Supreme Court of IndiaSupreme Court · 2019Division BenchAppeals dismissed.

M/S T.C. HEALTHCARE P. LTD. & ANR. v. UNION OF INDIA & ANR.

Case / Petition Number:
Civil Appeal No. 4687 of 2010
Neutral Citation:[2019] 14 S.C.R. 618

Case Synopsis & Summary

This is a Civil Appeal challenging price fixation under the Drugs (Prices Control) Order, 1995 (DPCO, 1995). The appellants, M/S T.C. Healthcare Pvt. Ltd. and Modi Mundipharma Pvt. Ltd., manufactured formulations using sustained release (SR) and continuous release technologies (Diucontin and Unicontin, respectively). Notifications dated 11 July 2006 and 30 April 2009 fixed ceiling prices for formulations, including those containing Frusemide and Theophylline. The appellants challenged these ceilings as ultra vires Para 7 of the DPCO, arguing that no norms existed to govern pricing for SR/continuous release drug delivery systems and that no notice or data had been sought from major manufacturers. The Allahabad High Court rejected the challenge, upholding the pricing norms and relying on data collected by the Cost Audit/Ministry of Finance and the NPPA process culminating in the August 2008 norms and the 30 April 2009 Note (d). The High Court also rejected the claim that the pricing exercise required participation or notice. The Supreme Court, per S. Ravindra Bhhat, J., affirmed that price fixation is primarily a legislative function under the DPCO. It stressed that Note (d) contemplated applying ceiling prices to different delivery systems unless companies sought specific NPPA price approvals and demonstrated a unique formulation. In doing so, the Court held there was no basis to differ from the High Court, and the appeals were dismissed.

Precedent Explorer

Find Cases Like This

Explore other judgments dealing with similar legal situations, facts, or statutory provisions.

Case Details & Bench

Court
Supreme Court of India
Hon'ble Judges
  • ARUN MISHRA
  • VINEET SARAN
  • S. RAVINDRA BHAT
Judgment Date
2019-11-15
Court Decision / Holding
Appeals dismissed.
Final Disposition
Appeals dismissed.

Parties to the Case

Appellants / Petitioners

  • M/S T.C. HEALTHCARE P. LTD.
  • ANR

Respondents

  • Union of India
  • ANR

Legal Representation & Advocates

Counsels for Petitioners

  • • Maninder Singh (Senior Advocate)
  • • N.S. Ahluwalia
  • • Salil Seth
  • • Neeraj D Malik
  • • Umesh Kumar Khaitan
  • • Somiran Sharma
  • • A.P. Mayee
  • • Gurmeet Singh Makker

Counsels for Respondents

  • • Nidhi Jain

Provisions of Law Cited

Drugs (Prices Control) Order, 1995 – Para 3Drugs (Prices Control) Order, 1995 – Para 7Drugs (Prices Control) Order, 1995 – Para 8Drugs (Prices Control) Order, 1995 – Para 9Drugs (Prices Control) Order, 1987 – Para 10

Legal Doctrines & Maxims

  • Ultra vires (Para 7 of the DPCO, 1995)
  • Price fixation is essentially a legislative exercise

Submissions & Arguments

Contentions of Appellants / Petitioners

The appellants contended that the price fixation under DPCO 1995 Para 7 was ultra vires due to absence of norms for SR/CR drug delivery systems. They argued that SR/CR technologies were not contemplated by the DPCO and that no prior notice, data, or opportunities were provided to major manufacturers. They asserted that there were no formulation-specific norms for their SR/CR products and sought quashing or modification of the ceiling prices fixed by the impugned notifications.

Contentions of Respondents

The respondents submitted that price fixation is a legislative exercise under the DPCO. They highlighted the norms fixed in August 2008 (conversion costs, packing costs, etc.) and explained the Note (d) to the 2009 notification, which provides that different drug delivery systems or special features would be subject to the ceiling prices unless NPPA price approvals are obtained. They argued the government relied on cost audits and data, and that the appellants did not obtain special approvals to claim unique pricing for their SR/CR formulations.

Legal Doctrine & Issue Explorer

Explore This Legal Issue

Find relevant judgments and authoritative positions on the legal questions discussed here.

Cited Precedents (1)

Case NameCitationTreatmentExplanation
Union of India v. Cynamide India Ltd.1987 (2) SCC 720PositiveCited by the High Court and relied upon by the Court to support that price fixation is essentially a legislative exercise.
Case Applicability Diagnostic

Apply This to My Facts

Share your situation and test whether this judgment governs, supports, or challenges your case.

Official Judgment Record
•3,454 words•~16 min read

In The Court Record

M/S T.C. HEALTHCARE P. LTD. & ANR. v. UNION OF INDIA & ANR.

618 SUPREME COURT REPORTS [2019] 14 S.C.R. 618 [2019] 14 S.C.R. A M/S T.C. HEALTHCARE P. LTD. & ANR. v. UNION OF INDIA & ANR. (Civil Appeal No. 4687 of 2010) B NOVEMBER 15, 2019 ## **[ARUN MISHRA, VINEET SARAN AND S. RAVINDRA BHAT, JJ.]** - _Drugs (Price Control) Order, 1995: Paras 3, 7, 8 and 9_ - _Fixation of ceiling price of drug, Scheduled formulations –_ - C _Notifications dated 11[th] July, 2006 and 30[th] April, 2009 imposing ceiling prices on a drug formulation, Frusemide, Potassium and Theophylline – Challenged to, by the drug manufacturers as ultra vires Para 7 of the DPCO – High Court dismissed the writ petitions – Interference with – Held: Not called for – Modifications in drug_ - D _release are often desirable to increase the stability, safety and efficacy of the drug, to improve the therapeutic outcome of the drug treatment and/or to increase patient compliance and convenience of administration – Use of the term “sustained release” denotes the systems that maintain the rate of drug release over a sustained_ - E _period – Controlled release systems are drug delivery systems in which the drug is released in a predetermined pattern over a fixed period of time – Materials on the record show that the DPCO was aware of the existence of different systems of drug delivery and of sustained release – Manufacturers ought to have demonstrated that the systems used by them were unique or different – In absence_ - F _thereof, they were obliged to follow the pricing norms and ceiling prices fixed by the impugned notifications._ ## **Dismissing the appeals, the Court** - **HELD: 1.1 The High Court, took note of the notification** - **dated 13[th] August, 2008, which fixed conversion costs for plain** - G **tablets, coated tablets, dispersible tablets, gelatin coated tablets, bi layered tablets,** _**sustained release**_ **tablets, chewable tablets, effervescent tablets, inlay tablets, capsules and other drugs. The appellants had not urged that different conversion costs were fixed for controlled release system, or the continuous release** - H **systems, anytime. In these circumstances, it was held that the** 618 619 M/S T.C. HEALTHCARE P. LTD. & ANR. v. UNION OF INDIA & ANR. **pricing norms were applicable. Note (d) to the notification of 30[th] April, 2009, stated that f** _**or different packing materials used or different drug delivery systems or any other special features/forms claimed, the ceiling prices, as specified in Column 5 shall be applicable unless the companies approach NPPA for specific price approvals for its formulations”.**_ **In the instant case, the appellants did not approach NPPA for specific price, or contend before it that their products contained special features. On the other hand, the allusion to “sustained release” and drug delivery systems (in Note (d)) clearly contemplated that unless otherwise specifically sought– in regard to particular drugs, the price fixation norms applied to all. [Para 10, 11] [626-C-G]** **1.2 According to pharmacopedias and the US Food and Drug Administration’s definitions, modifications in drug release are often desirable to increase the stability, safety and efficacy of the drug, to improve the therapeutic outcome of the drug treatment and/or to increase patient compliance and convenience of administration. In that context, the use of the term “sustained release” denotes the systems that maintain the rate of drug release over a sustained period. For example, if the release of the drug from the dosage form is sustained such that the release takes place throughout the entire gastrointestinal tract, one could prolong the time interval of drug concentration in the therapeutic range. This in turn may reduce the frequency of dosing, for example from three times a day to once a day. Sustained–release dosage forms achieve this mostly by the use of suitable polymers, used either to coat granules or tablets (reservoir systems) or to form a matrix in which the drug is dissolved or dispersed (matrix systems). Controlled release systems are drug delivery systems in which the drug is released in a predetermined pattern over a fixed period of time. Therefore, the materials on the record show that the DPCO was aware of the existence of different systems of drug delivery; it specifically talked of sustained release. If the appellants wished to say that the systems used by them were unique or different, it was open for them to have so demonstrated. Their omission to do so, did not in any way affect their obligation to follow the pricing norms and ceiling prices fixed by the impugned notifications. Therefore, there is no reason to differ from the** A B C D E F G H 620 SUPREME COURT REPORTS [2019] 14 S.C.R. ## A **conclusions and findings of the High Court. [Para 12] [626-GH; 627-A-D]** _Union of India v. Cynamide India Ltd._ **(1987) 2 SCC 720 – referred to.** ## **Case Law Reference** B ## **(1987) 2 SCC 720** **referred to Para 6** CIVIL APPELLATE JURISDICTION : Civil Appeal No. 4687 of 2010. From the Judgment and Order dated 20.04.2010 of the High C Court of Judicature at Allahabad in Writ Petition No. 33753 of 2009. With ## C.A. No. 4679/2010 and 10687/2011. Maninder Singh, Sr. Adv., N.S. Ahluwalia, Salil Seth, Neeraj D Malik, Umesh Kumar Khaitan, Somiran Sharma, A.P. Mayee, Gurmeet Singh Makker, Advs. for the appearing parties. The Judgment of the Court was delivered by ## **S. RAVINDRA BHAT, J.** E 1. This appeal by special leave questions a decision of the Allahabad High Court rejecting a writ petition. In those proceedings, the appellant had challenged the _vires_ of notifications dated 11[th] July, 2006 and 30[th] April, 2009, which imposed ceiling prices on a drug formulation, Frusemide. F 2. The facts necessary for deciding this appeal are that the appellants, i.e. TC Healthcare and Modi Mundipharma Pvt. Ltd. (hereafter “TCH” and “Modi” respectively and “the appellants” collectively), at the relevant time, manufactured drugs. By reason of a notification dated 2[nd] March, 1995, the appellants were exempted from the regime of price fixation, under the Drugs (Price Control) Order, G 1995 (hereafter “DPCO”) as they were small scale units. Para 8 of the DPCO prescribed that if the Central Government were to fix the price of any bulk drug under Para 3, and such bulk drug is used by a manufacturer to prepare a formulation, the manufacturer must apply under Form III for price revision of such formulation, upon which the H Central Government may fix or revise the price of the formulation. 621 M/S T.C. HEALTHCARE P. LTD. & ANR. v. UNION OF INDIA & ANR. [S. RAVINDRA BHAT, J.] 3. TCH, at the relevant time, was manufacturing several drug formulations. It was registered as a small-scale unit (SSU) and therefore, exempt, by reason of Para 8 of the DPCO, from the drug price control regime _._ Likewise, Modi too was, at the relevant time, exempt, as an SSU, from drug price control. TCH produces and distributes several formulations, including Diucontin K (20mg and 40mg) prepared from the bulk drug Frusemide. Modi on the other hand, manufactures Unicontin (400 mg and 600 mg) derived from the bulk drug Theophylline. For this formulation, (i.e in the 400 mg and 600 mg tablets) drug ceiling prices were fixed by a notification dated 11[th] July, 2006. Initially, Modi filed an injunction suit; however, that was dismissed for non-prosecution. Upon receiving demand notices, it sought for quashing of the said notification (dated 11[th] July, 2006) and the consequent notifications/ demands, in writ proceedings before the Allahabad High Court. Similarly, TCH’s writ petition challenged the notification dated 30[th] April, 2009, whereby the ceiling price of formulations containing Frusemide and Potassium were fixed; it also questioned the consequent demands by the Central Government. 4. Before the High Court, it was contended by the present appellants that the price fixation exercise was undertaken arbitrarily and was the result of non-application of mind. It was urged that the notification overlooked the cost and efficiency of major manufacturers. It was also urged that the price fixation through the impugned notifications was _ultra vires_ Para 7 of the DPCO, as there were no price norms in respect of formulations that used the sustained release technology or method in the final product for effective dose delivery. It was further urged that the respondents had no figures or details with respect to cost or efficiency of major manufacturers and that consequently, they were obliged to call for such particulars. Similarly, in respect of Unicontin, it was urged by Modi that there were no norms in respect of the continuous release technology used for effective and efficacious drug delivery. 5. In the impugned judgment, the High Court negatived the challenge to the notifications on the ground that they were _ultra vires_ Para 7 of the DPCO, observing that the material brought on record by the Central Government and other respondents revealed that a set of questionnaires were designed by the Cost Audit Branch of the Ministry of Finance to elicit information for various costs for CC, PC and PL A B C D E F G H 622 SUPREME COURT REPORTS [2019] 14 S.C.R. - A norms, which were sent to 470 pharmaceutical producers across the country, covering a diverse range of products. Further, a press release was issued and published in newspapers, informing the manufacturers about the move to revise the norms, and further seeking data and information. Such data and information was furnished by pharmaceutical manufacturers and companies, and was considered. The - B norms were notified on 13[th] August, 2008. In that, the conversion cost, packing charges, process loss of raw materials and other norms were fixed. 6. The High Court refuted the charge by the appellants that the C absence of any notice, permitting their participation- in the drug price fixation process, vitiated it. The court relied on the judgment of this court in _Union of India v. Cynamide India Ltd._ (1987) 2 SCC 720, to the effect that price fixation is essentially a legislative exercise. The High Court also rejected the argument that the technology used by TCH and Modi, i.e. sustained release (SR) and continuous release of dosage D through the products could not be subjected to price fixation as those methods or technologies were not contemplated by the DPCO, 1995. 7. The relevant provisions of DPCO, 1995, are extracted below: - _“2 (v) “Scheduled formulation” means a formulation_ - E _containing any bulk drug specified in the First Schedule either individually or in combination with other drugs, including one or more than one drug or drugs not specified in the First Schedule except single ingredient formulation based on bulk drugs specified in the First Schedule and sold under the generic name.”_ - F 8. Paragraph 7 of DCPO, 1995, (which replaced DCPO, 1987) and other relevant provisions are extracted below: - _“7. CALCULATION OF RETAIL PRICE OF FORMULATION—The retail price of a formulation shall be_ - G _calculated by the Government in accordance with the following formula, namely:_ - _R.P. = (M.C. + C.C. + P.M. + P.C.) x (1 + MAPE/100) + E.D._ - H - _“R.P.” means retail price._ 623 M/S T.C. HEALTHCARE P. LTD. & ANR. v. UNION OF INDIA & ANR. [S. RAVINDRA BHAT, J.] _“M.C.” means material cost and includes the cost of drugs_ A _and other pharmaceutical aids used including overages, if any, and process loss there on in accordance with such norms as may be specified by the government from time to time by notification in the official gazette in this behalf._ _“C.C” means conversion cost worked out in accordance with established procedures of costing and shall be fixed as a norm every year by notification in the Official Gazette in this behalf._ _“P.M.” means the cost of packing material used in the packing of a concerned formulation, including process loss, and shall be fixed as a norm every year by notification in the Official Gazette in this behalf._ _“P.C.” means packing charges worked out in accordance with established procedures of costing and shall be fixed as a norm every year by notification in the Official Gazette in this behalf._ _“MAPE” (Maximum Allowable Post Manufacturing Expenses) means all costs incurred by a manufacturer from the stage of ex-factory cost to retailing and includes trade margin and margin for the manufacturer and it shall not exceed One hundred per cent for indigenously manufactured Scheduled formulations:_ B C D E _“E.D.” means excise duty._ _Provided that in the case of an imported formulation, the landed cost shall form the basis for fixing its price along with such margin to cover selling and distribution expenses including interest and importer’s profit which shall not exceed fifty per cent of the landed cost._ _Explanation—For the purpose of this proviso, “landed cost” means the cost of import of formulation inclusive of customs duty and clearing charges._ _The relevant provision in DCPO 1987, i.e. Para 10, significantly, provided that retail cost had to be calculated in the following manner:_ F G H 624 SUPREME COURT REPORTS [2019] 14 S.C.R. A _“R.P. = (M.C. + C.C. + P.M. + P.C.) x (1 + M.U./100) + E.D._ _“R.P.” means retail price._ _“M.C.” means material cost and includes the cost of drugs_ B _and other pharmaceutical aids used including overages, if any, and process loss there on in accordance with such norms as may be specified by the government from time to time by notification in the official gazette in this behalf._ _“C.C” means conversion cost worked out in accordance with_ C _such norms as may be specified by the government from time to time by notification in the official gazette in this behalf._ D _“P.M.” means the cost of packing material including process loss thereon worked out in accordance with such norms as may be specified by the government from time to time by notification in the official gazette in this behalf._ _“P.C.” means packing charges worked out in accordance with such norms as may be specified by the government from time to time by notification in the official gazette in this behalf._ E _“M.U.” means mark-up referred to in para 11._ _“E.D.” means excise duty._ **==> picture [86 x 6] intentionally omitted <==** _8(4). Any manufacturer, who desires revision of the retail_ F _price of a formulation fixed under sub-paragraph (1), shall make an application to the, Government in Form III or Form IV, as the case maybe, and the Government shall after making such enquiry, as it deems fit within a period of two months from the date of receipt of the complete information, fix a_ G _revised price for such formulation or reject the application for revision for reasons to be recorded in writing._ G ## _**************_ H _8(6) No manufacturer or importer shall market a new pack, if not covered under sub-paragraph 3 of para 9, or a new_ 625 M/S T.C. HEALTHCARE P. LTD. & ANR. v. UNION OF INDIA & ANR. [S. RAVINDRA BHAT, J.] _formulation or a new dosage form of his existing Scheduled_ A _formulation without obtaining the prior approval of its price from the Government._ _9. Power to fix ceiling price of Scheduled formulations:_ _1. Notwithstanding anything contained in this Order, the Government may, from time to time, by notification in the Official Gazette, fix the ceiling price of a Scheduled formulation in accordance with the formula laid down in paragraph 7, keeping in view the cost or efficiency, or both, of major manufacturers of such formulations and such price shall operate as the ceiling sale price for all such packs including those sold under generic name and for every manufacturer of such formulations._ - B C _2. The Government may, either on its own motion or on application made to it in this behalf by a manufacturer in Form III or Form IV, as the case may be, after_ D _calling for such information as it may consider necessary, by notification in the Official Gazette, fix a revised ceiling price for a Scheduled formulation._ _3. With a view to enabling the manufacturers of similar formulations to sell those formulations in pack size_ E _different to the pack size for which ceiling price has been notified under the sub-paragraphs (1) and (2), manufacturers shall work out the price for their respective formulation packs in accordance with such norms, as may be notified by the Government from time_ F _to time, and he shall intimate the price of formulation pack, so worked out, to the Government and such formulation packs shall be released for sale only after the expiry of sixty days after such intimation._ ## _**************_ _13. Power to recover Overcharged Amount: Notwithstanding anything contained in this order, the Government shall by notice, require the manufacturers, importers or distributors, as the case maybe, to deposit the amount accrued due to charging of prices higher than those fixed or notified by the_ G H 626 SUPREME COURT REPORTS [2019] 14 S.C.R. A _Government under the provisions of Drugs (Prices Control) Order, 1987 and under the provisions of this Order.”_ 9. The appellants argue before this court, that the High Court erred in overlooking that the “sustained release” and “continuous release” technologies used in their products had not been made the B subject of any price fixation norm. Therefore, the price fixation resorted to in their case was contrary to law. The learned senior counsel appearing on their behalf submitted that the High Court had fallen into error in this regard, and consequently, its decision requires to be set aside. - C 10. The High Court, in the impugned judgment, we notice, had taken note of the notification dated 13[th] August, 2008, which fixed conversion costs for plain tablets, coated tablets, dispersible tablets, gelatin coated tablets, bi layered tablets, _sustained release_ tablets, chewable tablets, effervescent tablets, inlay tablets, capsules and other drugs. The appellants had not urged that different conversion costs were - D fixed for controlled release system, or the continuous release systems, anytime. In these circumstances, it was held that the pricing norms were applicable. The court also extracted Note (d) to the notification of 30[th] April, 2009, which pertinently stated that: - _“(d) For different packing materials used or different drug_ - E _delivery systems or any other special features/forms claimed, the ceiling prices, as specified in Column 5 above, shall be applicable unless the companies approach NPPA for specific price approvals for its formulations”_ 11. In this case, the appellants did not approach NPPA for specific F price, or contend before it that their products contained special features. On the other hand, the allusion to “sustained release” and drug delivery systems (in Note (d)) clearly contemplated that unless otherwise specifically sought- in regard to particular drugs, the price fixation norms applied to all. G 12. According to pharmacopedias and the US Food and Drug Administration’s definitions, modifications in drug release are often desirable to increase the stability, safety and efficacy of the drug, to improve the therapeutic outcome of the drug treatment and/or to increase patient compliance and convenience of administration. In that context, H the use of the term “sustained release” denotes the systems that 627 M/S T.C. HEALTHCARE P. LTD. & ANR. v. UNION OF INDIA & ANR. [S. RAVINDRA BHAT, J.] maintain the rate of drug release over a sustained period. For example, A if the release of the drug from the dosage form is sustained such that the release takes place throughout the entire gastrointestinal tract, one could prolong the time interval of drug concentration in the therapeutic range. This in turn may reduce the frequency of dosing, for example from three times a day to once a day. Sustained-release dosage forms B achieve this mostly by the use of suitable polymers, used either to coat granules or tablets (reservoir systems) or to form a matrix in which the drug is dissolved or dispersed (matrix systems). Controlled release systems are drug delivery systems in which the drug is released in a predetermined pattern over a fixed period of time. Therefore, the materials on the record show that the DPCO was aware of the C existence of different systems of drug delivery; it specifically talked of sustained release. If the appellants wished to say that the systems used by them were unique or different, it was open for them to have so demonstrated. Their omission to do so, did not in any way affect their obligation to follow the pricing norms and ceiling prices fixed by the D impugned notifications. This court, therefore, sees no reason to differ from the conclusions and findings of the High Court. 13. In view of the above analysis, these appeals have to fail. They are accordingly dismissed, without order on costs. E Nidhi Jain Appeals dismissed. F G H
End of Judgment Record
Browse All Supreme Court of India (2019) Decisions
2019-09-03

Uber India Systems Pvt. Ltd. v. Competition Commission of India & Ors.

Uber India Systems Pvt. Ltd. v. Competition Commission of India & Ors. concerns allegations that Uber, in its ride‑hailing network, abused a dominant position under the Competition Act, 2002. The case arose on appeals challenging the Competition Appellate Tribunal’s order in Appeal No. 31 of 2016, which upheld the Director General’s inquiry into whether Uber’s pricing and incentive practices violated Section 4. The Supreme Court analysed whether the information before it sufficed to constitute a prima facie case under Section 26(1) and whether there was abuse of a dominant position in the National Capital Region. It focused on the two ingredients for abuse: the existence of a dominant position and its misuse. The court considered, based on a statement summarizing driver incentives and a period when Uber reportedly paid high incentives to fleet owners, that Uber may have pursued a pricing strategy that would affect its competitors. Under Section 4(2)(a), abuse includes an unfair price, including predatory pricing. The Court accepted that there is a prima facie case for infringement, yet did not itself interfere with the Appellate Tribunal’s order and dismissed the appeals. It directed the Director General to complete the investigation within six months from today.

2019-07-19

STATE OF BIHAR & ORS. v. DR. CHAITRAYA KUMAR SINGH & ORS.

This civil appeal concerns the reorganization of the erstwhile Bihar into Bihar and Jharkhand in 2000 and the post-allocation transfer of an employee. The first respondent, Dr. Chaitraya Kumar Singh, was initially allocated to Jharkhand in 2007 as an Ayurvedic Medical Officer and, following Union guidelines permitting transfer after final allocations, was re-allocated to Bihar on 6 September 2010 with mutual consent of both States. Bihar issued formal orders, and the respondent joined Jharkhand in 2007; however, he remained in Jharkhand and continued to work there until his retirement on 30 April 2017. A few days before retirement, he filed a writ petition in Jharkhand seeking relief to join Bihar and to be relieved by Jharkhand so that Bihar could accept joining. The Jharkhand High Court confirmed a Single Judge’s order directing Bihar to absorb him. The appellants contend that after the 2010 allocation there was no vacancy, the respondent did not pursue available remedies promptly, and seven years of service in Jharkhand after allocation render absorption in Bihar inappropriate. The Court agrees, noting the allocation to Bihar continued to hold and the petitioner failed to pursue remedies in time; his superannuation in Jharkhand eliminates the basis for absorption. The relieving order issued post-retirement is irrelevant. The appeal is allowed, the High Court’s order set aside, and there shall be no costs; pending applications are disposed.

2019-01-07

PUNJAB FINANCIAL CORPORATION v. M/S PAULBRO LEATHERS PVT. LTD.

Punjab Financial Corporation (lender) filed against Paulbro Leathers Pvt. Ltd. after Paulbro defaulted on a loan. The dispute was settled under the Corporation’s One Time Settlement (OTS) policy on 01.04.2003, and a court-ordered reference to a Chartered Accountant (CA) was made to determine the remaining outstanding balance. After the CA submitted his report, a new dispute arose about the precise liability and how much had been paid, prompting the Corporation to issue a demand for Rs. 49,86,713 which Paulbro disputed in a writ petition before the Punjab and Haryana High Court. The High Court allowed the petition on the ground that the entire exercise had been carried out with consent and no objection had been raised, effectively barring re-opening of the settlement. The appellant challenged these rulings in this Court. The Supreme Court held that the settlement created a fresh dispute arising out of its terms and that the matter must be decided on its merits under the law. It emphasized that the High Court should record how and on what basis Paulbro satisfied the settlement and discharged liability, and if needed, refer the report to another CA. The Court remanded the case to the High Court to decide the writ petition afresh on merits, with a directions to decide expeditiously (preferably within six months).

2019-12-06

RAJESH KUMAR DWIVEDI v. STATE OF U.P. & ANR.

Rajesh Kumar Dwivedi challenges the rejection of his candidature for the post of Instructor in Fitter at Government Industrial Training Institutes in Uttar Pradesh. An advertisement of 17 March 2008 required candidates to possess a certificate in the respective trade from the NCVT, in addition to experience. Dwivedi possessed three National Trade Certificates from Model Industrial Training Institute, Haldwani (one-year basic training in Mechanical, six-month Fitter General module, six-month Metrology and Engineering Inspection), but did not hold a two-year NCVT certificate. The High Court had dismissed his writ petition, holding that three separate courses could not be treated as equivalent to the NCVT qualification. Dwivedi relied on (i) the 16 December 1983 circular clarifying equivalence between the Restructured and Conventional patterns of the Craftsmen Training Scheme, and (ii) 1988 and 1992 UP circulars recognizing MITI, Haldwani training as equivalent to NCVT, including a two-year Fitter trade certificate. The State argued that the amended UP ITI Rules require NCVT certification and that the reliance on circulars cannot override the Rules. The Supreme Court held that the eligibility condition is to have a certificate in the respective trade from NCVT, and that if the State had earlier treated certain qualifications as equivalent through its circulars, such equivalence cannot be disregarded. Consequently, the appellant’s candidature could not be validly rejected, and the State was directed to appoint him within two months. The decision underscores how State-issued equivalence can complement or override rigid Rule-based qualifications when consistently recognized.