Tenetowl LogoTenetowl
High Court of KeralaKerala High Court · 2009Single JudgeCrl.M.C. allowed; cognizance quashed; FIR quash...

M/S. SREENARAYANA ENGINEERING INDUSTRIES (P) LTD. v. STATE OF KERALA & ADDL.R2

Case / Petition Number:
CRL.MC.No.580 of 2005

Case Synopsis & Summary

This Criminal Miscellaneous case arises from Crime No. 245/04 registered by the Shoranur Police Station for alleged theft of electrical energy from the factory of the petitioners, under Sections 135 and 138 of the Indian Electricity Act, 2003. The petitioners, a company and its manager, challenge the FIR dated 20 October 2004 before the J.F.C.M., Ottappalam, on the ground that cognizance under Section 151 of the Act can be taken only on a written complaint by the Appropriate Government, Appropriate Commission, or their authorized officers, or by a Chief Electrical Inspector or Electrical Inspector, or by a licensee or the generating company. They contend that no valid written complaint exists and that the FIR is based on a police report following an Anti Power Theft Squad inspection; Annexure A (site mahazar) does not substantiate the allegations. The petition relies on Paramasivam v. Union of India and Others (2006(4) ILR Kerala 874) and urges that cognizance must be barred under Section 151 in the absence of a proper complaint. The State and the KSEB contend that the Board can file a complaint through an authorized officer, as recognized by legal authorities including State of Karnataka v. Adimurthy, and that the petition should be dismissed. The High Court ultimately quashes the FIR, holding cognizance cannot be taken on Annexure B without a valid written complaint and allows the Crl.M.C., with aforestated caveats.

Precedent Explorer

Find Cases Like This

Explore other judgments dealing with similar legal situations, facts, or statutory provisions.

Case Details & Bench

Court
High Court of Kerala
Hon'ble Judges
  • M.C. Hari Rani
Judgment Date
2009-03-18
Court Decision / Holding
Cognizance cannot be taken against the petitioners on the basis of the FIR registered against them; the FIR (Crime No. 245/04) is quashed. The Criminal Misc. Case is allowed. If a proper written complaint is filed in accordance with Section 151, the Magistrate may proceed in accordance with law.
Final Disposition
Crl.M.C. allowed; cognizance quashed; FIR quashed; potential for fresh complaint by KS E B through authorized officers if lawfully filed in future.

Parties to the Case

Appellants / Petitioners

  • M/S. SREENARAYANA ENGINEERING INDUSTRIES (P) LTD.
  • M.K.ASOKAN

Respondents

  • State of Kerala, represented by Public Prosecutor, High Court of Kerala, Ernakulam
  • ADDl.R2: Assistant Engineer, K.S.E.B. (Electrical Section), Shoranur

Legal Representation & Advocates

Counsels for Petitioners

  • • Sri.K.L.NARASIMHAN

Counsels for Respondents

  • • Public Prosecutor (R1) – Shri Thomas John Ambookken
  • • Sri. Asok M. Cherian, SC, KSEB (R2)

Provisions of Law Cited

Section 135 and 138 of Indian Electricity Act, 2003Section 151 of Indian Electricity Act, 2003Section 482 of Cr.P.C.Rule 12(4) of Electricity Rules, 2005 (Ext.P2)

Legal Doctrines & Maxims

  • Cognizance of offences under Section 151 requires a written complaint by the appropriate government/commission or their authorized officer or specified officers; embargo on cognizance unless a valid complaint is made
  • Authorized officer of the Electricity Board can file a complaint (subject to statutory authorization)
  • The Board may file complaints via its authorized officers and the court should proceed on such a compliant basis when legally permitted
  • Paramasivam v. Union of India and Others supports the embargo under Section 151 if no proper written complaint exists; State of Karnataka v. Adimurthy supports authorisation of board officers to move police for filing complaints

Submissions & Arguments

Contentions of Appellants / Petitioners

The petitioners argued that the FIR invoking Sections 135 and 138 of the Indian Electricity Act, 2003, was registered without a written complaint by an appropriate governmental authority or an authorised officer as required by Section 151. They contended that no such complaint exists, and the FIR is grounded on a police report following police inspection. Relying on Paramasivam v. Union of India and Others and State of Karnataka v. Adimurthy, they urged quashing of the FIR and cancellation of cognizance, with the possibility of refiling a complaint by KS E B through its authorised officers if warranted by law.

Contentions of Respondents

The respondents contended that cognizance can be legitimately taken if the KS E B or its authorised officer can file a complaint based on a police report. Citing Paramasivam and other authorities, they argued that Rule 12(4) of the Electricity Rules, 2005 and Section 151 permit the Electricity Board to initiate proceedings through authorized officers. They asserted the FIR was properly filed, and the court should not quash it simply on technical grounds, but rather consider the merits and procedure under the Electricity Act and Cr.P.C.

Legal Doctrine & Issue Explorer

Explore This Legal Issue

Find relevant judgments and authoritative positions on the legal questions discussed here.

Cited Precedents (2)

Case NameCitationTreatmentExplanation
Paramasivam v. Union of India and others2006(4) ILR Kerala 874PositiveThe decision was cited to support the embargo under Section 151, indicating cognizance cannot be taken on the basis of an unverified or improper complaint; the Kerala High Court concurs with the reasoning that a proper written complaint is necessary for cognizance.
State of Karnataka v. AdimurthyNot ProvidedPositiveThe Apex Court’s reasoning that an authorised officer of the Electricity Board can file a complaint with police on behalf of the Board is used to validate that KS E B can file complaints via authorized officers; this supports the petitioners’ argument that authorities may initiate enforcement through proper channels.
Case Applicability Diagnostic

Apply This to My Facts

Share your situation and test whether this judgment governs, supports, or challenges your case.

Official Judgment Record
•1,358 words•~7 min read

In The Court Record

M/S. SREENARAYANA ENGINEERING INDUSTRIES (P) LTD. v. STATE OF KERALA & ADDL.R2

IN THE HIGH COURT OF KERALA AT ERNAKULAM PRESENT : THE HONOURABLE MRS. JUSTICE M.C.HARI RANI WEDNESDAY, THE 18TH MARCH 2009 / 27TH PHALGUNA 1930 Crl.MC.No. 580 of 2005() ------------------------ .................... CRIME NO.245/04 OF SHORANUR POLICE STATION PETITIONER(S): --------------- 1. M/S. SREENARAYANA ENGINEERING INDUSTRIES (P) LTD., REPRESENTED BY MANAGING DIRECTOR FOR THE TIME BEING THE MANAGING DIRECTOR IS SMT.M.O.NALINI, AGED 63 YEARS, D/O.MELEPPUR UNNERI RESIDING AT SRI.NARAYANA PRABHALAYAM, KULAPPULLY, SHORNUR. 2. M.K.ASOKAN, MANAGER, M/S. SREENARAYANA ENGINEERING INDUSTRIES (PVT) LTD., SHORNUR. BY ADV. SRI.K.L.NARASIMHAN RESPONDENT(S): - --------------- 1 STATE OF KERALA, REPRESENTED BY ITS PUBLIC PROSECUTOR, HIGH COURT OF KERALA , ERNAKULAM. ADDL.R2: 2. ASSISTANT ENGINEER, K.S.E.B.(ELECTRICAL SECTION), SHORNUR. ADDL.R2 IMPLEADED VIDE ORDER DATED 23.11.07 ON CRL.M.A.NO. 6150/07 PUBLIC PROSECUTOR SHRI THOMAS JOHN AMBOOKKEN FOR R1 SRI. ASOK M.CHERIAN, SC, KSEB FOR R2 THIS CRIMINAL MISC. CASE HAVING BEEN FINALLY HEARD ON 27/02/2009, THE COURT ON 18/03/2009 PASSED THE FOLLOWING: ORDER ON CRL.M.A.NO.1573/05 IN CRL.M.C.NO.580/05 //DISMISSED// 18.3.09 SD/-M.C.HARI RANI, JUDGE. TRUE COPY P.A.TO JUDGE ## **M.C.HARI RANI, J. ----------------------------------------------------CRL.M.C.No.580 OF 2005 ----------------------------------------------------DATED THIS THE 18[th] DAY OF MARCH, 2009** O R D E R First petitioner is the Managing Director of the Company M/s Sreenarayana Engineering Industries (Private) Ltd.and the second petitioner is the Manager and implicated as accused Nos.1 and 2 respectively in Crime No.245/04 registered on 20.10.2004 by the Sub Inspector of Police, Shoranur Police Station, for the offence under Sections 135 and 138 of Indian Electricity Act, 2003. The allegation against the petitioners is that they have committed theft of electrical energy which was found out by the Anti Power Theft Squad, on 19.10.2004 during their inspection of the factory of the petitioners. True copy of the site mahazar prepared by the inspection squad is produced as Annexure A. Based on the report of the Anti Power Theft Squad, the Assistant Engineer, Electrical Section, Kerala State Electricity Board, Shoranur filed a complaint before the Sub Inspector of Police, Shoranur Police Station on 20.10.2004. The Sub Inspector of Police registered a case against the petitioners under **-2-** **CRL.M.C.No.580/05** sections 135 and 138 of Indian Electricity Act, 2003. The FIR No.245/04 dated 20.10.2004 was filed before the Court of J.F.C.M., Ottappalam. Copy of the first information report is produced as Annexure B. In the complaint, it is alleged that the petitioners, in order to reduce the use of current bye-passed the transformer thereby did not fully record the current used and thereby caused a loss of Rs.15 lakhs to the Electricity Board. The mahazar, Annexure A would not support such allegation. The petitioners have not committed the offence as alleged. There is no justification or basis for filing FIR before the J.F.C.M.s Court, Ottappalam against the petitioners. Therefore, this petition is filed before this Court under Section 482 of Cr.P.C. to quash Annexure B FIR. 2. Heard the learned counsel appearing for the petitioners, the learned counsel for the 2[nd] respondent-Electricity Board and also the learned Public Prosecutor. 3. It is submitted by the learned counsel appearing for the petitioners that the FIR is filed by the Sub Inspector of Police, Shoranur Police Station on 20.10.2004 as revealed from Annexure B on the basis of the complaint filed by the Assistant Engineer, Electrical Section, K.S.E.B., Shoranur and the same was received by the learned **CRL.M.C.No.580/05** **-3-** Magistrate, Ottappalam on 20.10.2004. Thus, it is revealed that the FIR was registered by the Sub Inspector of Police on the complaint allegedly received from the Assistant Engineer of K.S.E.B.. According to the learned counsel for the petitioner, the filing of the FIR by the Sub Inspector of Police before the Court of J.F.C.M., Ottappalam as revealed from Annexure B against the petitioners is clearly barred in view of the provisions of Section 151 of the Indian Electricity Act, 2003. The said Section reads as follows: S.151. Cognizance of offences.- No court shall take cognizance of an offence punishable under this act except upon a complaint in writing made by Appropriate Government or Appropriate Commission or any of their officer authorised by them or a Chief Electrical Inspector or an Electrical Inspector or licensee or the generating company, as the case may be, for this purpose.” 4. As per Section 151 of the Indian Electricity Act, no court is entitled to take cognizance of an offence punishable under the Indian Electricity Act except upon a complaint in writing by appropriate Government or appropriate commission or any other officer authorised by them or a Chief Electrical Inspector or Electrical Inspector or licensee or the generating company, as the case may be. In this case, **CRL.M.C.No.580/05** **-4-** admittedly, the FIR is filed before the Court of J.F.C.M., Ottappalam by the Sub Inspector of Police, Shoranur Police Station on the basis of the report submitted by the Anti Power Theft Squad, who inspected the factory of the petitioners on 19.10.2004 and prepared the site mahazar produced as Annexure A. No complaint has been made by any one of the persons in the enumerated category under Section 151 of the Act. Therefore, the FIR is liable to be set aside, submits the learned counsel for the petitioners. 5. The learned counsel for the petitioners has relied on a decision on the very same incident came up for consideration before another learned Judge of this Court in **Paramasivam v. Union of India and others (2006(4) ILR Kerala 874)** Paragraph 19 of the said judgment reads as follows: “19. The third point to be decided is whether on the facts of the present case, the Magistrate can proceed with the trial of the case. In view of the legal principles, which have been considered while considering the validity of Rule 12, the answer can only be an emphatic “No”. In this case, as the licensee has not filed any complaint in writing before the court, the court below shall stop the trial of the case in view of the embargo under Section 151. The **-5-** **CRL.M.C.No.580/05** K.S.E.B. can file a complaint before the court below, based on the facts and the materials disclosed by the police report and make a prayer to the learned Magistrate to take cognizance of the offence alleged against the petitioner. It will be permissible for any officer of the K.S.E.B., who is authorised by it under Rule 12(4) of the Electricity Rules, 2005 (Ext.P2), to file the complaint. The K.S.E.B. being a legal person, even in the absence of Rule 12(4), it may be permissible for it to file a complaint through its authorised officers. This view has been taken by the Apex Court in **State of Karnataka v. Adimurthy,** while interpreting Section 50 of the Indian Electricity Act, 1910, which is, to certain extent, similar to Section 151 of the Electricity Act, 2003. It was held that an authorised officer of the Electricity Board can move the police on behalf of the Board. Upon receipt of such a complaint, the trial court shall proceed with the case in accordance with law.” 6. The learned Judge has found that no cognizance can be taken and proceedings cannot be continued which is not legal or valid. I totally concur with the decision taken by the learned Judge. In the light of the specific observations in paragraph 19 referred above, the learned Public Prosecutor and also the learned counsel for the 2[nd] respondent conceded that cognizance cannot be taken on the basis of **-6-** **CRL.M.C.No.580/05** Annexure-B FIR, which is not valid and legal. 7. In the result, the Crl.M.C. is allowed. Cognizance cannot be taken against the petitioners on the basis of the FIR registered against them as Crime No.245/04 dated 20.10.2004 filed before the Court of J.F.C.M., Ottappalam, which is hereby quashed and the same is in violation of the mandate of Section 151 of the Indian Electricity Act. If appropriate complaint is filed as envisaged under Section 151 of the Indian Electricity Act, the learned Magistrate shall consider the matter afresh and the setting aside of the FIR as per this order will not in any way stand against such course available in law to the K.S.E.B. or its officials and the learned Magistrate. The Crl.M.C. is allowed. ## **M.C.HARI RANI, JUDGE.** dsn
End of Judgment Record
Browse All High Court of Kerala (2009) Decisions
2009-06-26

Nishana Mol.N v Alappuzha Municipality & Secretary, Alappuzha Municipality

This writ petition concerns the registration of a marriage under the Kerala Registration of Marriages (Common) Rules, 2008 (Common Rules). The petitioner Nishana Mol.N, whose marriage was solemnized on 8 March 2009, sought registration of her marriage by the Local Registrar. Her husband was abroad, and she submitted Form No. 1 along with documents; however, the Local Registrar demanded the presence of both spouses for registration, a point contested by the petitioner. The court recalls the apex court’s directions in Seema v. Ashwani Kumar (2006) to frame rules ensuring compulsory registration to protect women and provide evidence of marriage, while noting that registration under the Rules does not itself create a marriage but evidences one solemnized otherwise. The Rules specify that registration is mandatory for marriages solemnized within the state, with various procedural requirements (Rules 5, 6, 9, 10, 11, 13, 16, 17) and mechanisms for correction, appeal, and re-registration. The court clarifies that the presence of both parties is not ordinarily required; the registrar may require appearance only in cases where there is reasonable doubt about identity, and even then as an exception rather than a rule. Ultimately, the court directs that registration and certificate issuance be completed within one month from copy of the judgment, without insisting on joint appearance, provided the memorandum is in order.

2009-07-27

Abdul Majeed Kalathil v. District Collector, Malappuram & Others

This batch of writ petitions concerns the constitutional validity of Section 17 of the Kerala Anti-Social Activities (Prevention) Act, 2007, and the power of District Magistrates to confiscate vehicles used in anti-social activities. The petitions challenge the absence of a substantive prohibition against using vehicles for anti-social activities and the lack of a defined procedure for confiscation or an appellate remedy. In W.P.C. No. 9925 of 2009 (the lead case), Abdul Majeed Kalathil contends that his goods carriage KL 11-B/6651 was seized by the Sub Inspector of Pandikkad Police and reported to the District Collector, Exts.P1–P2. The court scrutinizes Section 17's scope, defining anti-social activity (Section 2(a)) and whether the District Collector’s power to confiscate is constitutionally tenable. It finds Section 17 to be vague and violative of Articles 14, 19(1)(g) and 21, as it rests on subjective police satisfaction with no clear standards or process. It also notes environmental objectives but concludes that fundamental rights must prevail. The court does not sustain confiscation under Section 17; instead, it directs that such vehicles be dealt with under the Kerala Protection of River Banks and Regulation of Removal of Sand Act, 2001 and Rules, with interim release under specified conditions. It further directs initiation of Sand Act proceedings within a month and finalization within another month. The writ petitions are disposed of accordingly, preserving the rule of law and environmental protection.

2009-06-11

WA No. 671 of 2006 (Fertilizers and Chemicals Travancore Ltd v Union of India)

This writ appeal concerns the pay revision and pensionary benefits of employees of the Fertilizers and Chemicals Travancore Ltd (FACT). The long-term settlement covering terms of employment expired on 31 December 1996. A fresh settlement was concluded (notified 28 August 2001) and made retroactive to 1 January 1997, with revisions in wages and benefits. Clause 29 of Ext. P1 provides that arrears relating to wage revision and dearness allowance for the period 1 January 1997 to 30 June 2001 will be reviewed and decided by management/government only when the company earns profits for at least three consecutive years; Clause 33.1 provides that employees who retired on or after 1 January 1997 will be eligible for arrears calculated from 1 January 1997 to the date of retirement, subject to adjustments for interim relief already paid, with any unclaimed amount transferred to a Welfare Fund. The appellants—the retirees who fall in the 1 January 1997 to 1 July 2001 window—argue that they were denied arrears and were paid pensionary benefits at pre-revised rates, creating discrimination. Respondents contend Ext. P1 binds the parties and arrears depend on profits, and that pay revision administered to others does not compel retroactive change. The court held that Ext. P1 terms survive as terms of employment and directed the management to consider terminal benefits at revised rates within two months and to release arrears when paid to current workers, with connected matters following."

2009-05-29

M/S. Palm Fibers & Yars Trading Co. v. State of Kerala & Others

The petitioner, a Small Scale Industrial unit, ran two LT power connections (No.13070 and No.13427) with commercial production starting in July 1994 and July 1995. On 06/02/1992, the Government issued Ext.P1 guaranteeing concessional tariffs (pre-1992 tariff) for five years from the date of commencement or substantial capacity expansion, certified by the District Industries Centre. Ext.P2 certified eligibility for this concession. Subsequently, the petitioner increased power demand to 300 KVA and was reclassified/advised to HT status from 15/05/1998, converting LT supply to HT. The petitioner argued that Ext.P1 benefits should extend for the full five-year period, covering the LT quantities certified in Ext.P2, and that the HT conversion was a mere reclassification directed by the Board, not a cessation of eligibility. The Board argued Ext.P1 targets only those who commenced production during 1992–1996 and that HT conversion from 15/05/1998 falls outside the Ext.P1 window, rendering the petitioner eligible only up to 15/05/1998. Earlier orders (Ext.P3) had set aside a cut-off date for merits, and Ext.P6/Ext.P4 handled appeals. Ultimately, the Court held that the HT conversion was outside Ext.P1’s period, but directed that the LT benefits for the two LT connections be extended only until 23/05/1998 (LT dismantling date) and without reimbursement from the Industries Department, as held in OP No.7622/1998. The petition was disposed of as above.