Court Decision / Holding
Writ petition partly allowed; Ombudsman’s order modified to limit the demand to 12 months under the proviso to Regulation 152, with rest of the order upheld. Respondents directed to issue revised bill within 15 days from receipt of a copy, and petitioner to deposit the amount within 15 days thereafter.
Final Disposition
Petition partly allowed; Ombudsman order modified to cap demand at 12 months; revised bill to be issued within 15 days; deposit within 15 days.

Parties to the Case

Appellants / Petitioners

  • Muhammed Haroon P.P

Respondents

  • The Secretary Kerala State Electricity Board Limited
  • The Chief Engineer Kerala State Electricity Board Limited
  • The Assistant Executive Engineer Electrical Sub-Division, Feroke, Kozhikode District
  • The Assistant Engineer Electrical Section, Kozhikode District
  • The State Electricity Ombudsman

Legal Representation & Advocates

Counsels for Petitioners

  • • DHEERAJ KRISHNAN PEROT
  • • Adv. DHEERAJ KRISHNAN PEROT

Counsels for Respondents

  • • B. PREMOD
  • • Adv. B. PREMOD

Case Synopsis & Summary

Petitioner Muhammed Haroon P.P., proprietor of M/s Prestige Polymers in Kozhikode, challenges the Kerala State Electricity Board’s demand raised on account of an incorrect multiplication factor used to compute energy charges. The establishment’s meter CT ratio was 200/5, implying a multiplication factor (MF) of 40, but the billing used MF 20. On 8 October 2020, a site inspection found the meter functioning properly with no tampering; however, the MF had been wrongly recorded. The petitioner protested the demand; RTI responses revealed that the CT ratio should have been 100/5 rather than 200/5, indicating an anomaly attributable to the licensee. The Consumer Grievance Redressal Forum (CGRF) Northern Region upheld the demand; the Electricity Ombudsman dismissed the appeal. The petitioner submits that Regulation 113 places the responsibility for meter accuracy on the licensee; Regulation 152 empowers the licensee to cure anomalies detected at the consumer’s premises but does not change the purpose of use; Regulation 109 imposes the licensee’s duty to install proper meters; and Section 56 of the Electricity Act, 2003 imposes a two-year limitation on recovery. The respondent argues that changing CT ratio would not alter actual consumption and relies on Regulation 152 and Section 56A to realize the shortfall, citing Prem Cottex v. Uttar Haryana Bijli Vitran Nigam Ltd. (Civil Appeal No. 7235 of 2009) to distinguish Ajmer. The High Court partially allows the petition, modifying the Ombudsman order to cap the demand at 12 months under Regulation 152’s proviso, while upholding the rest of the order, directing a revised bill within 15 days and deposit within 15 days.

Provisions of Law Cited

Regulation 113, Kerala Electricity Supply Code 2014Regulation 152, Kerala Electricity Supply Code 2014Regulation 109, Kerala Electricity Supply Code 2014Section 56, Electricity Act, 2003Section 56A, Electricity Act, 2003Section 126, Electricity Act, 2003Section 135, Electricity Act, 2003Regulation 155 (8)Proviso to Regulation 152

Submissions & Arguments

Contentions of Appellants / Petitioners

Petitioner submits that Regulation 113 places responsibility for meter accuracy on the licensee. The meter inspection on 8.10.2020 found no tampering; the only fault was the multiplication factor, misrecorded as 20 instead of 40, due to the CT ratio being 200/5 instead of 100/5. RTI replies indicate CT ratio should be 100/5. Regulation 152 allows the licensee to cure anomalies detected at the consumer’s premises but does not permit changing the purpose of use or retroactive charging beyond the period of anomaly. Regulation 109 imposes the licensee’s duty to install a proper meter with its accessories and maintain records. Section 56 of the Electricity Act, 2003 imposes a two-year limitation on recovery; liability from April 2018 cannot be fastened. The petitioner relies on Prem Cottex v. Uttar Haryana Bijli Vitran Nigam Ltd (Civil Appeal No. 7235 of 2009) to argue Ajmer Vidyut analogy should not apply here. The aim is to cap liability to 12 months under the proviso to Regulation 152, not to deny the licensee’s right to rectify the billing.

Contentions of Respondents

Respondents contend that the MF error resulted from a CT ratio change, but the consumption remains the same; the licensee can cure anomalies under Regulation 152 and recover the shortfall under the normal tariff; amounts are recoverable as anomalies persisted; the period of short collection might extend beyond 12 months as per the proviso; they rely on the Ombudsman order and Prem Cottex to justify their position, and assert that Ajmer’s analogy should not govern rectification in this case.

Cited Precedents (2)

Case NameCitationTreatmentExplanation
M/s Prem Cottex v. Uttar Haryana Bijli Vitran Nigam Ltd and Ors.Civil Appeal No.7235 of 2009PositiveCited to support that Ajmer’s analogy should not be applied to rectification of electricity department mistakes; Prem Cottex is used as authority favorable to restricting retroactive penalties in the present context.
Assistant Engineer, Ajmer Vidyut Vitran Nigam Limited and Anr. v. Rahmathullah Khan alias RahamjullaNot ProvidedDistinguishedCourt states Ajmer’s analogy would not apply to the present case; hence Ajmer’s ratio is not followed.

Diagnostic Tool

Beta

Does this judgment govern your specific facts?

Don't risk relying on a distinguishable precedent. Enter your facts or proposition below. We will test it against Muhammed Haroon P.P v. Kerala State Electricity Board Limited & Ors. and instantly map out authorities that support, challenge, or govern your position.

Extracted Judgment Text

Exact text extracted from official judgment records.

## **IN THE HIGH COURT OF KERALA AT ERNAKULAM** ## **PRESENT** ## **THE HONOURABLE MR. JUSTICE AMIT RAWAL** **FRIDAY, THE 16[TH] DAY OF SEPTEMBER 2022 / 25TH BHADRA, 1944** ## **WP(C) NO. 29471 OF 2022** ## **PETITIONER/S:** MUHAMMED HAROON P.P AGED 34 YEARS S/O LATE ABDUL LATHEEF P P, PATHAYA PARAMBIL, RAHIMAN BAZAR, KOLATHARA,P O CHERUVANNUR, KOZHIKODE, PIN - 673655 BY ADV DHEERAJ KRISHNAN PEROT ## **RESPONDENT/S:** 1 THE SECRETARY KERALA STATE ELECTRICITY BOARD LIMITED, VAIDHYUTHI BHAVAN, THIRUVANANTHAPURAM, PIN - 695004 2 THE CHIEF ENGINEER KERALA STATE ELECTRICITY BOARD LIMITED, NORTHERN CIRCLE, PALLIMUKKU, KOCHI, KERALA , PIN - 682011 3 THE ASSISTANT EXECUTIVE ENGINEER ELECTRICAL SUB-DIVISION, FEROKE, KOZHIKODE DISTRICT, PIN - 673631 4 THE ASSISTANT ENGINEER ELECTRICAL SECTION, KOZHIKODE DISTRICT, PIN - 67363 5 THE STATE ELECTRICITY OMBUDSMAN D.H ROAD & OFFSHORE ROAD, NEAR GANDHI SQUARE, ERNAKULAM, PIN - 682016 BY ADV B.PREMOD THIS WRIT PETITION (CIVIL) HAVING COME UP FOR ADMISSION ON 16.09.2022, THE COURT ON THE SAME DAY DELIVERED THE FOLLOWING: **WP(C) NO. 29471 OF 2022** **2** ## **JUDGMENT** Petitioner is claiming to be a owner/proprietor of M/s Prestige Polymers, a small scale Chappal manufacturing situated at Kozhikode. Earlier, the establishment was under the Electrical Section, Feroke with consumer number 1166319009259 and then it was brought under the Areekkad Electrical Section with consumer No.1167899019163 having a connected load of 37KW with LT IV tariff. 2. Petitioner has approached this Court challenging the action of the KSEB and seeking the recovery of the amount on account of the mistake in respect of multiplication factor. On 8.10.2020, Sub Engineer of respondent No.3, Assistant Executive Engineer, Electrical sub-division along with the overseer inspected the industrial premises of the petitioner and prepared a site mahazar and found there was no tampering of the meter which was functioning properly but the multiplication factor (MF) for calculating the energy charges was wrong as the CT used was with CT ratio of 200/5 with resultant MF as 40. Instead of taking multiplication factor as 40, the multiplication factor used for electrical bill was 20 and raised a bill of Rs.7,17,602/-, Ext.P2. **WP(C) NO. 29471 OF 2022** **3** Petitioner approached the Assistant Engineer and protested to the demand raised in Ext.P2 but of no avail. An information under the RTI Act was sought vide application dated 5.2.2021 and 9.2.2021, Ext.P3 and P3(a). The reply Ext.P4 indicated that there was no fault of the petitioner in fact the system required upgradation as the CT should have been in the ratio of 100/5 rather than 200/5. On the basis of the information, petitioner preferred an O.P No.4/2021 before the Consumer Grievance Redressal Forum (CGRF- Northern Region). The CRRF vide order dated 19.1.2022 upheld the demand raised in Ext.P2. Against the aforementioned order, an appeal was preferred before the Electricity Ombudsman, which was dismissed. Learned counsel for the petitioner in support of the averments made in the writ petitions has raised the following submissions: 3. Regulation 113 of the Kerala Electricity Supply Code 2014 casts the responsibility on the licencee ie., KSEB regarding the accuracy of the meter. The meter was inspected and it was not suffering from any inherent mistake or over draw of the power than the sanctioned load or unauthorized load. 4. Regulation 152 of the Kerala Electricity Supply Code 2014 empowers the Electricity Board to cure the anomalies detected at the premises of the consumer but the fact remains that **WP(C) NO. 29471 OF 2022** **4** there was no change in the purpose of use of electricity by the consumer. The inaccuracy in metering cannot be attributed to the petitioner except only to the licencee. 5. Regulation 109 of the Kerala Electricity Supply Code, 2014 provides that it shall be the responsibility of the officials of the licensee to install a proper meter with its accessories such as CT etc. and keep the records properly for the purpose of calculating the energy consumption and then the energy charges. 6. In the light of Section 56 with regard to limitation applicable in the collection of undervaluation amount from the petitioner will be illegal if the respondent to do so, because the alleged arrears became due as early as in April, 2018, much before the 2 year limitation period as provided in the Electricity Act, 2003. 7. On the other hand, counsel representing the Electricity Board submitted that there would not have any difference that in cases of contract demand of 50KVA, as in the case of the petitioner, there is provisions to enhance the contract at any point of time. Even if the old CT is replaced with ratio 100/5A CT, there would not be any change in the consumption. In other words, whether it is 100/5A CT or 200/5A CT, only the actual consumption of the consumer was recorded and billed. The only fault was that the **WP(C) NO. 29471 OF 2022** **5** multiplication factor was mistakenly recorded as 20 instead of 40. It should have been 40 with effect from April 2018 and rightly so, the demand has been raised as Rs.7,17,602/-. By applying the provisions of Regulation 152 and noticing the provisions of Section 56A of the Electricity Act, 2003, Electricity department cannot be prevented from recovering the amount actually due as the limitation would start from the date of the detection in 2020 and relating back to April 2018. In support of the contentions relied upon the judgment of the Supreme Court rendered in Civil Appeal No.7235 of 2009 _**(M/s Prem Cottex v. Uttar Haryana Bijli Vitran Nigam Ltd and Ors.)**_ dated 5[th] October 2021. It was held that the analogy laid down in _**Assistant Engineer, Ajmer Vidyut Vitran Nigam Limited and Anr. v. Rahmathullah Khan alias Rahamjulla**_ would not apply to the case of rectification of mistake by the electricity department nor the provisions of Section 56 of the Electricity Act would apply. 8. I have heard the learned counsel for the parties and appraised the paper book. It is a matter of record that on 8.10.2020, inspection was conducted in the establishment of the petitioner and it was found that the electric connection was of 111 kW in LT-IV Tariff with a load of 37 KW. There was no temporary LT chamber and found to be in perfectly sealed condition. Meter was found to be working properly but it was noticed **WP(C) NO. 29471 OF 2022** **6** that the multiplication factor was incorrectly recorded as 20 instead of 40 and the consumer was being issued the bills at that rate. Regulation 152 as noticed by the Ombudsman in the order reads thus: _As per Regulation 152 Anomalies attributable to the licensee which are detected at the premises of the consumer._ _(1) Anomalies attributable to the licensee which are detected on inspection at the premises of the consumer, such as wrong application of multiplication factor, incorrect application of tariff by the licensee even while there is no change in the purpose of use of electricity by the consumer and inaccuracies in metering shall not attract provisions of Section 126 of the Act or of Section 135 of the Act._ _(2) in such cases, the amount of electricity charges short collected by the licensee, if any, shall only be realized from the consumer under normal tariff applicable to the period during which such anomalies persisted._ _(3) The amount of electricity charges short collected for the entire period during which such anomalies persisted, may be realized by the licensee without any interest:_ _Provided that, if the period of such short collection due to the anomalies is not known or cannot be reliably assessed, the period of assessment of such short collection of electricity charges shall be limited to twelve. months:_ _Provided further that while assessing the period of such short collection the factors as specified in sub-regulation (8) of regulation 155 shall be considered:_ _Provided also that realization of electricity charges short collected shall be limited for a maximum period of twenty four months, even if the period during which such anomaly persisted is found to be more than twenty four months._ 9. From the perusal of the same, it empowers the licensee to cure the anomalies attributed to them when detected on **WP(C) NO. 29471 OF 2022** **7** inspection as there is no change in the purpose of use of electricity by the consumer and the electricity charges short collected for the entire period can be realized from the consumer under normal tariff without any interest or penalty but in the proviso, when the anomalies are not known, it is restricted to 12 months. In this case, according to the contention of the respondent, the anomaly was detected with effect from April 2018 and the demand had correctly been read, in my view is not acceptable for the reason that for the entire period, the officials of the licensee had been visiting the premises for recording the meter and raising the bills, but did not detect such anomalies, therefore, the liability from April 2018 cannot be fastened. In my view, it should have been as per the proviso by confining it to twelve months. The sole basis of the argument of the petitioner had been on the information received under the RTI that when there is a contract amount of 50 KVA, the CT rating should have been in the ratio of 100/5 whereas in the premises of the petitioner it was 200/5. Said contention would pale into insignificance as rightly noticed by the Ombudsman that there would not be any change of consumption as it was only the multiplication factor; instead of 40, it had been incorrectly recorded as 20. All the provisions of the Electricity Supply Code has been **WP(C) NO. 29471 OF 2022** **8** referred to extensively, in the order of the Ombudsman. The bill issued to the appellant was for the amount short assessed due to wrong application of the multiplication factor from April 2018 to September 2020. It is a matter of record that the meter and CT were tested by the accredited agency and found to be working in a good condition and within an admissible limits of error. KSEBL could not be faulted with in applying the multiplication factor 40 instead of 20. There is no quarrel to the ratio of decidendi culled out in the judgment cited by the respondent wherein it has been clarified that in case of the short assessment notice, the provisions of Section 56 restricting the recovery for a period would not be applicable but the said ratio would not be applicable in the facts of the case as the anomalies were in the knowledge of the licencees as despite previous inspections of the premises but did not take action. It is for that reason, I modified the order by restricting the demand for 12 months as per the proviso to Regulation 152. With the modification aforementioned that the demand has to be confined as per the proviso to Regulation 152 for 12 months, rest of the order of the Ombudsman is upheld. The respondents are directed to issue the revised bill in terms of the observations recorded herein above **WP(C) NO. 29471 OF 2022** **9** within a period of 15 days from the date of receipt of a copy to the petitioner who shall deposit the amount within 15 days thereafter. Sd/- sab **AMIT RAWAL JUDGE** **WP(C) NO. 29471 OF 2022** **10** ## **APPENDIX OF WP(C) 29471/2022** PETITIONER EXHIBITS - Exhibit P1 THE TRUE COPY OF THE SITE MAHAZAR DATED 8.10.2020 ALONG WITH TRANSLATION OF EXHIBIT - Exhibit P2 THE TRUE COPY OF THE COMMUNICATION WITH COMMUNICATION NO. ESF/SHORTASSESMENT/202021 DATED NIL ,ALONG WITH TRANSLATION OF EXHIBIT - Exhibit P3 TRUE COPY OF APPLICATION DATED 5.2.21 ,ALONG WITH TRANSLATION OF EXHIBIT - Exhibit 3(a) TRUE COPY OF APPLICATION DATED 9.2.21 ,ALONG WITH TRANSLATION OF EXHIBIT - Exhibit P4 THE TRUE COPY OF THE REPLY OBTAINED FROM THE AUTHORITY CONCERNED UNDER EXT P3, ALONG WITH TRANSLATION - Exhibit P4(a) THE TRUE COPY OF THE REPLY OBTAINED FROM THE AUTHORITY CONCERNED UNDER EXT P3(A), ALONG WITH TRANSLATION Exhibit P5 TRUE COPY OF THE REPRESENTATION DATED 30/08/2021, ALONG WITH TRANSLATION Exhibit P6 TRUE COPY OF THE ORDER OF THE HON'BLE STATE ELECTRICITY OMBUDSMAN AT ERNAKULAM