Supreme Court of IndiaSupreme Court · 2013Division BenchAppeals disposed of.

M/S Today Homes & Infrastructure Pvt. Ltd. v. Ludhiana Improvement Trust & ANR.

Case / Petition Number:
Civil Appeal No. 4596 of 2013; C.A. Nos. 4597, 4598 and 4595 of 2013
Neutral Citation:[2013] 3 S.C.R. 589

Case Synopsis & Summary

Today Homes & Infrastructure Pvt. Ltd. (the appellant) and Mapletree Properties Pvt. Ltd. challenged an arbitration-related order in disputes with Ludhiana Improvement Trust arising from a 2005 development framework for the Ludhiana City Centre. After bidding, the Trust and the developers entered into agreements including a Concession Agreement and a Tripartite Agreement with HDFC Bank, with revenue sharing and escrow arrangements. Disputes over deposits and alleged irregularities led the Trust to seek appointment of an arbitrator under Section 11(6) of the Arbitration and Conciliation Act, 1996. The Punjab & Haryana High Court appointed an arbitrator, a decision challenged before the Supreme Court. The Trust argued that since the main agreement was void, the arbitration agreement could not survive and should be left to be considered by the arbitrator under Section 16. The appellants relied on the SBP & Co. v. Patel Engineering Ltd. decision, arguing that an arbitration clause can stand independently of a void main contract and that Section 16 protects its enforceability even when the contract is void. The Court reaffirmed that the designated Judge exceeded his jurisdiction by delving into merits and that the matter must be reconsidered de novo in light of SBP & Co. and Reva Electric Car Company, with appeals disposed of and costs to the parties.

Precedent Explorer

Find Cases Like This

Explore other judgments dealing with similar legal situations, facts, or statutory provisions.

Case Details & Bench

Court
Supreme Court of India
Hon'ble Judges
  • Altamas Kabir, CJI
  • Surinder Singh Nijjar, J.
Judgment Date
2013-05-10
Court Decision / Holding
The Supreme Court set aside the impugned order of the designated Judge, holding that he exceeded his jurisdiction by engaging in detailed merits-like scrutiny. It reaffirmed SBP & Co.’s principle that arbitration agreements can stand independently of the main contract and that Section 16(1) creates a presumption of validity and continuity of the arbitration clause even if the contract is void. The matter was remitted to be considered de novo in light of this judgment and the Reva decision, with directions consistent with the SBP & Co. doctrine. The appeals were disposed of, with parties bearing their own costs.
Final Disposition
Appeals disposed of.

Parties to the Case

Appellants / Petitioners

  • Today Homes & Infrastructure Pvt. Ltd.
  • Mapletree Properties Pvt. Ltd.

Respondents

  • Ludhiana Improvement Trust
  • Anr.

Legal Representation & Advocates

Counsels for Petitioners

  • • Salil Sagar
  • • Uday U. Lalit
  • • Ajay Pal
  • • Kapil Chaudhary
  • • H. G Devarajan
  • • P.N. Gupta
  • • D. Ashok Rajagopalan
  • • Bharti Gupta

Counsels for Respondents

  • • Sumesh Dhawan
  • • P.N. Puri
  • • Vatsala Kak Panda
  • • Ruhi
  • • Kuldip Singh
  • • Jagjit Chhabra

Provisions of Law Cited

Arbitration and Conciliation Act, 1996Section 11(1)(b)Section 11(6)Section 16(1)(a)Section 16(1)(b)

Legal Doctrines & Maxims

  • Kompetenz-Kompetenz doctrine (arbitrator's jurisdiction to decide on existence/validity of arbitration agreement)

Submissions & Arguments

Contentions of Appellants / Petitioners

The applicants contended that Section 11(6) requires a preliminary enquiry limited to jurisdiction, existence of a valid arbitration agreement, and whether a live claim exists, not a meritorious adjudication. Citing SBP & Co. and Reva Electric Car Company, they argued that the arbitration clause can survive independently of the void main contract, and that Section 16(1)(a) presumes existence of a valid clause while Section 16(1)(b) preserves its enforceability even if the contract is void. They urged that the designated Judge overstepped his remit by examining merits and demerits, and that the matter should be remitted for de novo consideration in light of the judgments cited. They requested appointment of an arbitrator be allowed to proceed.

Contentions of Respondents

The respondents maintained that once the main agreement was found void, the arbitration clause could not survive, arguing the matter was sub judice and that the 11(6) inquiry should not be used to resurrect or adjudicate merits. They relied on the principle that a void main contract undermines the subsidiary arbitration agreement and contended the designated Judge acted correctly in not triggering a merits-based evaluation. They asserted that the archaic order should stand notwithstanding remand, if required, and stressed the need to resolve jurisdictional issues before appointment.

Legal Doctrine & Issue Explorer

Explore This Legal Issue

Find relevant judgments and authoritative positions on the legal questions discussed here.

Cited Precedents (2)

Case NameCitationTreatmentExplanation
SBP & Co. v. Patel Engineering Ltd. and Another2005 (4) Suppl. SCR 688; (2005) 8 SCC 618PositiveThe Court relied on SBP & Co. to hold that an arbitration clause can survive independently of a void main contract; the decision guided the remand for de novo consideration.
Reva Electric Car Company Private Limited v. Green Mobil2011 (13) SCR 359; 2012 (2) SCR 93PositiveUsed to support the interpretation of Section 16(1) in treating arbitration clauses as independent from contract terms, even when the contract is void.
Case Applicability Diagnostic

Apply This to My Facts

Share your situation and test whether this judgment governs, supports, or challenges your case.

Official Judgment Record
•3,907 words•~18 min read

In The Court Record

M/S Today Homes & Infrastructure Pvt. Ltd. v. Ludhiana Improvement Trust & ANR.

## [2013] 3 S.C.R. 589 ## M/S TODAY HOMES & INFRASTRUCTURE PVT. LTD. A ## _v._ LUDHIANA IMPROVEMENT TRUST & ANR. (Civil Appeal No. 4596 of 2013 etc.} ## MAY 10, 2013. B ## [ALTAMAS KABIR, CJI AND SURINDER SINGH NIJJAR, J.] _ARBITRATION AND CONG/LIA TION ACT, 1996:_ c _ss. 11(1)(b) and (6)_ - _Existence of arbitration agreement even if main agreement is illegal and void_ - _Held: An arbitration agreement could stand independent of the main agreement and did not necessarily become otiose, even if the main agreement, of which it is_ a _part, is declared void_ -- _By virtue of s. 16(1)(b), the arbitration clause continues to be enforceable, notwithstanding_ a _deflaration that the contract was null and void._ D _s. 11 (6)_ - _Application for appointment of arbitrator- Issues to be decided by Chief Justice or his designate_ - _Explained_ - E _Held: Designated Judge was not require'd to undertake_ a _detailed scrutiny of merits and de-merits oi the case, almost as if he was deciding_ a _suit_ - _He was only required to decide preliminary issues such as jurisdiction to entertain the application, existence of_ a _valid arbitration agreement,_ F _whether_ a _live claim existed or not, for the purpose of_ - _appointment of an arbitrator By the impugned order, much more than what is contemplated uls 11 (6) was sought to be decided, without any evidence being adduced by the parties_ - _Impugned order of designated Judge is set aside, and matter_ G _remitted to be considered de novo in the light of the instant judgment and the decision of the Court._ E Disputes having arisen between the developers and 589 H ## 590 SUPREME COURT REPORTS [2013] 3 S.C.R. A Ludhiana Improvement Trust with respect to the agreement dated 24.5.2005, in an arbitration application u/s 11 (6) of the Arbitration and Conciliation Act, 1996, filed by the developers, the Chief Justice of the High Court by order dated 4.4.2008 appointed the arbitrator. The said s order was challenged before the Supreme Court contending that since the main agreement which contained the arbitration agreement, was itself void, the arbitration agreement could not survive independent of the main agreement, and the question was required to be c left to the arbitrator in terms of s.16 of the Act. Having regard of the 7-Judge Bench decision in SBP & Co. , the Supreme Court set aside the order of the Chief Justice of the High Court and remitted the matter for a fresh decision in keeping with the decision in SBP & Co. D The instant appeals arose out of the order of the designate of the Chief Justice of the High Court, dismissing the arbitration application and holding that the agreement dated 24.5.2005 was not legal and valid and, therefore, the disputes between the parties arising out of E the said agreement could not be referred to arbitrator. It · was contended that the designate Judge treated the matter as if he was deciding a suit, but without adducing evidence . ## . F Disposing of the appeals, the Court HELD: 1.1. The issue regarding the continued existence of the arbitration agreement, notwithstanding the main agreement itself being declared void, was considered by the 7-Judge Bench in SBP & Co. and it G was held that an arbitration agreement could stand independent of the main agreement and did not necessarily become otiose, even if the main agreement, _of_ which it is a part, is declared void. Further, in Reva H SBP & Co. vs. Patel Engineering Ltd. and Another 2005 (4) Suppl. SCR. 688. TODAY HOMES & INFRASTRUCTURE PVf. LID. _v._ LUDHIANA IMPROVEMENT TRUST 591 Electric Car Company Private Limited, it has been held A that s.16(1)(a) of the 1996 Act presumes the existence of · a valid arbitration clause and mandates the same to be treated as an agreement independent of the other terms of the contract. By virtue of s. 16(1)(b), the arbitration clau~e continues to be enforceable, notwithstanding a B declaration that the contract was null and void. [para 1314] [598-C-E-H; 599-A-B] SBP & Co. _Vs. Patel Engineering Ltd. and Another_ 2005 (4) Suppl. SCR 688 = (2005) 8 SCC 618; and _Reva Electric Car Company Private Limited Vs. Green Mobil,_ 2011 (13) C SCR 359 = 2012 (2) sec 93 - relied on 1.2. In the instant case, the designated Judge misunderstood the scope of the order dated 14.10.2008, passed in the earlier proceedings and the provisions of s.16 of the 1996 Act in going into a detailed examination regarding the merits of the case and the existence of an arbitration agreement and in holding that once the main agreement between the parties was declared void, the entire contents thereof, including any arbitration clause E that may have been incorporated in the main agreement, were rendered invalid. The designated Judge was not required to undertake a detailed scrutiny of the merits and de-merits of the case, almost as if he was deciding a suit. He was only required to decide preliminary issues such F as jurisdiction to entertain the application, existence of a valid arbitration agreement, whether a live claim existed or not, for the purpose of appointment of an arbitrator. By the impugned order, much more than what is contemplated _uls_ 11(6) of the 1996 Act was sought to be decided, without any evidence being adduced by the G parties. [para 13 and 15] [598-B-D; 599-B-J)] 1.3. In SBP & Co., r.egarding what the Chief Justice is really required to decide on an application u/s 11(6) of the 1996 Act, it has been stated that obviously the Chief H 592 SUPREME COURT REPORTS [2013] 3 S.C.R. A Justice has to first decide his own jurisdiction and whether the party concerned has approached the right High Court. He also has to decide whether there is an arbitration agreement and as to whether the person who has made the request before him, is a party to such 8 agreement. It was further indicated that it was necessary to mention that the arbitrator could also decide the question as to whether the claim was a dead one or a long-barred claim, that was sought to be resurrected. [para 16) [599-D-G] c 1.4. Therefore, the impugned judgment and the order of the designated Judge is once again set aside and the matter is directed to be again considered de novo in the light of the observations made in the instant judgment and the various decisions of this Court. [para 17] [600-B-C] D Case Law Reference: 2005 (4) Suppl. SCR 688 relied on para 7 2011 (13) SCR 359 relied on para 14 E CIVIL APPELLATE JURISDICTION : Civil Appeal No. 4596 of 2013. From the Judgment & Order dated 08.10.2009 of the High Court of Punjab and Haryana at Chandigarh in Arbitration Case F No. 76 of 2007. ## WITH C.A. Nos. 4597, 4598 and 4595 of 2013. Salil Sagar, Uday U. Lalit, Ajay Pal, Kapil Chaudhary, H. G Devarajan, P.N. Gupta, D. Ashok Rajagopalan, Bharti Gupta. Lalit Chauhan, Vivek Sibal, Somesh, Pallavi Sharma (for Parekh & Co.), Sumesh Dhawan, P.N. Puri, Vatsala Kak Panda, Ruhi, Kuldip Singh, Jagjit Chhabra for the Appearing parties. H TODAY HOMES & INFRASTRUCTURE PVT. LTD. _v._ LUDHIANA IMPROVEMENT TRUST [ALTAMAS KABIR, CJI.] 593 The Judgment of the Court was delivered by **ALTAMAS.** KABIR, CJI. 1. Special Leave Petition (Civil) No. 7334 of 2010 and Special Leave Petition (Civil) No.11778 of 201 O have been filed by Mis Today Homes and Infrastructure Pvt. Ltd. and Mapletree Properties Pvt. Ltd. respectively, against a common judgment and order dated 08.10.2009, passed by the Punjab & Haryana High Court in Arbitration Case No.76 of 2007. Special Leave Petition (Civil) No.10795 of 2010 has been separately filed by Mis Mapletree Properties Pvt. Ltd. against the judgment and order dated 26.03.2010, passed by the aforesaid High Court in R.A. No.49-Cll/2010 (of M) in Arbitration Case No.76 of 2007. In addition I.A. No.2 of 2010 has been filed by Mis Mapletree Properties Pvt. ~td. in Special Leave Petition (Civil) No.26173 of 2010 filed by Ludhiana Improvement Trust for vacating the interim order of stay passed on 15.09.2010, or modification thereof. I.A. No.3 of 2010 has been filed by Ludhiana Improvement Trust in the said Special Leave Petition to bring on record certain additional documents. Both the said IAs have been taken up for hearing along with the four Special Leave Petitions, as referred to hereinabove. Leave granted in all the Special Leave Petitions. 2. The Ludhiana Improvement Trust, hereinafter referred to as "the Trust", the Appellant in the appeal arising out of SLP(C) No. 26173 of 2010, was constituted under the Punjab Town Improvement Act, 1922, hereinafter referred to as "the 1922 Act", for the planned development of the city of Ludhiana. For the purpose of construction of the City Centre in Ludhiana, the Trust invited bids by a Request of Proposal document dated 15.03.2005, with the intention of entering into a Joint-Venture with developers in the private sector. After evaluation of the bids, M/s. Today Homes and Infrastructure Pvt. Ltd., the Appellant in the appeal arising out of SLP(C) No. 7334 of 2010, was found to be the highest bidder and a Letter of Intent was issued in its favour on 18.05.2005, for de;velopment of the City Centre, Ludhiana. A 8 C D E F G H (2013] 3 S.C.R. 594 SUPREME COURT REPORTS A 3. The records indicate that after the Letter of Intent was issued in its favour, M/s. Today Homes and Infrastructure Pvt. Ltd. deposited Rs. 3.72 crores with the Trust as Performance Security. According to the agreement arrived at between the parties, the successful bidder would ultimately be required to B pay to the Trust Rs.371.12 crores. The records further reveal that possession of an area measuring 25.59 acres was handed over to the successful bidder by the Trust on 24.05.2005 by way of Concession Agreement. A Tripartite Agreement was signed on 25.04.2005, between Mis. Today Homes and Infrastructure C Pvt. Ltd., the Trust and the HDFC Bank. In terms of the said agreement, the entire proceeds from booking of the saleable areas were required to be deposited in the Joint Escrow Account of the Company and the Trust with the HDFC Bank, of which 30% was to be credited directly to the account of the D Trust and 70% was· to be deposited to the account of the Company. Disputes arose regarding the deposits made in the Escrow Account and on 12.09.2006, the Trust issued a letter to the Company seeking an explanation regarding the allegations. On the very next day, a reply was sent on behalf of the Company denying the allegations and indicating that its E accounts could be scrutinised, and, if the explanation was not found to be satisfactory, the dispute could be referred to arbitration. In fact, on 14.09.2006, the Trust wrote to M/s. Today Homes and Infrastructure Pvt. Ltd. indicating that it was going to appoint an arbitrator within the next two days. However, F before the expiry of the said period, on 15.09.2006, the Company filed an application before the Chief Justice of the Punjab and Haryana High Court under Section 11 (6) of the Arbitration and Conciliation Act, 1996, hereinafter referred to as "the 1996 Act", being Arbitration Application No. 263 of G 2006. 4. From the submissions made on behalf of the parties, it transpires that on 6.10.2006, a meeting was held between the Principal Secretary and officers of the Trust and the H representatives of the Company, wherein it was agreed that TODAY HOMES & INFRASTRUCTURE PVI LTD. _v._ 595 LUDHIANAIMPROVEMENTTRUST[ALTAMAS KABIR, CJI.] instead of the Company and the Trust sharing revenue from the project in the ratio of 70:30, the constructed area would be shared on the same basis. It was also agreed that the demarcation of the operations involved would be done jointly by the architects of the parties and all bookings prior to 15.10.2006, would be honoured and would go to the share of the Company. It was also decid~d that a Supplementary Agreement incorporating the said terms and conditions should also be executed. Instead of completing the said agreement, the Trust filed its response to the A~bitration Application No.263 of 2006, raising a plea, for the first time, that the agreement I executed with the Company was void. Such plea was raised two years after the agreement was entered into and allowing a substantial portion of the construction of the City Centre, Ludhiana, to be completed, without any protest, after the Trust had received a sum of Rs.23 crores as its share of the sale/ lease proceeds from over 300 customers. 5. Faced with the above situation, the Company wrote a letter to the Trust on 08.06.2007, invoking the provisions of Article 17.1 (a) and (b) of the Agreement dated 24.05.2005, for appointment of an arbitrator. It was also indicated in the letter that in the event no reply was received, the Company would nominate its arbitrator. Since no reply was received from the Trust, the Company wrote to the Trust on 30.06.2007, indicating that it had appointed its arbitrator. The Trust responded to the said letter by raising an objection that since the matter was sub judice before the Chief Justice of the High Court, no arbitrator could have been appointed by the Company. 6. On 22.08.2007, Arbitration Application No.263 of 2006, was taken up by the Chief Justice of the Punjab and Haryana High Court, but the same was dismissed as withdrawn with liberty to file a fresh petition. On the same day, a fresh petition was filed under Section 11 (6) of the 1996 Act, being Arbitration Case No. 76 of 2007. On 04.04.2008, the Chief Justice of the aforesaid High Court appointed retired Chief Justice of India, A 8 C D E F G H [2013] 3 S.C.R. 596 SUPREME COURT REPORTS A Shri R.C. Lahoti, as Arbitrator to adjudicate upon the disputes between the parties. Arbitration proceedings were, thereafter, held on 22.04.2008, when the Company filed its Statement of Claims. The next date for arguments, after completion of pleadings, was fixed on 02.06.2008. B 7. In the meantime, however, SLP(C) No. 10550 of 2008, filed by the Trust challenging the appointment of the arbitrator, in Arbitration Case No.76 of 2007, came up for consideration before this Court by way of Civil Appeal No.6104 of 2008. Having regard to the decision of the 7-Judge Bench in _SBP_ & C _Co. Vs. Patel Engineering Ltd. and Another_ [(2005) 8 SCC 618], this Court set aside the order of the Chief Justice and remitted the matter for a fresh decision in keeping with the decision of the 7-Judge Bench of this Court in the above case. o 8. The challenge to the appointment of the arbitrator by the Chief Justice of the Punjab and Haryana High Court was that the agreement itself was void having been entered into in suspicious circumstances. It had been contended that since the main agreement, which contained the arbitration agreement, E was itself void, the arbitration agreement could not survive independent of the main agreement. It was also contended that the said question was required to be left to the learned arbitrator in terms of Section 16 of the 1996 Act. Such a course of action, however, did not find favour with this Court, and as F indicated hereinbefore, the matter was remanded to the Chief Justice of the Punjab and Haryana High Court for a fresh decision. The matter was, thereafter, taken up by the designate Judge who came to. a finding that the agreement dated 24.05.2005 was not legal and valid and, therefore, the disputes between the parties arising out of the said agreement could not G be referred to an arbitrator. The application under Section 11 (6) of the 1996 Act was, therefore, dismissed. 9. It is the said decision of the designate Judge, which is the subject matter of challenge in these appeals. H TODAY HOMES & INFRASTRUCTURE PVT. LTD. _v._ 597 LUDHIANA IMPROVEMENT TRUST [ALTAMAS KABIR, CJI.] 10. On behalf of M/s. Today Homes and Infrastructure Pvt. A Ltd., it was urged that while considering the matter on remand, the designate Judge treated the matter as if he was deciding a suit, but without adducing evidence. Mr. Uday U. Lalit, learned Senior Advocate submitted that in the parameters for consideration of an application under Section 11 (6) of the 1996 B Act set out by this Court in the decision rendered by the 7- Judge Bench in _SBP_ & Co. (supra), this Court had intended a preliminary enquiry on the existence of an arbitration agreement and a dispute, which was required to be considered by an arbitrator to be appointed. c 11. Mr. Lalit urged that Section 11 (6) of the above Act nowhere contemplates an application filed thereunder to be gone into in intricate detail by framing issues and deciding the same without taking any evidence. Mr. Lalit submitted that the essence of the issue before the Arbitrator, was lost sight of by D the designated Judge. 12. An attempt was made by Mr. Salil Sagar, learned Senior Advocate, appearing for the Trust, to counter the submissions made by Mr. Lalit and Mr. H. Devarajan, learned E Advocate, appearing for the appellants in the appeals arising out of SLP (C) Nos. 11778 of 2010 and 10795 of 2010. The learned counsel supported the decision of the learned designate Judge to distinguish the decision rendered by this Court in _SBP_ & Co. (supra) and the facts of the present case. F Mr. Sagar insisted that once the main agreement had been found to be void, the contents thereof, including any arbitration agreement, was also rendered void. The learned counsel submitted that the arbitration clause contained in the arbitration agreement dated 24.05.2005, stood automatically dissolved G upon the agreement itself being held to be void. Mr. Sagar, therefore, urged that the appointment of an arbitrator by the designated Judge in Arbitration Case No.76 of 2007 was void and was liable to be set aside. F H [2013) 3 S.C.R. ## 598 SUPREME COURT REPORTS A 13. We have carefully considered the submissions made on behalf of the respective parties and we are of the view that the learned designated Judge exceeded the bounds of his jurisdiction, as envisaged in _SBP_ & _Co._ (supra). In our view, the learned designated Judge was not required to undertake B a detailed scrutiny of the merits and de-merits of the case, almost as if he was deciding a suit. The learned Judge was only required to decide such preliminary issues such as jurisdiction to entertain the application, the existence of a valid arbitration agreement, whether a live claim existed or not, for C the purpose of appointment of an arbitrator. By the impugned order, much more than what is contemplated under Section 11 (6) of the 1996 Act was sought to be decided, without any evidence being adduced by the parties. The issue regarding the continued existence of the arbitration agreement, notwithstanding the main agreement itself being declared void, 0 was considered by the 7-Judge Bench in SBP & Co. (supra) and it was held that an arbitration agreement could stand independent of the main agreement and did not necessarily become otiose, even if the main agreement, of which it is a part, is declared void. E 14. The same reasoning was adopted by a member of this Bench (S.S. Nijjar, J.), while deciding the case of _Reva Electric Car Company Private Limited Vs. Green Mobil_ ((2012) 2 SCC 93), wherein the provisions of Section 16(1) in the backdrop F of the doctrine of kompetenz kompetenz were considered and it was inter alia held that under Section 16(1), the legislature makes it clear that while considering any objection with regard to the existence or validity of the arbitration agreement, the arbitration clause, which formed part of the contract, had to be G treated as an agreement independent of the other terms of the contract. Reference was made in the said judgment to the provisions of Section 16(1)(b) of the 1996 Act, which provides that even if the arbitral tribunal concludes that the contract is null and void, it should not result, as a matter of law, in an H automatic invalidation of the arbitration clause. It was also held TODAY HOMES & INFRASTRUCTURE PVT. LTD. _v._ 599 LUDHIANAIMPROVEMENTTRUST[ALTAMAS KABIR, CJI.] that Section 16(1)(a) of the 1996 Act presumes the existence of a valid arbitration clause and mandates the same to be treated as an agreement independent of the other terms of the contract. By virtue of Section 16(1)(b) of the 1996 Act, the arbitration clause continues to be enforceable, notwithstanding a declaration that the contract was null and void. A B > 15. In our view, the learned designated Judge misunderstood the scope of the order dated 14.10.2008, passed in the earlier proceedings and the provisions of Section > 16 of the 1996 Act in going into a detailed examination . regarding the merits of the case and the existence of an arbitration agreement and in holding that once the main agreement between the parties was declared void, the entire contents thereof, including any arbitration clause that may have been incorporated in the main agreement, were rendered invalid. C D > 16. It may be profitable to remind ourselves of the observations made by the 7-Judge Bench in _SBP_ & Co. (supra), regarding what the Chief Justice is really required to decide on an appl.ication being made to him under Section E 11 (6) of the 1996 Act. In paragraph 39 of the judgment, it has been stated that obviously the Chief Justice has to first decide his own jurisdiction and whether the party concerned has approached the right High Court. He also has to decide whether there is an arbitration agreement and as to whether F the person who has made the request before him, is a party to such agreement. Their Lordships further indicated that it was necessary to mention that the learned arbitrator could also decide the question as to whether the claim was a dead one or a long-barred claim, that was sought to be cesurrected. Summing up its views, in paragraph 47 of the judgment, the 7-. G Judge Bench, while holding that the power exercised by the Chief Justice of the High Court or the Chief Justice of India under Section 11 (6) of the 1996 Act is not an administrative power but a judicial one, also held that the Chief Justice or the E F H 600 SUPREME COURT REPORTS [2013) 3 S.C.R. A designated Judge would have the right to decide the preliminary aspects, as indicated hereinbefore. 17. The above views expressed by the 7-Judge Bench and by the learned Single Judge are sufficient to dispose of these B appeals. In the light of what has been indicated hereinbefore, we have no hesitation in setting aside the impugned judgment and the order of the designated Judg~ once again and directing that the matter be again considered de novo in the light of the observations made hereinabove and the various decisions C cited at the Bar. 18. The appeals are, accordingly, disposed of along with the interlocutory applications. Having regard to the peculiar facts of this case, the parties will bear their own costs. > D R.P. Appeals disposed of.
End of Judgment Record
Browse All Supreme Court of India (2013) Decisions
2013-12-06

STATE OF RAJASTHAN v BASANT AGROTECH (INDIA) LTD.

This batch of appeals challenges Chapter VI I of the Rajasthan Finance Act, 2008, which imposes an environment and health cess on mineral rights, and the accompanying 2009 notification amending rates (notably Rock Phosphate to Rs.500 per tonne) with retrospective effect from 1.4.2008. The Rajasthan High Court held the levy within the legislative competence but struck down the 2009 notification’s retrospective operation. The State challenged this, contending that where a statute vests power in a state government, the power may be exercised “from time to time” and, by implication, retrospective action may be permissible under delegated powers under the main Act and General Clauses. The Court clarifies that fiscal statutes must be construed strictly and that subordinate legislation cannot ordinarily possess retrospective effect unless expressly or by necessary implication authorized by the parent statute. The majority emphasizes that the words “from time to time” have a futuristic tenor and do not automatically authorize retroactive rates, and that a notification can have prospective effect only. The judgment surveys a spectrum of precedents on taxation, the distinction between taxes/cess, and the constitutional framework regarding mineral development (MMDR Act) and the legislative scope of state versus central power. Ultimately, the appeals are dismissed with no costs, upholding the High Court’s view on retrospective validity of the notification and the need for precise statutory authorization for retrospective action.

2013-07-16

M/S. HOTEL QUEEN ROAD PVT. LTD. & ORS. v. MR. RAM PARSHOTAM MITTAL & ORS.

This Supreme Court judgment arises from Civil Appeal No. 5499 of 2013 in which M/S Hotel Queen Road Pvt. Ltd. and others challenged an order of the Delhi High Court that permitted withdrawal of FAO(OS) 349 of 2009 and extended interim relief beyond the date of withdrawal. The High Court had heard the matter on merits, allowed withdrawal to pursue an alternative remedy, and extended the interim relief up to 10 May 2010, with stated reasons. The appellants contended that such observations during withdrawal were improper and that upon final disposal the court would become functus officio; hence continuing interim relief beyond withdrawal was impermissible. The respondents argued that, in the interest of justice, the court retains inherent power to extend interim relief where the matter has been heard on merits and withdrawal is permitted to facilitate the remedy, and that the observations were prima facie and non-merits determinations. The Supreme Court, after examining the jurisprudence, held that the High Court’s observations were innocuous and did not decide the merits. It clarified that ordinarily a petition that is withdrawn should not receive continued interim relief, but where the matter has been heard on merits and withdrawal is permitted, interim relief can be extended for a limited period with reasons. The appeal and SLP were dismissed, and the interim relief stood vacated. The decision relies on authorities including State of Orissa v. Madan Gopal Rungta, Padam Sen, Ajay Mohan, and G.E. Power Controls (cited).

2013-02-07

Lakshmi alias Bhagyalakshmi and Anr. v. E. Jayaram (D) by LR.

This Supreme Court appeal arises from a Karnataka High Court decision in a suit for permanent injunction over the ownership and occupancy of the suit property. The plaintiffs claimed absolute ownership of the suit property purchased from defendant No.1, though the sale deed was not registered; the entire sale consideration was paid. Plaintiff No.2 asserted possession as a tenant of Plaintiff No.1, and the trial court granted ad-interim relief under Order 39 Rule 1 and 2 CPC restraining interference with possession. The defendants denied the purchase, contending that Plaintiff No.1 was a stranger and that Plaintiff No.2 was a tenant under Defendant No.1. The High Court, instead of testing the legality of the interim injunction, examined Section 53A of the Transfer of Property Act and Order 2 Rule 2 CPC and concluded that, since the suit complained only of injunction and not of specific performance, the incidental relief of injunction would be unavailable. The Supreme Court held that the High Court had completely misconstrued Order 39 and misconstrued the scope of Section 53A and Order 2 Rule 2, and that the trial court’s injunction could stand where interim protection was warranted. It allowed the appeal, set aside the High Court’s order, and directed the trial court to hear and dispose of the suit within four months from the date of receipt of copy of this order, treating the merits independently of appellate observations.

2013-06-18

Roop Singh v. State of Madhya Pradesh

Roop Singh v. State of Madhya Pradesh concerns a rape case arising from an incident in village Tighrapura in Morena district. The complainant (PW-5) alleged that at about 2 a.m. the appellant, her neighbour, forcibly committed intercourse with her while her sister‑in‑law (PW-4) slept nearby and her husband was away at the fields. A FIR was registered; the medical examination and FSL report supported the occurrence of sexual assault. The trial court convicted the appellant under Section 450, IPC (house trespass to commit an offence) and Section 376, IPC (rape) and sentenced him to three years’ RI for Section 450 and seven years’ RI for Section 376 with fines. The Madhya Pradesh High Court dismissed the appeal, upholding the convictions. In special leave proceedings before the Supreme Court, the appellant argued that the complainant had consented to the intercourse and that the case was false, allegedly due to a land dispute. The State countered that consent in rape requires voluntary participation after fully exercising the choice between resistance and assent, citing established authority on the meaning of consent (State of U.P. v. Chhotey Lal; Mango Ram) and that the evidence shows the complainant did not consent. The Court accepts the standard of consent and, after reviewing the testimonies of PW-4 and PW-5 and the medical evidence, holds that the complainant was not a willing participant. Consequently, the appeal is dismissed, and the convictions and sentences stand.