a Karnataka High Court decision in a suit for permanent injunction over the ownership and occupancy of the suit property. The plaintiffs claimed absolute ownership of the suit property purchased from defendant No.1, though the sale deed was not registered; the entire sale consideration was paid. Plaintiff No.2 asserted possession as a tenant of Plaintiff No.1, and the trial court granted ad-interim relief under Order 39 Rule 1 and 2 CPC restraining interference with possession. The defendants denied the purchase, contending that Plaintiff No.1 was a stranger and that Plaintiff No.2 was a tenant under Defendant No.1. The High Court, instead of testing the legality of the interim injunction, examined Section 53A of the Transfer of Property Act and Order 2 Rule 2 CPC and concluded that, since the suit complained only of injunction and not of specific performance, the incidental relief of injunction would be unavailable. The Supreme Court held that the High Court had completely misconstrued Order 39 and misconstrued the scope of Section 53A and Order 2 Rule 2, and that the trial court’s injunction could stand where interim protection was warranted. It allowed the appeal, set aside the High Court’s order, and directed the trial court to hear and dispose of the suit within four months from the date of receipt of copy of this order, treating the merits independently of appellate observations.

2013-06-18

Roop Singh v. State of Madhya Pradesh

Roop Singh v. State of Madhya Pradesh concerns a rape case arising from an incident in village Tighrapura in Morena district. The complainant (PW-5) alleged that at about 2 a.m. the appellant, her neighbour, forcibly committed intercourse with her while her sister‑in‑law (PW-4) slept nearby and her husband was away at the fields. A FIR was registered; the medical examination and FSL report supported the occurrence of sexual assault. The trial court convicted the appellant under Section 450, IPC (house trespass to commit an offence) and Section 376, IPC (rape) and sentenced him to three years’ RI for Section 450 and seven years’ RI for Section 376 with fines. The Madhya Pradesh High Court dismissed the appeal, upholding the convictions. In special leave proceedings before the Supreme Court, the appellant argued that the complainant had consented to the intercourse and that the case was false, allegedly due to a land dispute. The State countered that consent in rape requires voluntary participation after fully exercising the choice between resistance and assent, citing established authority on the meaning of consent (State of U.P. v. Chhotey Lal; Mango Ram) and that the evidence shows the complainant did not consent. The Court accepts the standard of consent and, after reviewing the testimonies of PW-4 and PW-5 and the medical evidence, holds that the complainant was not a willing participant. Consequently, the appeal is dismissed, and the convictions and sentences stand.