High Court of KeralaDivision BenchDisposed of; writ petition disposed of with dir...

Mujeeb Rahman v State of Kerala and Others

Case / Petition Number:W. P. (C) No. 31592 of 2024
Neutral Citation:2025:KER:29766

Case Details & Bench

Court
High Court of Kerala
Hon'ble Judges
  • Nitin Jamdar, C. J.
  • S. Manu, J.
Judgment Date
2025-04-03
Court Decision / Holding
Writ petition disposed of; the court accepts the counter affidavit’s position and directs that the activity shall not be carried out without prior environmental clearance, and that the project proponent must apply for prior clearance via the PARIVESH Portal before starting the activity, in line with the statutory framework.
Final Disposition
Disposed of; writ petition disposed of with directions to obtain prior environmental clearance before starting the activity.

Parties to the Case

Appellants / Petitioners

  • Mujeeb Rahman

Respondents

  • State of Kerala represented by Principal Secretary to Government, Water Resources Department
  • Principal Secretary to Government, Irrigation Department
  • Kerala Irrigation Infrastructure Development Corporation Limited (KIIDC)
  • Chief Executive Officer, Kerala Irrigation Infrastructure Development Corporation Limited
  • State Environmental Impact Assessment Authority (SEIAA)
  • Chief Secretary to Government, Government Secretariat
  • M/S. KSR Marine Services Pvt Ltd.

Legal Representation & Advocates

Counsels for Petitioners

  • • P. M. Ziraj
  • • Irfan Ziraj

Counsels for Respondents

  • • Pirappancode V. Sudheer
  • • M. P. Sreekrishnan
  • • Jolly John
  • • Akash S. (K/980/2008)
  • • Girish Kumar M S (K/001593/2018)
  • • Srividya K (K/001476/2018)
  • • Richu Theresa Robert (K/002427/2021)
  • • Rajalakshmi R. (K/001978/2023)
  • • Liza Meghan Cyriac
  • • C. S. Resmi
  • • Irene Babu
  • • Mehnaz P. Mohammed
  • • Rubin Shibu
  • • K. P. Harish, Sr. GP

Case Synopsis & Summary

This writ petition filed by Mujeeeb Rahman challenges a sand-desilting/mining plan along Bharathapuzha River near the Kankakadavu regulator/bridge in Kuttipuram. The petitioner asserts that the state machinery may permit dredging of large quantities of sand without environmental clearance or proper environmental impact assessment, violating statutory norms. The counter affidavit for SEIAA contends that the proposed desiltation, upstream and downstream works, and related processing and stocking constitute mining rather than mere maintenance, with commercial intent for sand. It cites that the tender documents describe desiltation, stocking, cleaning and sale of processed products—activities that fall under ‘winning’ of minerals, thus requiring Environmental Clearance under the EIA Notification, 2006. The affidavit relies on MoEFCC guidelines, including Sustainable Sand Mining Management Guidelines 2016 and Enforcement and Monitoring Guidelines for Sand Mining (EMGSM-2020), and on District Survey Reports prepared under MoEFCC guidelines to identify replenishment rates, mining zones, and monitoring standards. The court notes that the regulator’s field report and the DSR indicate that this is capital dredging, not maintenance, and that prior clearance is mandatory. Accepting the counter affidavit’s position, the court disposes of the petition, directing the project proponent to obtain prior environmental clearance via PARIVESH before starting the activity and to comply with the statutory framework for sand mining and environmental stewardship.

Provisions of Law Cited

Environment Protection Act, 1986 - Sections 15 and 19EIA Notification, 2006Sustainable Sand Mining Management Guidelines, 2016Enforcement and Monitoring Guidelines for Sand Mining (EMGSM-2020)Ministry of Environment, Forest & Climate Change (MoEF&CC) guidelines and notifications including S.O.141 (E) dated 15.01.2016Parivesh Portal requirements for prior Environmental Clearance

Submissions & Arguments

Contentions of Appellants / Petitioners

The petitioner contends that the State and official respondents may permit dredging of large quantities of sand near Bharathapuzha River without environmental clearance or adequate environmental study. The bid documents suggest desiltation, stocking, cleaning and sale of processed products, which the petitioner argues amounts to mineral extraction or mining. The petitioner invokes the EIA Notification, 2006 and Sustainable Sand Mining Guidelines to urge prior clearance and environmental evaluation, highlighting lack of certified environmental assessment and a robust plan. The petitioner emphasizes that the project, being capital dredging, requires scientific dredging depth, area, replenishment, bank protection and an Environmental Management Plan, and therefore cannot start without prior clearance.

Contentions of Respondents

The counter affidavit on behalf of SEIAA submits that the desiltation near the regulator/bridge amounts to capital dredging/mining with commercial intent to extract sand. It argues the activity falls under mining, thus requiring Environmental Clearance under the EIA Notification, 2006. It relies on MoEFCC guidelines (SSMMG-2016, EMGSM-2020) and MoEFCC District Survey Reports to show the need for a defined mining plan, monitoring, ecological protections, and PARIVESH-based clearance before commencement.

Cited Precedents (2)

Case NameCitationTreatmentExplanation
Deepak Kumar and Others v. State of HaryanaI.A. No.12-13 of 2011; Special Leave Petition (C) No.19628-19629 of 2009PositiveSupreme Court held that prior environmental clearance is mandatory for mining of minor minerals irrespective of the area of mining lease.
Sudarsan Das v. State of West Bengal & Ors.O.A. 173/2018PositiveNGT directed adherence to SSMMG-2016 and EMGSM-2020, emphasizing monitoring and safeguards in sand mining; used as supportive guidance.

Diagnostic Tool

Beta

Does this judgment govern your specific facts?

Don't risk relying on a distinguishable precedent. Enter your facts or proposition below. We will test it against Mujeeb Rahman v State of Kerala and Others and instantly map out authorities that support, challenge, or govern your position.

Extracted Judgment Text

Exact text extracted from official judgment records.

W. P. (C) No. 31592 of 2024 -1- ``` 2025:KER:29766 ``` **==> picture [58 x 57] intentionally omitted <==** ``` IN THE HIGH COURT OF KERALA AT ERNAKULAM ``` ## **`PRESENT`** ``` THE HONOURABLE THE CHIEF JUSTICE MR. NITIN JAMDAR ``` ## **`&`** ``` THE HONOURABLE MR. JUSTICE S.MANU ``` ``` THURSDAY, THE 3[RD] DAY OF APRIL 2025 / 13TH CHAITHRA, 1947 ``` ## **`WP(C) NO. 31592 OF 2024`** ## **`PETITIONER/S:`** ``` MUJEEEB RAHMAN AGED 50 YEARS SON OF ABDUL SALAM, KOTTILINGAL HOUSE, PATTAMBI P.O, PATTAMBI VILLAGE, PATTAMBI TALUK, PALAKKAD DISTRICT, PIN - 679303 ``` ``` BY ADVS. P.M.ZIRAJ IRFAN ZIRAJ ``` ## **`RESPONDENT/S:`** - **`1 THE STATE OF KERALA REPRESENTED BY PRINCIPAL SECRETARY TO GOVERNMENT, WATER RESOURCES DEPARTMENT, ROOM NO.393, MAIN BLOCK, GOVERNMENT SECRETARIAT, GOVERNMENT OF KERALA, THIRUVANANTHAPURAM, PIN - 695001`** ``` 2PRINCIPAL SECRETARY TO GOVERNMENT IRRIGATION DEPARTMENT, GOVERNMENT SECRETARIAT, GOVERNMENT OF KERALA, THIRUVANANTHAPURAM, PIN - 695001 ``` - **`3 KERALA IRRIGATION INFRASTRUCTURE DEVELOPMENT CORPORATION LIMITED (KIIDC) THIRUVANANTHAPURAM REPRESENTED BY ITS MANAGING DIRECTOR, SECRETARY TO GOVERNMENT, WATER RESOURCES DEPARTMENT, ROOM NO.393, MAIN BLOCK,`** W. P. (C) No. 31592 of 2024 -2- ``` 2025:KER:29766 ``` **==> picture [58 x 57] intentionally omitted <==** ``` GOVERNMENT SECRETARIAT, GOVERNMENT OF KERALA, THIRUVANANTHAPURAM, PIN - 695001 ``` ``` 4CHIEF EXECUTIVE OFFICER KERALA IRRIGATION INFRASTRUCTURE DEVELOPMENT CORPORATION LIMITED (KIIDC), PARVATHY, TC-36/1, NH-66 BYE PASS SERVICE ROAD, CHACKAI P.O, THIRUVANANTHAPURAM, PIN - 695024 ``` ``` 5STATE ENVIRONMENTAL IMPACT ASSESSMENT AUTHORITY(SEIAA) KSRTC BUS TERMINAL COMPLEX, THAMPANOOR, THIRUVANANTHAPURAM, KERALA REPRESENTED BY ITS MEMBER SECRETARY, PIN - 695001 ``` ``` 6CHIEF SECRETARY TO GOVERNMENT GOVERNMENT SECRETARIAT, GOVERNMENT OF KERALA, THIRUVANANTHAPURAM, PIN - 695001 ``` ``` 7M/S. KSR MARINE SERVICES PVT LTD. HAVING REGISTERED ADDRESS AT: 2-98/3, 10-B, BLOCK-B, KAKATEEYA NAGAR, HABSIGUDA, HYDERABAD- 500007 REPRESENTED BY AUTHORIZED SIGNATORY ANEESH K.R, S/O G. KARTHIKEYAN, AGED 54 YEARS, RESIDING AT PPRRA-11, PALAPPARAMBU ROAD, ELAMAKKARA, ERNAKULAM – 682025 IS IMPLEADED AS ADDL.R7 AS PER ORDER DATED 20/03/2025 IN I.A 2/2025. ``` ``` BY ADVS. PIRAPPANCODE V.S.SUDHEER M.P.SREEKRISHNAN JOLLY JOHN AKASH S.(K/980/2008) GIRISH KUMAR M S(K/001593/2018) SRIVIDYA K(K/001476/2018) RICHU THERESA ROBERT(K/002427/2021) RAJALAKSHMI.R.(K/001978/2023) LIZA MEGHAN CYRIAC C.S.RESHMI IRENE BABU MEHNAZ P. MOHAMMED RUBIN SHIBU K. P. HARISH, SR. GP ``` ``` THIS WRIT PETITION (CIVIL) HAVING COME UP FOR ADMISSION ON 03.04.2025, THE COURT ON THE SAME DAY DELIVERED THE FOLLOWING: ``` W. P. (C) No. 31592 of 2024 -3- **==> picture [58 x 57] intentionally omitted <==** ``` 2025:KER:29766 ``` ## J U D G M E N T Dated this the 3[rd] day of April, 2025 ## Nitin Jamdar, C. J. Heard Mr. Irfan Ziraj, learned counsel for the Petitioner, Mr. Pirappancode V. S. Sudheer, learned counsel for Respondent Nos. 3 and 4, Mr. M. P. Sreekrishnan, learned counsel for Respondent No. 5, Mr. Jolly John, learned counsel for Respondent No. 7 and Mr. K. P. Harish, learned Senior Government Pleader. 2. The main anxiety expressed by the Petitioner is that the State and the Official Respondents might permit the dredging of large quantities of sand without there being any environmental clearance or without conducting any environmental study. A counter affidavit is filed on behalf of the Kerala State Environment Impact Assessment Authority (Authority) in which it is stated as under:- “2. The above Writ Petition is filed seeking interference of this Hon’ble Court in the matter of sand mining based on Exhibit P1, Bid document in connection with tender No. KIIDC/ACUTION/07/2024-25 dated 14.08.2024 issued by the 4[th] respondent, Chief Executive officer Kerala Irrigation Infrastructure Development Corporation. 3. It is submitted that from the Exhibit P1 documents, the proposed activity is mentioned as desiltation of the deposits (1.5 km “upstream and 0.5km downstream) near regulator cum bridge at Kankakadavu which is under construction, across Bharathapuzha River in Kuttipuram Panchayat. From the Google imageries it is observed that river is meandering in the area mentioned in the bid i.e., between Kuttipuram W. P. (C) No. 31592 of 2024 -4- ``` 2025:KER:29766 ``` **==> picture [58 x 57] intentionally omitted <==** bridge and the Kanakakadavu RCB. It is also evident that huge quantity of sand is deposited at an average 1.5m above the current water level in the inner edge (a point bar) due to the meandering effect. Since the project is still under construction and not yet commissioned, the proposed desilting of sand from the upstream and downstream sections of Bharathapuzha River shall be regarded as Capital Dredging. Therefore the activity is not exempted from obtaining Environmental - Clearance as per Appendix — IX of the EIA Notification, 2006. 4. As per the Bid Document, the activities proposed are desiltation, Stocking, Cleaning and selling of processed products. All these processes would come under the term Winning. Any operation undertaken for the purpose of winning -any- mineral shall be considered as mining and the proposed de-silting project from Bharathapuzha river Basin shall be considered as sand mining rather than de-siltation. Therefore, the activity requires Environmental Clarence as per EIA Notification, 2006. 5. In the instant case the de-siltation, is not for the purpose of maintenance or Flood Control as in the case of dam or river or reservoir, which may not be considered as mining. But the activity proposed to be carried out for capital dredging which requires a clear cut scientific plan regarding dredging, the depth of dredging the extent of dredging, quantity to be dredged out, the protection and rejuvenation plan for the river bank and riparian vegetation, the stocking and transportation plan and Environment Management Plan for dredging approved by a competent authority, etc... are required. The minerals present in the proposed de-siltation/dredging area is for commercial purpose. Hence, it has to be considered as mining. 6. It is submitted that any operation undertaken for the purpose of winning any mineral shall be considered as ‘mining’. Accordingly, if desilting is undertaken per se with the objective of winning a mineral then it will be construed as W. P. (C) No. 31592 of 2024 -5- **==> picture [58 x 57] intentionally omitted <==** ``` 2025:KER:29766 ``` a ‘mining’ operation. Here, the desilted sand is stocking / processing and transporting for further usage. Hence, the proposed desilting project from the river basin shall be considered as a ‘mining’ activity. The soil investigation report also indicates the desilted material contains 90% sand of different quality. 7. The Ministry of Environment, Forest & Climate Change (MoEF&CC) published Environmental Impact Assessment Notification 1994 which is only applicable for the Major Minerals more than 5ha. In order to cover the minor minerals also into the preview of EIA, the MoEF&CC issued EIA Notification 2006 for Major & Minor Mineral more than 5 Ha. The Hon'ble Supreme Court in its Judgment dated the 27 February 2012 in I.A. No.12- 13 of 2011 in Special Leave Petition (C) No.19628-19629 of 2009, in the matter of Deepak Kumar etc, Vs. State of Haryana and Others etc. made prior environment clearance mandatory for mining of minor minerals irrespective of the area of mining lease. In order to comply with the judgment of Hon’ble Supreme Court, the Ministry issued S.0.141 (E) dated 15.01.2016. Further, MOEF&CC published Sustainable Sand Mining Management Guidelines 2016 for scientific and sustainable sand mining in the Country. The recommendations for the management of sustainable sand extraction are the key objective of the Guidelines. Special emphasis is given on monitoring of the mined out material, which is key to the success of the environmental management plan. Use of IT and IT-enabled services for effective monitoring of the quantity of mined out material and transportation along with process re-engineering has been made a part of the Guidelines. Guidelines support the fundamental concept, environmental limit promote protection, negative physiological, hydrogeological and social impacts underpinning sustainable economic growth. 8. The Hon'ble NGT in its order dated 04.09.2018 in O.A. 173/2018 in the matter of Sudarsan Das vs. State of West Bengal & Ors. Interalia observed that “There can be no two W. P. (C) No. 31592 of 2024 -6- **==> picture [58 x 57] intentionally omitted <==** ``` 2025:KER:29766 ``` views that an effective institutional monitoring mechanism is required not only at the stage when Environmental Clearance is granted but also at ‘subsequent stages”. “The guidelines focus on the preparation of District Survey Report and the Management Plan’ ... We are of the view that all the safeguards which are suggested in sustainable sand mining guidelines as well as notification dated 15.01.2016 ought to be scrupulously followed. “...It is a known fact that in spite of the above-suggested guidelines being in existence, on the ground level, illegal mining is still going on. The existing mechanism has not been successful and effective in remedying the situation.” “...Since there is an utter failure in the current monitoring mechanism followed by the State Boards, SEIAAs and DEIAAs, it is required to be revised for effective monitoring of sand and gravel mining and a dedicated monitoring mechanism be set up.” 9. Based on the above directions the Ministry of Environment, Forest and Climate Change also issued the Enforcement and Monitoring Guidelines for Sand Mining (EMGSM-2020). The Hon’ble National Green Tribunal (NGT) ordered all states and union territories to strictly adhere to the Sustainable Sand Mining Management Guidelines (SSMMG-2016) and the Enforcement and Monitoring Guidelines for Sand Mining (EMGSM-2020). These directives were further strengthened by mechanisms for the preparation of District Survey Report, Environment Management Plan, replenishment studies, the assessment and recovery of compensation, the seizure and release of vehicles involved in illegal mining, and other safeguards against violations. The EMGSM 2020 also explicitly deliberated about monitoring mechanism on transportation, stacking, etc. 10. Pursuant thereto, the Institute of Land and Disaster Management (ILDM), Revenue Department, Government of Kerala prepared the District Survey Reports for River Sand Mining across the State as per the guidelines issued by the MoEFCC dated 25.07.2018. The ILDM entrusted a NABET Accredited Consultant, CSIR-National Institute of W. P. (C) No. 31592 of 2024 -7- **==> picture [58 x 57] intentionally omitted <==** ``` 2025:KER:29766 ``` Interdisciplinary Science and Technology (NIIST), with the task of preparing District Survey Reports and the mining plan for the sustainable of removal of sand from the river bed. The DSR of the Bharathapuram River stretches in the Palakkad, Malappuram and Thrissur Districts were prepared by following all the procedures including public consultation as per above said guidelines and EIA Notification, 2006 and approved by the State Environment Impact Assessment Authority. 11. It is submitted that, the District Survey Report (DSR), is an important initial step before grant of mining lease/LoI. The DSR emphasizes the areas of aggradation/deposition where mining can be allowed and demarked the areas of erosion and proximity to infrastructural structures and installation where mining should be prohibited. It was also assessed the annual rate of replenishment, time for replenishment after mining, the ways of scientific and systematic mining; the quantity to be extracted, cluster conditions, measures for protection of environment and ecology as well as for protection of bank erosion, benchmark (BM) with respect to mean Sea Level (MSL) in mining channel reaches (MCR), below which no mining shall be allowed. The DSR also identified the potential ‘kadavus’ for the stacking of the mined material. 12. As per the EIA Notification, 2006 for the removal of river sand requires Environmental Clearance from the State Environmental Impact Assessment Authority. However, the desilting of reservoir, dredging for upkeep and maintenance of structures, channels and averting natural disasters will not be treated as mining for the purpose of environmental clearance. In the present case, the Regulator Cum Bridge is only under construction and the proposed activity cannot be considered as an upkeep and maintenance of structures, rather than sand mining. Besides, the authority which conducted the study is not a NABET Accredited Agency and are not entitled to conduct the environment impact study as per EIA Notification. In view of the above the proposed W. P. (C) No. 31592 of 2024 -8- **==> picture [58 x 57] intentionally omitted <==** ``` 2025:KER:29766 ``` activity is not entitled to be start without first obtaining a Prior Environmental Clearance. It is submitted that as per the provisions of EIA Notification, 2006 the project proponent has to make an application in the prescribed form-1 though PARVISEH Portal for obtaining a Prior Environmental Clerance. Once an application is received through PARIVESH Portal, for an Environmental Clearance, the same can be considered in terms of EIA Notification, 2006. It is brought to the kind attention of this Hon'ble Court that any activity which requires a prior Environmental Clearance, if started without obtaining Prior Environmental Clearance, would amount of violation of provisions of EIA Notification, 2006 and consequently, the provision of Environment Protection Act, including proceedings u/s.15 r/w. S.19 of Environment Protection Act, 1986. In the above facts and circumstances of the case, as the activity is not yet started, the above writ petition may be disposed of directing the Project Proponent to make an application for an prior Environmental Clearance before the answering respondent though PARVIESH Portal. The Report of Field inspection conducted on 01.10.2024 pursuant to the Orders of this Hon’ble Court on 12.09.2024 may also be read as part of this Affidavit. It is prayed accordingly.” 3. Therefore, the stand of the Authority in the affidavit, as reiterated by the learned counsel for the Authority is that the activity, which is the subject matter of this petition, requires an environmental clearance, and before starting the activity, the project proponent will have to make an application for prior environmental clearance to the Authority. This affidavit, according to us, takes care of the apprehension expressed by the Petitioner Public Interest Litigant in this petition. Therefore, it goes without saying that the activity as contemplated in the petition shall not be carried out without there W. P. (C) No. 31592 of 2024 -9- **==> picture [58 x 57] intentionally omitted <==** ``` 2025:KER:29766 ``` being any environmental clearance as pointed out above. 4. Accepting the statements made in the counter affidavit of the Authority and the observations as above, the writ petition is disposed of. Sd/NITIN JAMDAR CHIEF JUSTICE Sd/S. MANU JUDGE Eb W. P. (C) No. 31592 of 2024 -10- **==> picture [58 x 57] intentionally omitted <==** ``` 2025:KER:29766 ``` ## **`APPENDIX OF WP(C) 31592/2024`** ``` PETITIONER EXHIBITS ``` ``` Exhibit P1 ``` ``` TRUE COPY OF THE RELEVANT PAGES OF BID DOCUMENT IN CONNECTION WITH TENDER NO. KIIDC/ACUTION/ 07/ 2024-25 DATED 14.8.2024 ISSUED BY THE FOURTH RESPONDENT ``` ``` Exhibit P2 ``` ``` TRUE COPY OF THE SCHEDULE IN CONNECTION WITH EXHIBIT P1 TENDER DETAILS PUBLISHED BY THE FOURTH RESPONDENT DATED 27.8.2024 ``` ``` Exhibit P3 ``` ``` TRUE COPY OF THE REPORT OF KERI PUBLISHED BY THE THIRD RESPONDENT DATED NIL IN JANUARY 2024 ```