High Court of KeralaKerala High Court · 2009Single JudgeOriginal Petition dismissed.

M/S. SLEEVES INDIA PVT.LTD. v. Kerala State Electricity Board

Case / Petition Number:
OP.No. 18602 of 2002(M)

Case Synopsis & Summary

The petitioner, a High Tension consumer of electricity, entered into Ext.P4 agreement with the Kerala State Electricity Board for a contract demand of 200 KVA, with the obligation to pay the contracted demand irrespective of actual consumption. The factory suffered a major machinery breakdown on 19.9.2000, and a student-wide/employee strike prevented restart; production could not resume and the electrical installation was dismantled. For the period 19.9.2000 to 14.2.2001 there was no energy consumption. The petitioner sought waiver of the demand charges under clause 16(b) of Ext.P4, arguing that the conditions for waiver were satisfied and that non-consumption due to circumstances beyond control should not bar the benefit. The board rejected the waiver via Ext.P6, and the appeal via Ext.P9 upheld that denial, noting that the petitioner had not resumed consumption. The petitioner contends that the condition of resumption is not essential if the minimum revenue is already realized and other conditions are satisfied; respondent board argues that clause 16(b) is an incentive for continued consumption and that cessation breaks the reciprocal contract. The court interprets clause 16(b), citing Orissa State Electricity Board v. IPI Steel Ltd. to emphasize the contract-demand concept; it holds that the ability to resume consumption as soon as reasonably possible is an essential condition. Consequently, since resumption could not occur, the waiver is not available, and the petition is dismissed.

Precedent Explorer

Find Cases Like This

Explore other judgments dealing with similar legal situations, facts, or statutory provisions.

Case Details & Bench

Court
High Court of Kerala
Hon'ble Judges
  • S. Siri Jagan
Judgment Date
2009-01-23
Court Decision / Holding
Accordingly, the original petition is dismissed.
Final Disposition
Original Petition dismissed.

Parties to the Case

Appellants / Petitioners

  • M/S. SLEEVES INDIA PVT.LTD.

Respondents

  • Kerala State Electricity Board (represented by its Secretary)
  • Chief Engineer (Tariff & Commercial), KSEB
  • Special Officer (Revenue), KSEB
  • Deputy Chief Engineer, Electrical Circle, Palakkad

Legal Representation & Advocates

Counsels for Petitioners

  • • Sri PKM Hassan
  • • Sri J. Julian Xavier
  • • Sri Firoz K. Robin

Counsels for Respondents

  • • Sri P. Santhalingam, SC
  • • Sri C.K. Karunakaran, SC

Provisions of Law Cited

Clause 16(b) of Ext.P4 (contract demand agreement)

Submissions & Arguments

Contentions of Appellants / Petitioners

The petitioner contends that clause 16(b) provides for waiver of the contract demand charges during periods of non-consumption caused by lock-outs, strikes, major breakdowns, or other force majeure events, provided the minimum annual revenue has already been realized and the consumer has satisfied the other specified conditions. It is argued that resumption of consumption is not an essential condition if the stated criteria are met, and that dismantling the plant upon termination of the agreement should not bar a waiver when circumstances are beyond control. It is argued that denial would defeat the object of the contract and its waiver provision.

Contentions of Respondents

The Board contends that clause 16(b) is an incentive for continued energy consumption and the contract demand is designed to be reciprocal; non-consumption due to shutdown cannot automatically qualify for waiver because resumption of consumption as soon as reasonably possible is an essential condition. The board emphasizes that the contract's purpose is to ensure ongoing energy availability and revenue, and termination of the contract does not create entitlement to waivers not contemplated by clause 16(b).

Legal Doctrine & Issue Explorer

Explore This Legal Issue

Find relevant judgments and authoritative positions on the legal questions discussed here.

Cited Precedents (1)

Case NameCitationTreatmentExplanation
Orissa State Electricity Board v. IPI Steel Ltd.1995 (4) SCC 320PositiveCited to explain the rationale of contract demand and the need for a continued relationship between board and consumer; used to justify the incentive structure and the necessity of resuming consumption under Clause 16(b).
Case Applicability Diagnostic

Apply This to My Facts

Share your situation and test whether this judgment governs, supports, or challenges your case.

Official Judgment Record
•2,017 words•~10 min read

In The Court Record

M/S. SLEEVES INDIA PVT.LTD. v. Kerala State Electricity Board

**IN THE HIGH COURT OF KERALA AT ERNAKULAM** **PRESENT :** **THE HONOURABLE MR. JUSTICE S.SIRI JAGAN** **FRIDAY, THE 23RD JANUARY 2009 / 3RD MAGHA 1930** **OP.No. 18602 of 2002(M)** **---------------------------------** **PETITIONER(S):** **-----------------------** **M/S. SLEEVES INDIA PVT.LTD., NEW INDUSTRIAL DEVELOPMENT AREA, KANJIKODE, PALAKKAD, REPRESENTED BY ITS MANAGING DIRECTOR.** **BY ADV. SRI.PKM.HASSAN SRI.J.JULIAN XAVIER SRI.FIROZ K.ROBIN** **RESPONDENTS:** **-----------------------** **1. KERALA STATE ELECTRICITY BOARD, REPRESENTED BY ITS SECRETARY, VYDYUTHI BHAVAN, PATTOM, THIRUVANANTHAPURAM.** **2. CHIEF ENGINEER (TARIFF & COMMERCIAL), KERALA STATE ELECTRICITY BOARD, VYDYUTHI BHAVAN, PATTOM, THIRUVANANTHAPURAM.** **3. SPECIAL OFFICER (REVENUE) KERALA STATE ELECTRICITY BOARD, VYDYUTHI BHAVAN, PATTOM, THIRUVANANTHAPURAM.** **4. DEPUTY CHIEF ENGINEER, ELECTRICAL CIRCLE, PALAKKAD.** **ADV. SRI.P.SANTHALINGAM, SC, KSEB FOR R1 TO R4 SRI.C.K.KARUNAKARAN, SC FOR KSEB FOR R1 TO 4** **THIS ORIGINAL PETITION HAVING BEEN FINALLY HEARD ON 23/01/2009, THE COURT ON THE SAME DAY DELIVERED THE FOLLOWING:** ## **OP.No. 18602 of 2002(M)** ## **APPENDIX** ## **PETITIONER'S EXHIBITS:** - **EXT.P1 - TRUE COPY OF THE LETTER DATED 19.8.2000 INTIMATING THE STOPPAGE OF PETITIONER'S FACTORY.** - **EXT.P2 - TRUE COPY OF THE LETTER DATED 14.11.2000 SEND BY THE PETITIONER TO THE 4TH RESPONDENT.** - **EXT.P3 - TRUE COPY OF THE CERTIFICATE ISSUED BY THE DISTRICT LABOUR OFICER DATED 7.12.2000.** - **EXT.P4 - TRUE COPY OF THE RELEVANT EXTRACT OF THE AGREEMENT BETWEEN THE PETITIONER AND THE BOARD.** - **EXT.P5 - TRUE COPY OF THE CHART SHOWING THE PAYMENT OF ELECTRICITY BILLS BY THE PETITIONER FOR THE PERIOD FROM 1/2000 TO 2/2001.** - **EXT.P6 - TRUE COPY OF THE ORDER DATED 27.2.2001 ISSUED B THE 3RD RESPONDENT.** - **EXT.P7 - TRUE COPY OF THE REVIEW PETITION DATED 17.9.2001.** - **EXT.P8 - TRUE COPY OF THE APPEAL DATED 17.12.2001 FILED BY THE PETITIONER BEFORE THE 2ND RESPONDENT.** **EXT.P9- TRUE COPY OF THE ORDER DATED 16.5.2002 PASSED BY THE 2ND RESPONDENT.** ## **// TRUE COPY //** **PA TO JUDGE** **rhs** ## **S.SIRI JAGAN, J** **- - - - - - - - - - - - - - - - - - - - - - - O.P.No. 18602 of 2002** **- - - - - - - - - - - - - - - - - - - - - - - Dated this the 23[rd] day of January, 2009** ## **J U D G M E N T** The petitioner was a High Tension consumer of electricity from the Kerala State Electricity Board. For the purpose of drawing electricity, he entered into Ext.P4 agreement as per which the board agreed to supply a contract demand of 200 KVA on the conditions mentioned therein as per which the petitioner was liable to pay for the contracted power irrespective of whether he uses the same or not. The petitioner's factory suffered a major breakdown of machinery on 19.9.2000. Before they could restart production after repair, the employees started a strike on 19.9.2000 which continued and therefore they could not resume consumption of electrical energy. Ultimately, on 14.11.2000 the petitioner called it quits and issued notice for termination of the agreement and the electrical installation of the petitioner was thereafter dismantled. For the period from 19.9.2000 to 14.2.2001, the petitioner did not consume any electricity. Therefore the petitioner claimed waiver of demand charges for that period, in accordance with clause 16(b) of Ext.P4, which provided for such waiver on the petitioner satisfying the conditions mentioned therein. According to the petitioner, he had satisfied the conditions stipulated in clause 16(b) and - 2 - **O.P.No. 18602 of 2002** therefore requested for waiver of demand charges for the said period. The same was rejected by Ext.P6 order thus: “It is reported that the reason for the shut down is “Maintenance”. Your plant is still under shut down ie. from 21-8-2000. Maintenance work cannot be considered as a reason beyond control. You have also failed to resume consumption of energy within a reasonable period. Hence your firm is not eligible for rebate in demand charges under force majure clause.” Petitioner's appeal against P6 was rejected by Ext.P9, in which it was found that the petitioner has satisfied all other conditions except resumption of consumption of energy and on the ground that, that condition was not satisfied the petitioner was denied the benefit of the waiver. The petitioner is challenging Exts.P6 and P9 orders in this writ petition. 2. The contention of the petitioner is that the alleged condition of resumption of consumption of energy as soon as the petitioner reasonably could, is not an essential condition for becoming eligible for waiver under clause 16(b). According to them, in so far as much more than the minimum revenue per year fixed in Ext.P4 has been realised from the petitioner and other conditions in clause 16(b) have been fully satisfied, there was no justification in denying benefit of that clause on the ground that the petitioner did not resume consumption of electrical energy. According to the petitioner once the petitioner has satisfied the essential conditions for becoming eligible for waiver then the benefit cannot be denied to him only because they could not continue the functioning of the - 3 - **O.P.No. 18602 of 2002** factory because of circumstances beyond their control. 3. The contentions of the petitioner are opposed by the learned standing counsel appearing for the KSEB. He would contend that if the interpretation sought to be put by the petitioner to Clause 16(b) is adopted then the very purpose of Ext.P4 agreement of contract demand would be defeated in so far as the very agreement contemplates a continued contract between the electricity board and the petitioner for drawing of electrical energy and payment of contract demand. According to him, the clause 16(b) is an incentive for continued consumption of energy and if there is no possibility of continued consumption by the consumer of electrical energy the board would not gain anything by granting that incentive and therefore the benefit of Clause 16(b) cannot be extended to the petitioner. On these contentions the respondents seek to sustain the impugned orders. 4. I have considered the rival contentions in detail. 5. Since a decision on the issue depends on the interpretation of Clause 16(b), I shall extract the same here. “16 (a) xxx xxx xxx xxx xxx (b) The consumer shall not be responsible for non consumption of energy due to lock out, strike of employees of the consumer, major break down of machinery/plant which to the satisfaction of the Board is responsible for the non consumption of energy or other forced majeure condition over which the consumer has no control but shall resume consumption of energy as soon as he reasonably can. In such cases, where the consumer is unable to - 4 - **O.P.No. 18602 of 2002** consume energy, he shall promptly intimate the Board the reasons for such non consumption. In any event the consumer shall be bound to pay to the Board the annual minimum guaranteed by the consumer and specified in the schedule appended herewith, irrespective of the question whether any energy has been consumed or not, whatever be the reason for non consumption and also irrespective of the actual quantity consumed. However, the Board shall have the right to take periodical shut down as and when required for the purpose or routine maintenance after giving reasonable notice to the consumer and in such event no claim of any kind for rebate or refund or charges on this account etc. shall be entertainable by the Board.” (underlining supplied) It contemplates essentially the following conditions for the purpose of become eligible for waiver which is also referred to as a rebate. - 1) There must be a shut down due to major break down of the machinery. - 2) The fact of break down of machinery and shut down should be intimated by the consumer to the Board. - 3) Minimum annual revenue guaranteed as per agreement should have been realised already. The above three conditions have been admittedly fulfilled by the petitioner. Clause 16(b) also refers to resumption of consumption of energy as soon as the petitioner reasonably can. The question is whether the petitioner can be denied the benefit of Clause 16(b) on the ground that he had not resumed consumption of energy after the shut down. It is not disputed before me that the petitioner had not so resumed consumption of electrical energy. In fact the whole electrical installation had been dismantled at the request of the petitioner and Ext.P4 agreement itself has been terminated. 6. The object behind the concept of contract demand has been - 5 - **O.P.No. 18602 of 2002** ## stated thus by the Supreme Court in the decision of _**Orissa State Electricity Board v. IPI Steel Ltd.**_ **[1995 (4) SCC 320].** “Normally speaking a factory utilises energy at a broadly constant level. May be, on certain occasions whether on account of breakdowns, strikes or shutdowns or for other reasons, the factory may not utilise energy at the requisite level over certain periods, but these are exceptions. Every factory expects to work normally. So does the Electricity Board expect - and accordingly produces energy required by the factory and keeps it in readiness for that factory - keeping it ready on tap, so to speak. As already emphasised, electricity once generated cannot be stored for future use. This is the reason and the justification for the demand charges and the manner of charging for it. There is yet another justification for this type of levy and it is this: demand charges and consumption charges are intended to defray different items. Broadly speaking while demand charges are meant to defray the capital costs, consumption charges are supposed to meet the running charges. Every Electricity Board requires machinery, plant, equipment, sub-stations, transmission lines and so on, all of which require a huge capital outlay. The Board like any other corporation has to raise funds for the purpose which means it has to obtain loans. The loans have to be repaid, and with interest. Provision has to be made for depreciation of machinery, equipment and buildings, plants, machines, stations and transmission lines have to be maintained, all of which require a huge staff. It is to meet the capital outlay that demand charges are levied and collected whereas the consumption charges are levied and collected to meet the running charges.” 7. The above object can be achieved only if there is continued relationship of licencee and consumer between the Board and the consumer. Therefore the very concept of contract demand contemplates a continued consumption of energy by the consumer. Clause 16(b) offers an incentive to the petitioner to resume consumption of energy as soon as he reasonably can. That being so, the contention that the consumer should be able to consume energy as soon as he can is also one of the essential conditions for becoming eligible for the said benefit appears to be a - 6 - **O.P.No. 18602 of 2002** reasonable interpretation of clause 16(b). As far as the Board is concerned once the contract demand agreement is terminated they do not get any benefit from the petitioner with reference to the objects sought to be achieved by entering into the contract demand agreement, which stipulates reciprocal obligations on both parties and that being so the board would not benefit from giving the benefit under Section 16(b) to the petitioner. Therefore, according to me, the very object of granting that benefit contemplates a necessary condition of the petitioner being able to resume consumption of energy as soon as he reasonably can. Hence, if he cannot resume consumption of electrical energy he would not be eligible for the benefit of clause 16(b). I am therefore satisfied that the condition of the petitioner being able to resume consumption of energy as soon as he reasonably can is a very essential condition precedent for becoming eligible for the benefit of waiver under Clause 16(b) and that if the petitioner is not able to resume consumption he ceases to be eligible for the benefit of clause 16(b). In that view, I do not find any infirmity in the impugned orders. Accordingly, the original petition is dismissed. ## **S.SIRI JAGAN, JUDGE** rhs
End of Judgment Record
Browse All High Court of Kerala (2009) Decisions
2009-06-26

Nishana Mol.N v Alappuzha Municipality & Secretary, Alappuzha Municipality

This writ petition concerns the registration of a marriage under the Kerala Registration of Marriages (Common) Rules, 2008 (Common Rules). The petitioner Nishana Mol.N, whose marriage was solemnized on 8 March 2009, sought registration of her marriage by the Local Registrar. Her husband was abroad, and she submitted Form No. 1 along with documents; however, the Local Registrar demanded the presence of both spouses for registration, a point contested by the petitioner. The court recalls the apex court’s directions in Seema v. Ashwani Kumar (2006) to frame rules ensuring compulsory registration to protect women and provide evidence of marriage, while noting that registration under the Rules does not itself create a marriage but evidences one solemnized otherwise. The Rules specify that registration is mandatory for marriages solemnized within the state, with various procedural requirements (Rules 5, 6, 9, 10, 11, 13, 16, 17) and mechanisms for correction, appeal, and re-registration. The court clarifies that the presence of both parties is not ordinarily required; the registrar may require appearance only in cases where there is reasonable doubt about identity, and even then as an exception rather than a rule. Ultimately, the court directs that registration and certificate issuance be completed within one month from copy of the judgment, without insisting on joint appearance, provided the memorandum is in order.

2009-07-27

Abdul Majeed Kalathil v. District Collector, Malappuram & Others

This batch of writ petitions concerns the constitutional validity of Section 17 of the Kerala Anti-Social Activities (Prevention) Act, 2007, and the power of District Magistrates to confiscate vehicles used in anti-social activities. The petitions challenge the absence of a substantive prohibition against using vehicles for anti-social activities and the lack of a defined procedure for confiscation or an appellate remedy. In W.P.C. No. 9925 of 2009 (the lead case), Abdul Majeed Kalathil contends that his goods carriage KL 11-B/6651 was seized by the Sub Inspector of Pandikkad Police and reported to the District Collector, Exts.P1–P2. The court scrutinizes Section 17's scope, defining anti-social activity (Section 2(a)) and whether the District Collector’s power to confiscate is constitutionally tenable. It finds Section 17 to be vague and violative of Articles 14, 19(1)(g) and 21, as it rests on subjective police satisfaction with no clear standards or process. It also notes environmental objectives but concludes that fundamental rights must prevail. The court does not sustain confiscation under Section 17; instead, it directs that such vehicles be dealt with under the Kerala Protection of River Banks and Regulation of Removal of Sand Act, 2001 and Rules, with interim release under specified conditions. It further directs initiation of Sand Act proceedings within a month and finalization within another month. The writ petitions are disposed of accordingly, preserving the rule of law and environmental protection.

2009-06-11

WA No. 671 of 2006 (Fertilizers and Chemicals Travancore Ltd v Union of India)

This writ appeal concerns the pay revision and pensionary benefits of employees of the Fertilizers and Chemicals Travancore Ltd (FACT). The long-term settlement covering terms of employment expired on 31 December 1996. A fresh settlement was concluded (notified 28 August 2001) and made retroactive to 1 January 1997, with revisions in wages and benefits. Clause 29 of Ext. P1 provides that arrears relating to wage revision and dearness allowance for the period 1 January 1997 to 30 June 2001 will be reviewed and decided by management/government only when the company earns profits for at least three consecutive years; Clause 33.1 provides that employees who retired on or after 1 January 1997 will be eligible for arrears calculated from 1 January 1997 to the date of retirement, subject to adjustments for interim relief already paid, with any unclaimed amount transferred to a Welfare Fund. The appellants—the retirees who fall in the 1 January 1997 to 1 July 2001 window—argue that they were denied arrears and were paid pensionary benefits at pre-revised rates, creating discrimination. Respondents contend Ext. P1 binds the parties and arrears depend on profits, and that pay revision administered to others does not compel retroactive change. The court held that Ext. P1 terms survive as terms of employment and directed the management to consider terminal benefits at revised rates within two months and to release arrears when paid to current workers, with connected matters following."

2009-05-29

M/S. Palm Fibers & Yars Trading Co. v. State of Kerala & Others

The petitioner, a Small Scale Industrial unit, ran two LT power connections (No.13070 and No.13427) with commercial production starting in July 1994 and July 1995. On 06/02/1992, the Government issued Ext.P1 guaranteeing concessional tariffs (pre-1992 tariff) for five years from the date of commencement or substantial capacity expansion, certified by the District Industries Centre. Ext.P2 certified eligibility for this concession. Subsequently, the petitioner increased power demand to 300 KVA and was reclassified/advised to HT status from 15/05/1998, converting LT supply to HT. The petitioner argued that Ext.P1 benefits should extend for the full five-year period, covering the LT quantities certified in Ext.P2, and that the HT conversion was a mere reclassification directed by the Board, not a cessation of eligibility. The Board argued Ext.P1 targets only those who commenced production during 1992–1996 and that HT conversion from 15/05/1998 falls outside the Ext.P1 window, rendering the petitioner eligible only up to 15/05/1998. Earlier orders (Ext.P3) had set aside a cut-off date for merits, and Ext.P6/Ext.P4 handled appeals. Ultimately, the Court held that the HT conversion was outside Ext.P1’s period, but directed that the LT benefits for the two LT connections be extended only until 23/05/1998 (LT dismantling date) and without reimbursement from the Industries Department, as held in OP No.7622/1998. The petition was disposed of as above.